C.04_Bid Abstract W912HY23B0023 PCO signed 6 Sep 2023.pdf
PDF 111 KB Posted
- Solicitation number
- W912HY23B0023
About this file
This abstract of offers is for the solicitation of construction services related to improvements of the Houston Ship Channel in Rosa Allen, Harris County, Texas. The scope of work includes clearing, grubbing, stripping, dike construction, ditching, turfing, and drop-outlet structure modifications. Four offers were received by the deadline of September 6, 2023 from small businesses. The apparent low offeror was Scrimgeours Farm All, LLC at $6,907,945, which is 12.4% below the independent government estimate. Pricing was provided as lump sums, unit rates per cubic yard or linear foot. The solicitation was issued by the U.S. Army Corps of Engineers Galveston District for the restricted competition opportunity numbered W912HY23B0023.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIT
PRICE TOTAL
1 JB SUM $277,450.00
1 JB SUM $87,300.00
249,128 CY $14.35 $3,574,986.80
1 JB SUM $190,120.00
1 JB SUM $167,450.00
1 JB SUM $100,430.00
1 JB SUM $141,400.00
1 JB SUM $6,720.00
11,644 LF $52.50 $611,310.00
12,797 LF $40.00 $511,880.00
$5,669,046.80
Drop-Outlet Structure Modifications
I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED IN RESPONSE TO THIS
SOLICITATION.
0004 Stripping
Final Condition Survey
Lateral Ditching
NO. DESCRIPTION
0005 Turfing
0002 Clearing, Grubbing, and Removal of Debris
Mobilization and Demobilization
* The apparent low bidder, Scrimgeours Farm All, LLC. is 12.4% below the Government's Estimate.
Jo Ann McCue
CONTRACTING OFFICER
Semi-Compacted Dike Construction Using Onsite Soils
SCHEDULE NO. 1ITEM
ABSTRACT OF OFFERS Page 1 of 5
Solicitation No.: W912HY23B0023 Date Issued: 7 Aug 2023 Date Opened: 6 Sep 2023
Issuing Office: USACE-Galveston
Project Title: FY 23 Houston Ship Channel, Rosa Allen PA Improvements, Harris County, Texas, Restricted Procurement
Number of Amendments Issued: 0
Government Estimate (Without Profit)
QUANTITY
Final As-Built Drawings for Drop-Outlet Structure
Perimeter Ditching
TOTAL SCHEDULE NO. 1
1 JB SUM $1,500,000.00
1 JB SUM $110,000.00
249,128 CY $9.75 $2,428,998.00
1 JB SUM $55,000.00
1 JB SUM $320,500.00
1 JB SUM $161,000.00
1 JB SUM $420,000.00
1 JB SUM $86,000.00
11,644 LF $88.00 $1,024,672.00
12,797 LF $66.00 $844,602.00
$6,950,772.00
0007 Drop-Outlet Structure Modifications
0005 Turfing
0006 Final Condition Survey
0010 Lateral Ditching
TOTAL SCHEDULE NO. 1
Issuing Office: USACE-Galveston
ABSTRACT OF OFFERS (CONT'D) Page 2 of 5
0002 Clearing, Grubbing, and Removal of Debris
0003 Semi-Compacted Dike Construction Using Onsite Soils
0004 Stripping
ITEM SCHEDULE NO. 1
NO. DESCRIPTION
0001 Mobilization and Demobilization
Business Size: Small Business
0008 Final As-Built Drawings for Drop-Outlet Structure
0009 Perimeter Ditching
Project Title: FY 23 Houston Ship Channel, Rosa Allen PA Improvements, Harris County, Texas, Restricted Procurement
Offeror 1: Texas Dewatering LLC.; 13105 Northwest Fwy, Suite 1116, Houston, TX 77040
QUANTITY
Solicitation No.: W912HY23B0023 Date Issued: 7 Aug 2023 Date Opened: 6 Sep 2023
1 JB SUM $400,400.00
1 JB SUM $509,600.00
249,128 CY $20.38 $5,078,225.15
1 JB SUM $152,122.88
1 JB SUM $232,960.00
1 JB SUM $174,720.00
1 JB SUM $291,200.00
1 JB SUM $182,000.00
11,644 LF $46.59 $542,517.25
12,797 LF $39.31 $503,075.66
$8,066,820.94
0006 Final Condition Survey
TOTAL SCHEDULE NO. 1
0008 Final As-Built Drawings for Drop-Outlet Structure
0009 Perimeter Ditching
0001 Mobilization and Demobilization
0002 Clearing, Grubbing, and Removal of Debris
0003 Semi-Compacted Dike Construction Using Onsite Soils
Drop-Outlet Structure Modifications
0010 Lateral Ditching
ITEM SCHEDULE NO. 1
NO. DESCRIPTION QUANTITY
Solicitation No.: W912HY23B0023 Date Issued: 7 Aug 2023 Date Opened: 6 Sep 2023
Issuing Office: USACE-Galveston
Project Title: FY 23 Houston Ship Channel, Rosa Allen PA Improvements, Harris County, Texas, Restricted Procurement
ABSTRACT OF OFFERS (CONT'D) Page 3 of 5
Offeror 2: Tandem Services LLC.; 4425 FM 2351, Suite 5, Friendswood, Texas 77546
Business Size: Small Business
0005 Turfing
0004 Stripping
1 JB SUM $1,000,000.00
1 JB SUM $200,000.00
249,128 CY $10.33 $2,573,492.24
1 JB SUM $90,000.00
1 JB SUM $150,000.00
1 JB SUM $50,000.00
1 JB SUM $150,000.00
1 JB SUM $25,000.00
11,644 LF $35.00 $407,540.00
12,797 LF $25.00 $319,925.00
$4,965,957.24
0007 Drop-Outlet Structure Modifications
ABSTRACT OF OFFERS (CONT'D) Page 4 of 5
TOTAL SCHEDULE NO. 1
NO. DESCRIPTION QUANTITY
Issuing Office: USACE-Galveston
Project Title: FY 23 Houston Ship Channel, Rosa Allen PA Improvements, Harris County, Texas, Restricted Procurement
Offeror 3: Scrimgeours Farm All, LLC. ; 12965 NW 110th Ave, Reddick, FL 32686 ***Apparent Low Bidder***
ITEM SCHEDULE NO. 1
Final Condition Survey
Mobilization and Demobilization
Stripping
Semi-Compacted Dike Construction Using Onsite Soils
Solicitation No.: W912HY23B0023 Date Issued: 7 Aug 2023 Date Opened: 6 Sep 2023
Business Size: Small Business
0010 Lateral Ditching
0008 Final As-Built Drawings for Drop-Outlet Structure
0009 Perimeter Ditching
Turfing
Clearing, Grubbing, and Removal of Debris
1 JB SUM $439,128.00
1 JB SUM $281,128.00
249,128 CY $15.25 $3,799,202.00
1 JB SUM $94,000.00
1 JB SUM $42,750.00
1 JB SUM $16,125.00
1 JB SUM $941,550.00
1 JB SUM $5,550.00
11,644 LF $64.50 $751,038.00
12,797 LF $42.00 $537,474.00
$6,907,945.00
0008 Final As-Built Drawings for Drop-Outlet Structure
NO. DESCRIPTION QUANTITY
ABSTRACT OF OFFERS (CONT'D) Page 5 of 5
Project Title: FY 23 Houston Ship Channel, Rosa Allen PA Improvements, Harris County, Texas, Restricted Procurement
Offeror 4: EVCO Development, LLC.; 304 Fairline Dr, Lafayette, LA 70507
Business Size: Small Business
SCHEDULE NO. 1ITEM
0002 Clearing, Grubbing, and Removal of Debris
0003 Semi-Compacted Dike Construction Using Onsite Soils
Stripping
0010 Lateral Ditching
TOTAL SCHEDULE NO. 1
Perimeter Ditching0009
Solicitation No.: W912HY23B0023 Date Issued: 7 Aug 2023 Date Opened: 6 Sep 2023
Issuing Office: USACE-Galveston
Turfing
Mobilization and Demobilization
0006 Final Condition Survey
0007 Drop-Outlet Structure Modifications