C.04_Bid Abtract W912HY24B0024 PCO Signed 23 JUN2023.pdf
PDF 367 KB Posted
- Attached to
- SABINE-NECHES WATERWAY MAINTENANCE DREDGING
- Solicitation number
- W912HY23B0024
About this file
This abstract of offers summarizes bids received in response to Solicitation Number W912HY23B0024 issued by the Department of the Army Corps of Engineers Engineering District Galveston. The solicitation sought bids for maintenance dredging of the Sabine-Neches Waterway in Jefferson County, Texas, including dredging of sections 1 through 13 and related pipeline management. Five offers were received for the base work and four options. Apparent low bidder was Orion Marine Construction, Inc. at $23,770,000. Other bidders included Callan Marine Ltd. at $35,883,750, Weeks Marine Inc. at $23,797,750, Inland Dredging Company at $26,220,000, and Crosby Dredging LLC at $21,786,116. The abstract provides itemized pricing for the base work and each option submitted by each bidder. Award is anticipated to be made in the near future.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM
7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
FY23 Sabine-Neches Waterway (SNWW) MAINTENANCE DREDGING, JEFFERSON COUNTY, Texas Pipeline Dredging
1 9
Jo Ann McCue Contracting Officer
3 3
MCCUE.JO.ANN.12645
66130
Digitally signed by
MCCUE.JO.ANN.1264566130
Date: 2023.06.23 16:27:02 -05'00'
06/23/2023
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
1. SOLICITATION NUMBER PAGE OF
PAGES
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
4. OFFERS (Continued)2. PROJECT TITLE
NO.: NO.: NO.: NO.:
A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A.
ITEM
NO.
B.
ESTIMATED
QUANTITY
C.
UNIT D. UNIT
PRICE
E. ESTIMATED
AMOUNT
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
FY23 Sabine-Neches Waterway
(SNWW) MAINTENANCE
DREDGING, JEFFERSON
COUNTY, Texas Pipeline Dredging
3 3 3
2 9
CROSBY DREDGING LLC
UNIT
PRICE TOTAL
1 JB 2,400,000.00 $2,400,000.00
1 JB $176,193.00 $176,193.00
1 JB $155,197.00 $155,197.00
970,000 CY $4.08 $3,957,600.00
460,000 CY $6.19 $2,847,400.00
290,000 CY $2.87 $832,300.00
$10,368,690.00
725,000 CY $2.72 $1,972,000.00
1 JOB $109,779.00 $109,779.00
$2,081,779.00
$12,450,469.00
OPTION NO. 2
1,200,000 CY 4.75 $5,700,000.00
1 JOB $107,593.00 $107,593.00
$5,807,593.00
$18,258,062.00
290,000 CY $1.95 $565,500.00
1 JOB $115,491.00 $115,491.00
$680,991.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2 & 3 $18,939,053.00
285,000 CY $9.25 $2,636,250.00
1 JOB $210,813.00 $210,813.00
$2,847,063.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2, 3, & 4 $21,786,116.00
TOTAL OPTION NO. 4
ABSTRACT OF OFFERS Page 1 of 7
Solicitation No.: W912HY23B0024 Date Issued: May 09, 2023 Date Opened: June 22, 2023
Issuing Office: USACE-Galveston
Project Title: FY23 Sabine-Neches Waterway (SNWW) MAINTENANCE DREDGING, JEFFERSON COUNTY, Texas Pipeline Dredging
Mobilization and Demobilization
Pipeline Management for Section Nos. 1 through 4 and 7
Number of Amendments Issued: 0001, 0002, 0003
Government Estimate (Without Profit)
TOTAL SCHEDULE NO. 1
SCHEDULE NO. 1ITEM
NO. DESCRIPTION
QUANTITY
Dredging Section No. 8
OPTION NO. 3
TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2
TOTAL OPTION NO. 2
Dredging Section No. 11
Pipeline Management
TOTAL SCHEDULE NO.1 & OPTION NO.1
Pipeline Management
OPTION NO. 1
TOTAL OPTION NO. 1
0009 Dredging Section Nos. 9A, 9B, and 10
OPTION NO. 4
0013 Dredging Section No. 12 and 13
0014 Pipeline Management
0010 Pipeline Management
TOTAL OPTION NO. 3
Pipeline Management for Sections 5A, 5B, and 6
Dredging Section Nos. 1 through 4
Dredging Section Nos. 5A, 5B, and 6
Dredging Section No. 7
The apparent low bidder, ORION MARINE CONSTRUCTION, INC
I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED IN RESPONSE TO
THIS SOLICITATION.
Jo Ann McCue
CONTRACTING OFFICER
1 JOB 2,300,000.00 $2,300,000.00
1 JOB $820,000.00 $820,000.00
1 JOB $300,000.00 $300,000.00
970,000 CY $5.00 $4,850,000.00
460,000 CY $8.00 $3,680,000.00
290,000 CY $3.50 $1,015,000.00
$12,965,000.00
725,000 CY $2.00 $1,450,000.00
1 JOB $170,000.00 $170,000.00
$1,620,000.00
$14,585,000.00
1,200,000 CY $4.00 $4,800,000.00
1 JOB $170,000.00 $170,000.00
$4,970,000.00
$19,555,000.00
290,000 CY $2.00 $580,000.00
1 JOB $100,000.00 $100,000.00
$680,000.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2 & 3
$20,235,000.00
285,000 CY $11.00 $3,135,000.00
1 JOB $400,000.00 $400,000.00
$3,535,000.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2, 3, & 4
$23,770,000.00
TOTAL OPTION NO. 1
OPTION NO. 2
0009 Dredging Section Nos. 9A, 9B, and 10
0010 Pipeline Management
TOTAL SCHEDULE NO.1 & OPTION NO.1
NO. DESCRIPTION QUANTITY
0001 Mobilization and Demobilization
0002 Pipeline Management for Section Nos. 1 through 4 and 7
SCHEDULE NO. 1
Offeror 1:ORION MARINE CONSTRUCTION, INC 1715 N West Shore BLVD STE 875
Tampa, Florida
Business Size: large
TOTAL SCHEDULE NO. 1
OPTION NO. 1
Dredging Section No. 8
0008 Pipeline Management
TOTAL OPTION NO. 2
Solicitation No.: W912HY23B0024 Date Issued: May 09, 2023 Date Opened: June 22, 2023
Issuing Office: USACE-Galveston
Project Title: FY23 Sabine-Neches Waterway (SNWW) MAINTENANCE DREDGING, JEFFERSON COUNTY, Texas Pipeline Dredging
ABSTRACT OF OFFERS (CONT'D) Page 2 of 7
TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2
OPTION NO. 3
0011 Dredging Section No. 11
0012 Pipeline Management
TOTAL OPTION NO. 3
OPTION NO. 4
Dredging Section No. 12 and 13
Pipeline Management
TOTAL OPTION NO. 4
0003 Pipeline Management for Sections 5A, 5B, and 6
0004 Dredging Section Nos. 1 through 4
0005 Dredging Section Nos. 5A, 5B, and 6
0006 Dredging Section No. 7
1 JOB 1,880,000.00 $1,880,000.00
1 JOB $470,000.00 $470,000.00
1 JOB $375,000.00 $375,000.00
970,000 CY $5.30 $5,141,000.00
460,000 CY $6.60 $3,036,000.00
290,000 CY $4.55 $1,319,500.00
$12,221,500.00
725,000 CY $4.10 $2,972,500.00
1 JOB $200,000.00 $200,000.00
$3,172,500.00
$15,394,000.00
1,200,000 CY $5.10 $6,120,000.00
1 JOB $200,000.00 $200,000.00
$6,320,000.00
$21,714,000.00
290,000 CY $4.55 $1,319,500.00
1 JOB $150,000.00 $150,000.00
$1,469,500.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2 & 3
$23,183,500.00
285,000 CY $5.75 $1,638,750.00
1 JOB $275,000.00 $275,000.00
$1,913,750.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2, 3, & 4
$25,097,250.00
Dredging Section No. 8
0008 Pipeline Management
TOTAL OPTION NO. 1
OPTION NO. 1
TOTAL SCHEDULE NO. 1
DESCRIPTION
ABSTRACT OF OFFERS (CONT'D) Page 3 of 7
Offeror 2: CALLAN MARINE LTD 6800 Harborside DR Galveston, Texas 77554-2830
Business Size: large
ITEM SCHEDULE NO. 1
NO. QUANTITY
Solicitation No.: W912HY23B0024 Date Issued: May 09, 2023 Date Opened: June 22, 2023
Dredging Section No. 7
TOTAL SCHEDULE NO.1 & OPTION NO.1
0010 Pipeline Management
TOTAL OPTION NO. 2
Dredging Section Nos. 1 through 4
Dredging Section Nos. 5A, 5B, and 6
OPTION NO. 3
Dredging Section No. 11
Mobilization and Demobilization
Pipeline Management for Section Nos. 1 through 4 and 7
OPTION NO. 2
Dredging Section Nos. 9A, 9B, and 10
Issuing Office: USACE-Galveston
Project Title: FY23 Sabine-Neches Waterway (SNWW) MAINTENANCE DREDGING, JEFFERSON COUNTY, Texas Pipeline Dredging
TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2
Pipeline Management for Sections 5A, 5B, and 6
Dredging Section No. 12 and 13
Pipeline Management
TOTAL OPTION NO. 4
0012 Pipeline Management
TOTAL OPTION NO. 3
OPTION NO. 4
1 JOB 4,750,000.00 $4,750,000.00
1 JOB $500,000.00 $500,000.00
1 JOB $500,000.00 $500,000.00
970,000 CY $7.75 $7,517,500.00
460,000 CY $12.25 $5,635,000.00
290,000 CY $6.50 $1,885,000.00
$20,787,500.00
725,000 CY $5.25 $3,806,250.00
1 JOB $50,000.00 $50,000.00
$3,856,250.00
$24,643,750.00
1,200,000 CY $6.25 $7,500,000.00
1 JOB $50,000.00 $50,000.00
$7,550,000.00
$32,193,750.00
290,000 CY $5.50 $1,595,000.00
1 JOB $50,000.00 $50,000.00
$1,645,000.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2 & 3
$33,838,750.00
285,000 CY $7.00 $1,995,000.00
1 JOB $50,000.00 $50,000.00
$2,045,000.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2, 3, & 4
$35,883,750.00
ABSTRACT OF OFFERS (CONT'D) Page 4 of 7
Offeror 3: WEEKS MARINE INC 304 Gaille DR Covington, Louisiana 70433-9125
TOTAL SCHEDULE NO. 1
Pipeline Management for Section Nos. 1 through 4 and 7
ITEM SCHEDULE NO. 1
Solicitation No.: W912HY23B0024 Date Issued: May 09, 2023 Date Opened: June 22, 2023
Business Size: large
QUANTITYNO. DESCRIPTION
0001 Mobilization and Demobilization
Issuing Office: USACE-Galveston
Dredging Section No. 8
OPTION NO. 2
Dredging Section Nos. 9A, 9B, and 100009
TOTAL OPTION NO. 1
0008 Pipeline Management
TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2
OPTION NO. 1
TOTAL SCHEDULE NO.1 & OPTION NO.1
0010 Pipeline Management
TOTAL OPTION NO. 2
Project Title: FY23 Sabine-Neches Waterway (SNWW) MAINTENANCE DREDGING, JEFFERSON COUNTY, Texas Pipeline Dredging
TOTAL OPTION NO. 3
OPTION NO. 3
0011 Dredging Section No. 11
0012 Pipeline Management
OPTION NO. 4
0013 Dredging Section No. 12 and 13
0014 Pipeline Management
TOTAL OPTION NO. 4
Pipeline Management for Sections 5A, 5B, and 6
Dredging Section Nos. 1 through 4
Dredging Section Nos. 5A, 5B, and 6
Dredging Section No. 7
1 JOB 4,500,000.00 $4,500,000.00
1 JOB $1,500,000.00 $1,500,000.00
1 JOB $1,000,000.00 $1,000,000.00
970,000 CY $4.00 $3,880,000.00
460,000 CY $4.00 $1,840,000.00
290,000 CY $3.50 $1,015,000.00
$13,735,000.00
725,000 CY $3.00 $2,175,000.00
1 JOB $250,000.00 $250,000.00
$2,425,000.00
$16,160,000.00
1,200,000 CY $3.25 $3,900,000.00
1 JOB $500,000.00 $500,000.00
$4,400,000.00
$20,560,000.00
290,000 CY 3.00 $870,000.00
1 JOB $250,000.00 $250,000.00
$1,120,000.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2 & 3
$21,680,000.00
285,000 CY $5.15 $1,467,750.00
1 JOB $650,000.00 $650,000.00
$2,117,750.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2, 3, & 4
$23,797,750.00
ABSTRACT OF OFFERS (CONT'D) Page 5 of 7
Solicitation No.: W912HY23B0024 Date Issued: May 09, 2023 Date Opened: June 22, 2023
Issuing Office: USACE-Galveston
ABSTRACT OF OFFERS (CONT'D) Page 6 of 7
Offeror 4: INLAND DREDGING COMPANY, L.L.C. 103 N King AVE Dyersburg, Tennessee 38024-4609
Mobilization and Demobilization
0008 Pipeline Management
TOTAL SCHEDULE NO. 1
OPTION NO. 1
Pipeline Management for Section Nos. 1 through 4 and 7
SCHEDULE NO. 1
NO. DESCRIPTION QUANTITY
Business Size: large
ITEM
Solicitation No.: W912HY23B0024 Date Issued: May 09, 2023 Date Opened: June 22, 2023
Issuing Office: USACE-Galveston
Project Title: FY23 Sabine-Neches Waterway (SNWW) MAINTENANCE DREDGING, JEFFERSON COUNTY, Texas Pipeline Dredging
Dredging Section No. 11
0012 Pipeline Management
TOTAL OPTION NO. 3
OPTION NO. 4
0013 Dredging Section No. 12 and 13
TOTAL SCHEDULE NO.1 & OPTION NO.1
0010 Pipeline Management
0014 Pipeline Management
TOTAL OPTION NO. 4
OPTION NO. 3
Pipeline Management for Sections 5A, 5B, and 6
Dredging Section Nos. 1 through 4
Dredging Section Nos. 5A, 5B, and 6
Dredging Section No. 7
TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2
TOTAL OPTION NO. 1
OPTION NO. 2
0009 Dredging Section Nos. 9A, 9B, and 10
TOTAL OPTION NO. 2
Dredging Section No. 8
1 JOB 2,600,000.00 $2,600,000.00
1 JOB $740,000.00 $740,000.00
1 JOB 655,000.00$ $655,000.00
970,000 CY $4.70 $4,559,000.00
460,000 CY $9.30 $4,278,000.00
290,000 CY 3.90 $1,131,000.00
$13,963,000.00
725,000 CY $3.70 $2,682,500.00
1 JOB $530,000.00 $530,000.00
$3,212,500.00
$17,175,500.00
1,200,000 CY $4.10 $4,920,000.00
1 JOB $590,000.00 $590,000.00
$5,510,000.00
$22,685,500.00
290,000 CY $4.00 $1,160,000.00
1 JOB $350,000.00 $350,000.00
$1,510,000.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2 & 3 $24,195,500.00
285,000 CY $5.70 $1,624,500.00
1 JOB $400,000.00 $400,000.00
$2,024,500.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2, 3, & 4
$26,220,000.00
TOTAL OPTION 3
0010 Pipeline Management
TOTAL OPTION NO. 4
Project Title: FY23 Sabine-Neches Waterway (SNWW) MAINTENANCE DREDGING, JEFFERSON COUNTY, Texas Pipeline Dredging
Offeror 5: CROSBY DREDGING LLC 17771 Highway 3235 Galliano, Louisiana 70354-3578
Business Size: large
Pipeline Management for Section Nos. 1
Dredging Section No. 7
NO. DESCRIPTION QUANTITY
TOTAL SCHEDULE NO. 1
ITEM SCHEDULE NO. 1
OPTION NO. 3
TOTAL OPTION NO. 2
Dredging Section No. 12 and 13
0014 Pipeline Management
OPTION NO. 1
TOTAL OPTION NO. 1
OPTION NO. 2
0009 Dredging Section Nos. 9A, 9B, and 10
TOTAL SCHEDULE NO.1 & OPTION NO. 1
0011 Dredging Section No. 11
0012 Pipeline Management
OPTION NO. 4
0003 Pipeline Management for Sections 5A, 5B, and 6
0005 Dredging Section Nos. 5A, 5B, and 6
TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2
0001 Mobilization and Demobilization
0004 Dredging Section Nos. 1 through 4
0007 Dredging Section No. 8
0008 Pipeline Management