Abstract 25B0011 Houston Ship Channel Morgan Point to Boggy Bayou 09JUL2025.pdf
PDF 255 KB Posted
- Solicitation number
- W912HY25B0011
About this file
This Abstract of Offers details a federal contract opportunity for dredging services in the Houston Ship Channel, issued by the U.S. Army Corps of Engineers Galveston District. The solicitation (W912HY25B0011) covers an unrestricted procurement for Fiscal Year 2025, spanning Morgan's Point to Boggy Bayou in Harris and Chambers County, Texas. Six offerors submitted bids, with total contract values ranging from approximately $32.5 million (Inland Dredging Company) to $154.5 million (Callan Marine), with the government estimate at $39.3 million.
The contract includes multiple line items and options for dredging different sections of the Houston Ship Channel, such as Morgan's Point to Exxon, Exxon to Jacinto Port, Jacinto Port sections, and various additional areas like Barbours Flare and Channel Docks. Each offeror provided unit pricing for cubic yard (CY) dredging, mobilization and demobilization, pipeline management, site management, and standby time. The solicitation was issued on May 9, 2025, with bids opened on July 2, 2025, and all bidders classified as "other than small" businesses. The apparent low bidder, Curtin Maritime Corp, submitted a bid 27.91% below the government's estimate.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
U.S. Army Corps of Engineers, Galveston District Contracting Division 2000 Fort Point Road Galveston, Texas 77550
5. PROJECT TITLE
Project Title: Unrestricted Procurement For FY 25 USACE Galveston District, Houston Ship Channel Morgan's Point to Boggy Bayou Harris and Chambers County , Texas
1. SOLICITATION NUMBER
W912HY25B0011 1
Curtis Cole Jr. Contracting Officer
07/02/202505/09/2025
07/09/2025
See Continuation Pages
UNIT
PRICE TOTAL
1 JOB $4,740,000.00 $4,740,000.00
1 JOB $2,397,000.00 $2,397,000.00
1,282,950 CY $7.54 $9,673,443.00
2,493,900 CY $5.53 $13,791,267.00
85,997 CY $7.53 $647,557.41
317,700 CY $10.69 $3,396,213.00
1 JOB $66,000.00 $66,000.00
$34,711,480.41
15,500
CY $12.02 $186,310.00
3,172
CY $33.52 $106,325.44
TON $7,192.12 $100,689.68
HR $2,438.06 $170,664.20
$563,989.32
$35,275,469.73
175,950 CY $13.77 $2,422,831.50
$2,422,831.50
$37,698,301.23
335,700 CY 4.85 $1,628,145.00
$1,628,145.00
$39,326,446.23
Standby Time for Jacinto Port Dock A and CARE
Docks, Sections 15 thru 17
TOTAL OPTION NO. 3
TOTAL SCHEDULE NO.1 & OPTION NO. 1,2 & 3
OPTION NO. 4
Dredging of HSC Jacinto Port to Boggy Bayou, Sections
13-14
TOTAL SCHEDULE NO. 1
TOTAL OPTION NO. 1
OPTION NO. 2
Dredging for HSC Boggy Bayou to Greens and Greens
Bayou, Sections 18-21
Dredging of Barbours Flare, Sections 22
ITEM
NO. DESCRIPTION
Dredging of Jacinto Port, Sections 12
Pipeline Management
Mobilization and Demobilization
Site Management for Alexander Island PA and Lost
Lake PA
Dredging of HSC Exxon to Jacinto Port, Sections 6-11
TOTAL SCHEDULE NO.1 & OPTION NO.1
Dredging of CARE Docks, Sections 16-17
OPTION NO. 1
TOTAL OPTION NO. 2
TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2
OPTION NO. 3
ABSTRACT OF OFFERS
Solicitation No.: W912HY25B0011 Date Issued: 09 May 2025 Date Opened: 02 July 2025
Issuing Office: USACE-Galveston
Project Title: Unrestricted Procurement For FY 25 USACE Galveston District, Houston Ship Channel Morgan's Point to Boggy Bayou Harris and
Chambers County , Texas
Number of Amendments Issued: 4
Government Estimate (Without Profit)
QUANTITY
Dredging of HSC Morgans to Exxon, Sections 1-5
SCHEDULE NO. 1
Debris Removal for Jacinto Port Dock A and CARE
Docks, Sections 15 thru 17
Dredging of Jacinto Port Dock A, Sections 15
88,650 CY $11.09 $983,128.5026,480 CY $0.00 $0.00
$983,128.50
$40,309,574.73
177,300 CY $13.62 $2,414,826.00
$2,414,826.00
$42,724,400.73
211,000 CY $10.19 $2,150,090.00
6 TON $13,205.23 $79,231.38
105 HR $2,438.06 $255,996.30
$2,485,317.68
$45,209,718.41
TOTAL OPTION NO. 5
I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED IN RESPONSE TO THIS
SOLICITATION.
0014 Dredging of Barbours Cut, Sections 23
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3 &4
OPTION NO. 5
Dredging of Barbours TB, Sections 24
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4 &5
TOTAL OPTION NO. 4
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5
& 6
CONTRACTING OFFICER
Curtis Cole, Jr.
* The apparent low bidder, Curtin Maritime Corp is 27.91% below the Government's Estimate.
OPTION NO. 6
Dredging of Barbour's Channel Docks, Sections 25-27
Debris Removal for Barbour's Channel Docks, Sections
25 thru 27
Standby Time for Barbour's Channel Docks, Sections 25 thru 27
TOTAL OPTION NO. 6
1 JOB $6,518,105.96 $6,518,105.96
1 JOB $0.00 $0.00
1,282,950 CY $4.99 $6,401,920.50
2,493,900 CY $5.00 $12,469,500.00
85,997 CY $5.00 $429,985.00
317,700 CY $4.99 $1,585,323.00
1 JOB $0.00 $0.00
$27,404,834.46
15,500
CY $5.66 $87,730.00
3,172
CY $5.65 $17,921.80
TON $2,500.00 $35,000.00
HR $0.00 $0.00
$140,651.80
$27,545,486.26
175,950 CY $5.00 $879,750.00
$879,750.00
$28,425,236.26
335,700 CY 4.85 $1,628,145.00
$1,628,145.00
$30,053,381.26
Dredging of HSC Jacinto Port to Boggy Bayou, Sections
13-14
OPTION NO. 3
TOTAL SCHEDULE NO.1 & OPTION NO.1
Dredging for HSC Boggy Bayou to Greens and Greens
Bayou, Sections 18-21
TOTAL OPTION NO. 3
TOTAL SCHEDULE NO.1 & OPTION NO. 1,2 & 3
OPTION NO. 4
OPTION NO. 2
Dredging of Barbours Flare, Sections 22
TOTAL OPTION NO. 2
TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2
Debris Removal for Jacinto Port Dock A and CARE
Docks, Sections 15 thru 17
Standby Time for Jacinto Port Dock A and CARE
Docks, Sections 15 thru 17
TOTAL OPTION NO. 1
OPTION NO. 1
Dredging of CARE Docks, Sections 16-17
Dredging of Jacinto Port Dock A, Sections 15
QUANTITY
Issuing Office: USACE-Galveston
ABSTRACT OF OFFERS (CONT'D)
Business Size: other than small
ITEM SCHEDULE NO. 1
Offeror 1: CURTIN MARINE CORP.
Project Title: Unrestricted Procurement For FY 25 USACE Galveston District, Houston Ship Channel Morgan's Point to Boggy Bayou Harris and
Chambers County , Texas
Solicitation No.: W912HY25B0011 Date Issued: 09 MAY 2025 Date Opened: 02 JUL 2025
Pipeline Management
Site Management for Alexander Island PA and Lost
Lake PA
Dredging of HSC Morgans to Exxon, Sections 1-5
Dredging of HSC Exxon to Jacinto Port, Sections 6-11
Dredging of Jacinto Port, Sections 12
NO. DESCRIPTION
Mobilization and Demobilization
TOTAL SCHEDULE NO. 1
88,650 CY $5.00 $443,250.00
$443,250.00
$30,496,631.26
177,300 CY $4.99 $884,727.00
$884,727.00
$31,381,358.26
211,000 CY $5.66 $1,194,260.00
6 TON $2,500.00 $15,000.00
105 HR $0.00 $0.00
$1,209,260.00
$32,590,618.26
UNIT
1 JOB $4,000,000.00 $4,000,000.00
1 JOB $2,750,000.00 $2,750,000.00
1,282,950 CY $6.25 $8,018,437.50
2,493,900 CY $4.00 $9,975,600.00
85,997 CY $6.00 $515,982.00
317,700 CY $15.40 $4,892,580.00
1 JOB $180,000.00 $180,000.00
$30,332,599.50
15,500
CY $17.60 $272,800.00
3,172
CY $19.80 $62,805.60
Dredging of Jacinto Port Dock A, Sections 15
OPTION NO. 1
Dredging of CARE Docks, Sections 16-17
Dredging of HSC Jacinto Port to Boggy Bayou, Sections
13-14
Site Management for Alexander Island PA and Lost
Lake PA
Dredging of HSC Morgans to Exxon, Sections 1-5
Dredging of HSC Exxon to Jacinto Port, Sections 6-11
Dredging of Jacinto Port, Sections 12
TOTAL OPTION NO. 4
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3 &4
Mobilization and Demobilization
TOTAL OPTION NO. 5
0015 Dredging of Barbours TB, Sections 24
Business Size: other than small
Pipeline Management
ITEM
Dredging of Barbours Cut, Sections 23
OPTION NO. 5
Standby Time for Barbour's Channel Docks, Sections 25 thru 27
Debris Removal for Barbour's Channel Docks, Sections
25 thru 27
0016 Dredging of Barbour's Channel Docks, Sections 25-27
OPTION NO. 6
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4 &5
ABSTRACT OF OFFERS (CONT'D)
TOTAL OPTION NO. 6
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5
& 6
SCHEDULE NO. 1
TOTAL SCHEDULE NO. 1
Solicitation No.: W912HY25B0011 Date Issued: 09 MAY 2025 Date Opened: 02 JUL 2025
Issuing Office: USACE-Galveston
Project Title: Unrestricted Procurement For FY 25 USACE Galveston District, Houston Ship Channel Morgan's Point to Boggy Bayou Harris and
Chambers County , Texas
Offeror 2: ORION MARINE CONSTRUCTION, INC
TON $4,000.00 $56,000.00
HR $2,900.00 $203,000.00
$594,605.60
$30,927,205.10
175,950 CY $18.00 $3,167,100.00
$3,167,100.00
$34,094,305.10
335,700 CY 5.50 $1,846,350.00
$1,846,350.00
$35,940,655.10
88,650 CY $5.50 $487,575.00
$487,575.00
$36,428,230.10
177,300 CY $5.50 $975,150.00
$975,150.00
$37,403,380.10
211,000 CY $18.30 $3,861,300.00
6 TON $4,000.00 $24,000.00
105 HR $2,900.00 $304,500.00
$4,189,800.00
$41,593,180.10
Standby Time for Jacinto Port Dock A and CARE
Docks, Sections 15 thru 17
Dredging for HSC Boggy Bayou to Greens and Greens
Bayou, Sections 18-21
Dredging of Barbours Cut, Sections 23
Debris Removal for Jacinto Port Dock A and CARE
Docks, Sections 15 thru 17
TOTAL SCHEDULE NO.1 & OPTION NO.1
TOTAL SCHEDULE NO.1 & OPTION NO. 1& 2
OPTION NO. 2
TOTAL OPTION NO. 1
OPTION NO. 3
0013 Dredging of Barbours Flare, Sections 22
0015 Dredging of Barbours TB, Sections 24
TOTAL OPTION NO. 2
OPTION NO. 5
TOTAL OPTION NO. 3
TOTAL SCHEDULE NO.1 & OPTION NO. 1,2 & 3
OPTION NO. 4
TOTAL OPTION NO. 4
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3 &4
TOTAL OPTION NO. 5
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4 &5
OPTION NO. 6
0016 Dredging of Barbour's Channel Docks, Sections 25-27
Debris Removal for Barbour's Channel Docks, Sections
25 thru 27
Standby Time for Barbour's Channel Docks, Sections 25 thru 27
TOTAL OPTION NO. 6
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5
& 6
1 JOB $11,250,000.00 $11,250,000.00
1 JOB $750,000.00 $750,000.00
1,282,950 CY $15.00 $19,244,250.00
2,493,900 CY $13.00 $32,420,700.00
85,997 CY $20.00 $1,719,940.00
317,700 CY $22.50 $7,148,250.00
1 JOB $250,000.00 $250,000.00
$72,783,140.00
15,500
CY $20.00 $310,000.00
3,172
CY $100.00 $317,200.00
TON $1,500.00 $21,000.00
HR $10,000.00 $700,000.00
$1,348,200.00
$74,131,340.00
175,950 CY $30.00 $5,278,500.00
$5,278,500.00
$79,409,840.00
335,700 CY 10.00 $3,357,000.00
$3,357,000.00
$82,766,840.00
Dredging of Jacinto Port Dock A, Sections 15
TOTAL OPTION NO. 1
Debris Removal for Jacinto Port Dock A and CARE
Docks, Sections 15 thru 17
Dredging of Jacinto Port, Sections 12
Dredging of HSC Morgans to Exxon, Sections 1-5
Dredging of HSC Exxon to Jacinto Port, Sections 6-11
Project Title: Unrestricted Procurement For FY 25 USACE Galveston District, Houston Ship Channel Morgan's Point to Boggy Bayou Harris and
Chambers County , Texas
Offeror 3: WEEKS MARINE, INC
QUANTITY
0002 Pipeline Management
Mobilization and Demobilization
Dredging for HSC Boggy Bayou to Greens and Greens
Bayou, Sections 18-21
OPTION NO. 3
DESCRIPTION
Business Size: OTHER THAN SMALL
ABSTRACT OF OFFERS (CONT'D)
Solicitation No.: W912HY25B0011 Date Issued: 09 MAY 2025 Date Opened: 02 JUL 2025
Issuing Office: USACE-Galveston
TOTAL SCHEDULE NO. 1
OPTION NO. 2
NO.
Site Management for Alexander Island PA and Lost
Lake PA
Dredging of CARE Docks, Sections 16-17
OPTION NO. 1
ITEM SCHEDULE NO. 1
Dredging of HSC Jacinto Port to Boggy Bayou, Sections
13-14
TOTAL OPTION NO. 3
0013 Dredging of Barbours Flare, Sections 22
TOTAL SCHEDULE NO.1 & OPTION NO. 1& 2
TOTAL OPTION NO. 2
TOTAL SCHEDULE NO.1 & OPTION NO.1
Standby Time for Jacinto Port Dock A and CARE
Docks, Sections 15 thru 17
TOTAL SCHEDULE NO.1 & OPTION NO. 1,2 & 3
88,650 CY $20.00 $1,773,000.00
$1,773,000.00
$84,539,840.00
177,300 CY $30.00 $5,319,000.00
$5,319,000.00
$89,858,840.00
211,000 CY $20.00 $4,220,000.00
6 TON $1,500.00 $9,000.00
105 HR $10,000.00 $1,050,000.00
$5,279,000.00
$95,137,840.00
UNIT
1 JOB $12,360,000.00 $12,360,000.00
1 JOB $19,630,000.00 $19,630,000.00
1,282,950 CY $18.00 $23,093,100.00
2,493,900 CY $21.00 $52,371,900.00
85,997 CY $40.00 $3,439,880.00
317,700 CY $39.00 $12,390,300.00
1 JOB $1,000,000.00 $1,000,000.00
$124,285,180.00
OPTION NO. 1
TOTAL SCHEDULE NO. 1
Site Management for Alexander Island PA and Lost
Lake PA
Dredging of HSC Morgans to Exxon, Sections 1-5
Solicitation No.: W912HY25B0011 Date Issued: 09 MAY 2025 Date Opened: 02 JUL 2025
Issuing Office: USACE-Galveston
Project Title: Unrestricted Procurement For FY 25 USACE Galveston District, Houston Ship Channel Morgan's Point to Boggy Bayou Harris and
Chambers County , Texas
Offeror 4: CALLAN MARINE, LTD
Business Size: OTHER THAN SMALL
ITEM
SCHEDULE NO. 1
Mobilization and Demobilization
Pipeline Management
OPTION NO. 4
0014 Dredging of Barbours Cut, Sections 23
TOTAL OPTION NO. 4
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3 &4
OPTION NO. 5
0015 Dredging of Barbours TB, Sections 24
TOTAL OPTION NO. 5
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4 &5
OPTION NO. 6
0016 Dredging of Barbour's Channel Docks, Sections 25-27
Debris Removal for Barbour's Channel Docks, Sections
25 thru 27
Standby Time for Barbour's Channel Docks, Sections 25 thru 27
TOTAL OPTION NO. 6
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5
& 6
Dredging of HSC Exxon to Jacinto Port, Sections 6-11
Dredging of Jacinto Port, Sections 12
Dredging of HSC Jacinto Port to Boggy Bayou, Sections
13-14
ABSTRACT OF OFFERS (CONT'D)
15,500
CY $43.00 $666,500.00
3,172
CY $138.00 $437,736.00
TON $35,000.00 $490,000.00
HR $5,000.00 $350,000.00
$1,944,236.00
$126,229,416.00
175,950 CY $52.00 $9,149,400.00
$9,149,400.00
$135,378,816.00
335,700 CY 19.00 $6,378,300.00
$6,378,300.00
$141,757,116.00
88,650 CY $22.00 $1,950,300.00
$1,950,300.00
$143,707,416.00
177,300 CY $28.00 $4,964,400.00
$4,964,400.00
$148,671,816.00
211,000 CY $24.00 $5,064,000.00
6 TON $35,000.00 $210,000.00
105 HR $5,000.00 $525,000.00
$5,799,000.00
$154,470,816.00
TOTAL OPTION NO. 3
TOTAL SCHEDULE NO.1 & OPTION NO. 1,2 & 3
TOTAL OPTION NO. 2
TOTAL SCHEDULE NO.1 & OPTION NO. 1& 2
OPTION NO. 3
Dredging for HSC Boggy Bayou to Greens and Greens
Bayou, Sections 18-21
Dredging of Jacinto Port Dock A, Sections 15
Dredging of CARE Docks, Sections 16-17
Debris Removal for Jacinto Port Dock A and CARE
Docks, Sections 15 thru 17
Standby Time for Jacinto Port Dock A and CARE
Docks, Sections 15 thru 17
TOTAL SCHEDULE NO.1 & OPTION NO.1
TOTAL OPTION NO. 1
OPTION NO. 2
Dredging of Barbours Flare, Sections 22
OPTION NO. 4
0014 Dredging of Barbours Cut, Sections 23
TOTAL OPTION NO. 4
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3 &4
OPTION NO. 5
0015 Dredging of Barbours TB, Sections 24
TOTAL OPTION NO. 5
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4 &5
OPTION NO. 6
0016 Dredging of Barbour's Channel Docks, Sections 25-27
Debris Removal for Barbour's Channel Docks, Sections
25 thru 27
Standby Time for Barbour's Channel Docks, Sections 25 thru 27
TOTAL OPTION NO. 6
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5
& 6
Solicitation No.: W912HY25B0011 Date Issued: 09 MAY 2025 Date Opened: 02 JUL 2025
1 JOB $5,000,000.00 $5,000,000.00
1 JOB $2,500,000.00 $2,500,000.00
1,282,950 CY $5.70 $7,312,815.00
2,493,900 CY $4.70 $11,721,330.00
85,997 CY $13.10 $1,126,560.70
317,700 CY $13.10 $4,161,870.00
1 JOB $166,647.10 $166,647.10
$31,989,222.80
15,500 CY $16.10 $249,550.00
3,172 CY $16.10 $51,069.20
TON $1,150.00 $16,100.00
HR $2,850.00 $199,500.00
$516,219.20
$32,505,442.00
175,950 CY $14.10 $2,480,895.00
$2,480,895.00
$34,986,337.00
335,700 CY 5.40 $1,812,780.00
$1,812,780.00
$36,799,117.00
88,650 CY $9.40 $833,310.00
$833,310.00
Issuing Office: USACE-Galveston
Project Title: Unrestricted Procurement For FY 25 USACE Galveston District, Houston Ship Channel Morgan's Point to Boggy Bayou Harris and
Chambers County , Texas
Offeror 5: INLAND DREDGINF COMPANY, LLC
Business Size: OTHER THAN SMALL
ITEM
SCHEDULE NO. 1
0001 Mobilization and Demobilization
0002 Pipeline Management
Site Management for Alexander Island PA and Lost
Lake PA
0003 Dredging of HSC Morgans to Exxon, Sections 1-5
0004 Dredging of HSC Exxon to Jacinto Port, Sections 6-11
0005 Dredging of Jacinto Port, Sections 12
Dredging of HSC Jacinto Port to Boggy Bayou, Sections
13-14
TOTAL SCHEDULE NO. 1
OPTION NO. 1
0008 Dredging of Jacinto Port Dock A, Sections 15
0009 Dredging of CARE Docks, Sections 16-17
Debris Removal for Jacinto Port Dock A and CARE
Docks, Sections 15 thru 17
Standby Time for Jacinto Port Dock A and CARE
Docks, Sections 15 thru 17
TOTAL OPTION NO. 1
TOTAL SCHEDULE NO.1 & OPTION NO.1
OPTION NO. 2
Dredging for HSC Boggy Bayou to Greens and Greens
Bayou, Sections 18-21
TOTAL OPTION NO. 2
TOTAL SCHEDULE NO.1 & OPTION NO. 1& 2
OPTION NO. 3
0013 Dredging of Barbours Flare, Sections 22
TOTAL OPTION NO. 3
TOTAL SCHEDULE NO.1 & OPTION NO. 1,2 & 3
OPTION NO. 4
0014 Dredging of Barbours Cut, Sections 23
TOTAL OPTION NO. 4
$37,632,427.00
177,300 CY $15.10 $2,677,230.00
$2,677,230.00
$40,309,657.00
211,000 CY $15.60 $3,291,600.00
6 TON $1,150.00 $6,900.00
105 HR $2,850.00 $299,250.00
$3,597,750.00
$43,907,407.00
UNIT
1 JOB $12,125,000.00 $12,125,000.00
1 JOB $50,000.00 $50,000.00
1,282,950 CY $12.20 $15,651,990.00
2,493,900 CY $8.90 $22,195,710.00
85,997 CY $14.00 $1,203,958.00
317,700 CY $13.75 $4,368,375.00
1 JOB $35,000.00 $35,000.00
$55,630,033.00
15,500 CY $17.00 $263,500.00
3,172 CY $17.00 $53,924.00
TON $1,550.00 $21,700.00
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3 &4
OPTION NO. 5
0015 Dredging of Barbours TB, Sections 24
TOTAL OPTION NO. 5
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4 &5
OPTION NO. 6
0016 Dredging of Barbour's Channel Docks, Sections 25-27
Debris Removal for Barbour's Channel Docks, Sections
25 thru 27
Standby Time for Barbour's Channel Docks, Sections 25 thru 27
TOTAL OPTION NO. 6
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5
& 6
Solicitation No.: W912HY25B0011 Date Issued: 09 MAY 2025 Date Opened: 02 JUL 2025
Issuing Office: USACE-Galveston
Project Title: Unrestricted Procurement For FY 25 USACE Galveston District, Houston Ship Channel Morgan's Point to Boggy Bayou Harris and
Chambers County , Texas
Offeror 6: GREAT LAKES DREDGE & DOCK COMPANY, LLC
Business Size: OTHER THAN SMALL
ITEM SCHEDULE NO. 1
0001 Mobilization and Demobilization
0002 Pipeline Management
Site Management for Alexander Island PA and Lost
Lake PA
0003 Dredging of HSC Morgans to Exxon, Sections 1-5
0004 Dredging of HSC Exxon to Jacinto Port, Sections 6-11
0005 Dredging of Jacinto Port, Sections 12
Dredging of HSC Jacinto Port to Boggy Bayou, Sections
13-14
TOTAL SCHEDULE NO. 1
OPTION NO. 1
0008 Dredging of Jacinto Port Dock A, Sections 15
0009 Dredging of CARE Docks, Sections 16-17
Debris Removal for Jacinto Port Dock A and CARE
Docks, Sections 15 thru 17
HR $3,000.00 $210,000.00
$549,124.00
$56,179,157.00
175,950 CY $14.80 $2,604,060.00
$2,604,060.00
$58,783,217.00
335,700 CY 8.75 $2,937,375.00
$2,937,375.00
$61,720,592.00
88,650 CY $13.00 $1,152,450.00
$1,152,450.00
$62,873,042.00
177,300 CY $16.00 $2,836,800.00
$2,836,800.00
$65,709,842.00
211,000 CY $16.25 $3,428,750.00
6 TON $1,550.00 $9,300.00
105 HR $3,000.00 $315,000.00
$3,753,050.00
$69,462,892.00
Standby Time for Jacinto Port Dock A and CARE
Docks, Sections 15 thru 17
TOTAL OPTION NO. 1
TOTAL SCHEDULE NO.1 & OPTION NO.1
OPTION NO. 2
Dredging for HSC Boggy Bayou to Greens and Greens
Bayou, Sections 18-21
TOTAL OPTION NO. 2
TOTAL SCHEDULE NO.1 & OPTION NO. 1& 2
OPTION NO. 3
0013 Dredging of Barbours Flare, Sections 22
TOTAL OPTION NO. 3
TOTAL SCHEDULE NO.1 & OPTION NO. 1,2 & 3
OPTION NO. 4
0014 Dredging of Barbours Cut, Sections 23
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4 &5
TOTAL OPTION NO. 4
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3 &4
OPTION NO. 5
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5
& 6
OPTION NO. 6
0016 Dredging of Barbour's Channel Docks, Sections 25-27
Debris Removal for Barbour's Channel Docks, Sections
25 thru 27
Standby Time for Barbour's Channel Docks, Sections 25 thru 27
TOTAL OPTION NO. 6
0015 Dredging of Barbours TB, Sections 24
TOTAL OPTION NO. 5
| Abstract_25B0011_ FORM 1419_02JUL2025.pdf |
| Revised Bid Abstract Boggy Bayou 28JUL2025.pdf |
| 2025-07-09T15:57:25-0500 | |
| COLE.CURTIS.JR.1231025746 |
| 2025-07-09T15:58:25-0500 | |
| COLE.CURTIS.JR.1231025746 |
File details come from the government source that posted it. Updated .