C.04_Bid Abstract W912HY24B0021 FINAL_signed.pdf
PDF 466 KB Posted
- Solicitation number
- W912HY24B0021
About this file
This document is an Abstract of Offers for a federal construction solicitation issued by the U.S. Army Corps of Engineers Galveston District. The solicitation is for the FY24 Unrestricted Procurement of the Sabine-Neches Waterway Channel Improvement Project (SNWWCIP) in Jefferson County, Texas. The project includes hopper dredging of the Sabine Extension Channel to Sabine Pass Outer Bar and Jetty Channel. The solicitation was issued on July 29, 2024, with offers opened on September 4, 2024. The apparent low bidder is Great Lakes Dredge & Dock Company LLC at $194,848,680, which is 13.06% above the government estimate. The contract includes base items for dredging, debris removal, surveys, and support items, as well several option items. Key quantities include 3,000,000 CY of new work dredging and 21,934,000 CY of shoaled material dredging across the various sections of the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.08_W912HY24B0021 Amend 0001 081424.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
FY24, Unrestricted Procurement, USACE Galveston District, Sabine-Neches Waterway Channel Improvement Project (SNWWCIP), TX Sabine Extension Channel to Sabine Pass Outer Bar, Jetty Channel, Sabine Pass, Hopper Dredging, in Jefferson County, Texas
Jeremy S. Babb Contracting Officer
3 3
Great Lakes Dredge & Dock Company, LLC.
SEE ATTACHED PAGES
09/04/2024
UNIT
PRICE TOTAL
1 JB SUM $10,252,000.00
1 JB SUM $196,900.00
5 ST $15,100.00 $75,500.00
3,000,000 CY $1.99 $5,970,000.00
1,467,000 CY $1.99 $2,919,330.00
20,685,000 CY $5.80 $119,973,000.00
1 JB SUM $116,000.00
1 JB SUM $1,130,700.00
1 JB SUM $108,000.00
682 DAYS $10,149.00 $6,921,618.00
1 JB SUM $11,200.00
2 EA $30,500.00 $61,000.00
$147,735,248.00
1 JB SUM $16,100.00
700,000 CY $1.63 $1,141,000.00
346,000 CY $1.63 $563,980.00
2,512,000 CY $4.74 $11,906,880.00
1 JB SUM $4,000.00
1 JB SUM $120,200.00
89 DAYS $10,149.00 $903,261.00
$14,655,421.00
$162,390,669.00
1 JB SUM $38,400.00
600,000 CY $2.38 $1,428,000.00
217,000 CY $2.38 $516,460.00
1,871,000 CY $6.40 $11,974,400.00
1 JB SUM $4,000.00
1 JB SUM $90,500.00
67 DAYS $10,149.00 $679,983.00
$14,731,743.00
$177,122,412.00
1 JB SUM $18,100.00
450,000 CY $2.98 $1,341,000.00
TOTAL SCHEDULE NO. 1
TOTAL OPTION NO. 1
0013AA
0012 Pre-Dredge Hazard Survey - Section Nos. 36 thru 39
ABSTRACT OF OFFERS Page 2 of 8
Solicitation No.: W912HY24B0021 Date Issued: 29 Jul 2024 Date Opened: 04 Sep 2024
Issuing Office: USACE-Galveston
Project Title: FY 24 Unrestricted Procurement, Sabine-Neches Waterway Channel Improvement Project (SNWWCIP), TX Sabine Extension Channel to
Sabine Pass Outer Bar, Jetty Channel, Sabine Pass, Hopper Dredging, in Jefferson County, Texas
Number of Amendments Issued: 3
Government Estimate (Without Profit)
QUANTITY
Mobilization and Demobilization - Sea Turtle Trawling and RelocationSea Turtle Trawling & Relocation
Dredging (New Work Material) Section Nos. 40 thru 43, and 45 thru 46
OPTION NO. 2
TOTAL SCHEDULE NO.1 & OPTION NO.1
Dredging (Shoaled Material) - Section Nos. 36 thru 39
OPTION NO. 1
Debris Removal - Section 1 - 5, 7 - 35
TOTAL OPTION NO. 2
TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2
OPTION NO. 3
0025AA
Dredging (Shoaled Material) Section Nos. 40 thru 46
SCHEDULE NO. 1ITEM
0019AA
0018 Pre-Dredge Hazard Survey Sect. 40 - 46
0024 Pre-Dredge Hazard Survey Sect. 47 - 50
NO. DESCRIPTION
Dredging (New Work Material) Section Nos. 1 thru 5, 7 thru 18, 20
0002 Pre-Dredge Hazard Survey Sect 1 - 35
Mobilization and Demobilization
Turtle Deflector Device & ESO
0010 As-Built & Record Drawings
0011 Allowance for Subsurface Investigation (Per Pipeline)
0004AA
Dredging (Shoaled Material) Section Nos. 2 thru 5, 7 thru
ODMS Monitoring Surveys
Dredging (Shoaled Material) Section Nos. 47 thru 50
0015 ODMDS Monitoring Surveys
0016 Turtle Deflector Device & ESO
0017 Sea Turtle Trawling & Relocation
0021 ODMDS Monitoring Surveys
0022 Turtle Deflector Device & ESO
0023 Sea Turtle Trawling & Relocation
Dredging (New Work Material) Section Nos. 36 thru 39
0004AB Dredging (Shoaled Material)
0013BB Dredging (Shoaled Material) - Section Nos. 36 thru 39
0019BB Dredging (Shoaled Material) Section Nos. 40 thru 46
188,000 CY $2.98 $560,240.00
1,847,000 CY $8.17 $15,089,990.00
1 JB SUM $4,000.00
1 JB SUM $83,700.00
62 DAYS $10,149.00 $629,238.00
$17,726,268.00
$194,848,680.00
1 ST SUM $18,400.00
392,000 CY $5.77 $2,261,840.00
1 JB SUM $23,000.00
$2,303,240.00
$197,151,920.00
549,000 CY $6.11 $3,354,390.00
1 JB SUM $33,800.00
$3,388,190.00
$200,540,110.00
299,000 CY $5.73 $1,713,270.00
1 JB SUM $17,600.00
$1,730,870.00
$202,270,980.00
220,000 CY $5.83 $1,282,600.00
1 JB SUM $13,500.00
$1,296,100.00
$203,567,080.00
44,000 CY $6.67 $293,480.00
1 JB SUM $4,100.00
$297,580.00
$203,864,660.00
487,000 CY $8.55 $4,163,850.00
1 JB SUM $43,200.00
$4,207,050.00
$208,071,710.00
0032 Turtle Deflector Device & ESO
TOTAL OPTION NO. 4
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4 &
* The apparent low bidder, Great Lakes Dredge & Dock Company LLC., is 13.06% above the Government's Estimate.
Dredging (New Work Material) Section Nos. 47, 48, and
0027 ODMDS Monitoring Surveys
TOTAL OPTION NO. 3
TOTAL SCHEDULE NO.1 & OPTION NO. 1,2 & 3
OPTION NO. 4
0030 Debris Removal - Section No. 6
0031 Dredging (New Work Material) Section No. 6
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3 & 4
OPTION NO. 5
0033 Dredging (New Work Material) Section No. 19
OPTION NO. 8
0039 Dredging (New Work Material) Section No. 44
0040 Turtle Deflector Device & ESO
TOTAL OPTION NO. 6
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5
&6
OPTION NO. 7
0037 Dredging (New Work Material) Section No. 32
0038 Turtle Deflector Device & ESO
Turtle Deflector Device & ESO
0029 Sea Turtle Trawling & Relocation
OPTION NO. 6
0035 Dredging (New Work Material) Section No. 25
0036 Turtle Deflector Device & ESO
Turtle Deflector Device & ESO
TOTAL OPTION NO. 5
TOTAL OPTION NO. 9
TOTAL SCHEDULE NO.1 & OPTION
NO.1,2,3,4,5,6,7,8 & 9
0025BB Dredging (Shoaled Material) Section Nos. 47 thru 50
TOTAL OPTION NO. 8
TOTAL SCHEDULE NO.1 & OPTION
NO.1,2,3,4,5,6,7 & 8
OPTION NO. 9
0041 Dredging (New Work Material) Section No. 49
0042 Turtle Deflector Device & ESO
TOTAL OPTION NO. 7
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5,6
& 7
Jeremy Babb
CONTRACTING OFFICER
I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED IN RESPONSE TO THIS
SOLICITATION.
1 JB SUM $9,250,000.00
1 JB SUM $406,000.00
5 ST $39,000.00 $195,000.00
3,000,000 CY $2.00 $6,000,000.00
1,467,000 CY $2.00 $2,934,000.00
20,685,000 CY $7.41 $153,275,850.00
1 JB SUM $80,000.00
1 JB SUM $771,000.00
1 JB SUM $129,000.00
682 DAYS $1.00 $682.00
1 JB SUM $106,000.00
2 EA $37,000.00 $74,000.00
$173,221,532.00
1 JB SUM $59,000.00
700,000 CY $2.00 $1,400,000.00
346,000 CY $2.00 $692,000.00
2,512,000 CY $3.95 $9,922,400.00
1 JB SUM $27,000.00
1 JB SUM $96,000.00
89 DAYS $1.00 $89.00
$12,196,489.00
$185,418,021.00
1 JB SUM $101,000.00
600,000 CY $3.15 $1,890,000.00
217,000 CY $3.15 $683,550.00
1,871,000 CY $5.20 $9,729,200.00
1 JB SUM $27,000.00
1 JB SUM $77,000.00
67 DAYS $1.00 $67.00
$12,507,817.00
$197,925,838.00
1 JB SUM $83,000.00
450,000 CY $3.25 $1,462,500.00
0001 Mobilization and Demobilization
0002 Pre-Dredge Hazard Survey Sect 1 - 35
0003 Debris Removal - Section 1 - 5, 7 - 35
0004AA
Dredging (Shoaled Material) Section Nos. 2 thru 5, 7 thru
0004AB Dredging (Shoaled Material)
Dredging (New Work Material) Section Nos. 1 thru 5, 7 thru 18, 20
0010 As-Built & Record Drawings
0011 Allowance for Subsurface Investigation (Per Pipeline)
0007 Turtle Deflector Device & ESO
0008 Mobilization and Demobilization - Sea Turtle Trawling and Relocation
Project Title: FY 24 Unrestricted Procurement, Sabine-Neches Waterway Channel Improvement Project (SNWWCIP), TX Sabine Extension Channel to
Sabine Pass Outer Bar, Jetty Channel, Sabine Pass, Hopper Dredging, in Jefferson County, Texas
Solicitation No.: W912HY24B0021 Date Issued: 29 Jul 2024 Date Opened: 04 Sep 2024
Offeror 1: Great Lakes Dredge & Dock Company LLC., 9811 Katy Freeway, Suite 1200 Houston, TX 77024 ***Apparent Low Bidder***
QUANTITY
Issuing Office: USACE-Galveston
ABSTRACT OF OFFERS (CONT'D) Page 5 of 8
Business Size: Other Than Small Business
ITEM SCHEDULE NO. 1
NO. DESCRIPTION
OPTION NO. 1
TOTAL SCHEDULE NO. 1
0012 Pre-Dredge Hazard Survey - Section Nos. 36 thru 39
0013AA Dredging (Shoaled Material) - Section Nos. 36 thru 39
0013BB Dredging (Shoaled Material) - Section Nos. 36 thru 39
0015 ODMDS Monitoring Surveys
0014 Dredging (New Work Material) Section Nos. 36 thru 39
Turtle Deflector Device & ESO
0017 Sea Turtle Trawling & Relocation
TOTAL OPTION NO. 1
TOTAL SCHEDULE NO.1 & OPTION NO.1
OPTION NO. 2
0018 Pre-Dredge Hazard Survey Sect. 40 - 46
Dredging (Shoaled Material) Section Nos. 40 thru 460019AA
0009 Sea Turtle Trawling & Relocation
0006 ODMS Monitoring Surveys
0019BB Dredging (Shoaled Material) Section Nos. 40 thru 46
Dredging (New Work Material) Section Nos. 40 thru 43, and 45 thru 46
0021 ODMDS Monitoring Surveys
0024 Pre-Dredge Hazard Survey Sect. 47 - 50
0023 Sea Turtle Trawling & Relocation
TOTAL OPTION NO. 2
OPTION NO. 3
0025AA Dredging (Shoaled Material) Section Nos. 47 thru 50
TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2
0016 Turtle Deflector Device & ESO
188,000 CY $3.25 $611,000.00
1,847,000 CY $7.65 $14,129,550.00
1 JB SUM $27,000.00
1 JB SUM $91,000.00
62 DAYS $1.00 $62.00
$16,404,112.00
$214,329,950.00
1 ST SUM $39,000.00
392,000 CY $12.15 $4,762,800.00
1 JB SUM $20,000.00
$4,821,800.00
$219,151,750.00
549,000 CY $4.10 $2,250,900.00
1 JB SUM $12,000.00
$2,262,900.00
$221,414,650.00
299,000 CY $14.80 $4,425,200.00
1 JB SUM $28,000.00
$4,453,200.00
$225,867,850.00
220,000 CY $5.30 $1,166,000.00
1 JB SUM $10,000.00
$1,176,000.00
$227,043,850.00
44,000 CY $7.35 $323,400.00
1 JB SUM $1,800.00
$325,200.00
$227,369,050.00
487,000 CY $16.10 $7,840,700.00
1 JB SUM $36,000.00
$7,876,700.00
$235,245,750.00
Dredging (New Work Material) Section Nos. 47, 48, and
0031 Dredging (New Work Material) Section No. 6
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5,6
& 7
0039 Dredging (New Work Material) Section No. 44
0040 Turtle Deflector Device & ESO
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4 &
OPTION NO. 6
0035 Dredging (New Work Material) Section No. 25
0036 Turtle Deflector Device & ESO
TOTAL OPTION NO. 6
Turtle Deflector Device & ESO
TOTAL OPTION NO. 7
0041 Dredging (New Work Material) Section No. 49
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3 & 4
OPTION NO. 5
0033 Dredging (New Work Material) Section No. 19
0034 Turtle Deflector Device & ESO
TOTAL OPTION NO. 3
TOTAL SCHEDULE NO.1 & OPTION NO. 1,2 & 3
OPTION NO. 4
0032 Turtle Deflector Device & ESO
TOTAL OPTION NO. 4
0030 Debris Removal - Section No. 6
0025BB Dredging (Shoaled Material) Section Nos. 47 thru 50
TOTAL OPTION NO. 5
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5
&6
TOTAL OPTION NO. 9
TOTAL SCHEDULE NO.1 & OPTION
NO.1,2,3,4,5,6,7,8 & 9
OPTION NO. 8
TOTAL OPTION NO. 8
TOTAL SCHEDULE NO.1 & OPTION
NO.1,2,3,4,5,6,7 & 8
OPTION NO. 9
OPTION NO. 7
0037 Dredging (New Work Material) Section No. 32
Turtle Deflector Device & ESO
0027 ODMDS Monitoring Surveys
0028 Turtle Deflector Device & ESO
0029 Sea Turtle Trawling & Relocation
1 JB SUM $42,250,000.00
1 JB SUM $200,000.00
5 ST $2,000.00 $10,000.00
3,000,000 CY $5.50 $16,500,000.00
1,467,000 CY $5.50 $8,068,500.00
20,685,000 CY $13.00 $268,905,000.00
1 JB SUM $3,500,000.00
1 JB SUM $750,000.00
1 JB SUM $75,000.00
682 DAYS $20,000.00 $13,640,000.00
1 JB SUM $100,000.00
2 EA $50,000.00 $100,000.00
$354,098,500.00
1 JB SUM $100,000.00
700,000 CY $12.00 $8,400,000.00
346,000 CY $12.00 $4,152,000.00
2,512,000 CY $12.00 $30,144,000.00
1 JB SUM $50,000.00
1 JB SUM $10,000.00
89 DAYS $20,000.00 $1,780,000.00
$44,636,000.00
$398,734,500.00
1 JB SUM $150,000.00
600,000 CY $10.00 $6,000,000.00
217,000 CY $10.00 $2,170,000.00
1,871,000 CY $11.00 $20,581,000.00
1 JB SUM $50,000.00
1 JB SUM $10,000.00
67 DAYS $20,000.00 $1,340,000.00
$30,301,000.00
$429,035,500.00
1 JB SUM $150,000.00
450,000 CY $11.00 $4,950,000.00
0003 Debris Removal - Section 1 - 5, 7 - 35
Turtle Deflector Device & ESO
0004AA
Dredging (Shoaled Material) Section Nos. 2 thru 5, 7 thru
0004AB Dredging (Shoaled Material)
ITEM SCHEDULE NO. 1
NO.
TOTAL SCHEDULE NO.1 & OPTION NO.1
0025AA Dredging (Shoaled Material) Section Nos. 47 thru 50
OPTION NO. 3
0023 Sea Turtle Trawling & Relocation
TOTAL OPTION NO. 1
Dredging (New Work Material) Section Nos. 36 thru 39
Dredging (New Work Material) Section Nos. 40 thru 43, and 45 thru 46
TOTAL OPTION NO. 2
ODMDS Monitoring Surveys
Dredging (Shoaled Material) - Section Nos. 36 thru 390013AA
0015 ODMDS Monitoring Surveys
Sea Turtle Trawling & Relocation
0019BB Dredging (Shoaled Material) Section Nos. 40 thru 46
Pre-Dredge Hazard Survey Sect. 40 - 460018
Dredging (New Work Material) Section Nos. 1 thru 5, 7 thru 18, 20
0006 ODMS Monitoring Surveys
Pre-Dredge Hazard Survey Sect. 47 - 50
Mobilization and Demobilization - Sea Turtle Trawling and Relocation0009 Sea Turtle Trawling & Relocation
0010 As-Built & Record Drawings
ABSTRACT OF OFFERS (CONT'D) Page 7 of 8
DESCRIPTION
0001 Mobilization and Demobilization
Dredging (Shoaled Material) Section Nos. 40 thru 46
Turtle Deflector Device & ESO0016
0019AA
OPTION NO. 1
0012 Pre-Dredge Hazard Survey - Section Nos. 36 thru 39
Solicitation No.: W912HY24B0021 Date Issued: 29 Jul 2024 Date Opened: 04 Sep 2024
Issuing Office: USACE-Galveston
Project Title: FY 24 Unrestricted Procurement, Sabine-Neches Waterway Channel Improvement Project (SNWWCIP), TX Sabine Extension Channel to
Sabine Pass Outer Bar, Jetty Channel, Sabine Pass, Hopper Dredging, in Jefferson County, Texas
Offeror 2: Weeks Marine, Inc. 304 Gaille Drive, Covington, LA 70433
Business Size: Other Than Small Business
QUANTITY
0002 Pre-Dredge Hazard Survey Sect 1 - 35
0007 Turtle Deflector Device & ESO
TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2
TOTAL SCHEDULE NO. 1
OPTION NO. 2
0013BB Dredging (Shoaled Material) - Section Nos. 36 thru 39
0011 Allowance for Subsurface Investigation (Per Pipeline)
188,000 CY $11.00 $2,068,000.00
1,847,000 CY $14.00 $25,858,000.00
1 JB SUM $50,000.00
1 JB SUM $50,000.00
62 DAYS $20,000.00 $1,240,000.00
$34,366,000.00
$463,401,500.00
1 ST SUM $2,000.00
392,000 CY $10.00 $3,920,000.00
1 JB SUM $20,000.00
$3,942,000.00
$467,343,500.00
549,000 CY $10.00 $5,490,000.00
1 JB SUM $20,000.00
$5,510,000.00
$472,853,500.00
299,000 CY $11.00 $3,289,000.00
1 JB SUM $20,000.00
$3,309,000.00
$476,162,500.00
220,000 CY $10.00 $2,200,000.00
1 JB SUM $20,000.00
$2,220,000.00
$478,382,500.00
44,000 CY $11.00 $484,000.00
1 JB SUM $20,000.00
$504,000.00
$478,886,500.00
487,000 CY $14.00 $6,818,000.00
1 JB SUM $20,000.00
$6,838,000.00
$485,724,500.00
TOTAL OPTION NO. 3
TOTAL SCHEDULE NO.1 & OPTION NO. 1,2 & 3
OPTION NO. 4
0030 Debris Removal - Section No. 6
0031 Dredging (New Work Material) Section No. 6
0027 ODMDS Monitoring Surveys
0028 Turtle Deflector Device & ESO
0029 Sea Turtle Trawling & Relocation
0025BB Dredging (Shoaled Material) Section Nos. 47 thru 50
Dredging (New Work Material) Section Nos. 47, 48, and
0034 Turtle Deflector Device & ESO
TOTAL OPTION NO. 5
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4 &
OPTION NO. 6
0035 Dredging (New Work Material) Section No. 25
0032 Turtle Deflector Device & ESO
TOTAL OPTION NO. 4
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3 & 4
OPTION NO. 5
0033 Dredging (New Work Material) Section No. 19
0038 Turtle Deflector Device & ESO
TOTAL OPTION NO. 7
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5,6
& 7
OPTION NO. 8
0039 Dredging (New Work Material) Section No. 44
0036 Turtle Deflector Device & ESO
TOTAL OPTION NO. 6
TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5
&6
OPTION NO. 7
0037 Dredging (New Work Material) Section No. 32
0042 Turtle Deflector Device & ESO
TOTAL OPTION NO. 9
TOTAL SCHEDULE NO.1 & OPTION
NO.1,2,3,4,5,6,7,8 & 9
0040 Turtle Deflector Device & ESO
TOTAL OPTION NO. 8
TOTAL SCHEDULE NO.1 & OPTION
NO.1,2,3,4,5,6,7 & 8
OPTION NO. 9
0041 Dredging (New Work Material) Section No. 49
| 2024-09-04T11:36:32-0500 | |
| BABB.JEREMY.S.1176121633 |
| 2024-09-04T11:37:14-0500 | |
| BABB.JEREMY.S.1176121633 |