C.04_Abstract-W912HY23B0026-CCSC Contract #4-PCO-Signed.pdf
PDF 400 KB Posted
- Solicitation number
- W912HY23B0026
About this file
This document is an abstract of offers for a federal dredging contract opportunity issued by the U.S. Army Corps of Engineers Galveston District. The solicitation sought offers for dredging services in the Corpus Christi Ship Channel in Nueces and San Patricio Counties, Texas to improve the upper harbor reach. Three offers were received in response to solicitation number W912HY23B0026 issued on July 6, 2023 with an opening date of August 18, 2023. The apparent low bidder was Callan Marine, Ltd. at $264,152,806. The scope of work included dredging over 4.4 million cubic yards of material, construction of breakwaters, installation of articulating concrete block fencing and turfing, and removal of utility pipelines. Offerors were required to provide lump sum pricing for mobilization, demobilization and individual line items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C.04_Abstract-Rev-W912HY23B0026-CCSC Contract #4-PCO.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
US Army Corps of Engineers Galveston District 2000 Fort Point Road Galveston, Texas 77550
5. PROJECT TITLE
Unrestricted Procurement for Corpus Christi Ship Channel, Texas, Upper Harbor Reach, Channel Improvement Project in Nueces and San Patricio Counties, Texas, Dredging.
SEE ATTACHED THREE BIDS RECEIVED
0001 - 0003
1. SOLICITATION NUMBER
W912HY23B0026 1 508/18/202307/06/2023
SEE ATTACHED SEE ATTACHED
Curtis Cole, Jr.
18 Aug 2023
UNIT
PRICE TOTAL
1 JB SUM $4,800,000.00
1 JB SUM $2,027,000.00
1 JB SUM $174,900.00
1 JB SUM $248,400.00
4,457,300 CY $10.59 $47,202,807.00
48 HR $4,885.00 $234,480.00
2,000 LF $3,591.00 $7,182,000.00
22,000 SF $56.40 $1,240,800.00
1 JB SUM $80,200.00
1 JB SUM $173,200.00
4,300 SF $57.24 $246,132.00
208 LF $169.00 $35,152.00
$63,645,071.00
1 JB SUM $37,400.00
1,500 FT $1,275.00 $1,912,500.00
$1,949,900.00
1 JB SUM $169,100.00
1 JB SUM $22,100.00
1 JB SUM $5,300.00
42,900 CY $8.02 $344,058.00
$540,558.00
$66,135,529.00
ABSTRACT OF OFFERS Page 2 of 5
Solicitation No.: W912HY23B0026 Date Issued: 6 July 2023 Date Opened: 18 August 2023
Issuing Office: USAED-Galveston
Project Title: Unrestricted Procurement for Corpus Christi Ship Channel, Texas, Upper Harbor Reach, Channel Improvement Project in Nueces and San Patricio Counties, Texas, Dredging.Unrestricted Procurement for Corpus Christi Ship Channel, Texas, Upper Harbor Reach, Channel Improvement Project in Nueces and San Patricio Counties, Texas, Dredging.
TOTAL OPTION NO. 1
0001 Mobilization and Demobilization
Pipeline Management
Pre-Dredging Hazard Survey
Number of Amendments Issued: 0001 - 0003
Government Estimate (Without Profit)
NO.
TOTAL OPTION NO. 2
Biological Monitor
OPTION NO. 2
DESCRIPTION QUANTITY
OPTION NO. 1
TOTAL SCHEDULE NO. 1
SCHEDULE NO. 1ITEM
TOTAL SCHEDULE NO. 1 & OPTION NOS. 1 & 2
Dredging (Section Nos. 1 thru 14)
Standby
Breakwater
Industrial BU Over Flow Weir
Turfing
Demolition
Articulating concrete Block
Fence
0015 Pipeline Management
0016 Pre-Dredging Hazard Survey
0017 Biological Monitor
0018 Dredging (Section No. 15)
Mobilization and Demobilization - E51 Utility Pipeline Removal Utility Pipeline E51 Removal
* The apparent low bidder, Callan Marine, Ltd is 55.58% above the Government's Estimate.
1 JB SUM $45,250,000.00
1 JB SUM $7,500,000.00
1 JB SUM $500,000.00
1 JB SUM $250,000.00
4,457,300 CY $40.00 $178,292,000.00
48 HR $10,500.00 $504,000.00
2,000 LF $5,000.00 $10,000,000.00
22,000 SF $200.00 $4,400,000.00
1 JB SUM $200,000.00
1 JB SUM $2,000,000.00
4,300 SF $175.00 $752,500.00
208 LF $35.00 $7,280.00
$249,655,780.00
1 JB SUM $750,000.00
1,500 FT $4,000.00 $6,000,000.00
$6,750,000.00
1 JB SUM $500,000.00
1 JB SUM $150,000.00
1 JB SUM $5,000.00
42,900 CY $40.00 $1,716,000.00
$2,371,000.00
$258,776,780.00
Articulating concrete Block
0014 Utility Pipeline E51 Removal
Mobilization and Demobilization - E51 Utility Pipeline Removal
OPTION NO. 2
TOTAL OPTION NO. 2
0018 Dredging (Section No. 15)
ABSTRACT OF OFFERS (CONT'D) Page 3 of 5
Project Title: Unrestricted Procurement for Corpus Christi Ship Channel, Texas, Upper Harbor Reach, Channel Improvement Project in Nueces and San Patricio Counties, Texas, Dredging.Unrestricted Procurement for Corpus Christi Ship Channel, Texas, Upper Harbor Reach, Channel Improvement Project in Nueces and San Patricio Counties, Issuing Office: USAED-Galveston
QUANTITY
Mobilization and Demobilization
DESCRIPTION
ITEM SCHEDULE NO. 1
Pre-Dredging Hazard Survey
TOTAL SCHEDULE NO. 1
0007 Breakwater
Fence
OPTION NO. 1
0006 Standby
Pipeline Management
Industrial BU Over Flow Weir
NO.
0009 Turfing
TOTAL SCHEDULE NO. 1 & OPTION NOS. 1 & 2
Biological Monitor
Pipeline Management
0016 Pre-Dredging Hazard Survey
TOTAL OPTION NO. 1
Demolition
Offeror: #1 - Weeks Marine, Inc., 304 Gaille Drive, Covington, LA 70433
Business Size: Large Business
Solicitation No.: W912HY23B0026 Date Issued: 6 July 2023 Date Opened: 18 August 2023
Biological Monitor
Dredging (Section Nos. 1 thru 14)
1 JB SUM $10,126,000.00
1 JB SUM $8,000,000.00
1 JB SUM $425,000.00
1 JB SUM $1,150,000.00
4,457,300 CY $15.00 $66,859,500.00
48 HR $7,000.00 $336,000.00
2,000 LF $2,900.00 $5,800,000.00
22,000 SF $40.00 $880,000.00
1 JB SUM $60,000.00
1 JB SUM $4,071,000.00
4,300 SF $44.00 $189,200.00
208 LF $182.00 $37,856.00
$97,934,556.00
1 JB SUM $3,547,200.00
1,500 FT $400.00 $600,000.00
$4,147,200.00
1 JB SUM $310,000.00
1 JB SUM $45,000.00
1 JB SUM $9,100.00
42,900 CY $10.50 $450,450.00
$814,550.00
$102,896,306.00
ABSTRACT OF OFFERS (CONT'D) Page 4 of 5
Solicitation No.: W912HY23B0026 Date Issued: 6 July 2023 Date Opened: 18 August 2023
Issuing Office: USAED-Galveston
Project Title: Unrestricted Procurement for Corpus Christi Ship Channel, Texas, Upper Harbor Reach, Channel Improvement Project in Nueces and San Patricio Counties, Texas, Dredging.Unrestricted Procurement for Corpus Christi Ship Channel, Texas, Upper Harbor Reach, Channel Improvement Project in Nueces and San Patricio Counties, *Offeror: #2 - Callan Marine, Ltd, 6800 Harborside Dr., Galveston, TX 77554 **APPARENT LOW BIDDER**
Business Size: Large Business
QUANTITY
TOTAL OPTION NO. 2
SCHEDULE NO. 1
Pipeline Management
ITEM
NO.
0004 Biological Monitor
OPTION NO. 1
Biological Monitor
Dredging (Section Nos. 1 thru 14)
Pre-Dredging Hazard Survey
Dredging (Section No. 15)0018
TOTAL SCHEDULE NO. 1 & OPTION NOS. 1 & 2
Mobilization and Demobilization
0006 Standby
0007 Breakwater
DESCRIPTION
0008 Industrial BU Over Flow Weir
0009 Turfing
0010 Demolition
0011 Articulating concrete Block
0012 Fence
TOTAL SCHEDULE NO. 1
0016 Pre-Dredging Hazard Survey
0014 Utility Pipeline E51 Removal
Pipeline Management
OPTION NO. 2
TOTAL OPTION NO. 1
0013 Mobilization and Demobilization - E51 Utility Pipeline Removal
1 JB SUM $35,500,000.00
1 JB SUM $37,500,000.00
1 JB SUM $275,000.00
1 JB SUM $450,000.00
4,457,300 CY $38.80 $172,943,240.00
48 HR $13,000.00 $624,000.00
2,000 LF $3,625.00 $7,250,000.00
22,000 SF $57.75 $1,270,500.00
1 JB SUM $210,000.00
1 JB SUM $90,000.00
4,300 SF $45.50 $195,650.00
208 LF $87.00 $18,096.00
$256,326,486.00
1 JB SUM $171,500.00
1,500 FT $3,500.00 $5,250,000.00
$5,421,500.00
1 JB SUM $1,000,000.00
1 JB SUM $25,000.00
1 JB SUM $15,600.00
42,900 CY $31.80 $1,364,220.00
$2,404,820.00
$264,152,806.00
0014 Utility Pipeline E51 Removal
Demolition
Pre-Dredging Hazard Survey
0004 Biological Monitor
0008 Industrial BU Over Flow Weir
0005 Dredging (Section Nos. 1 thru 14)
0009 Turfing
Standby
Breakwater
TOTAL OPTION NO. 1
Offeror: #3 - Great Lakes Dredge & Dock Co., LLC, 9811 Katy Freeway, Suite 1200, Houston, TX 77024
Business Size: Large Business
QUANTITY
0011 Articulating concrete Block
0012 Fence
TOTAL SCHEDULE NO. 1
OPTION NO. 1
0013 Mobilization and Demobilization - E51 Utility Pipeline Removal
0015 Pipeline Management
OPTION NO. 2
Pipeline Management
ITEM SCHEDULE NO. 1
Solicitation No.: W912HY23B0026 Date Issued: 6 July 2023 Date Opened: 18 August 2023
NO. DESCRIPTION
ABSTRACT OF OFFERS (CONT'D) Page 5 of 5
Issuing Office: USAED-Galveston
Project Title: Unrestricted Procurement for Corpus Christi Ship Channel, Texas, Upper Harbor Reach, Channel Improvement Project in Nueces and San Patricio Counties, Texas, Dredging.Unrestricted Procurement for Corpus Christi Ship Channel, Texas, Upper Harbor Reach, Channel Improvement Project in Nueces and San Patricio Counties, 0001 Mobilization and Demobilization
0016 Pre-Dredging Hazard Survey
0017 Biological Monitor
0018 Dredging (Section No. 15)
TOTAL OPTION NO. 2
TOTAL SCHEDULE NO. 1 & OPTION NOS. 1 & 2
| 2023-08-18T15:12:30-0500 | |
| COLE.CURTIS.JR.1231025746 |