Bid Abstract W912HY25BA006 FINAL.KOSigned.pdf

PDF 264 KB Posted

Attached to
GIWW, Texas Channel to Victoria, Maintenance Dredging, Calhoun and Victoria County, Texas
Solicitation number
W912HY25BA006
Issued by

About this file

This document is an Abstract of Offers for a U.S. Army Corps of Engineers solicitation (W912HY25BA006) for maintenance dredging in the Gulf Intracoastal Waterway, Texas Channel to Victoria, located in Calhoun and Victoria County. The solicitation is an unrestricted procurement for Fiscal Year 2025, with four bidders: Callan Marine, Ltd.; Inland Dredging Company, LLC; Muddy Water Dredging, LP; and Orion Marine Construction, Inc. The project involves multiple dredging sections and options, including pipeline management, dredging various channel sections, and placement of dredged material at the Guadalupe River Mouth Marsh.

The bid abstract shows total bid amounts ranging from approximately $23 million to $90 million across different offerors. Orion Marine Construction is noted as the apparent low bidder at $23,020,618, which is 4.46% below the Government's Estimate. The solicitation includes seven distinct options covering different dredging sections and material placement, with quantities ranging from 103,000 to 827,000 cubic yards. The procurement is classified as "Other Than Small Business" for most bidders, with Muddy Water Dredging being the only small business bidder. The solicitation was issued on May 16, 2025, with bids opened on June 25, 2025, by the USACE Galveston District Contracting Division.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

U.S. Army Corps of Engineers, Galveston District Contracting Division 2000 Fort Point Road Galveston, Texas 77550

5. PROJECT TITLE

FY25, Unrestricted Procurement, USACE Galveston District, GIWW, Texas Channel to Victoria, Maintenance Dredging, Calhoun and Victoria County, Texas

1. SOLICITATION NUMBER

W912HY25BA006 1

Mirian R, Tudor Contracting Officer

06/25/202505/16/2025

06/25/2025

See Continuation Pages

UNIT

PRICE TOTAL

1 JB SUM $2,755,415.00

1 JB SUM $653,637.00

827,000 CY $4.70 $3,886,900.00

$7,295,952.00

1 JB SUM $299,904.00

474,000 CY $3.18 $1,507,320.00

$1,807,224.00

$9,103,176.00

1 JB SUM $462,878.00

522,000 CY $7.38 $3,852,360.00

$4,315,238.00

$13,418,414.00

1 JB SUM $798,642.00

533,000 CY $9.50 $5,063,500.00

$5,862,142.00

$19,280,556.00

1 JB SUM $156,146.00

103,000 CY $9.41 $969,230.00

$1,125,376.00

$20,405,932.00

1 JB SUM $364,156.00

$364,156.00

$20,770,088.00

1 JB SUM $1,536,142.00

$1,536,142.00

$22,306,230.00

1 JB SUM $714,388.00

$714,388.00

QUANTITY

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4 &

0004 Pipeline Management

TOTAL OPTION NO. 4

OPTION NO. 6

SCHEDULE NO. 1ITEM

ABSTRACT OF OFFERS Page 2 of 11

Solicitation No.: W912HY25BA006 Date Issued: 16 May 2025 Date Opened: 25 June 2025

Issuing Office: USACE-Galveston

Project Title: Unrestricted Procurement For FY 25 USACE Galveston District, GIWW, Texas Channel to Victoria, Maintenance Dredging, Calhoun and

Victoria County, Texas

Number of Amendments Issued: 2

Government Estimate (Without Profit)

NO. DESCRIPTION

0002 Pipeline Management

Mobilization and Demobilization

TOTAL SCHEDULE NO.1 & OPTION NO.1

Dredging (Sea Drift Channel Section No. 8 - 13)

OPTION NO. 1

Dredging (Channel to Victoria Section No. 1 -7)

TOTAL OPTION NO. 2

TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2

Dredging (Channel to Victoria Section No. 20 - 25)

TOTAL SCHEDULE NO. 1

TOTAL OPTION NO. 1

OPTION NO. 2

0006 Pipeline Management

0008 Pipeline Management

OPTION NO. 3

Dredging (Channel to Victoria Section No. 14 - 19)

TOTAL OPTION NO. 3

TOTAL SCHEDULE NO.1 & OPTION NO. 1,2 & 3

OPTION NO. 4

0010 Pipeline Management

0011 Dredging (Channel to Victoria Section 26 - 27)

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3 &4

OPTION NO. 5

Placement of Dredged Material (Guadalupe River Mouth

Marsh (GRMM) for Section No. 5- 7)

TOTAL OPTION NO. 5

TOTAL OPTION NO. 7

Placement of Dredged Material (Guadalupe River Mouth

Marsh (GRMM) for Section No. 8-13)

TOTAL OPTION NO. 6

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5

& 6

OPTION NO. 7

Placement of Dredged Material (Guadalupe River Mouth

Marsh (GRMM) for Section No. 14-16)

$23,020,618.00

* The apparent low bidder, Orion Marine Construction, Inc. is 4.46% below the Government's Estimate.

Mirian R. Tudor

CONTRACTING OFFICER

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED IN RESPONSE TO THIS

SOLICITATION.

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5,6

& 7

1 JB SUM $10,100,000.00

1 JB SUM $2,700,000.00

827,000 CY $13.00 $10,751,000.00

$23,551,000.00

1 JB SUM $2,500,000.00

474,000 CY $13.50 $6,399,000.00

$8,899,000.00

$32,450,000.00

1 JB SUM $2,300,000.00

522,000 CY $12.00 $6,264,000.00

$8,564,000.00

$41,014,000.00

1 JB SUM $2,200,000.00

533,000 CY $19.00 $10,127,000.00

$12,327,000.00

$53,341,000.00

1 JB SUM $1,900,000.00

103,000 CY $18.00 $1,854,000.00

$3,754,000.00

$57,095,000.00

1 JB SUM $12,000,000.00

$12,000,000.00

$69,095,000.00

1 JB SUM $14,200,000.00

$14,200,000.00

$83,295,000.00

1 JB SUM $6,800,000.00

$6,800,000.00

Project Title: Unrestricted Procurement For FY 25 USACE Galveston District, GIWW, Texas Channel to Victoria, Maintenance Dredging, Calhoun and

Victoria County, Texas

Solicitation No.: W912HY25BA006 Date Issued: 16 May 2025 Date Opened: 25 June 2025

Offeror 1: Callan Marine, Ltd. 6800 Harborside Dr Galveston, TX 77554

QUANTITY

Issuing Office: USACE-Galveston

ABSTRACT OF OFFERS (CONT'D) Page 4 of 11

Business Size: Other Than Small Business

ITEM SCHEDULE NO. 1

NO. DESCRIPTION

0008 Pipeline Management

OPTION NO. 4

0001 Mobilization and Demobilization

0002 Pipeline Management

0003 Dredging (Channel to Victoria Section No. 1 -7)

OPTION NO. 6

Placement of Dredged Material (Guadalupe River Mouth

Marsh (GRMM) for Section No. 8-13)

Placement of Dredged Material (Guadalupe River Mouth

Marsh (GRMM) for Section No. 5- 7)

TOTAL OPTION NO. 5

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4 &

0010 Pipeline Management

OPTION NO. 5

0007 Dredging (Channel to Victoria Section No. 14 - 19)

0005 Dredging (Sea Drift Channel Section No. 8 - 13)

TOTAL SCHEDULE NO. 1

OPTION NO. 1

Placement of Dredged Material (Guadalupe River Mouth

Marsh (GRMM) for Section No. 14-16)

TOTAL OPTION NO. 7

TOTAL OPTION NO. 6

OPTION NO. 7

OPTION NO. 2

0006 Pipeline Management

TOTAL OPTION NO. 2

0004 Pipeline Management

TOTAL OPTION NO. 1

TOTAL SCHEDULE NO.1 & OPTION NO.1

TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2

TOTAL OPTION NO. 4

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3 &4

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5

& 6

TOTAL SCHEDULE NO.1 & OPTION NO. 1,2 & 3

0011 Dredging (Channel to Victoria Section 26 - 27)

0009 Dredging (Channel to Victoria Section No. 20 - 25)

TOTAL OPTION NO. 3

OPTION NO. 3

$90,095,000.00

1 JB SUM $3,000,000.00

1 JB SUM $1,900,000.00

827,000 CY $6.60 $5,458,200.00

$10,358,200.00

1 JB SUM $300,000.00

474,000 CY $5.00 $2,370,000.00

$2,670,000.00

$13,028,200.00

1 JB SUM $200,000.00

522,000 CY $5.50 $2,871,000.00

$3,071,000.00

$16,099,200.00

1 JB SUM $200,000.00

533,000 CY $7.00 $3,731,000.00

$3,931,000.00

$20,030,200.00

1 JB SUM $100,000.00

103,000 CY $6.00 $618,000.00

$718,000.00

$20,748,200.00

1 JB SUM $1,500,000.00

$1,500,000.00

$22,248,200.00

1 JB SUM $900,000.00

$900,000.00

$23,148,200.00

1 JB SUM $600,000.00

OPTION NO. 5

Placement of Dredged Material (Guadalupe River Mouth

Marsh (GRMM) for Section No. 14-16)

Pipeline Management

0005 Dredging (Sea Drift Channel Section No. 8 - 13)

OPTION NO. 1

TOTAL SCHEDULE NO. 1

NO. DESCRIPTION

0001 Mobilization and Demobilization

SCHEDULE NO. 1ITEM

ABSTRACT OF OFFERS (CONT'D) Page 6 of 11

Solicitation No.: W912HY25BA006 Date Issued: 16 May 2025 Date Opened: 25 June 2025

Project Title: Unrestricted Procurement For FY 25 USACE Galveston District, GIWW, Texas Channel to Victoria, Maintenance Dredging, Calhoun and

Victoria County, Texas

0002 Pipeline Management

0010 Pipeline Management

TOTAL OPTION NO. 6

OPTION NO. 3

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3 & 4

0009 Dredging (Channel to Victoria Section No. 20 - 25)

Pipeline Management

Placement of Dredged Material (Guadalupe River Mouth

Marsh (GRMM) for Section No. 5- 7)

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4 &

OPTION NO. 6

Placement of Dredged Material (Guadalupe River Mouth

Marsh (GRMM) for Section No. 8-13)

OPTION NO. 4

TOTAL SCHEDULE NO.1 & OPTION NO. 1,2 & 3

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5

& 6

0003 Dredging (Channel to Victoria Section No. 1 -7)

TOTAL OPTION NO. 4

TOTAL SCHEDULE NO.1 & OPTION NO.1

OPTION NO. 2

0006 Pipeline Management

0007 Dredging (Channel to Victoria Section No. 14 - 19)

TOTAL OPTION NO. 3

0011 Dredging (Channel to Victoria Section 26 - 27)

Offeror 2: Inland Dredging Company, LLC P.O Box 1189 Dyersburg, TN 38024

Business Size: Other Than Small Business

QUANTITY

TOTAL OPTION NO. 1

TOTAL OPTION NO. 2

TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2

TOTAL OPTION NO. 5

OPTION NO. 7

$600,000.00

$23,748,200.00

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5,6

TOTAL OPTION NO. 7

1 JB SUM $2,900,000.00

1 JB SUM $270,000.00

827,000 CY $8.50 $7,029,500.00

$10,199,500.00

1 JB SUM $150,000.00

474,000 CY $7.00 $3,318,000.00

$3,468,000.00

$13,667,500.00

1 JB SUM $275,000.00

522,000 CY $13.50 $7,047,000.00

$7,322,000.00

$20,989,500.00

1 JB SUM $380,000.00

533,000 CY $13.50 $7,195,500.00

$7,575,500.00

$28,565,000.00

1 JB SUM $250,000.00

103,000 CY $17.00 $1,751,000.00

$2,001,000.00

$30,566,000.00

1 JB SUM $2,000,000.00

$2,000,000.00

$32,566,000.00

1 JB SUM $2,000,000.00

$2,000,000.00

$34,566,000.00

Dredging (Channel to Victoria Section No. 20 - 25)

TOTAL OPTION NO. 3

TOTAL SCHEDULE NO.1 & OPTION NO. 1,2 & 3

OPTION NO. 4

OPTION NO. 2

0006 Pipeline Management

0007 Dredging (Channel to Victoria Section No. 14 - 19)

TOTAL OPTION NO. 2

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5

& 6

TOTAL OPTION NO. 4

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4 &

Solicitation No.: W912HY25BA006 Date Issued: 16 May 2025 Date Opened: 25 June 2025

Issuing Office: USACE-Galveston

Project Title: Unrestricted Procurement For FY 25 USACE Galveston District, GIWW, Texas Channel to Victoria, Maintenance Dredging, Calhoun and

Victoria County, Texas

TOTAL OPTION NO. 1

TOTAL SCHEDULE NO.1 & OPTION NO.1

OPTION NO. 1

OPTION NO. 7

0011 Dredging (Channel to Victoria Section 26 - 27)

OPTION NO. 5

TOTAL OPTION NO. 5

OPTION NO. 6

Placement of Dredged Material (Guadalupe River Mouth

Marsh (GRMM) for Section No. 8-13)

TOTAL OPTION NO. 6

ABSTRACT OF OFFERS (CONT'D) Page 8 of 11

Offeror 3: Muddy Water Dredging, LP 905 Pier Rd Orange, TX 77630

Business Size: Small Business

ITEM SCHEDULE NO. 1

NO. DESCRIPTION QUANTITY

0001 Mobilization and Demobilization

0002 Pipeline Management

0003 Dredging (Channel to Victoria Section No. 1 -7)

TOTAL SCHEDULE NO. 1

Placement of Dredged Material (Guadalupe River Mouth

Marsh (GRMM) for Section No. 5- 7)

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3 &4

Pipeline Management

0005 Dredging (Sea Drift Channel Section No. 8 - 13)

0010 Pipeline Management

TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2

OPTION NO. 3

0008 Pipeline Management

1 JB SUM $2,000,000.00

$2,000,000.00

$36,566,000.00

Placement of Dredged Material (Guadalupe River Mouth

Marsh (GRMM) for Section No. 14-16)

TOTAL OPTION NO. 7

1 JB SUM $1,800,000.00

1 JB SUM $675,000.00

827,000 CY $4.25 $3,514,750.00

$5,989,750.00

1 JB SUM $225,000.00

474,000 CY $3.00 $1,422,000.00

$1,647,000.00

$7,636,750.00

1 JB SUM $225,000.00

522,000 CY $5.00 $2,610,000.00

$2,835,000.00

$10,471,750.00

1 JB SUM $150,000.00

533,000 CY $9.00 $4,797,000.00

$4,947,000.00

$15,418,750.00

1 JB SUM $150,000.00

103,000 CY $8.00 $824,000.00

$974,000.00

$16,392,750.00

1 JB SUM $2,300,000.00

$2,300,000.00

$18,692,750.00

1 JB SUM $2,800,000.00

$2,800,000.00

$21,492,750.00

1 JB SUM $500,000.00

$500,000.00

ABSTRACT OF OFFERS (CONT'D) Page 10 of 11

Solicitation No.: W912HY25BA006 Date Issued: 16 May 2025 Date Opened: 25 June 2025

Issuing Office: USACE-Galveston

Project Title: Unrestricted Procurement For FY 25 USACE Galveston District, GIWW, Texas Channel to Victoria, Maintenance Dredging, Calhoun and

Offeror 4: Orion Marine Construction, Inc 1715 N West Shore Blvd, Suite 875 Tampa, FL 33607 ***Apparent Low Bidder***

Business Size: Other Than Small Business

ITEM SCHEDULE NO. 1

NO. DESCRIPTION QUANTITY

0001 Mobilization and Demobilization

0002 Pipeline Management

0003 Dredging (Channel to Victoria Section No. 1 -7)

TOTAL SCHEDULE NO. 1

OPTION NO. 1

0004 Pipeline Management

0005 Dredging (Sea Drift Channel Section No. 8 - 13)

TOTAL OPTION NO. 1

TOTAL SCHEDULE NO.1 & OPTION NO.1

OPTION NO. 2

0006 Pipeline Management

0007 Dredging (Channel to Victoria Section No. 14 - 19)

TOTAL OPTION NO. 2

TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2

OPTION NO. 3

0008 Pipeline Management

0009 Dredging (Channel to Victoria Section No. 20 - 25)

TOTAL OPTION NO. 3

TOTAL SCHEDULE NO.1 & OPTION NO. 1,2 & 3

OPTION NO. 4

0010 Pipeline Management

0011 Dredging (Channel to Victoria Section 26 - 27)

TOTAL OPTION NO. 4

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3 &4

OPTION NO. 5

Placement of Dredged Material (Guadalupe River Mouth

Marsh (GRMM) for Section No. 5- 7)

TOTAL OPTION NO. 5

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4 &

OPTION NO. 6

Placement of Dredged Material (Guadalupe River Mouth

Marsh (GRMM) for Section No. 8-13)

TOTAL OPTION NO. 6

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5

& 6

OPTION NO. 7

Placement of Dredged Material (Guadalupe River Mouth

Marsh (GRMM) for Section No. 14-16)

TOTAL OPTION NO. 7

$21,992,750.00

2025-06-25T11:52:32-0500
TUDOR.MIRIAN.ROSA.1069051800
2025-06-25T11:53:23-0500
TUDOR.MIRIAN.ROSA.1069051800

File details come from the government source that posted it. Updated .