This document is an Abstract of Offers for a federal construction solicitation. The solicitation number is W912HY24B0016, titled "USACE FY24 Unrestricted Procurement, Brazos Island Harbor Channel Improvement Project - Phase II, Brownsville, Texas in Cameron County, Texas". The government estimate for the project is $79,862,246, and the apparent low bidder, Callan Marine LTD, is 31.44% above the government estimate at $104,974,200. The key requirements include mobilization/demobilization, surveys, debris removal, pipeline management, dredging, endangered species monitoring, and as-built drawings. The solicitation was issued on March 1, 2024 with a bid opening date of April 8, 2024. This is an unrestricted procurement being issued by the U.S. Army Corps of Engineers, Galveston District.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C.04_Revised Abstract 1419-W912HY24B0016_15 Apr 24-PCO.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
ITEM
NO.
Galveston District A/E Construction Branch Galveston, Texas
5. PROJECT TITLE
USACE FY24,Unrestricted Procurement, Brazos Island Harbor Channel Improvement Project - Phase II, Brownsville, Texas in Cameron County, Texas.
W912HY24B0016 1 3
Curtis Cole, Jr.
04/08/202403/01/2024
SEE ATTACHED PAGES
9 April 2024
UNIT ESTIMATED
PRICE AMOUNT
1 JOB 3,900,000.00$ 3,900,000.00$
1 JOB 336,545.00$ 336,545.00$
1 JOB 336,545.00$ 336,545.00$
100 TON 8,442.40$ 844,240.00$
10 TON 9,438.10$ 94,381.00$
10 TON 9,438.10$ 94,381.00$
10 TON $ 9,438.10 94,381.00$
1 JOB 639,838.00$ 639,838.00$
7,012,000 CY 10.44$ 73,205,280.00$
1 JOB 284,610.00$ 284,610.00$
1 JOB 32,045.00$ 32,045.00$
79,862,246.00$
UNIT ESTIMATED
PRICE AMOUNT
1 JOB 25,750,000.00 25,750,000.00$
1 JOB 300,000.00$ 300,000.00$
1 JOB 175,000.00$ 175,000.00$
100 TON 15,000.00$ 1,500,000.00$
10 TON 15,000.00$ 150,000.00$
10 TON 15,000.00$ 150,000.00$
10 TON $ 15,000.00 150,000.00$
SOLICITATION.
Curtis Cole, Jr.
Contracting Officer
Solicitation No.: W912HY24B0016 Date Issued: 1 March 2024 Date Opened: 8 April 2024
0001 Mobilization & Demobilization 0002 Surveys - Pre Dredging Hazard Survey
Surveys - Subsurface Investigation 0004 Debris Removal - First 100 Tons 0005 Debris Removal - Next 10 Tons 0006 Debris Removal - Next 10 Tons 0007 Debris Removal - Next 10 Tons
Surveys - Pre Dredging Hazard Survey
Surveys - Subsurface Investigation
0007 Debris Removal - Next 10 Tons 0008 Pipeline Management: PA5B
Mobilization & Demobilization
0004 Debris Removal - First 100 Tons 0005 Debris Removal - Next 10 Tons 0006 Debris Removal - Next 10 Tons
0009 Dredging
ABSTRACT OF OFFERS
Solicitation No.: W912HY24B0016 Date Issued: 1 March 2024 Date Opened: 8 April 2024 Issuing Office: USAED- Galveston Project Title: FY24 Unrestricted Procurement Brazos Island Harbor Channel Improvement Project - Phase II, Brownsville, Texas in Cameron County, Texas Number of Amendments Issued: 3 GOVERNMENT ESTIMATE (Without Profit)
NO.
ESTIMATED
DESCRIPTION QUANTITY
ITEM
0010 Endangered Species Monitoring
0011 As-Builts and Record Drawings
*The apparent low bidder, Callan Marine LTD is 31.44% above the Government Estimate.
DESCRIPTION
Issuing Office: USAED-Galveston Offeror #1 : Weeks Marine, Inc.
Business Size: Other than small business
ESTIMATED
QUANTITY
TOTAL SCHEDULE 1
ITEM
NO.
I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED TO THIS
1 JOB 2,750,000.00$ 2,750,000.00$
7,012,000 CY 54.75$ 383,907,000.00$
1 JOB 850,000.00$ 850,000.00$
1 JOB 250,000.00$ 250,000.00$
415,932,000.00$
UNIT ESTIMATED
PRICE AMOUNT
1 JOB 16,000,000.00 16,000,000.00$
1 JOB 100,000.00$ 100,000.00$
1 JOB 100,000.00$ 100,000.00$
100 TON 16,740.00$ 1,674,000.00$
10 TON 16,740.00$ 167,400.00$
10 TON 16,740.00$ 167,400.00$
10 TON $ 16,740.00 167,400.00$
1 JOB 5,250,000.00$ 5,250,000.00$
7,012,000 CY 11.50$ 80,638,000.00$
1 JOB 700,000.00$ 700,000.00$
1 JOB 10,000.00$ 10,000.00$
104,974,200.00$
UNIT ESTIMATED
PRICE AMOUNT
1 JOB 14,700,000.00 14,700,000.00$
1 JOB 200,000.00$ 200,000.00$
1 JOB 50,000.00$ 50,000.00$
100 TON 1,500.00$ 150,000.00$
10 TON 1,500.00$ 15,000.00$
10 TON 1,500.00$ 15,000.00$
10 TON $ 1,500.00 15,000.00$
1 JOB 4,000,000.00$ 4,000,000.00$
7,012,000 CY 19.30$ 135,331,600.00$
1 JOB 100,000.00$ 100,000.00$
1 JOB 10,000.00$ 10,000.00$
154,586,600.00$
Solicitation No.: W912HY24B0016 Date Issued: 1 March 2024 Date Opened: 8 April 2024 Issuing Office: USAED-Galveston Offeror #3 : Great Lakes Dredge & Dock Company, LLC
Business Size: Other than small business
ESTIMATED
QUANTITY
0009 Dredging 0010 Endangered Species Monitoring
0001 Mobilization & Demobilization 0002 Surveys - Pre Dredging Hazard Survey
0003 Surveys - Subsurface Investigation 0004 Debris Removal - First 100 Tons
ITEM
NO. DESCRIPTION
0011 As-Builts and Record Drawings
TOTAL SCHEDULE 1
0005 Debris Removal - Next 10 Tons 0006 Debris Removal - Next 10 Tons 0007 Debris Removal - Next 10 Tons 0008 Pipeline Management: PA5B
0011 As-Builts and Record Drawings
TOTAL SCHEDULE 1
Debris Removal - Next 10 Tons Debris Removal - Next 10 Tons
0008 Pipeline Management: PA5B 0009 Dredging 0010 Endangered Species Monitoring
Debris Removal - First 100 Tons Debris Removal - Next 10 Tons0005
0008 Pipeline Management: PA5B
ITEM
Surveys - Subsurface Investigation
Mobilization & Demobilization Surveys - Pre Dredging Hazard Survey
NO. DESCRIPTION
TOTAL SCHEDULE 1
Solicitation No.: W912HY24B0016 Date Issued: 1 March 2024 Date Opened: 8 April 2024 Issuing Office: USAED-Galveston Offeror #2 : Callan Marine LTD
Business Size: Other than small business
ESTIMATED
QUANTITY
0010 Endangered Species Monitoring 0009 Dredging
As-Builts and Record Drawings0011
| C.04_ABSTRACT_24B0016-9APR24.pdf |
| Page 1 |
| 2024-04-09T14:32:01-0500 | |
| COLE.CURTIS.JR.1231025746 |
| 2024-04-09T14:33:02-0500 | |
| COLE.CURTIS.JR.1231025746 |
File details come from the government source that posted it. Updated .