Galveston Harbor and Channel- San Jacinto PA 1 Improvements, Galveston County, Texas
Solicitation number
W912HY26BA020
Issued by

About this file

This is an Abstract of Offers for a construction solicitation issued by the U.S. Army Corps of Engineers, Galveston District for harbor and channel improvements in Galveston County, Texas. The solicitation number is W912HY26BA020, issued on April 3, 2026, and opened on May 12, 2026. The project is restricted to Small Business (SB) procurement and includes three main components: Schedule No. 1 (base work), Option No. 1 (additional Cell BC work), and Option No. 2 (terminal drainage structure work).

The government's estimated cost for Schedule No. 1 and both options combined is $9,010,572.20, based on a reasonable contract with profit. Work items include mobilization/demobilization, clearing and grubbing, stripping, surveys, turfing, geotechnical evaluation, construction of berms and dikes using onsite fill, drop-inlet structure rehabilitation, excavation, and construction of new terminal drainage structures with stone protection. Quantities range from single job-sum items to 198,500 cubic yards of semi-compacted dike construction. Six offerors submitted bids: Affolter Contracting Company ($11,451,720.00), Dredgit Corporation ($13,361,131.46), Maverick Constructors, LLC ($17,008,824.00), Precision Construction, LLC ($8,323,092.00—apparent low bidder at 7.63% below government estimate), Texas Dewatering, LLC ($11,428,758.00), and TKTMJ, Inc ($13,756,747.00). Precision Construction, LLC is identified as the apparent low bidder.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM

7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

U.S. Army Corps of Engineers, Galveston District Contracting Division 2000 Fort Point Road Galveston, Texas 77550

5. PROJECT TITLE

FY2 , estricted Procurement, USACE Galveston District, See Attachments (pages 2 through )

1. SOLICITATION NUMBER

W912HY2 B 1

Contracting Officer

02202

05/12/2026

UNIT

PRICE TOTAL

1 JB SUM $358,000.00

1 JB SUM $227,000.00

1 JB SUM $173,000.00

1 JB SUM $88,000.00

1 JB SUM $99,000.00

1 JB SUM $70,000.00

1 JB SUM $50,500.00

74,900 CY $7.90 $591,710.00

198,500 CY $13.90 $2,759,150.00

44,000 CY $7.90 $347,600.00

1 JB SUM $160,600.00

1 JB SUM $1,151,000.00

$6,075,560.00

1 JB SUM $71,300.00

1 JB SUM $56,000.00

1 JB SUM $20,000.00

1 JB SUM $23,200.00

1 JB SUM $111,000.00

11,800 CY $11.90 $140,420.00

17,822 CY $13.90 $247,725.80

6,226 CY $13.90 $86,541.40

2,200 CY $7.50 $16,500.00

1 JB SUM $1,148,000.00

6,270 CY $7.50 $47,025.00

$1,967,712.20

$8,043,272.20

1 JB SUM $118,800.00

1 JB SUM $650,000.00

1 JB SUM $198,500.00

$967,300.00

0026 Stone Protection at New Terminal Drainage Structure

Mobilization and Demobilization

0007 As-Built Documentation

OPTION NO. 2

Uncompacted Berm Construction Using Onsite Random Fill (Cell A)

Semi-Compacted Dike Construction Using Onsite Impervious Fill (Cell A) Uncompacted Training Dike Construction Using Onsite Random Fill (Cell A) Cell A Drop-Inlet Structure Rehab

0025 New Terminal Drainage Structure

TOTAL OPTION NO. 1

0022 Cell BC New Drop-Inlet Structure

Uncompacted Berm Construction Using Onsite Impervious Fill - Cell BC

Cell A Additional Foundation Preparation0012

Demolition of Old Terminal Drainage Structure

ABSTRACT OF OFFERS Page 2 of 9

Solicitation No.: W912HY26BA020 Date Issued: 03 Apr 2026 Date Opened: 12 May 2026 Issuing Office: USACE-Galveston Project Title: FY 26 Galveston Harbor and Channel - San Jacinto PA Improvements in Galveston County, Texas, Restricted For Small Business Procurement Number of Amendments Issued: 0003 Government Estimate (Without Profit)

QUANTITY

TOTAL SCHEDULE NO. 1

Stripping (Cell A)

SCHEDULE NO. 1ITEM

Final Condition Survey (Cell A)

Onsite Borrow Soils Geotechnical Evaluation

NO. DESCRIPTION

Turfing (Cell A)

0002 Clearing, Grubbing and Debris Removal - (Cell A)

TOTAL SCHEDULE NO.1 & OPTION NO.1

Existing Drainage Ditch Excavation

0016 Turfing (Cell BC) 0015 Final Condition Survey (Cell BC) 0014 Stripping (Cell BC) 0013 Clearing, Grubbing and Removal Debris(Cell BC)

Excavation for Cross-Dike Foundation

Semi-Compacted Cross-Dike and Foundation Fill Using Onsite Impervious Fill - Cell BC

Semi-Compacted Dike Construction Using Onsite Impervious Fill - Cell BC

OPTION NO. 1

0017 Cell B Cross-Dike Splashpad

TOTAL OPTION NO. 2

$9,010,572.20

Curtis Cole, Jr.

CONTRACTING OFFICER

TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2

* The apparent low bidder, Precision Construction, LLC, is7.63 % below the Government's Estimate.

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED IN RESPONSE TO THIS

SOLICITATION.

Solicitation No.: W912HY26BA020 Date Issued: 03 Apr 2026 Date Opened: 12 May 2026

PRICE TOTAL

1 JB SUM $1,295,000.00

1 JB SUM $200,000.00

1 JB SUM $176,000.00

1 JB SUM $60,000.00

1 JB SUM $480,000.00

1 JB SUM $100,000.00

1 JB SUM $20,000.00

74,900 CY $13.00 $973,700.00

198,500 CY $13.00 $2,580,500.00

44,000 CY $13.00 $572,000.00

1 JB SUM $295,000.00

1 JB SUM $690,000.00

$7,442,200.00

1 JB SUM $130,000.00

1 JB SUM $81,000.00

1 JB SUM $30,000.00

1 JB SUM $160,000.00

1 JB SUM $170,000.00

11,800 CY $13.00 $153,400.00

17,822 CY $15.00 $267,330.00

6,226 CY $15.00 $93,390.00

2,200 CY $20.00 $44,000.00

1 JB SUM $1,750,000.00

6,270 CY $20.00 $125,400.00

$3,004,520.00

$10,446,720.00

1 JB SUM $100,000.00

1 JB SUM $580,000.00

1 JB SUM $325,000.00

$1,005,000.00

$11,451,720.00

Final Condition Survey (Cell A)

Turfing (Cell A)

TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2

TOTAL SCHEDULE NO.1 & OPTION NO.1

OPTION NO. 2

0024 Demolition of Old Terminal Drainage Structure 0025 New Terminal Drainage Structure 0026 Stone Protection at New Terminal Drainage Structure

TOTAL OPTION NO. 2

0021 Excavation for Cross-Dike Foundation 0022 Cell BC New Drop-Inlet Structure

TOTAL OPTION NO. 1

0015 Final Condition Survey (Cell BC)

0017 Cell B Cross-Dike Splashpad

Semi-Compacted Cross-Dike and Foundation Fill Using Onsite Impervious Fill - Cell BC

Uncompacted Berm Construction Using Onsite Impervious Fill - Cell BC

0023 Existing Drainage Ditch Excavation

Semi-Compacted Dike Construction Using Onsite Impervious Fill - Cell BC

Cell A Additional Foundation Preparation

TOTAL SCHEDULE NO. 1

0014 Stripping (Cell BC)

OPTION NO. 1

0013 Clearing, Grubbing and Removal Debris(Cell BC)

Onsite Borrow Soils Geotechnical Evaluation

DESCRIPTION QUANTITY

Issuing Office: USACE-Galveston

ABSTRACT OF OFFERS (CONT'D) Page 4 of 9

ITEM SCHEDULE NO. 1

Business Size: Small Business

NO.

Project Title: FY 26 Galveston Harbor and Channel - San Jacinto PA Improvements in Galveston County, Texas, Restricted For Small Business Procurement Offeror 1: Affolter Contracting Company

0001 Mobilization and Demobilization 0002 Clearing, Grubbing and Debris Removal - (Cell A)

0016 Turfing (Cell BC)

Stripping (Cell A)

0007 As-Built Documentation

Uncompacted Berm Construction Using Onsite Random Fill (Cell A)

Semi-Compacted Dike Construction Using Onsite Impervious Fill (Cell A)

Uncompacted Training Dike Construction Using Onsite Random Fill (Cell A)

0011 Cell A Drop-Inlet Structure Rehab

PRICE TOTAL

1 JB SUM $640,726.00

1 JB SUM $432,496.00

1 JB SUM $218,720.00

1 JB SUM $12,128.00

1 JB SUM $226,512.00

1 JB SUM $59,664.00

1 JB SUM $6,050.00

74,900 CY $16.83 $1,260,567.00

198,500 CY $19.40 $3,850,900.00

44,000 CY $24.33 $1,070,520.00

1 JB SUM $490,136.00

1 JB SUM $1,837,777.00

$10,106,196.00

1 JB SUM $49,936.00

1 JB SUM $89,620.00

1 JB SUM $8,250.00

1 JB SUM $34,848.00

1 JB SUM $53,482.00

11,800 CY $19.69 $232,342.00

17,822 CY $19.67 $350,558.74

6,226 CY $19.67 $122,465.42

2,200 CY $52.19 $114,818.00

1 JB SUM $1,741,397.00

6,270 CY $13.19 $82,701.30

$2,880,418.46

$12,986,614.46

1 JB SUM $104,390.00

1 JB SUM $144,287.00

1 JB SUM $125,840.00

$374,517.00

$13,361,131.46

0016 Turfing (Cell BC)

0022 Cell BC New Drop-Inlet Structure

OPTION NO. 2

0025 New Terminal Drainage Structure

Cell B Cross-Dike Splashpad

Uncompacted Berm Construction Using Onsite Impervious Fill - Cell BC

Semi-Compacted Dike Construction Using Onsite Impervious Fill - Cell BC

Issuing Office: USACE-Galveston

0007 As-Built Documentation

Clearing, Grubbing and Debris Removal - (Cell A)

0003 Stripping (Cell A) 0004 Final Condition Survey (Cell A) 0005 Turfing (Cell A) 0006 Onsite Borrow Soils Geotechnical Evaluation

TOTAL OPTION NO. 1

Project Title: FY 26 Galveston Harbor and Channel - San Jacinto PA Improvements in Galveston County, Texas, Restricted For Small Business Offeror 2: Dredgit Corporation; 701 North Post Oak Rd, Suite 350 Houston, TX 77024

Uncompacted Berm Construction Using Onsite Random

Semi-Compacted Dike Construction Using Onsite Impervious Fill (Cell A)

ITEM SCHEDULE NO. 1

NO. DESCRIPTION

Mobilization and Demobilization

TOTAL SCHEDULE NO. 1

ABSTRACT OF OFFERS (CONT'D) Page 5 of 9

Excavation for Cross-Dike Foundation

Existing Drainage Ditch Excavation

Business Size: Small Business

QUANTITY

0013 Clearing, Grubbing and Removal Debris(Cell BC)

Semi-Compacted Cross-Dike and Foundation Fill Using Onsite Impervious Fill - Cell BC

0024 Demolition of Old Terminal Drainage Structure

Uncompacted Training Dike Construction Using Onsite Random Fill (Cell A)

0015 Final Condition Survey (Cell BC) 0014 Stripping (Cell BC)

0011 Cell A Drop-Inlet Structure Rehab

0012 Cell A Additional Foundation Preparation

OPTION NO. 1

TOTAL SCHEDULE NO.1 & OPTION NO.1

Stone Protection at New Terminal Drainage Structure

TOTAL OPTION NO. 2

TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2

PRICE TOTAL

1 JB SUM $1,710,000.00

1 JB SUM $187,500.00

1 JB SUM $138,610.00

1 JB SUM $50,000.00

1 JB SUM $80,000.00

1 JB SUM $30,000.00

1 JB SUM $60,000.00

74,900 CY $28.00 $2,097,200.00

198,500 CY $19.00 $3,771,500.00

44,000 CY $8.50 $374,000.00

1 JB SUM $250,000.00

1 JB SUM $1,610,437.00

$10,359,247.00

1 JB SUM $2,093,800.00

1 JB SUM $48,246.00

1 JB SUM $50,000.00

1 JB SUM $15,350.00

1 JB SUM $80,000.00

11,800 CY $27.00 $318,600.00

17,822 CY $14.00 $249,508.00

6,226 CY $10.50 $65,373.00

2,200 CY $5.00 $11,000.00

1 JB SUM $1,600,000.00

6,270 CY $10.00 $62,700.00

$4,594,577.00

$14,953,824.00

1 JB SUM $200,000.00

1 JB SUM $1,600,000.00

1 JB SUM $255,000.00

$2,055,000.00

$17,008,824.00

0011 Cell A Drop-Inlet Structure Rehab

0014 Stripping (Cell BC)

Semi-Compacted Cross-Dike and Foundation Fill Using Onsite Impervious Fill - Cell BC

ABSTRACT OF OFFERS (CONT'D) Page 6 of 9

Mobilization and Demobilization

TOTAL OPTION NO. 2

TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2

TOTAL SCHEDULE NO.1 & OPTION NO.1

0021 Excavation for Cross-Dike Foundation

Existing Drainage Ditch Excavation

Semi-Compacted Dike Construction Using Onsite Impervious Fill (Cell A)

Turfing (Cell BC)

Uncompacted Berm Construction Using Onsite Random 0008

0012 Cell A Additional Foundation Preparation

TOTAL SCHEDULE NO. 1

0013 Clearing, Grubbing and Removal Debris(Cell BC)

OPTION NO. 1

ITEM SCHEDULE NO. 1

NO. DESCRIPTION

Clearing, Grubbing and Debris Removal - (Cell A)

0006 Onsite Borrow Soils Geotechnical Evaluation 0007 As-Built Documentation

Uncompacted Training Dike Construction Using Onsite Random Fill (Cell A)

Business Size: Small Business

QUANTITY

0003 Stripping (Cell A) 0004 Final Condition Survey (Cell A) 0005 Turfing (Cell A)

0015 Final Condition Survey (Cell BC)

0022 Cell BC New Drop-Inlet Structure

Uncompacted Berm Construction Using Onsite Impervious Fill - Cell BC

OPTION NO. 2

0024 Demolition of Old Terminal Drainage Structure 0025 New Terminal Drainage Structure 0026 Stone Protection at New Terminal Drainage Structure

Semi-Compacted Dike Construction Using Onsite Impervious Fill - Cell BC

Cell B Cross-Dike Splashpad

TOTAL OPTION NO. 1

Issuing Office: USACE-Galveston Project Title: FY 26 Galveston Harbor and Channel - San Jacinto PA Improvements in Galveston County, Texas, Restricted For Small Business Offeror 3: Maverick Constructors, LLC; 3091 Highway 104, Opelousas, LA 70570

PRICE TOTAL

1 JB SUM $1,100,000.00

1 JB SUM $282,910.00

1 JB SUM $197,190.00

1 JB SUM $125,000.00

1 JB SUM $72,354.00

1 JB SUM $26,235.00

1 JB SUM $55,000.00

74,900 CY $7.27 $544,523.00

198,500 CY $7.53 $1,494,705.00

44,000 CY $26.09 $1,147,960.00

1 JB SUM $277,169.00

1 JB SUM $673,614.00

$5,996,660.00

1 JB SUM $18,948.00

1 JB SUM $36,955.00

1 JB SUM $10,109.00

1 JB SUM $15,610.00

1 JB SUM $67,772.00

11,800 CY $46.44 $547,992.00

17,822 CY $7.00 $124,754.00

6,226 CY $7.00 $43,582.00

2,200 CY $4.13 $9,086.00

1 JB SUM $1,022,422.00

6,270 CY $11.70 $73,359.00

$1,970,589.00

$7,967,249.00

1 JB SUM $80,700.00

1 JB SUM $138,017.00

1 JB SUM $137,126.00

$355,843.00

$8,323,092.00

TOTAL OPTION NO. 2

0024 Demolition of Old Terminal Drainage Structure 0025 New Terminal Drainage Structure 0026 Stone Protection at New Terminal Drainage Structure

TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2

0011 Cell A Drop-Inlet Structure Rehab

TOTAL SCHEDULE NO. 1

0013 Clearing, Grubbing and Removal Debris(Cell BC)

OPTION NO. 1

0005 Turfing (Cell A) 0006 Onsite Borrow Soils Geotechnical Evaluation 0007 As-Built Documentation

0008 Uncompacted Berm Construction Using Onsite Random

0012 Cell A Additional Foundation Preparation

0014 Stripping (Cell BC)

0015 Final Condition Survey (Cell BC)

Semi-Compacted Dike Construction Using Onsite Impervious Fill - Cell BC

Uncompacted Berm Construction Using Onsite Impervious Fill - Cell BC

0017 Cell B Cross-Dike Splashpad 0016 Turfing (Cell BC)

Issuing Office: USACE-Galveston Project Title: FY 26 Galveston Harbor and Channel - San Jacinto PA Improvements in Galveston County, Texas, Restricted For Small Business Offeror 4: Precision Construction, LLC; 401 Sonnier Rd Carencro, LA 70520 *** Appparent Low Bidder ***

Uncompacted Training Dike Construction Using Onsite Random Fill (Cell A)

Mobilization and Demobilization

Clearing, Grubbing and Debris Removal - (Cell A)

Semi-Compacted Dike Construction Using Onsite Impervious Fill (Cell A)

ITEM SCHEDULE NO. 1

0003 Stripping (Cell A) 0004 Final Condition Survey (Cell A)

Business Size: Small Business

QUANTITYNO. DESCRIPTION

ABSTRACT OF OFFERS (CONT'D) Page 7 of 9

TOTAL OPTION NO. 1

TOTAL SCHEDULE NO.1 & OPTION NO.1

OPTION NO. 2

0023 Existing Drainage Ditch Excavation

Semi-Compacted Cross-Dike and Foundation Fill Using Onsite Impervious Fill - Cell BC

0021 Excavation for Cross-Dike Foundation

0022 Cell BC New Drop-Inlet Structure

PRICE TOTAL

1 JB SUM $1,500,000.00

1 JB SUM $400,000.00

1 JB SUM $100,000.00

1 JB SUM $150,000.00

1 JB SUM $150,000.00

1 JB SUM $50,000.00

1 JB SUM $150,000.00

74,900 CY $10.50 $786,450.00

198,500 CY $8.60 $1,707,100.00

44,000 CY $19.00 $836,000.00

1 JB SUM $1,300,000.00

1 JB SUM $21,500.00

$7,151,050.00

1 JB SUM $40,000.00

1 JB SUM $20,000.00

1 JB SUM $32,500.00

1 JB SUM $25,500.00

1 JB SUM $130,000.00

11,800 CY $19.00 $224,200.00

17,822 CY $10.00 $178,220.00

6,226 CY $13.00 $80,938.00

2,200 CY $18.00 $39,600.00

1 JB SUM $2,600,000.00

6,270 CY $25.00 $156,750.00

$3,527,708.00

$10,678,758.00

1 JB SUM $100,000.00

1 JB SUM $300,000.00

1 JB SUM $350,000.00

$750,000.00

$11,428,758.00

0026 Stone Protection at New Terminal Drainage Structure

TOTAL OPTION NO. 2

TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2

0025 New Terminal Drainage Structure

TOTAL OPTION NO. 1

TOTAL SCHEDULE NO.1 & OPTION NO.1

OPTION NO. 2

0024 Demolition of Old Terminal Drainage Structure

0021 Excavation for Cross-Dike Foundation

0015 Final Condition Survey (Cell BC)

0017 Cell B Cross-Dike Splashpad

Uncompacted Berm Construction Using Onsite Impervious Fill - Cell BC

Semi-Compacted Dike Construction Using Onsite Impervious Fill - Cell BC

0016 Turfing (Cell BC)

OPTION NO. 1

0013 Clearing, Grubbing and Removal Debris(Cell BC)

TOTAL SCHEDULE NO. 1

Semi-Compacted Cross-Dike and Foundation Fill Using Onsite Impervious Fill - Cell BC

Uncompacted Berm Construction Using Onsite Random

Semi-Compacted Dike Construction Using Onsite Impervious Fill (Cell A)

0007 As-Built Documentation

0011 Cell A Drop-Inlet Structure Rehab

0012 Cell A Additional Foundation Preparation

ABSTRACT OF OFFERS (CONT'D) Page 8 of 9

ITEM SCHEDULE NO. 1

Issuing Office: USACE-Galveston Project Title: FY 26 Galveston Harbor and Channel - San Jacinto PA Improvements in Galveston County, Texas, Restricted For Small Business Offeror 5: Texas Dewatering, LLC.; 4691 FM 529 Rd. Bellville, TX 77418 Business Size: Small Business

QUANTITY

Uncompacted Training Dike Construction Using Onsite Random Fill (Cell A)

0014 Stripping (Cell BC)

0022 Cell BC New Drop-Inlet Structure 0023 Existing Drainage Ditch Excavation

NO. DESCRIPTION

Mobilization and Demobilization

Clearing, Grubbing and Debris Removal - (Cell A)

0003 Stripping (Cell A) 0004 Final Condition Survey (Cell A) 0005 Turfing (Cell A) 0006 Onsite Borrow Soils Geotechnical Evaluation

& SDB

PRICE TOTAL

1 JB SUM $2,285,000.00

1 JB SUM $300,000.00

1 JB SUM $200,000.00

1 JB SUM $25,000.00

1 JB SUM $180,000.00

1 JB SUM $152,000.00

1 JB SUM $25,000.00

74,900 CY $14.00 $1,048,600.00

198,500 CY $19.25 $3,821,125.00

44,000 CY $14.00 $616,000.00

1 JB SUM $245,000.00

1 JB SUM $145,000.00

$9,042,725.00

1 JB SUM $175,000.00

1 JB SUM $100,000.00

1 JB SUM $15,000.00

1 JB SUM $95,000.00

1 JB SUM $285,000.00

11,800 CY $19.00 $224,200.00

17,822 CY $24.00 $427,728.00

6,226 CY $19.00 $118,294.00

2,200 CY $40.00 $88,000.00

1 JB SUM $1,785,000.00

6,270 CY $40.00 $250,800.00

$3,564,022.00

$12,606,747.00

1 JB SUM $215,000.00

1 JB SUM $550,000.00

1 JB SUM $385,000.00

$1,150,000.00

$13,756,747.00

Semi-Compacted Dike Construction Using Onsite Impervious Fill - Cell BC

0013 Clearing, Grubbing and Removal Debris(Cell BC)

0015 Final Condition Survey (Cell BC) 0016 Turfing (Cell BC) 0017 Cell B Cross-Dike Splashpad

0014 Stripping (Cell BC)

0003 Stripping (Cell A) 0004 Final Condition Survey (Cell A)

0006 Onsite Borrow Soils Geotechnical Evaluation 0007 As-Built Documentation

0005 Turfing (Cell A)

Project Title: FY 26 Galveston Harbor and Channel - San Jacinto PA Improvements in Galveston County, Texas, Restricted For Small Business Offeror 6: TKTMJ, Inc; 109 Arthur St Natchitoches, LA 71457

ITEM SCHEDULE NO. 1

NO. DESCRIPTION

Mobilization and Demobilization

Clearing, Grubbing and Debris Removal - (Cell A)

Business Size: Small Business/HUBZone

QUANTITY

ABSTRACT OF OFFERS (CONT'D) Page 9 of 9

Issuing Office: USACE-Galveston

0008 Uncompacted Berm Construction Using Onsite Random

OPTION NO. 1

Semi-Compacted Cross-Dike and Foundation Fill Using Onsite Impervious Fill - Cell BC

0021 Excavation for Cross-Dike Foundation

0022 Cell BC New Drop-Inlet Structure

Semi-Compacted Dike Construction Using Onsite Impervious Fill (Cell A)

Uncompacted Training Dike Construction Using Onsite Random Fill (Cell A)

0012 Cell A Additional Foundation Preparation

TOTAL SCHEDULE NO. 1

0011 Cell A Drop-Inlet Structure Rehab

Uncompacted Berm Construction Using Onsite Impervious Fill - Cell BC

0025 New Terminal Drainage Structure 0026 Stone Protection at New Terminal Drainage Structure

TOTAL OPTION NO. 2

TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2

0023 Existing Drainage Ditch Excavation

TOTAL OPTION NO. 1

TOTAL SCHEDULE NO.1 & OPTION NO.1

OPTION NO. 2

0024 Demolition of Old Terminal Drainage Structure

2026-05-12T16:04:21-0500
COLE.CURTIS.JR.1231025746
2026-05-12T16:05:15-0500
COLE.CURTIS.JR.1231025746

File details come from the government source that posted it. Updated .