This document is an Abstract of Offers for a federal construction solicitation issued by the U.S. Army Corps of Engineers Galveston District. The solicitation is for the FY24 Unrestricted Procurement of the Sabine-Neches Waterway Channel Improvement Project (SNWWCIP) in Jefferson County, Texas. The project includes hopper dredging of the Sabine Extension Channel to Sabine Pass Outer Bar and Jetty Channel. The solicitation was issued on July 29, 2024, with offers opened on September 4, 2024. The apparent low bidder is Great Lakes Dredge & Dock Company LLC at $194,848,680, which is 13.06% above the government estimate. The contract includes base items for dredging, debris removal, surveys, and support items, as well several option items. Key quantities include 3,000,000 CY of new work dredging and 21,934,000 CY of shoaled material dredging across the various sections of the project.

View the file

Other files

File Type Posted
B.08_W912HY24B0021 Amend 0001 081424.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

5. PROJECT TITLE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM

7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

FY24, Unrestricted Procurement, USACE Galveston District, Sabine-Neches Waterway Channel Improvement Project (SNWWCIP), TX Sabine Extension Channel to Sabine Pass Outer Bar, Jetty Channel, Sabine Pass, Hopper Dredging, in Jefferson County, Texas

Jeremy S. Babb Contracting Officer

3 3

Great Lakes Dredge & Dock Company, LLC.

SEE ATTACHED PAGES

09/04/2024

UNIT

PRICE TOTAL

1 JB SUM $10,252,000.00

1 JB SUM $196,900.00

5 ST $15,100.00 $75,500.00

3,000,000 CY $1.99 $5,970,000.00

1,467,000 CY $1.99 $2,919,330.00

20,685,000 CY $5.80 $119,973,000.00

1 JB SUM $116,000.00

1 JB SUM $1,130,700.00

1 JB SUM $108,000.00

682 DAYS $10,149.00 $6,921,618.00

1 JB SUM $11,200.00

2 EA $30,500.00 $61,000.00

$147,735,248.00

1 JB SUM $16,100.00

700,000 CY $1.63 $1,141,000.00

346,000 CY $1.63 $563,980.00

2,512,000 CY $4.74 $11,906,880.00

1 JB SUM $4,000.00

1 JB SUM $120,200.00

89 DAYS $10,149.00 $903,261.00

$14,655,421.00

$162,390,669.00

1 JB SUM $38,400.00

600,000 CY $2.38 $1,428,000.00

217,000 CY $2.38 $516,460.00

1,871,000 CY $6.40 $11,974,400.00

1 JB SUM $4,000.00

1 JB SUM $90,500.00

67 DAYS $10,149.00 $679,983.00

$14,731,743.00

$177,122,412.00

1 JB SUM $18,100.00

450,000 CY $2.98 $1,341,000.00

TOTAL SCHEDULE NO. 1

TOTAL OPTION NO. 1

0013AA

0012 Pre-Dredge Hazard Survey - Section Nos. 36 thru 39

ABSTRACT OF OFFERS Page 2 of 8

Solicitation No.: W912HY24B0021 Date Issued: 29 Jul 2024 Date Opened: 04 Sep 2024

Issuing Office: USACE-Galveston

Project Title: FY 24 Unrestricted Procurement, Sabine-Neches Waterway Channel Improvement Project (SNWWCIP), TX Sabine Extension Channel to

Sabine Pass Outer Bar, Jetty Channel, Sabine Pass, Hopper Dredging, in Jefferson County, Texas

Number of Amendments Issued: 3

Government Estimate (Without Profit)

QUANTITY

Mobilization and Demobilization - Sea Turtle Trawling and RelocationSea Turtle Trawling & Relocation

Dredging (New Work Material) Section Nos. 40 thru 43, and 45 thru 46

OPTION NO. 2

TOTAL SCHEDULE NO.1 & OPTION NO.1

Dredging (Shoaled Material) - Section Nos. 36 thru 39

OPTION NO. 1

Debris Removal - Section 1 - 5, 7 - 35

TOTAL OPTION NO. 2

TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2

OPTION NO. 3

0025AA

Dredging (Shoaled Material) Section Nos. 40 thru 46

SCHEDULE NO. 1ITEM

0019AA

0018 Pre-Dredge Hazard Survey Sect. 40 - 46

0024 Pre-Dredge Hazard Survey Sect. 47 - 50

NO. DESCRIPTION

Dredging (New Work Material) Section Nos. 1 thru 5, 7 thru 18, 20

0002 Pre-Dredge Hazard Survey Sect 1 - 35

Mobilization and Demobilization

Turtle Deflector Device & ESO

0010 As-Built & Record Drawings

0011 Allowance for Subsurface Investigation (Per Pipeline)

0004AA

Dredging (Shoaled Material) Section Nos. 2 thru 5, 7 thru

ODMS Monitoring Surveys

Dredging (Shoaled Material) Section Nos. 47 thru 50

0015 ODMDS Monitoring Surveys

0016 Turtle Deflector Device & ESO

0017 Sea Turtle Trawling & Relocation

0021 ODMDS Monitoring Surveys

0022 Turtle Deflector Device & ESO

0023 Sea Turtle Trawling & Relocation

Dredging (New Work Material) Section Nos. 36 thru 39

0004AB Dredging (Shoaled Material)

0013BB Dredging (Shoaled Material) - Section Nos. 36 thru 39

0019BB Dredging (Shoaled Material) Section Nos. 40 thru 46

188,000 CY $2.98 $560,240.00

1,847,000 CY $8.17 $15,089,990.00

1 JB SUM $4,000.00

1 JB SUM $83,700.00

62 DAYS $10,149.00 $629,238.00

$17,726,268.00

$194,848,680.00

1 ST SUM $18,400.00

392,000 CY $5.77 $2,261,840.00

1 JB SUM $23,000.00

$2,303,240.00

$197,151,920.00

549,000 CY $6.11 $3,354,390.00

1 JB SUM $33,800.00

$3,388,190.00

$200,540,110.00

299,000 CY $5.73 $1,713,270.00

1 JB SUM $17,600.00

$1,730,870.00

$202,270,980.00

220,000 CY $5.83 $1,282,600.00

1 JB SUM $13,500.00

$1,296,100.00

$203,567,080.00

44,000 CY $6.67 $293,480.00

1 JB SUM $4,100.00

$297,580.00

$203,864,660.00

487,000 CY $8.55 $4,163,850.00

1 JB SUM $43,200.00

$4,207,050.00

$208,071,710.00

0032 Turtle Deflector Device & ESO

TOTAL OPTION NO. 4

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4 &

* The apparent low bidder, Great Lakes Dredge & Dock Company LLC., is 13.06% above the Government's Estimate.

Dredging (New Work Material) Section Nos. 47, 48, and

0027 ODMDS Monitoring Surveys

TOTAL OPTION NO. 3

TOTAL SCHEDULE NO.1 & OPTION NO. 1,2 & 3

OPTION NO. 4

0030 Debris Removal - Section No. 6

0031 Dredging (New Work Material) Section No. 6

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3 & 4

OPTION NO. 5

0033 Dredging (New Work Material) Section No. 19

OPTION NO. 8

0039 Dredging (New Work Material) Section No. 44

0040 Turtle Deflector Device & ESO

TOTAL OPTION NO. 6

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5

&6

OPTION NO. 7

0037 Dredging (New Work Material) Section No. 32

0038 Turtle Deflector Device & ESO

Turtle Deflector Device & ESO

0029 Sea Turtle Trawling & Relocation

OPTION NO. 6

0035 Dredging (New Work Material) Section No. 25

0036 Turtle Deflector Device & ESO

Turtle Deflector Device & ESO

TOTAL OPTION NO. 5

TOTAL OPTION NO. 9

TOTAL SCHEDULE NO.1 & OPTION

NO.1,2,3,4,5,6,7,8 & 9

0025BB Dredging (Shoaled Material) Section Nos. 47 thru 50

TOTAL OPTION NO. 8

TOTAL SCHEDULE NO.1 & OPTION

NO.1,2,3,4,5,6,7 & 8

OPTION NO. 9

0041 Dredging (New Work Material) Section No. 49

0042 Turtle Deflector Device & ESO

TOTAL OPTION NO. 7

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5,6

& 7

Jeremy Babb

CONTRACTING OFFICER

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED IN RESPONSE TO THIS

SOLICITATION.

1 JB SUM $9,250,000.00

1 JB SUM $406,000.00

5 ST $39,000.00 $195,000.00

3,000,000 CY $2.00 $6,000,000.00

1,467,000 CY $2.00 $2,934,000.00

20,685,000 CY $7.41 $153,275,850.00

1 JB SUM $80,000.00

1 JB SUM $771,000.00

1 JB SUM $129,000.00

682 DAYS $1.00 $682.00

1 JB SUM $106,000.00

2 EA $37,000.00 $74,000.00

$173,221,532.00

1 JB SUM $59,000.00

700,000 CY $2.00 $1,400,000.00

346,000 CY $2.00 $692,000.00

2,512,000 CY $3.95 $9,922,400.00

1 JB SUM $27,000.00

1 JB SUM $96,000.00

89 DAYS $1.00 $89.00

$12,196,489.00

$185,418,021.00

1 JB SUM $101,000.00

600,000 CY $3.15 $1,890,000.00

217,000 CY $3.15 $683,550.00

1,871,000 CY $5.20 $9,729,200.00

1 JB SUM $27,000.00

1 JB SUM $77,000.00

67 DAYS $1.00 $67.00

$12,507,817.00

$197,925,838.00

1 JB SUM $83,000.00

450,000 CY $3.25 $1,462,500.00

0001 Mobilization and Demobilization

0002 Pre-Dredge Hazard Survey Sect 1 - 35

0003 Debris Removal - Section 1 - 5, 7 - 35

0004AA

Dredging (Shoaled Material) Section Nos. 2 thru 5, 7 thru

0004AB Dredging (Shoaled Material)

Dredging (New Work Material) Section Nos. 1 thru 5, 7 thru 18, 20

0010 As-Built & Record Drawings

0011 Allowance for Subsurface Investigation (Per Pipeline)

0007 Turtle Deflector Device & ESO

0008 Mobilization and Demobilization - Sea Turtle Trawling and Relocation

Project Title: FY 24 Unrestricted Procurement, Sabine-Neches Waterway Channel Improvement Project (SNWWCIP), TX Sabine Extension Channel to

Sabine Pass Outer Bar, Jetty Channel, Sabine Pass, Hopper Dredging, in Jefferson County, Texas

Solicitation No.: W912HY24B0021 Date Issued: 29 Jul 2024 Date Opened: 04 Sep 2024

Offeror 1: Great Lakes Dredge & Dock Company LLC., 9811 Katy Freeway, Suite 1200 Houston, TX 77024 ***Apparent Low Bidder***

QUANTITY

Issuing Office: USACE-Galveston

ABSTRACT OF OFFERS (CONT'D) Page 5 of 8

Business Size: Other Than Small Business

ITEM SCHEDULE NO. 1

NO. DESCRIPTION

OPTION NO. 1

TOTAL SCHEDULE NO. 1

0012 Pre-Dredge Hazard Survey - Section Nos. 36 thru 39

0013AA Dredging (Shoaled Material) - Section Nos. 36 thru 39

0013BB Dredging (Shoaled Material) - Section Nos. 36 thru 39

0015 ODMDS Monitoring Surveys

0014 Dredging (New Work Material) Section Nos. 36 thru 39

Turtle Deflector Device & ESO

0017 Sea Turtle Trawling & Relocation

TOTAL OPTION NO. 1

TOTAL SCHEDULE NO.1 & OPTION NO.1

OPTION NO. 2

0018 Pre-Dredge Hazard Survey Sect. 40 - 46

Dredging (Shoaled Material) Section Nos. 40 thru 460019AA

0009 Sea Turtle Trawling & Relocation

0006 ODMS Monitoring Surveys

0019BB Dredging (Shoaled Material) Section Nos. 40 thru 46

Dredging (New Work Material) Section Nos. 40 thru 43, and 45 thru 46

0021 ODMDS Monitoring Surveys

0024 Pre-Dredge Hazard Survey Sect. 47 - 50

0023 Sea Turtle Trawling & Relocation

TOTAL OPTION NO. 2

OPTION NO. 3

0025AA Dredging (Shoaled Material) Section Nos. 47 thru 50

TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2

0016 Turtle Deflector Device & ESO

188,000 CY $3.25 $611,000.00

1,847,000 CY $7.65 $14,129,550.00

1 JB SUM $27,000.00

1 JB SUM $91,000.00

62 DAYS $1.00 $62.00

$16,404,112.00

$214,329,950.00

1 ST SUM $39,000.00

392,000 CY $12.15 $4,762,800.00

1 JB SUM $20,000.00

$4,821,800.00

$219,151,750.00

549,000 CY $4.10 $2,250,900.00

1 JB SUM $12,000.00

$2,262,900.00

$221,414,650.00

299,000 CY $14.80 $4,425,200.00

1 JB SUM $28,000.00

$4,453,200.00

$225,867,850.00

220,000 CY $5.30 $1,166,000.00

1 JB SUM $10,000.00

$1,176,000.00

$227,043,850.00

44,000 CY $7.35 $323,400.00

1 JB SUM $1,800.00

$325,200.00

$227,369,050.00

487,000 CY $16.10 $7,840,700.00

1 JB SUM $36,000.00

$7,876,700.00

$235,245,750.00

Dredging (New Work Material) Section Nos. 47, 48, and

0031 Dredging (New Work Material) Section No. 6

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5,6

& 7

0039 Dredging (New Work Material) Section No. 44

0040 Turtle Deflector Device & ESO

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4 &

OPTION NO. 6

0035 Dredging (New Work Material) Section No. 25

0036 Turtle Deflector Device & ESO

TOTAL OPTION NO. 6

Turtle Deflector Device & ESO

TOTAL OPTION NO. 7

0041 Dredging (New Work Material) Section No. 49

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3 & 4

OPTION NO. 5

0033 Dredging (New Work Material) Section No. 19

0034 Turtle Deflector Device & ESO

TOTAL OPTION NO. 3

TOTAL SCHEDULE NO.1 & OPTION NO. 1,2 & 3

OPTION NO. 4

0032 Turtle Deflector Device & ESO

TOTAL OPTION NO. 4

0030 Debris Removal - Section No. 6

0025BB Dredging (Shoaled Material) Section Nos. 47 thru 50

TOTAL OPTION NO. 5

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5

&6

TOTAL OPTION NO. 9

TOTAL SCHEDULE NO.1 & OPTION

NO.1,2,3,4,5,6,7,8 & 9

OPTION NO. 8

TOTAL OPTION NO. 8

TOTAL SCHEDULE NO.1 & OPTION

NO.1,2,3,4,5,6,7 & 8

OPTION NO. 9

OPTION NO. 7

0037 Dredging (New Work Material) Section No. 32

Turtle Deflector Device & ESO

0027 ODMDS Monitoring Surveys

0028 Turtle Deflector Device & ESO

0029 Sea Turtle Trawling & Relocation

1 JB SUM $42,250,000.00

1 JB SUM $200,000.00

5 ST $2,000.00 $10,000.00

3,000,000 CY $5.50 $16,500,000.00

1,467,000 CY $5.50 $8,068,500.00

20,685,000 CY $13.00 $268,905,000.00

1 JB SUM $3,500,000.00

1 JB SUM $750,000.00

1 JB SUM $75,000.00

682 DAYS $20,000.00 $13,640,000.00

1 JB SUM $100,000.00

2 EA $50,000.00 $100,000.00

$354,098,500.00

1 JB SUM $100,000.00

700,000 CY $12.00 $8,400,000.00

346,000 CY $12.00 $4,152,000.00

2,512,000 CY $12.00 $30,144,000.00

1 JB SUM $50,000.00

1 JB SUM $10,000.00

89 DAYS $20,000.00 $1,780,000.00

$44,636,000.00

$398,734,500.00

1 JB SUM $150,000.00

600,000 CY $10.00 $6,000,000.00

217,000 CY $10.00 $2,170,000.00

1,871,000 CY $11.00 $20,581,000.00

1 JB SUM $50,000.00

1 JB SUM $10,000.00

67 DAYS $20,000.00 $1,340,000.00

$30,301,000.00

$429,035,500.00

1 JB SUM $150,000.00

450,000 CY $11.00 $4,950,000.00

0003 Debris Removal - Section 1 - 5, 7 - 35

Turtle Deflector Device & ESO

0004AA

Dredging (Shoaled Material) Section Nos. 2 thru 5, 7 thru

0004AB Dredging (Shoaled Material)

ITEM SCHEDULE NO. 1

NO.

TOTAL SCHEDULE NO.1 & OPTION NO.1

0025AA Dredging (Shoaled Material) Section Nos. 47 thru 50

OPTION NO. 3

0023 Sea Turtle Trawling & Relocation

TOTAL OPTION NO. 1

Dredging (New Work Material) Section Nos. 36 thru 39

Dredging (New Work Material) Section Nos. 40 thru 43, and 45 thru 46

TOTAL OPTION NO. 2

ODMDS Monitoring Surveys

Dredging (Shoaled Material) - Section Nos. 36 thru 390013AA

0015 ODMDS Monitoring Surveys

Sea Turtle Trawling & Relocation

0019BB Dredging (Shoaled Material) Section Nos. 40 thru 46

Pre-Dredge Hazard Survey Sect. 40 - 460018

Dredging (New Work Material) Section Nos. 1 thru 5, 7 thru 18, 20

0006 ODMS Monitoring Surveys

Pre-Dredge Hazard Survey Sect. 47 - 50

Mobilization and Demobilization - Sea Turtle Trawling and Relocation0009 Sea Turtle Trawling & Relocation

0010 As-Built & Record Drawings

ABSTRACT OF OFFERS (CONT'D) Page 7 of 8

DESCRIPTION

0001 Mobilization and Demobilization

Dredging (Shoaled Material) Section Nos. 40 thru 46

Turtle Deflector Device & ESO0016

0019AA

OPTION NO. 1

0012 Pre-Dredge Hazard Survey - Section Nos. 36 thru 39

Solicitation No.: W912HY24B0021 Date Issued: 29 Jul 2024 Date Opened: 04 Sep 2024

Issuing Office: USACE-Galveston

Project Title: FY 24 Unrestricted Procurement, Sabine-Neches Waterway Channel Improvement Project (SNWWCIP), TX Sabine Extension Channel to

Sabine Pass Outer Bar, Jetty Channel, Sabine Pass, Hopper Dredging, in Jefferson County, Texas

Offeror 2: Weeks Marine, Inc. 304 Gaille Drive, Covington, LA 70433

Business Size: Other Than Small Business

QUANTITY

0002 Pre-Dredge Hazard Survey Sect 1 - 35

0007 Turtle Deflector Device & ESO

TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2

TOTAL SCHEDULE NO. 1

OPTION NO. 2

0013BB Dredging (Shoaled Material) - Section Nos. 36 thru 39

0011 Allowance for Subsurface Investigation (Per Pipeline)

188,000 CY $11.00 $2,068,000.00

1,847,000 CY $14.00 $25,858,000.00

1 JB SUM $50,000.00

1 JB SUM $50,000.00

62 DAYS $20,000.00 $1,240,000.00

$34,366,000.00

$463,401,500.00

1 ST SUM $2,000.00

392,000 CY $10.00 $3,920,000.00

1 JB SUM $20,000.00

$3,942,000.00

$467,343,500.00

549,000 CY $10.00 $5,490,000.00

1 JB SUM $20,000.00

$5,510,000.00

$472,853,500.00

299,000 CY $11.00 $3,289,000.00

1 JB SUM $20,000.00

$3,309,000.00

$476,162,500.00

220,000 CY $10.00 $2,200,000.00

1 JB SUM $20,000.00

$2,220,000.00

$478,382,500.00

44,000 CY $11.00 $484,000.00

1 JB SUM $20,000.00

$504,000.00

$478,886,500.00

487,000 CY $14.00 $6,818,000.00

1 JB SUM $20,000.00

$6,838,000.00

$485,724,500.00

TOTAL OPTION NO. 3

TOTAL SCHEDULE NO.1 & OPTION NO. 1,2 & 3

OPTION NO. 4

0030 Debris Removal - Section No. 6

0031 Dredging (New Work Material) Section No. 6

0027 ODMDS Monitoring Surveys

0028 Turtle Deflector Device & ESO

0029 Sea Turtle Trawling & Relocation

0025BB Dredging (Shoaled Material) Section Nos. 47 thru 50

Dredging (New Work Material) Section Nos. 47, 48, and

0034 Turtle Deflector Device & ESO

TOTAL OPTION NO. 5

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4 &

OPTION NO. 6

0035 Dredging (New Work Material) Section No. 25

0032 Turtle Deflector Device & ESO

TOTAL OPTION NO. 4

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3 & 4

OPTION NO. 5

0033 Dredging (New Work Material) Section No. 19

0038 Turtle Deflector Device & ESO

TOTAL OPTION NO. 7

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5,6

& 7

OPTION NO. 8

0039 Dredging (New Work Material) Section No. 44

0036 Turtle Deflector Device & ESO

TOTAL OPTION NO. 6

TOTAL SCHEDULE NO.1 & OPTION NO.1,2,3,4,5

&6

OPTION NO. 7

0037 Dredging (New Work Material) Section No. 32

0042 Turtle Deflector Device & ESO

TOTAL OPTION NO. 9

TOTAL SCHEDULE NO.1 & OPTION

NO.1,2,3,4,5,6,7,8 & 9

0040 Turtle Deflector Device & ESO

TOTAL OPTION NO. 8

TOTAL SCHEDULE NO.1 & OPTION

NO.1,2,3,4,5,6,7 & 8

OPTION NO. 9

0041 Dredging (New Work Material) Section No. 49

2024-09-04T11:36:32-0500
BABB.JEREMY.S.1176121633
2024-09-04T11:37:14-0500
BABB.JEREMY.S.1176121633

File details come from the government source that posted it. Updated .