C.04_Abstract-24B0010_FORM 1419-PCO-SIGNED.pdf

PDF 298 KB Posted

Attached to
HOUSTON SHIP CHANNEL ? ALEXANDER ISLAND PA DEWATERING, HARRIS COUNTY, TEXAS
Solicitation number
W912HY24B0010
Issued by

About this file

This document is an Abstract of Offers for a federal construction contract opportunity, Solicitation Number W912HY24B0010, for the FY24 Houston Ship Channel - Alexander Island Placement Area Dewatering project in Harris County, Texas.

The contract is set-aside for small businesses and includes the following key requirements: mobilization and demobilization, collector sumps, lateral and perimeter ditches, stripping, and turfing. The government estimate for the contract is $2,913,924. Three small business offerors submitted bids, with the apparent low bidder, E & L Construction Group, LLC, bidding $3,013,585.34, which is 3.31% below the government estimate. Other offerors include GLS Equity, LLC (large business) and Patriot Industries, LLC (bid disqualified). The solicitation was issued on March 1, 2023 and offers were opened on April 1, 2023. The contract is for work to be performed in Harris County, Texas.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

U.S. Army Corps of Engineers, Galveston District Contracting Division 2000 Fort Point Road Galveston, Texas 77550

5. PROJECT TITLE

FY24, USACE Set -Aside for Small Business, Galveston District, Houston Ship Channel, Alexander Island, Placement Area Dewatering in Harris County, Texas.

W912HY24B0010

Curtis Cole, Jr. Contracting Officer

04/01/202403/01/2024

2 April 2024

SEE ATTACHED PAGES

1 4

UNIT

PRICE TOTAL

1 JB SUM $346,000.00

1 JB SUM $25,757.00

38,925 LF $37.88 $1,474,479.00

18,398 LF $61.33 $1,128,349.34

1 JB SUM $39,000.00

$3,013,585.34TOTAL SCHEDULE NO. 1

ABSTRACT OF OFFERS Page 2 of 4

Solicitation No.: W912HY24B0010 Date Issued: 1 Mar 2023 Date Opened: 1 Apr 2023

Issuing Office: USACE-Galveston

Project Title: FY 24 Houston Ship Channel, Alexander Island Placement Area Dewatering, Harris County, Texas, Set-Aside for Small Business

Number of Amendments Issued: 1

Government Estimate (Without Profit)

QUANTITY

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED IN RESPONSE TO THIS

SOLICITATION.

* The apparent low bidder, E & L Construction Group, LLC is 3.31% below the Government's Estimate.

Curtis Cole, Jr.

CONTRACTING OFFICER

Lateral Ditches

SCHEDULE NO. 1ITEM

0004 Perimeter Ditches

NO. DESCRIPTION

0005 Condition Surveys

0002 Collector Sumps

Mobilization and Demobilization

1 JB SUM $526,575.00

1 JB SUM $89,000.00

38,925 LF $37.00 $1,440,225.00

18,398 LF $38.00 $699,124.00

1 JB SUM $159,000.00

$2,913,924.00

UNIT

PRICE TOTAL

1 JB SUM $145,000.00

1 JB SUM $153,000.00

38,925 LF $0.00 $0.00

18,398 LF $0.00 $1,481,000.00

1 JB SUM $181,000.00

$5,000,000.00

UNIT

PRICE TOTAL

1 JB SUM $889,350.00

1 JB SUM $58,825.00

38,925 LF $38.00 $1,479,150.00

18,398 LF $38.00 $699,124.00

1 JB SUM $41,000.00

$3,167,449.00

Turfing

Clearing, Grubbing, and Removal of Debris

Project Title: FY 24 Houston Ship Channel, Alexander Island Placement Area Dewatering, Harris County, Texas, Set-Aside for Small Business

Solicitation No.: W912HY24B0010 Date Issued: 1 Mar 2023 Date Opened: 1 Apr 2023

0005 Turfing

0004 Stripping

Offeror 1: E & L Construction Group, LLC; 134 E. Main Street New Iberia, LA 70560 ***Apparent Low Bidder***

QUANTITY

Issuing Office: USACE-Galveston

ABSTRACT OF OFFERS (CONT'D) Page 3 of 4

Solicitation No.: W912HY24B0010 Date Issued: 1 Mar 2023 Date Opened: 1 Apr 2023

Issuing Office: USACE-Galveston

Project Title: FY 24 Houston Ship Channel, Alexander Island Placement Area Dewatering, Harris County, Texas, Set-Aside for Small Business

ABSTRACT OF OFFERS (CONT'D) Page 2 of 3

Offeror 2: GLS Equity, LLC; 643 Tinton Ave 21 Bronx, NY 10455

Business Size:Large Business.

Business Size: Small Business,SDV,and SDVOSB

ITEM SCHEDULE NO. 1

NO. DESCRIPTION

0001 Mobilization and Demobilization

0002 Collector Sumps

0003 Lateral Ditches

0004 Perimeter Ditches

0005 Condition Surveys

TOTAL SCHEDULE NO. 1

ITEM SCHEDULE NO. 1

NO. DESCRIPTION QUANTITY

0001 Mobilization and Demobilization

0002 Clearing, Grubbing, and Removal of Debris

0003 Semi-Compacted Dike Construction Using Onsite Soils

TOTAL SCHEDULE NO. 1

ABSTRACT OF OFFERS (CONT'D) Page 2 of 3

NO. DESCRIPTION QUANTITY

Solicitation No.: W912HY24B0010 Date Issued: 1 Mar 2023 Date Opened: 1 Apr 2023

Business Size: Small Business, VOSB and SDVOSB

TOTAL SCHEDULE NO. 1

Issuing Office: USACE-Galveston

Project Title: FY 24 Houston Ship Channel, Alexander Island Placement Area Dewatering, Harris County, Texas, Set-Aside for Small Business

Offeror 3: Patriot Industries, LLC; 1718 Lobdell Hwy Port Allen, LA 70767

ITEM SCHEDULE NO. 1

Mobilization and Demobilization

Stripping

Semi-Compacted Dike Construction Using Onsite Soils

Bid is Disqualified in accordance with FAR 52.214-18. Failed to submit Unit Price for CLINS 0003 & 0004 as required..

1 JB SUM $1,900,000.00

1 JB SUM $437,000.00

38,925 LF $103.50 $4,028,737.50

18,398 LF $158.50 $2,916,083.00

1 JB SUM $61,000.00

$9,342,820.50

UNIT

PRICE TOTAL

1 JB SUM $347,570.00

1 JB SUM $86,000.00

38,925 LF $40.00 $1,557,000.00

18,398 LF $39.00 $717,522.00

1 JB SUM $244,000.00

$2,952,092.00

UNIT

PRICE TOTAL

1 JB SUM $298,975.00

1 JB SUM $95,000.00

38,925 LF $44.00 $1,712,700.00

18,398 LF $44.00 $809,512.00

1 JB SUM $58,000.00

$2,974,187.00TOTAL SCHEDULE NO. 1

0001 Mobilization and Demobilization

0002 Clearing, Grubbing, and Removal of Debris

0003 Semi-Compacted Dike Construction Using Onsite Soils

0004 Stripping

0005 Turfing

Solicitation No.: W912HY24B0010 Date Issued: 1 Mar 2023 Date Opened: 1 Apr 2023

Issuing Office: USACE-Galveston

Project Title: FY 24 Houston Ship Channel, Alexander Island Placement Area Dewatering, Harris County, Texas, Set-Aside for Small Business

Offeror 6: Wilson Coastal Development, LLC; 2806 E Milton Ave. Suite 100 Youngsville, LA 70592

Business Size: Small Business

ITEM SCHEDULE NO. 1

NO. DESCRIPTION QUANTITY

TOTAL SCHEDULE NO. 1

ABSTRACT OF OFFERS (CONT'D) Page 3 of 3

QUANTITY

0004 Stripping

0005 Turfing

ABSTRACT OF OFFERS (CONT'D) Page 3 of 3

Solicitation No.: W912HY24B0010 Date Issued: 1 Mar 2023 Date Opened: 1 Apr 2023

Issuing Office: USACE-Galveston

Project Title: FY 24 Houston Ship Channel, Alexander Island Placement Area Dewatering, Harris County, Texas, Set-Aside for Small Business

Offeror 5: US Aqua Services, LLC; 4406 Hwy 14 New Iberia, LA 70560

Business Size: Small Business

ITEM SCHEDULE NO. 1

QUANTITY

ABSTRACT OF OFFERS (CONT'D) Page 4 of 4

Project Title: FY 24 Houston Ship Channel, Alexander Island Placement Area Dewatering, Harris County, Texas, Set-Aside for Small Business

Offeror 4: Texas Dewatering, LLC; 13105 Northwest Freeway Suite 1116, Houston, Texas 77040 Business Size: Small Business

SCHEDULE NO. 1ITEM

0002 Clearing, Grubbing, and Removal of Debris

0003 Semi-Compacted Dike Construction Using Onsite Soils

Stripping

TOTAL SCHEDULE NO. 1

Solicitation No.: W912HY24B0010 Date Issued: 1 Mar 2023 Date Opened: 1 Apr 2023

Issuing Office: USACE-Galveston

NO. DESCRIPTION

Clearing, Grubbing, and Removal of Debris

0003 Semi-Compacted Dike Construction Using Onsite Soils

Mobilization and Demobilization

Turfing

Mobilization and Demobilization

NO. DESCRIPTION

2024-04-02T15:51:18-0500
COLE.CURTIS.JR.1231025746
2024-04-02T15:51:50-0500
COLE.CURTIS.JR.1231025746

File details come from the government source that posted it. Updated .