About this file

This document is an abstract of offers for a federal dredging contract opportunity issued by the U.S. Army Corps of Engineers Galveston District. The solicitation sought offers for dredging services in the Corpus Christi Ship Channel in Nueces and San Patricio Counties, Texas to improve the upper harbor reach. Three offers were received in response to solicitation number W912HY23B0026 issued on July 6, 2023 with an opening date of August 18, 2023. The apparent low bidder was Callan Marine, Ltd. at $264,152,806. The scope of work included dredging over 4.4 million cubic yards of material, construction of breakwaters, installation of articulating concrete block fencing and turfing, and removal of utility pipelines. Offerors were required to provide lump sum pricing for mobilization, demobilization and individual line items.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM

7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

US Army Corps of Engineers Galveston District 2000 Fort Point Road Galveston, Texas 77550

5. PROJECT TITLE

Unrestricted Procurement for Corpus Christi Ship Channel, Texas, Upper Harbor Reach, Channel Improvement Project in Nueces and San Patricio Counties, Texas, Dredging.

SEE ATTACHED THREE BIDS RECEIVED

0001 - 0003

1. SOLICITATION NUMBER

W912HY23B0026 1 508/18/202307/06/2023

SEE ATTACHED SEE ATTACHED

Curtis Cole, Jr.

18 Aug 2023

UNIT

PRICE TOTAL

1 JB SUM $4,800,000.00

1 JB SUM $2,027,000.00

1 JB SUM $174,900.00

1 JB SUM $248,400.00

4,457,300 CY $10.59 $47,202,807.00

48 HR $4,885.00 $234,480.00

2,000 LF $3,591.00 $7,182,000.00

22,000 SF $56.40 $1,240,800.00

1 JB SUM $80,200.00

1 JB SUM $173,200.00

4,300 SF $57.24 $246,132.00

208 LF $169.00 $35,152.00

$63,645,071.00

1 JB SUM $37,400.00

1,500 FT $1,275.00 $1,912,500.00

$1,949,900.00

1 JB SUM $169,100.00

1 JB SUM $22,100.00

1 JB SUM $5,300.00

42,900 CY $8.02 $344,058.00

$540,558.00

$66,135,529.00

ABSTRACT OF OFFERS Page 2 of 5

Solicitation No.: W912HY23B0026 Date Issued: 6 July 2023 Date Opened: 18 August 2023

Issuing Office: USAED-Galveston

Project Title: Unrestricted Procurement for Corpus Christi Ship Channel, Texas, Upper Harbor Reach, Channel Improvement Project in Nueces and San Patricio Counties, Texas, Dredging.Unrestricted Procurement for Corpus Christi Ship Channel, Texas, Upper Harbor Reach, Channel Improvement Project in Nueces and San Patricio Counties, Texas, Dredging.

TOTAL OPTION NO. 1

0001 Mobilization and Demobilization

Pipeline Management

Pre-Dredging Hazard Survey

Number of Amendments Issued: 0001 - 0003

Government Estimate (Without Profit)

NO.

TOTAL OPTION NO. 2

Biological Monitor

OPTION NO. 2

DESCRIPTION QUANTITY

OPTION NO. 1

TOTAL SCHEDULE NO. 1

SCHEDULE NO. 1ITEM

TOTAL SCHEDULE NO. 1 & OPTION NOS. 1 & 2

Dredging (Section Nos. 1 thru 14)

Standby

Breakwater

Industrial BU Over Flow Weir

Turfing

Demolition

Articulating concrete Block

Fence

0015 Pipeline Management

0016 Pre-Dredging Hazard Survey

0017 Biological Monitor

0018 Dredging (Section No. 15)

Mobilization and Demobilization - E51 Utility Pipeline Removal Utility Pipeline E51 Removal

* The apparent low bidder, Callan Marine, Ltd is 55.58% above the Government's Estimate.

1 JB SUM $45,250,000.00

1 JB SUM $7,500,000.00

1 JB SUM $500,000.00

1 JB SUM $250,000.00

4,457,300 CY $40.00 $178,292,000.00

48 HR $10,500.00 $504,000.00

2,000 LF $5,000.00 $10,000,000.00

22,000 SF $200.00 $4,400,000.00

1 JB SUM $200,000.00

1 JB SUM $2,000,000.00

4,300 SF $175.00 $752,500.00

208 LF $35.00 $7,280.00

$249,655,780.00

1 JB SUM $750,000.00

1,500 FT $4,000.00 $6,000,000.00

$6,750,000.00

1 JB SUM $500,000.00

1 JB SUM $150,000.00

1 JB SUM $5,000.00

42,900 CY $40.00 $1,716,000.00

$2,371,000.00

$258,776,780.00

Articulating concrete Block

0014 Utility Pipeline E51 Removal

Mobilization and Demobilization - E51 Utility Pipeline Removal

OPTION NO. 2

TOTAL OPTION NO. 2

0018 Dredging (Section No. 15)

ABSTRACT OF OFFERS (CONT'D) Page 3 of 5

Project Title: Unrestricted Procurement for Corpus Christi Ship Channel, Texas, Upper Harbor Reach, Channel Improvement Project in Nueces and San Patricio Counties, Texas, Dredging.Unrestricted Procurement for Corpus Christi Ship Channel, Texas, Upper Harbor Reach, Channel Improvement Project in Nueces and San Patricio Counties, Issuing Office: USAED-Galveston

QUANTITY

Mobilization and Demobilization

DESCRIPTION

ITEM SCHEDULE NO. 1

Pre-Dredging Hazard Survey

TOTAL SCHEDULE NO. 1

0007 Breakwater

Fence

OPTION NO. 1

0006 Standby

Pipeline Management

Industrial BU Over Flow Weir

NO.

0009 Turfing

TOTAL SCHEDULE NO. 1 & OPTION NOS. 1 & 2

Biological Monitor

Pipeline Management

0016 Pre-Dredging Hazard Survey

TOTAL OPTION NO. 1

Demolition

Offeror: #1 - Weeks Marine, Inc., 304 Gaille Drive, Covington, LA 70433

Business Size: Large Business

Solicitation No.: W912HY23B0026 Date Issued: 6 July 2023 Date Opened: 18 August 2023

Biological Monitor

Dredging (Section Nos. 1 thru 14)

1 JB SUM $10,126,000.00

1 JB SUM $8,000,000.00

1 JB SUM $425,000.00

1 JB SUM $1,150,000.00

4,457,300 CY $15.00 $66,859,500.00

48 HR $7,000.00 $336,000.00

2,000 LF $2,900.00 $5,800,000.00

22,000 SF $40.00 $880,000.00

1 JB SUM $60,000.00

1 JB SUM $4,071,000.00

4,300 SF $44.00 $189,200.00

208 LF $182.00 $37,856.00

$97,934,556.00

1 JB SUM $3,547,200.00

1,500 FT $400.00 $600,000.00

$4,147,200.00

1 JB SUM $310,000.00

1 JB SUM $45,000.00

1 JB SUM $9,100.00

42,900 CY $10.50 $450,450.00

$814,550.00

$102,896,306.00

ABSTRACT OF OFFERS (CONT'D) Page 4 of 5

Solicitation No.: W912HY23B0026 Date Issued: 6 July 2023 Date Opened: 18 August 2023

Issuing Office: USAED-Galveston

Project Title: Unrestricted Procurement for Corpus Christi Ship Channel, Texas, Upper Harbor Reach, Channel Improvement Project in Nueces and San Patricio Counties, Texas, Dredging.Unrestricted Procurement for Corpus Christi Ship Channel, Texas, Upper Harbor Reach, Channel Improvement Project in Nueces and San Patricio Counties, *Offeror: #2 - Callan Marine, Ltd, 6800 Harborside Dr., Galveston, TX 77554 **APPARENT LOW BIDDER**

Business Size: Large Business

QUANTITY

TOTAL OPTION NO. 2

SCHEDULE NO. 1

Pipeline Management

ITEM

NO.

0004 Biological Monitor

OPTION NO. 1

Biological Monitor

Dredging (Section Nos. 1 thru 14)

Pre-Dredging Hazard Survey

Dredging (Section No. 15)0018

TOTAL SCHEDULE NO. 1 & OPTION NOS. 1 & 2

Mobilization and Demobilization

0006 Standby

0007 Breakwater

DESCRIPTION

0008 Industrial BU Over Flow Weir

0009 Turfing

0010 Demolition

0011 Articulating concrete Block

0012 Fence

TOTAL SCHEDULE NO. 1

0016 Pre-Dredging Hazard Survey

0014 Utility Pipeline E51 Removal

Pipeline Management

OPTION NO. 2

TOTAL OPTION NO. 1

0013 Mobilization and Demobilization - E51 Utility Pipeline Removal

1 JB SUM $35,500,000.00

1 JB SUM $37,500,000.00

1 JB SUM $275,000.00

1 JB SUM $450,000.00

4,457,300 CY $38.80 $172,943,240.00

48 HR $13,000.00 $624,000.00

2,000 LF $3,625.00 $7,250,000.00

22,000 SF $57.75 $1,270,500.00

1 JB SUM $210,000.00

1 JB SUM $90,000.00

4,300 SF $45.50 $195,650.00

208 LF $87.00 $18,096.00

$256,326,486.00

1 JB SUM $171,500.00

1,500 FT $3,500.00 $5,250,000.00

$5,421,500.00

1 JB SUM $1,000,000.00

1 JB SUM $25,000.00

1 JB SUM $15,600.00

42,900 CY $31.80 $1,364,220.00

$2,404,820.00

$264,152,806.00

0014 Utility Pipeline E51 Removal

Demolition

Pre-Dredging Hazard Survey

0004 Biological Monitor

0008 Industrial BU Over Flow Weir

0005 Dredging (Section Nos. 1 thru 14)

0009 Turfing

Standby

Breakwater

TOTAL OPTION NO. 1

Offeror: #3 - Great Lakes Dredge & Dock Co., LLC, 9811 Katy Freeway, Suite 1200, Houston, TX 77024

Business Size: Large Business

QUANTITY

0011 Articulating concrete Block

0012 Fence

TOTAL SCHEDULE NO. 1

OPTION NO. 1

0013 Mobilization and Demobilization - E51 Utility Pipeline Removal

0015 Pipeline Management

OPTION NO. 2

Pipeline Management

ITEM SCHEDULE NO. 1

Solicitation No.: W912HY23B0026 Date Issued: 6 July 2023 Date Opened: 18 August 2023

NO. DESCRIPTION

ABSTRACT OF OFFERS (CONT'D) Page 5 of 5

Issuing Office: USAED-Galveston

Project Title: Unrestricted Procurement for Corpus Christi Ship Channel, Texas, Upper Harbor Reach, Channel Improvement Project in Nueces and San Patricio Counties, Texas, Dredging.Unrestricted Procurement for Corpus Christi Ship Channel, Texas, Upper Harbor Reach, Channel Improvement Project in Nueces and San Patricio Counties, 0001 Mobilization and Demobilization

0016 Pre-Dredging Hazard Survey

0017 Biological Monitor

0018 Dredging (Section No. 15)

TOTAL OPTION NO. 2

TOTAL SCHEDULE NO. 1 & OPTION NOS. 1 & 2

2023-08-18T15:12:30-0500
COLE.CURTIS.JR.1231025746

File details come from the government source that posted it. Updated .