Abstract of Offers Amendment 0001 - W912HY26BA013 w Coversheet.pdf

PDF 318 KB Posted

Attached to
TEXAS CITY SHIP CHANNEL, TEXAS PLACEMENT AREAS NO. 5 AND 6 IMPROVEMENTS
Solicitation number
W912HY26BA013
Issued by

About this file

This is an Abstract of Offers for a construction solicitation issued by the U.S. Army Corps of Engineers, Galveston District. The solicitation number W912HY26BA013 was issued on November 4, 2025, and opened on December 19, 2025. The project involves improvements to the Texas City Ship Channel in Galveston County, Texas, specifically placement areas No. 5 and 6 non-dredging improvements. This is a small business set-aside with 4 amendments issued. The government estimate (without profit) totals $4,801,000.00.

The abstract documents nine responsive offerors with bids ranging from $2,325,000.00 to $8,022,112.35. The low responsive bidder is Maverick Constructors, LLC (small business), at $3,961,071.29, which is 17.49% lower than the government estimate. Other responsive bidders include Dredgit Corporation, Affolter Contracting Company Inc., Texas Dewatering LLC, RLB Contracting Inc., Southern Gulf Solutions, and MB Western. Offeror 8 (Viking) submitted a non-responsive bid and was not considered for award. Work items include mobilization and demobilization, clearing and grubbing, semi-compacted containment dike construction using onsite soil, stripping, turfing, walkway demolition and installation, as-built drawings, final conditions surveys, and onsite borrow soils geotechnical evaluation, all priced individually as job items. The contracting officer is Mirian Tudor.

View the file

Other files

File Type Posted
W912HY26BA013 Abstract with Coversheet.KOSigned.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

5. PROJECT TITLE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

U.S. Army Corps of Engineers, Galveston District Contracting Division 2000 Fort Point Road Galveston , TX 77550

Texas City Ship Channel, Texas, Placement Areas No. 5 and 6 Improvements Non-Dredging in Galveston County, Texas

AMENDED ABSTRACT

See Attachment (pages 1 through 7)

W912HY26BA013 1 1

Mirian Tudor, Contracting Officer

12/19/202511/04/2025

ABSTRACT OF OFFERS - Amendment 0001

ITEM SCHEDULE NO. 1 UNIT

NO. DESCRIPTION PRICE TOTAL

Mobilization and Demobilization

1 JOB $406,000.00 $406,000.00

Clearing, Grubbing, and Debris Removal

1 JOB $239,000.00 $239,000.00

Semi-Compacted Containment Dike Construction Using Onsite Soil 1 JOB $3,533,000.00 $3,533,000.00

Stripping

1 JOB $255,000.00 $255,000.00

Turfing

1 JOB $119,000.00 $119,000.00

Demolition of Existing Walkway, Installation of New Walkway and Rehabilitation of Existing Structure 1 JOB $64,000.00 $64,000.00

As-Built Drawings

1 JOB $19,000.00 $19,000.00

Final Conditions Surveys

1 JOB $106,000.00 $106,000.00

Onsite Borrow Soils Geotechnical Evaluation

1 JOB $60,000.00 $60,000.00

TOTAL SCHEDULE NO. 1 $4,801,000.00

ITEM SCHEDULE NO. 1 UNIT

NO. DESCRIPTION PRICE TOTAL

0001 Mobilization and Demobilization 1 JOB $850,000.00 $850,000.00 0002 Clearing, Grubbing, and Debris Removal 1 JOB $52,000.00 $52,000.00

Semi-Compacted Containment Dike Construction Using Onsite Soil 1 JOB $2,659,409.50 $2,659,409.50

0004 Stripping 1 JOB $146,947.50 $146,947.50 0005 Turfing 1 JOB $104,500.00 $104,500.00

Demolition of Existing Walkway, Installation of New Walkway and Rehabilitation of Existing Structure 1 JOB $58,214.29 $58,214.29

0007 As-Built Drawings 1 JOB $30,000.00 $30,000.00 0008 Final Conditions Surveys 1 JOB $40,000.00 $40,000.00 0009 Onsite Borrow Soils Geotechnical Evaluation 1 JOB $20,000.00 $20,000.00

TOTAL SCHEDULE NO. 1 $3,961,071.29

Number of Amendments Issued: 4

QUANTITY

Offeror 1: Maverick Constructors, LLC Business Size: SB

Government Estimate (Without Profit)

QUANTITY

Solicitation No.: W912HY26BA013 Date Issued: 04 NOV 2025 Date Opened: 19 DEC 2025 Issuing Office: USACE-Galveston Project Title: Small Business Set-Aside, Texas City Ship Channel, Texas, Placement Areas No. 5 and 6 Improvements Non-Dreding in Galveston County, Texas

NO. DESCRIPTION PRICE TOTAL

0001 Mobilization and Demobilization 1 JOB $1,000,000.00 $1,000,000.00 0002 Clearing, Grubbing, and Debris Removal 1 JOB $2,150,000.00 $2,150,000.00

Semi-Compacted Containment Dike Construction Using Onsite Soil 1 JOB $1,900,000.00 $1,900,000.00

0004 Stripping 1 JOB $650,000.00 $650,000.00 0005 Turfing 1 JOB $250,000.00 $250,000.00

Demolition of Existing Walkway, Installation of New Walkway and Rehabilitation of Existing Structure 1 JOB $400,000.00 $400,000.00

0007 As-Built Drawings 1 JOB $25,000.00 $25,000.00 0008 Final Conditions Surveys 1 JOB $25,000.00 $25,000.00 0009 Onsite Borrow Soils Geotechnical Evaluation 1 JOB $100,000.00 $100,000.00

TOTAL SCHEDULE NO. 1 $6,500,000.00

ITEM SCHEDULE NO. 1 UNIT

NO. DESCRIPTION PRICE TOTAL

0001 Mobilization and Demobilization 1 JOB $250,000.00 $250,000.00 0002 Clearing, Grubbing, and Debris Removal 1 JOB $100,000.00 $100,000.00

Semi-Compacted Containment Dike Construction Using Onsite Soil 1 JOB $3,200,000.00 $3,200,000.00

0004 Stripping 1 JOB $100,000.00 $100,000.00 0005 Turfing 1 JOB $120,000.00 $120,000.00

Demolition of Existing Walkway, Installation of New Walkway and Rehabilitation of Existing Structure 1 JOB $100,000.00 $100,000.00

0007 As-Built Drawings 1 JOB $25,000.00 $25,000.00 0008 Final Conditions Surveys 1 JOB $40,000.00 $40,000.00 0009 Onsite Borrow Soils Geotechnical Evaluation 1 JOB $40,000.00 $40,000.00

TOTAL SCHEDULE NO. 1 $3,975,000.00

ITEM SCHEDULE NO. 1 UNIT

NO. DESCRIPTION PRICE TOTAL

0001 Mobilization and Demobilization 1 JOB $500,000.00 $500,000.00 0002 Clearing, Grubbing, and Debris Removal 1 JOB $31,000.00 $31,000.00

Semi-Compacted Containment Dike Construction Using Onsite Soil 1 JOB $3,800,000.00 $3,800,000.00

0004 Stripping 1 JOB $110,000.00 $110,000.00 0005 Turfing 1 JOB $170,000.00 $170,000.00

Demolition of Existing Walkway, Installation of New Walkway and Rehabilitation of Existing Structure 1 JOB $145,000.00 $145,000.00

0007 As-Built Drawings 1 JOB $25,000.00 $25,000.00 0008 Final Conditions Surveys 1 JOB $25,000.00 $25,000.00 0009 Onsite Borrow Soils Geotechnical Evaluation 1 JOB $50,000.00 $50,000.00

TOTAL SCHEDULE NO. 1 $4,856,000.00

Offeror 2: Dredgit Corporation

QUANTITY

Offeror 3: Affolter Contracting Company, Inc

Business Size: SB

Business Size: SB

QUANTITY

Offeror 4: Texas Dewatering LLC

QUANTITY

Offeror 5: RLB Contracting, Inc

Business Size: SB, SDB

NO. DESCRIPTION PRICE TOTAL

0001 Mobilization and Demobilization 1 JOB $400,000.00 $400,000.00 0002 Clearing, Grubbing, and Debris Removal 1 JOB $225,000.00 $225,000.00

Semi-Compacted Containment Dike Construction Using Onsite Soil 1 JOB $1,400,000.00 $1,400,000.00

0004 Stripping 1 JOB $60,000.00 $60,000.00 0005 Turfing 1 JOB $60,000.00 $60,000.00

Demolition of Existing Walkway, Installation of New Walkway and Rehabilitation of Existing Structure 1 JOB $100,000.00 $100,000.00

0007 As-Built Drawings 1 JOB $30,000.00 $30,000.00 0008 Final Conditions Surveys 1 JOB $40,000.00 $40,000.00 0009 Onsite Borrow Soils Geotechnical Evaluation 1 JOB $10,000.00 $10,000.00

TOTAL SCHEDULE NO. 1 $2,325,000.00

ITEM SCHEDULE NO. 1 UNIT

NO. DESCRIPTION PRICE TOTAL

0001 Mobilization and Demobilization 1 JOB $1,727,860.00 $1,727,860.00 0002 Clearing, Grubbing, and Debris Removal 1 JOB $85,450.00 $85,450.00

Semi-Compacted Containment Dike Construction Using Onsite Soil 1 JOB $3,725,450.00 $3,725,450.00

0004 Stripping 1 JOB $47,110.00 $47,110.00 0005 Turfing 1 JOB $71,690.00 $71,690.00

Demolition of Existing Walkway, Installation of New Walkway and Rehabilitation of Existing Structure 1 JOB $160,670.00 $160,670.00

0007 As-Built Drawings 1 JOB $28,225.00 $28,225.00 0008 Final Conditions Surveys 1 JOB $27,525.00 $27,525.00 0009 Onsite Borrow Soils Geotechnical Evaluation 1 JOB $26,750.00 $26,750.00

TOTAL SCHEDULE NO. 1 $5,900,730.00

ITEM SCHEDULE NO. 1 UNIT

NO. DESCRIPTION PRICE TOTAL

0001 Mobilization and Demobilization 1 JOB $2,000,000.00 $2,000,000.00 0002 Clearing, Grubbing, and Debris Removal 1 JOB $325,000.00 $325,000.00

Semi-Compacted Containment Dike Construction Using Onsite Soil 1 JOB $4,186,800.00 $4,186,800.00

0004 Stripping 1 JOB $106,450.00 $106,450.00 0005 Turfing 1 JOB $225,000.00 $225,000.00 0006 Gov 1 JOB $83,000.00 $83,000.00 0007 As-Built Drawings 1 JOB $18,750.00 $18,750.00 0008 Final Conditions Surveys 1 JOB $68,750.00 $68,750.00 0009 Onsite Borrow Soils Geotechnical Evaluation 1 JOB $185,000.00 $185,000.00

TOTAL SCHEDULE NO. 1 $7,198,750.00

ITEM SCHEDULE NO. 1 UNIT

NO. DESCRIPTION PRICE TOTAL

QUANTITY

Offeror 8: Viking

QUANTITY

Offeror 6: Southern Gulf Solutions

QUANTITY

Business Size: SB, WO, HZ

Business Size: SB, SDVOSB

Business Size: SB Offeror 7: TKTMJ, Inc

Business Size: SB

QUANTITY

Bid non-responsive and not considered for award.

0001 Mobilization and Demobilization 1 JOB $935,000.00 $935,000.00 0002 Clearing, Grubbing, and Debris Removal 1 JOB $390,000.00 $390,000.00

Semi-Compacted Containment Dike Construction Using Onsite Soil 1 JOB $3,979,000.00 $3,979,000.00

0004 Stripping 1 JOB $200,000.00 $200,000.00 0005 Turfing 1 JOB $115,000.00 $115,000.00

Demolition of Existing Walkway, Installation of New Walkway and Rehabilitation of Existing Structure 1 JOB $447,000.00 $447,000.00

0007 As-Built Drawings 1 JOB $13,800.00 $13,800.00 0008 Final Conditions Surveys 1 JOB $42,000.00 $42,000.00 0009 Onsite Borrow Soils Geotechnical Evaluation 1 JOB $91,000.00 $91,000.00

TOTAL SCHEDULE NO. 1 $6,212,800.00

ITEM SCHEDULE NO. 1 UNIT

NO. DESCRIPTION PRICE TOTAL

0001 Mobilization and Demobilization 1 JOB $950,950.00 $950,950.00 0002 Clearing, Grubbing, and Debris Removal 1 JOB $374,321.52 $374,321.52

Semi-Compacted Containment Dike Construction Using Onsite Soil 1 JOB $5,734,128.75 $5,734,128.75

0004 Stripping 1 JOB $544,948.32 $544,948.32 0005 Turfing 1 JOB $179,893.26 $179,893.26

Demolition of Existing Walkway, Installation of New Walkway and Rehabilitation of Existing Structure 1 JOB $82,460.00 $82,460.00

0007 As-Built Drawings 1 JOB $9,975.00 $9,975.00 0008 Final Conditions Surveys 1 JOB $51,205.00 $51,205.00 0009 Onsite Borrow Soils Geotechnical Evaluation 1 JOB $94,230.50 $94,230.50

TOTAL SCHEDULE NO. 1 $8,022,112.35

Business Size: SB

*The overall responsive low bidder, Maverick Constructors LLC, is 17.49% lower than the Government Estimate.

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED TO

THIS SOLICITATION.

Offeror 9: MB Western

QUANTITY

X Mirian Tudor Contracting Officer

Abstract of Offers - Construction Coversheet - W912HY26BA013 PDF.pdf
Bid Abstract 26BA013 Amendment 0001.pdf
Page 1
2026-02-23T10:43:15-0600
TUDOR.MIRIAN.ROSA.1069051800
2026-02-23T11:40:53-0600
TUDOR.MIRIAN.ROSA.1069051800

File details come from the government source that posted it. Updated .