This Abstract of Offers document details the bid responses for Solicitation No. W912HY25B0006 for the Houston Ship Channel, Segment 4 Beltway 8 Placement Area project in Harris County, Texas. The solicitation was issued by the USACE Galveston District on 12 Feb 2025, with bids opened on 26 Mar 2025, and received eight small business offers. The project involves multiple construction elements including mobilization, access control gates, clearing and grubbing, drainage infrastructure, geotechnical testing, temporary road construction, UXO support, and various earthwork and environmental mitigation tasks.

The Government Estimate for the total project was $25,387,283.90, with the apparent low bidder EVCO Development LLC submitting a bid that was 53.91% lower at $11,702,252.87. The bid includes line items for tasks such as perimeter dikes, aggregate surfacing, geotextile/geogrid installation, riprap, outfall channel work, and rock filter dam construction. Other bidders included Five-S Group LLC, MCOE JV, Miami Marine Services LLC, RLB Contracting, Texas Dewatering, AAA Valley Gravel LLC, and Affolter Contracting Company, with total bid amounts ranging from approximately $11.7 million to $61.6 million.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIT ESTIMATED

PRICE AMOUNT

1 JOB 1,734,100.00$ 1,734,100.00$

1 JOB 34,500.00$ 34,500.00$

1 JOB 1,680,300.00$ 1,680,300.00$

1 JOB 845,600.00$ 845,600.00$

1 JOB 198,500.00$ 198,500.00$

1 JOB 878,900.00$ 878,900.00$

1 JOB $ 498,600.00 498,600.00$

1 JOB 266,300.00$ 266,300.00$

1 JOB 10,293,400.00$ 10,293,400.00$

1 JOB 35,400.00$ 35,400.00$

1 JOB 306,800.00$ 306,800.00$

1 JOB 210,000.00$ 210,000.00$

1 JOB 539,300.00$ 539,300.00$

60 LF 110.72$ 6,643.20$

275,300 CY 19.83$ 5,459,199.00$

22,250 CY 12.48$ 277,680.00$

1,820 TN 85.33$ 155,300.60$

17,800 SQ YD 10.87$ 193,486.00$

10,170 TN 161.71$ 1,644,590.70$

1,500 CY 33.45$ 50,175.00$

1,020 LF 76.97$ 78,509.40$

25,387,283.90$

25,387,283.90$

UNIT ESTIMATED

PRICE AMOUNT

1 JOB 1,310,466.70$ 1,310,466.70$

1 JOB 18,869.40$ 18,869.40$

1 JOB 194,311.50$ 194,311.50$

1 JOB 1,680,000.00$ 1,680,000.00$

1 JOB 112,240.00$ 112,240.00$

1 JOB 907,197.60$ 907,197.60$

1 JOB 51,480.00$ 51,480.00$

1 JOB 276,583.27$ 276,583.27$

TOTAL SCHEDULE 1

0008 UXO Construction Support

Two Access Control Gates Clearing and Grubbing

0004 Drop Outlet Structure and Discharge Piping 0005 Geotechnical Construction Testing 0006 Temporary Access Road 0007 Temporary Access Road Incidentals/Flagging

ITEM

NO.

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED TO THIS

SOLICITATION.

Jeremy S. Babb Contracting Officer

Solicitation No.: W912HY25B0006 Date Issued: 12 Feb 2025 Date Opened: 26 Mar 2025

*The apparent low bidder, EVCO Development LLC is 53.91% lower than the Government Estimate.

ABSTRACT OF OFFERS

Solicitation No.: W912HY25B0006 Date Issued: 12 Feb 2025 Date Opened: 26 Mar 2025 Issuing Office: USAED- Galveston

Project Title: Houston Ship Channel, Segment 4 Beltway 8 Placement Area, Harris County, Texas

Number of Amendments Issued: 4 GOVERNMENT ESTIMATE (Without Profit)

NO.

ESTIMATED

DESCRIPTION QUANTITY

ITEM

Two Access Control Gates

Clearing and Grubbing

0007 Temporary Access Road Incidentals/Flagging 0008 UXO Construction Support

Mobilization and Demoblization

TOTAL SCHEDULE 1

0004 Drop Outlet Structure and Discharge Piping 0005 Geotechnical Construction Testing 0006 Temporary Access Road

0009 Realigned Drainage Channel Pipes 0010 Dike Access Ramps 0011 Hydroseeding 0012 Demolition and Disposal 0013 Topsoil Strip, Stockpile, and Grade 0014 Security Fence

Perimeter Dikes 0016 Perimeter Ditching 0017 Aggregate Surfacing 0018 Geotextile / Geogrid 0019 Riprap 0020 Outfall Channel 0021 Rock Filter Dams-Perimeter Drainage

DESCRIPTION

Mobilization and Demoblization

Issuing Office: USAED-Galveston Offeror #1 : Evco Development LLC - Carencro, LA Business Size: Small Business

ESTIMATED

QUANTITY

1 JOB 2,095,650.50$ 2,095,650.50$

1 JOB 25,200.00$ 25,200.00$

1 JOB 152,685.00$ 152,685.00$

1 JOB 7,091.60$ 7,091.60$

1 JOB 149,760.00$ 149,760.00$

60 LF 857.79$ 51,467.40$

275,300 CY 8.52$ 2,345,556.00$

22,250 CY 6.83$ 151,967.50$

1,820 TN 71.41$ 129,966.20$

17,800 SQ YD 14.53$ 258,634.00$

10,170 TN 154.66$ 1,572,892.20$

1,500 CY 40.91$ 61,365.00$

1,020 LF 145.95$ 148,869.00$

11,702,252.87$

UNIT ESTIMATED

PRICE AMOUNT

1 JOB 560,000.00$ 560,000.00$

1 JOB 13,000.00$ 13,000.00$

1 JOB 100,000.00$ 100,000.00$

1 JOB 1,600,000.00$ 1,600,000.00$

1 JOB 325,000.00$ 325,000.00$

1 JOB 260,000.00$ 260,000.00$

1 JOB 42,000.00$ 42,000.00$

1 JOB 375,000.00$ 375,000.00$

1 JOB 4,350,000.00$ 4,350,000.00$

1 JOB 72,500.00$ 72,500.00$

1 JOB 180,000.00$ 180,000.00$

1 JOB 45,000.00$ 45,000.00$

1 JOB 430,000.00$ 430,000.00$

60 LF 167.00$ 10,020.00$

275,300 CY 33.25$ 9,153,725.00$

22,250 CY 8.50$ 189,125.00$

1,820 TN 71.50$ 130,130.00$

17,800 SQ YD 11.00$ 195,800.00$

10,170 TN 90.00$ 915,300.00$

1,500 CY 10.00$ 15,000.00$

1,020 LF 46.00$ 46,920.00$

19,008,520.00$

UNIT ESTIMATED

PRICE AMOUNT

1 JOB 2,050,400.00$ 2,050,400.00$

1 JOB 11,380.00$ 11,380.00$

1 JOB 25,890.00$ 25,890.00$

1 JOB 1,429,700.00$ 1,429,700.00$

1 JOB 225,700.00$ 225,700.00$

1 JOB 618,200.00$ 618,200.00$

1 JOB 363,900.00$ 363,900.00$

1 JOB 149,100.00$ 149,100.00$

1 JOB 4,187,800.00$ 4,187,800.00$

1 JOB 9,410.00$ 9,410.00$

1 JOB 533,500.00$ 533,500.00$

1 JOB 57,890.00$ 57,890.00$

1 JOB 312,900.00$ 312,900.00$

60 LF 139.00$ 8,340.00$

275,300 CY 15.70$ 4,322,210.00$

22,250 CY 7.35$ 163,537.50$

1,820 TN 85.00$ 154,700.00$

17,800 SQ YD 12.10$ 215,380.00$

10,170 TN 153.00$ 1,556,010.00$

1,500 CY 4.60$ 6,900.00$

0018 Geotextile / Geogrid 0019 Riprap 0020 Outfall Channel

0013 Topsoil Strip, Stockpile, and Grade 0014 Security Fence 0015 Perimeter Dikes 0016 Perimeter Ditching 0017 Aggregate Surfacing

0008 UXO Construction Support 0009 Realigned Drainage Channel Pipes 0010 Dike Access Ramps 0011 Hydroseeding 0012 Demolition and Disposal

NO. DESCRIPTION

0001 Mobilization and Demoblization

Business Size: Small Business

ESTIMATED

QUANTITY

0007 Temporary Access Road Incidentals/Flagging

0002 Two Access Control Gates 0003 Clearing and Grubbing 0004 Drop Outlet Structure and Discharge Piping 0005 Geotechnical Construction Testing 0006 Temporary Access Road

0021 Rock Filter Dams-Perimeter Drainage

TOTAL SCHEDULE 1

Issuing Office: USAED-Galveston Offeror #3 : MCOE JV - Navato, CA

ITEM

Solicitation No.: W912HY25B0006 Date Issued: 12 Feb 2025 Date Opened: 26 Mar 2025

0016 Perimeter Ditching 0017 Aggregate Surfacing 0018 Geotextile / Geogrid 0019 Riprap 0020 Outfall Channel

0011 Hydroseeding 0012 Demolition and Disposal 0013 Topsoil Strip, Stockpile, and Grade 0014 Security Fence 0015 Perimeter Dikes

0006 Temporary Access Road 0007 Temporary Access Road Incidentals/Flagging 0008 UXO Construction Support 0009 Realigned Drainage Channel Pipes 0010 Dike Access Ramps

0001 Mobilization and Demoblization 0002 Two Access Control Gates 0003 Clearing and Grubbing 0004 Drop Outlet Structure and Discharge Piping 0005 Geotechnical Construction Testing

TOTAL SCHEDULE 1

0019 Riprap Geotextile / Geogrid

ITEM

NO. DESCRIPTION

0020 Outfall Channel 0021 Rock Filter Dams-Perimeter Drainage

QUANTITY

Topsoil Strip, Stockpile, and Grade Security Fence

0015 Perimeter Dikes 0016 Perimeter Ditching

0009 Realigned Drainage Channel Pipes

Hydroseeding

Solicitation No.: W912HY25B0006 Date Issued: 12 Feb 2025 Date Opened: 26 Mar 2025 Issuing Office: USAED-Galveston Offeror #2 : Five-S Group, LLC - Baton Rouge, LA Business Size: Small Business

ESTIMATED

Aggregate Surfacing

Demolition and Disposal

0010 Dike Access Ramps

1,020 LF 105.00$ 107,100.00$

16,509,947.50$

UNIT ESTIMATED

PRICE AMOUNT

1 JOB 2,333,821.39$ 2,333,821.39$

1 JOB 126,084.35$ 126,084.35$

1 JOB 1,323,885.72$ 1,323,885.72$

1 JOB 2,836,897.97$ 2,836,897.97$

1 JOB 1,008,674.83$ 1,008,674.83$

1 JOB 2,521,687.08$ 2,521,687.08$

1 JOB 1,891,265.31$ 1,891,265.31$

1 JOB 1,513,012.25$ 1,513,012.25$

1 JOB 6,934,639.48$ 6,934,639.48$

1 JOB 466,512.11$ 466,512.11$

1 JOB 498,033.20$ 498,033.20$

1 JOB 252,168.71$ 252,168.71$

1 JOB 3,152,108.85$ 3,152,108.85$

60 LF 914.11$ 54,846.60$

275,300 CY 102.98$ 28,350,394.00$

22,250 CY 18.26$ 406,285.00$

1,820 TN 214.34$ 390,098.80$

17,800 SQ YD 11.35$ 202,030.00$

10,170 TN 277.38$ 2,820,954.60$

1,500 CY 54.21$ 81,315.00$

1,020 LF 1,071.72$ 1,093,154.40$

58,257,869.65$

UNIT ESTIMATED

PRICE AMOUNT

1 JOB 4,000,000.00$ 4,000,000.00$

1 JOB 170,000.00$ 170,000.00$

1 JOB 2,500,000.00$ 2,500,000.00$

1 JOB 1,500,000.00$ 1,500,000.00$

1 JOB 875,000.00$ 875,000.00$

1 JOB 2,200,000.00$ 2,200,000.00$

1 JOB 400,000.00$ 400,000.00$

1 JOB 2,000,000.00$ 2,000,000.00$

1 JOB 8,000,000.00$ 8,000,000.00$

1 JOB 350,000.00$ 350,000.00$

1 JOB 450,000.00$ 450,000.00$

1 JOB 375,000.00$ 375,000.00$

1 JOB 700,000.00$ 700,000.00$

60 LF 500.00$ 30,000.00$

275,300 CY 26.00$ 7,157,800.00$

22,250 CY 19.00$ 422,750.00$

1,820 TN 175.00$ 318,500.00$

17,800 SQ YD 6.00$ 106,800.00$

10,170 TN 200.00$ 2,034,000.00$

1,500 CY 40.00$ 60,000.00$

1,020 LF 900.00$ 918,000.00$

34,567,850.00$

UNIT ESTIMATED

PRICE AMOUNT

1 JOB 3,000,000.00$ 3,000,000.00$

1 JOB 60,000.00$ 60,000.00$

1 JOB 150,000.00$ 150,000.00$

0019 Riprap 0020 Outfall Channel 0021 Rock Filter Dams-Perimeter Drainage

TOTAL SCHEDULE 1

ITEM

0015 Perimeter Dikes 0016 Perimeter Ditching

0014 Security Fence

0017 Aggregate Surfacing 0018 Geotextile / Geogrid

0001 Mobilization and Demoblization

Business Size: Small Business

ESTIMATED

QUANTITY

0003 Clearing and Grubbing 0004 Drop Outlet Structure and Discharge Piping

0002 Two Access Control Gates

0021 Rock Filter Dams-Perimeter Drainage

TOTAL SCHEDULE 1

Offeror #5 : RLB Contracting, Inc.- Port Lavaca, Texas

ITEM

NO. DESCRIPTION

0016 Perimeter Ditching 0017 Aggregate Surfacing 0018 Geotextile / Geogrid 0019 Riprap 0020 Outfall Channel

0011 Hydroseeding 0012 Demolition and Disposal 0013 Topsoil Strip, Stockpile, and Grade 0014 Security Fence 0015 Perimeter Dikes

Temporary Access Road 0007 Temporary Access Road Incidentals/Flagging 0008 UXO Construction Support 0009 Realigned Drainage Channel Pipes 0010 Dike Access Ramps

0021 Rock Filter Dams-Perimeter Drainage

TOTAL SCHEDULE 1

Solicitation No.: W912HY25B0006 Date Issued: 12 Feb 2025 Date Opened: 26 Mar 2025 Issuing Office: USAED-Galveston Offeror #4 : Miami Marine Services, LLC - Miami, Oklahoma Business Size: Small Business

ESTIMATED

QUANTITY

Solicitation No.: W912HY25B0006 Date Issued: 12 Feb 2025 Date Opened: 26 Mar 2025 Issuing Office: USAED-Galveston

ITEM

NO. DESCRIPTION

0001 Mobilization and Demoblization 0002 Two Access Control Gates 0003 Clearing and Grubbing 0004 Drop Outlet Structure and Discharge Piping 0005 Geotechnical Construction Testing

0010 Dike Access Ramps 0011 Hydroseeding 0012 Demolition and Disposal 0013 Topsoil Strip, Stockpile, and Grade

0005 Geotechnical Construction Testing 0006 Temporary Access Road 0007 Temporary Access Road Incidentals/Flagging 0008 UXO Construction Support 0009 Realigned Drainage Channel Pipes

Solicitation No.: W912HY25B0006 Date Issued: 12 Feb 2025 Date Opened: 26 Mar 2025 Issuing Office: USAED-Galveston Offeror #6 : Texas Dewatering - Bellville, Texas Business Size: Small Business

ESTIMATED

QUANTITYNO. DESCRIPTION

0001 Mobilization and Demoblization 0002 Two Access Control Gates 0003 Clearing and Grubbing

1 JOB 1,200,000.00$ 1,200,000.00$

1 JOB 250,000.00$ 250,000.00$

1 JOB 700,000.00$ 700,000.00$

1 JOB 100,000.00$ 100,000.00$ Mistake

1 JOB 750,000.00$ 750,000.00$

1 JOB 4,300,000.00$ 4,300,000.00$

1 JOB 300,000.00$ 300,000.00$

1 JOB 550,000.00$ 550,000.00$

1 JOB 75,000.00$ 75,000.00$

1 JOB 1,100,000.00$ 1,100,000.00$

60 LF 15,000.00$ 900,000.00$

275,300 CY 2,000,000.00$

22,250 CY 3.50$ 77,875.00$

1,820 TN 84.18$ 153,207.60$

17,800 SQ YD 5.50$ 97,900.00$

10,170 TN 160.00$ 1,627,200.00$

1,500 CY 20.00$ 30,000.00$

1,020 LF 110.00$ 112,200.00$

17,533,382.60$

UNIT ESTIMATED

PRICE AMOUNT

1 JOB 3,700,000.00$ 3,700,000.00$

1 JOB 80,000.00$ 80,000.00$

1 JOB 2,100,000.00$ 2,100,000.00$

1 JOB 2,000,000.00$ 2,000,000.00$

1 JOB 525,500.00$ 525,500.00$

1 JOB 1,400,000.00$ 1,400,000.00$

1 JOB 1,820,000.00$ 1,820,000.00$

1 JOB 1,200,000.00$ 1,200,000.00$

1 JOB 4,000,000.00$ 4,000,000.00$

1 JOB 25,000.00$ 25,000.00$

1 JOB 1,000,000.00$ 1,000,000.00$

1 JOB 154,000.00$ 154,000.00$

1 JOB 11,500,000.00$ 11,500,000.00$

60 LF 55.00$ 3,300.00$

275,300 CY 104.00$ 28,631,200.00$

22,250 CY 40.00$ 890,000.00$

1,820 TN 210.00$ 382,200.00$

17,800 SQ YD 6.00$ 106,800.00$

10,170 TN 172.25$ 1,751,782.50$

1,500 CY 54.00$ 81,000.00$

1,020 LF 289.00$ 294,780.00$

61,645,562.50$

UNIT ESTIMATED

PRICE AMOUNT

1 JOB 2,630,000.00$ 2,630,000.00$

1 JOB 60,000.00$ 60,000.00$

1 JOB 726,000.00$ 726,000.00$

1 JOB 1,590,000.00$ 1,590,000.00$

1 JOB 800,000.00$ 800,000.00$

1 JOB 1,300,000.00$ 1,300,000.00$

1 JOB 985,000.00$ 985,000.00$

1 JOB 1,270,000.00$ 1,270,000.00$

1 JOB 3,850,000.00$ 3,850,000.00$

1 JOB 150,000.00$ 150,000.00$

1 JOB 1,285,000.00$ 1,285,000.00$

1 JOB 100,000.00$ 100,000.00$

1 JOB 495,000.00$ 495,000.00$

60 LF 175.00$ 10,500.00$

275,300 CY 34.75$ 9,566,675.00$

TOTAL SCHEDULE 1

0007 Temporary Access Road Incidentals/Flagging 0008 UXO Construction Support 0009 Realigned Drainage Channel Pipes

0011 Hydroseeding 0012 Demolition and Disposal

0010 Dike Access Ramps

0018 Geotextile / Geogrid 0019 Riprap 0020 Outfall Channel 0021 Rock Filter Dams-Perimeter Drainage

0002 Two Access Control Gates 0003 Clearing and Grubbing 0004 Drop Outlet Structure and Discharge Piping 0005 Geotechnical Construction Testing 0006 Temporary Access Road

TOTAL SCHEDULE 1

Issuing Office: USAED-Galveston Offeror #7 : AAA Valley Gravel, LLC - Anchorage AK

ITEM

NO. DESCRIPTION

0001 Mobilization and Demoblization

Business Size: Small Business

ESTIMATED

QUANTITY

0017 Aggregate Surfacing 0018 Geotextile / Geogrid 0019 Riprap 0020 Outfall Channel 0021 Rock Filter Dams-Perimeter Drainage

0012 Demolition and Disposal 0013 Topsoil Strip, Stockpile, and Grade 0014 Security Fence 0015 Perimeter Dikes 0016 Perimeter Ditching

Temporary Access Road Incidentals/Flagging 0008 UXO Construction Support 0009 Realigned Drainage Channel Pipes 0010 Dike Access Ramps 0011 Hydroseeding

Solicitation No.: W912HY25B0006 Date Issued: 12 Feb 2025 Date Opened: 26 Mar 2025

0004 Drop Outlet Structure and Discharge Piping 0005 Geotechnical Construction Testing 0006 Temporary Access Road

Topsoil Strip, Stockpile, and Grade 0014 Security Fence 0015 Perimeter Dikes 0016 Perimeter Ditching 0017 Aggregate Surfacing

Solicitation No.: W912HY25B0006 Date Issued: 12 Feb 2025 Date Opened: 26 Mar 2025 Issuing Office: USAED-Galveston Offeror #8 : Affolter Contracting Company, Inc. - La Marque, Texas Business Size: Small Business

ITEM ESTIMATED

NO. DESCRIPTION QUANTITY

0001 Mobilization and Demoblization 0002 Two Access Control Gates 0003 Clearing and Grubbing 0004 Drop Outlet Structure and Discharge Piping 0005 Geotechnical Construction Testing 0006 Temporary Access Road 0007 Temporary Access Road Incidentals/Flagging 0008 UXO Construction Support 0009 Realigned Drainage Channel Pipes 0010 Dike Access Ramps 0011 Hydroseeding 0012 Demolition and Disposal 0013 Topsoil Strip, Stockpile, and Grade 0014 Security Fence 0015 Perimeter Dikes

22,250 CY 7.00$ 155,750.00$

1,820 TN 130.00$ 236,600.00$

17,800 SQ YD 7.00$ 124,600.00$

10,170 TN 200.00$ 2,034,000.00$

1,500 CY 6.00$ 9,000.00$

1,020 LF 178.00$ 181,560.00$

27,559,685.00$ 0021 Rock Filter Dams-Perimeter Drainage

TOTAL SCHEDULE 1

0016 Perimeter Ditching 0017 Aggregate Surfacing 0018 Geotextile / Geogrid 0019 Riprap 0020 Outfall Channel

2025-03-27T11:38:46-0500
BABB.JEREMY.S.1176121633

File details come from the government source that posted it. Updated .