This document is an Abstract of Offers for Solicitation No. W912HY24B0007, a construction project for the USACE Houston Ship Channel, Bayport to Morgans and Bayport Ship Channel in Chambers and Harris County, Texas, involving hopper dredging.
The solicitation was issued on April 30, 2024 and opened on May 31, 2024. The project includes dredging of the Bayport Flare, Houston Ship Channel (Bayport to Morgans), and Bayport Ship Channel, with various optional items such as sea turtle protection, sound protection, and maintenance re-dredging. The government estimate for the base bid was $31,762,430 and the total with all options was $50,215,704. Three offerors are listed - Manson Construction Co., Weeks Marine, Inc., and Great Lakes Dredge & Dock Company, LLC - with their respective base bids and pricing for the options. The apparent low bidder is Weeks Marine, Inc. at $38,722,500 for the base bid and $61,131,000 with all options.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER
W912HY24B0007
2. DATE ISSUED
04/30/2024
3. DATE OPENED
05/31/2024
PAGE OF
1 7 PAGES
4. ISSUING OFFICE
USACE Galveston District A/E Construction Branch Galveston, Texas
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
Curtis Cole, Jr.
SIGNATURE DATE SIGNED
06/04/2024
5. PROJECT TITLE
USACE FY24,Unrestricted Procurement for Houston Ship Channel,Bayport to Morgans & Bayport Ship Channel, Chambers and Harris Counties,Texas, Hopper Dredging
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR A. OFFEROR
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
6. NUMBER OF AMENDMENTS ISSUED
C. REASONABLE CONTRACT
(Including Profit)
C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
7A.
ITEMNO.
7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
SEE ATTACHED PAGES
UNIT ESTIMATED
PRICE AMOUNT
1 Job 2,453,260.00$ 2,453,260.00$
1,025,000 Cubic Yard 11.74$ 12,033,500.00$
1,143,000 Cubic Yard 14.57$ 16,653,510.00$
1 Job 308,160.00$ 308,160.00$
1 Job 314,000.00$ 314,000.00$
Total Base Bid 31,762,430.00$
413,000 Cubic Yard 12.54$ 5,179,020.00$
1 Job $ 55,890.00 55,890.00$
Total Option 1 5,234,910.00$
Total Base Bid & Option 1 36,997,340.00$
276,000 Cubic Yard 15.01$ 4,142,760.00$
1 Job 44,710.00$ 44,710.00$
1 Job 32,330.00$ 32,330.00$
Total Option 2 4,219,800.00$
Total Base Bid & Option 1 & 2 41,217,140.00$
390,000 Cubic Yard 13.67$ 5,331,300.00$
1 Job 57,490.00$ 57,490.00$
1 Job 34,120.00$ 34,120.00$
Total Option 3 5,422,910.00$
Total Base Bid & Option 1, 2, & 3 46,640,050.00$
183,000 Cubic Yard 12.32$ 2,254,560.00$
Option 1
Option 2
Option 3
Option 4
Option 2, Sound Protection BSC Main Channel - Land Cut Sections 12-13
Option 3, Dredging of BSC Turning Basin, Section 14 (Hopper Overflow - 30 minutes
ABSTRACT OF OFFERS
Solicitation No.: W912HY24B0007 Date Issued: 30 April 2024 Date Opened: 31 May 2024 Issuing Office: USAED- Galveston Project Title: FY24 Unrestricted Procurement Houston Ship Channel, Bayport to Morgans & Bayport Ship Channel, Chambers and Harris County, Texas, Hopper Dredging Number of Amendments Issued: 3 GOVERNMENT ESTIMATE (Without Profit)
NO.
ESTIMATED
DESCRIPTION QUANTITY
ITEM
Dredging of Bayport Flare, Section 8 through 9
Dredging of HSC (Bayport to Morgans) Sections 1-7
Option 1, Sea Turtle Protection for BSC Main Channel Sections 10-11
Option 2, Dredging of BSC Main Channel - Land Cut Sections 12-13 (Hopper Overflow - 30 minutes
Mobilization and Demobilization
Sea Turtle Protection Bayport Flare Section 8-9 and HSC Bayport to Morgans Sections 1-7
0005 ODMDS No. 1 Monitor Surveys
Option 1, Dredging of BSC Main Channel Sections 10-
Option 2, Sea Turtle Protection BSC Main Channel - Land Cut Sections 12-13
Option 3, Sea Turtle Protection BSC Turning Basin, Section 14 Option 3, Sound Protection BSC Turning Basin, Section 14
Option 4, Re-dredging Bayport Flare (Maintenance) Section 8 - Red Side
1 Job 23,960.00$ 23,960.00$
Total Option 4 2,278,520.00$
Total Base Bid & Option 1, 2, 3,& 4 48,918,570.00$
44,000 Cubic Yard 24.21$ 1,065,240.00$
1 Job 11,180.00$ 11,180.00$
Total Option 5 1,076,420.00$
Total Base Bid & Option 1, 2, 3,4, & 5 49,994,990.00$
1 Job 21,130.00$ 21,130.00$
30 Days 6,652.80$ 199,584.00$
Total Option 6 220,714.00$
50,215,704.00$
50,215,704.00$
UNIT ESTIMATED
PRICE AMOUNT
1 Job 4,350,000.00$ 4,350,000.00$
1,025,000 Cubic Yard 15.30$ 15,682,500.00$
1,143,000 Cubic Yard 17.00$ 19,431,000.00$
ITEM
NO.
I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED TO THIS
Option 5
Option 6
Total Base Bid & Option 1, 2, 3,4, 5, & 6
ESTIMATED
QUANTITY
Total Bid
Mobilization and Demobilization
0002 Dredging of Bayport Flare, Section 8 through 9
Dredging of HSC (Bayport to Morgans) Sections 1-7
*The apparent low bidder, Weeks Marine is 21.74% above the Government Estimate.
DESCRIPTION
Option 4, Sea Turtle Protection Re-dredging (Maintenance) of Bayport Flare, Section 8 - Red Side
Option 5, Re-dredging (Maintenance) Bayport Flare, Section 9 - Green Side
Option 5, Sea Turtle Protection for Re-dredging (Maintenance) of Bayport Flare, Section 9 - Green Side
0018 Option 6, Mob/Demob Sea Turtle Trawler -Relocation
0019 Option 6, Sea Turtle Trawling & Relocation
SOLICITATION.
Curtis Cole, Jr.
Contracting Officer
Solicitation No.: W912HY24B0007 Date Issued: 30 April 2024 Date Opened: 31 May 2024
Issuing Office: USAED-Galveston Offeror #1 : Manson Construction Co. 5209 East Marginal Way S. Seattle, WA 98134 Business Size: Other than Small
1 Job 150,000.00$ 150,000.00$
1 Job 100,000.00$ 100,000.00$
Total Base Bid 39,713,500.00$
Option 1
413,000 Cubic Yard 17.50$ 7,227,500.00$
1 Job $ 30,000.00 30,000.00$ Total Option 1 7,257,500.00$
Total Base Bid & Option 1 46,971,000.00$
Option 2
276,000 Cubic Yard 27.00$ 7,452,000.00$
1 Job 25,000.00$ 25,000.00$
1 Job 45,000.00$ 45,000.00$
Total Option 2 7,522,000.00$
Total Base Bid & Option 1 & 2 54,493,000.00$
Option 3
390,000 Cubic Yard 26.00$ 10,140,000.00$
1 Job 35,000.00$ 35,000.00$
1 Job 70,000.00$ 70,000.00$
Total Option 3 10,245,000.00$
Total Base Bid & Option 1, 2, & 3 64,738,000.00$
Option 4
183,000 Cubic Yard 17.00$ 3,111,000.00$
1 Job 20,000.00$ 20,000.00$
Total Option 4 3,131,000.00$
Total Base Bid & Option 1, 2, 3,& 4 67,869,000.00$
Option 5
44,000 Cubic Yard 17.00$ 748,000.00$
1 Job 5,000.00$ 5,000.00$
Total Option 5 753,000.00$
Total Base Bid & Option 1, 2, 3,4, & 5 68,622,000.00$
Option 6
1 Job 60,000.00$ 60,000.00$
30 Days 7,000.00$ 210,000.00$
Sea Turtle Protection Bayport Flare Section 8-9 and HSC Bayport to Morgans Sections 1-7
Option 4, Re-dredging Bayport Flare (Maintenance) Section 8 - Red Side
Option 4, Sea Turtle Protection Re-dredging (Maintenance) of Bayport Flare, Section 8 - Red Side
Option 2, Dredging of BSC Main Channel - Land Cut Sections 12-13 (Hopper Overflow - 30 minutes0008
ODMDS No. 1 Monitor Surveys
Option 1, Dredging of BSC Main Channel Sections 10-
Option 2, Sound Protection BSC Main Channel - Land Cut Sections 12-13
Option 3, Dredging of BSC Turning Basin, Section 14 (Hopper Overflow - 30 minutes
Option 1, Sea Turtle Protection for BSC Main Channel Sections 10-11
Option 2, Sea Turtle Protection BSC Main Channel - Land Cut Sections 12-13
Option 3, Sea Turtle Protection BSC Turning Basin, Section 14 Option 3, Sound Protection BSC Turning Basin, Section 140013
Option 5, Re-dredging (Maintenance) Bayport Flare, Section 9 - Green Side
Option 5, Sea Turtle Protection for Re-dredging (Maintenance) of Bayport Flare, Section 9 - Green Side
0018 Option 6, Mob/Demob Sea Turtle Trawler -Relocation
0019 Option 6, Sea Turtle Trawling & Relocation
Total Option 6 270,000.00$
68,892,000.00$
68,892,000.00$
UNIT ESTIMATED
PRICE AMOUNT
1 Job 3,950,000.00$ 3,950,000.00$
1,025,000 Cubic Yard 11.50$ 11,787,500.00$
1,143,000 Cubic Yard 20.00$ 22,860,000.00$
1 Job 100,000.00$ 100,000.00$
1 Job 25,000.00$ 25,000.00$ Total Base Bid 38,722,500.00$
Option 1
413,000 Cubic Yard 11.50$ 4,749,500.00$
1 Job $ 25,000.00 25,000.00$ Total Option 1 4,774,500.00$
Total Base Bid & Option 1 43,497,000.00$ Option 2
276,000 Cubic Yard 25.00$ 6,900,000.00$
1 Job 25,000.00$ 25,000.00$
1 Job 2,500.00$ 2,500.00$ Total Option 2 6,927,500.00$
Total Base Bid & Option 1 & 2 50,424,500.00$ Option 3
390,000 Cubic Yard 20.00$ 7,800,000.00$
1 Job 25,000.00$ 25,000.00$
1 Job 2,500.00$ 2,500.00$ Total Option 3 7,827,500.00$
Total Base Bid & Option 1, 2, & 3 58,252,000.00$ Option 4
183,000 Cubic Yard 10.50$ 1,921,500.00$
1 Job 10,000.00$ 10,000.00$ Total Option 4 1,931,500.00$
Total Base Bid & Option 1, 2, 3,& 4 60,183,500.00$
Option 3, Dredging of BSC Turning Basin, Section 14 (Hopper Overflow - 30 minutes
Option 3, Sea Turtle Protection BSC Turning Basin, Section 14
ITEM
NO. DESCRIPTION
Option 2, Dredging of BSC Main Channel - Land Cut Sections 12-13 (Hopper Overflow - 30 minutes
Solicitation No.: W912HY24B0007 Date Issued: 30 April 2024 Date Opened: 31 May 2024 Issuing Office: USAED-Galveston
Total Bid
Offeror #2 : Weeks Marine, Inc. 304 Gaille Drive, Covington, LA 70433 Business Size: Other than Small
ESTIMATED
QUANTITY
Option 1, Sea Turtle Protection for BSC Main Channel Sections 10-11
0001 Mobilization and Demobilization
0002 Dredging of Bayport Flare, Section 8 through 9
0003 Dredging of HSC (Bayport to Morgans) Sections 1-7
Sea Turtle Protection Bayport Flare Section 8-9 and HSC Bayport to Morgans Sections 1-7
0005 ODMDS No. 1 Monitor Surveys
Option 1, Dredging of BSC Main Channel Sections 10-
Total Base Bid & Option 1, 2, 3,4, 5, & 6
Option 2, Sea Turtle Protection BSC Main Channel - Land Cut Sections 12-13 Option 2, Sound Protection BSC Main Channel - Land Cut Sections 12-13
Option 4, Re-dredging Bayport Flare (Maintenance) Section 8 - Red Side
Option 4, Sea Turtle Protection Re-dredging (Maintenance) of Bayport Flare, Section 8 - Red Side
Option 3, Sound Protection BSC Turning Basin, Section 14
Option 5
44,000 Cubic Yard 17.50$ 770,000.00$
1 Job 2,500.00$ 2,500.00$ Total Option 5 772,500.00$
Total Base Bid & Option 1, 2, 3,4, & 5 60,956,000.00$ Option 6
1 Job 10,000.00$ 10,000.00$ 30 Days 5,500.00$ 165,000.00$
Total Option 6 175,000.00$ 61,131,000.00$
61,131,000.00$
UNIT ESTIMATED
PRICE AMOUNT
1 Job 4,600,000.00$ 4,600,000.00$
1,025,000 Cubic Yard 24.35$ 24,958,750.00$
1,143,000 Cubic Yard 24.40$ 27,889,200.00$
1 Job 215,000.00$ 215,000.00$
1 Job 32,000.00$ 32,000.00$ Total Base Bid 57,694,950.00$
Option 1
413,000 Cubic Yard 22.50$ 9,292,500.00$
1 Job $ 39,000.00 39,000.00$ Total Option 1 9,331,500.00$
Total Base Bid & Option 1 67,026,450.00$ Option 2
276,000 Cubic Yard 22.80$ 6,292,800.00$
1 Job 32,000.00$ 32,000.00$
1 Job 42,000.00$ 42,000.00$ Total Option 2 6,366,800.00$
Total Base Bid & Option 1 & 2 73,393,250.00$ Option 3
390,000 Cubic Yard 29.90$ 11,661,000.00$
1 Job 64,000.00$ 64,000.00$
1 Job 42,000.00$ 42,000.00$ Total Option 3 11,767,000.00$
QUANTITYNO. DESCRIPTION
0001 Mobilization and Demobilization
0002 Dredging of Bayport Flare, Section 8 through 9
0003 Dredging of HSC (Bayport to Morgans) Sections 1-7
Sea Turtle Protection Bayport Flare Section 8-9 and HSC Bayport to Morgans Sections 1-7
0005 ODMDS No. 1 Monitor Surveys
Option 1, Dredging of BSC Main Channel Sections 10-
Solicitation No.: W912HY24B0007 Date Issued: 30 April 2024 Date Opened: 31 May 2024 Issuing Office: USAED-Galveston
Option 5, Sea Turtle Protection for Re-dredging (Maintenance) of Bayport Flare, Section 9 - Green Side
Option 5, Re-dredging (Maintenance) Bayport Flare, Section 9 - Green Side
0018 Option 6, Mob/Demob Sea Turtle Trawler -Relocation 0019 Option 6, Sea Turtle Trawling & Relocation
Total Base Bid & Option 1, 2, 3,4, 5, & 6 Total Bid
ITEM
Offeror #3 : Great Lakes Dredge & Dock Company, LLC, 9811 Katy Freeway, STE 1200, Houston, TX 77024 Business Size: Other than Small
ESTIMATED
Option 1, Sea Turtle Protection for BSC Main Channel Sections 10-11
Option 2, Dredging of BSC Main Channel - Land Cut Sections 12-13 (Hopper Overflow - 30 minutes
Option 2, Sea Turtle Protection BSC Main Channel - Land Cut Sections 12-13
Option 2, Sound Protection BSC Main Channel - Land Cut Sections 12-13
Option 3, Dredging of BSC Turning Basin, Section 14 (Hopper Overflow - 30 minutes
Option 3, Sea Turtle Protection BSC Turning Basin, Section 14
Option 3, Sound Protection BSC Turning Basin, Section 14
Total Base Bid & Option 1, 2, & 3 85,160,250.00$ Option 4
183,000 Cubic Yard 18.50$ 3,385,500.00$
1 Job 18,000.00$ 18,000.00$ Total Option 4 3,403,500.00$
Total Base Bid & Option 1, 2, 3,& 4 88,563,750.00$ Option 5
44,000 Cubic Yard 17.50$ 770,000.00$
1 Job 5,300.00$ 5,300.00$ Total Option 5 775,300.00$
Total Base Bid & Option 1, 2, 3,4, & 5 89,339,050.00$ Option 6
1 Job 19,000.00$ 19,000.00$ 30 Days 4,700.00$ 141,000.00$
Total Option 6 160,000.00$ 89,499,050.00$
89,499,050.00$
Total Base Bid & Option 1, 2, 3,4, 5, & 6 Total Bid
Option 4, Re-dredging Bayport Flare (Maintenance) Section 8 - Red Side
Option 4, Sea Turtle Protection Re-dredging (Maintenance) of Bayport Flare, Section 8 - Red Side
0018 Option 6, Mob/Demob Sea Turtle Trawler -Relocation 0019 Option 6, Sea Turtle Trawling & Relocation
Option 5, Re-dredging (Maintenance) Bayport Flare, Section 9 - Green Side
Option 5, Sea Turtle Protection for Re-dredging (Maintenance) of Bayport Flare, Section 9 - Green Side
| C.04_ABSTRACT_24B0007_3 Jun 24_PCO-Cole.pdf |
| Page 1 |
| 2024-06-04T08:53:09-0500 | |
| COLE.CURTIS.JR.1231025746 |
| 2024-06-04T08:53:52-0500 | |
| COLE.CURTIS.JR.1231025746 |
File details come from the government source that posted it. Updated .