B.08_W912HY23B0009 Amend 0001 041423.pdf

PDF 2 MB Posted

Attached to
Brazos Island Harbor, Texas Entrance and Jetty Channels Hopper Maintenance Dredging, Cameron County Texas
Solicitation number
W912HY23B0009
Issued by

About this file

This document is an amendment to a solicitation for hopper dredging services. The U.S. Army Corps of Engineers is seeking a contractor to dredge the Brazos Island Harbor entrance and jetty channels in Cameron County, Texas using a hopper dredge. The amendment modifies the bid schedule, measurement and payment terms, specifications for dredging and placement of excavated material, and endangered species monitoring requirements. Key details include dredging approximately 433,000 cubic yards from specified channel sections, transporting material to nearshore berm placement sites or beach placement areas if Option 4 is exercised, and complying with protections for sea turtles, piping plovers, and red knots if work occurs during periods of potential species occurrence.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

See Continuation Sheet

1. CONTRACT ID CODE PAGE OF PAGES

J

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HY23B0009

X 9B. DATED (SEE ITEM 11)

24-Mar-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

NO. 0001

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

CODE

US ARMY CORPS OF ENGINEERS

GALVESTON DISTRICT

CONTRACTING DIVISION

2000 FORT POINT ROAD

GALVESTON TX 77550-1229

W912HY 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

1 65

14 Apr 2023

W912HY23B0009

A0001-2

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. The specifications for Solicitation No. W912HY23B0009, BRAZOS ISLAND HARBOR, Texas, ENTRANCE AND JETTY CHANNEL in CAMERON COUNTY, Texas, HOPPER DREDGING, are hereby amended as follows:

a) Changes by narrative.

(1) SECTION 00 00 00, SOLICITATION, OFFER, AND AWARD, SF-1442. Block 11. –

(a) The following have been modified:

The contractor period of performance end date has increased by 2 days from 41 days to 43 days.

(2) SECTION 00 72 00, GENERAL CONDITIONS –

(a) The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 43

Calendar Days* The time stated for completion shall include final cleanup of the premises.

(End of clause)

b) Specifications.

(1) SECTION 00 11 00.00 45, BID SCHEDULE – The enclosed SECTION 00 11 00.00 45 entitled BID SCHEDULE supersedes that issued with this Solicitation.

(2) SECTION 01 22 00.10 45, MEASUREMENT AND PAYMENT – The enclosed SECTION 01

22 00.10 45 entitled MEASUREMENT AND PAYMENT supersedes that issued with this

Solicitation.

(3) SECTION 35 20 23.12 45, HOPPER DREDGING – The enclosed SECTION 35 20 23.12 45 entitled HOPPER DREDGING supersedes that issued with this Solicitation.

(4) SECTION 35 20 23.12 451, APPENDIX 1 – QUANTITY SUMMARY TABLE – The enclosed SECTION 35 20 23.12 451 entitled APPENDIX 1 – QUANTITY SUMMARY

TABLE supersedes that issued with this Solicitation.

(5) SECTION 35 20 23.14 45, PROTECTION OF SEA TURTLES – The enclosed SECTION 35

20 23.14 45 entitled PROTECTION OF SEA TURTLES supersedes that issued with this

Solicitation.

c) Drawings.

(1) DRAWINGS NO. G-002 and C-102 - The enclosed Drawings No. G-002 and C-102, supersedes that issued with this Solicitation.

2. This amendment shall be attached to and become a part of the solicitation.

W912HY23B0009

A0001-3

7 Encls:

1. SECTION 00 11 00.00 45, BID SCHEDULE

2. SECTION 01 22 00.10 45, MEASUREMENT AND PAYMENT

3. SECTION 35 20 23.12 45, HOPPER DREDGING

4. SECTION 35 20 23.12 451, APPENDIX 1 – QUANTITY SUMMARY TABLE

5. SECTION 35 20 23.14 45, PROTECTION OF SEA TURTLES

6. DRAWING NO. G-002

7. DRAWING NO. C-102

SWG FILE NO.: RIO 0901-0271 SOLICITATION NO.: W912HY23B0009

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 11 00.00 45

BID SCHEDULE

PART 1 GENERAL

1.1 BID SCHEDULE

1.1.1 Schedule No. 1

1.1.2 Option No. 1

1.1.3 Option No. 2

1.1.4 Option No. 3

1.1.5 Option No. 4

1.1.6 Option No. 5

-- End of Section Table of Contents --

DOCUMENT 00 11 00.00 45 Page 1

TO ACCOMPANY AMENDMENT NO. 0001 TO SOLICITATION W912HY23B0009

THIS PAGE INTENTIONALLY LEFT BLANK

DOCUMENT 00 11 00.00 45 Page 2

00 11 00.00 45

BID SCHEDULE

AMENDMENT NO. 0001

PART 1 GENERAL

1.1 BID SCHEDULE

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.1 Schedule No. 1

Item No. Description Estimated Quantity

Unit Unit Price Estimated Amount

SCHEDULE NO. 1

0001 Mobilization and Demobilization 1 JOB SUM $___________

0002 Turtle Deflector Device and Endangered Species Observers

1 JOB SUM $___________

0003 Dredging Entrance and Jetty Channel Sections 1 and 2 (STA. -13+000 to STA. 0+000)Section 3 (2+400 to 4+400)

433,000 C.Y. $_________ $___________

0004 Mobilization and Demobilization - Sea Turtle Trawling and Relocation

1 JOB SUM $___________

0005 Sea Turtle Trawling and Relocation

15 DAY $_________ $___________

TOTAL SCHEDULE NO. 1 $___________

NOTE: Completion time stated in SECTION 00 72 00 CONTRACT CLAUSES is for Schedule No. 1 work.

DOCUMENT 00 11 00.00 45 Page 3

DOCUMENT 00 11 00.00 45 Page 4

BID SCHEDULE (CONT'D)

(TO BE ATTACHED TO STANDARD FORM 1442)

1.1.2 Option No. 1

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 1

0006 Sea Turtle Trawling and Relocation

15 DAY $_________ $___________

TOTAL SCHEDULE NO. 1 AND OPTION NO. 1 $___________

NOTE FOR OPTI ON NO. 1: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or pr i or t o compl et i on of al l aut hor i zed wor k. No addi t i onal t i me wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Option.

1.1.3 Option No. 2

Item No. Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 2

0007 Sea Turtle Trawling and Relocation 15 DAY $_________ $___________

TOTAL OPTION NO. 2 $___________

TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1 AND 2 $___________

NOTE FOR OPTI ON NO. 2: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or pr i or t o compl et i on of al l aut hor i zed wor k. No addi t i onal t i me wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Option.

DOCUMENT 00 11 00.00 45 Page 5

1.1.4 Option No. 3

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 3

Sea Turtle Trawling and Relocation

15 DAY $_________ $___________

TOTAL OPTION NO. 3 $___________

TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, AND 3 $___________

NOTE FOR OPTI ON NO. 3: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or pr i or t o compl et i on of al l aut hor i zed wor k. No addi t i onal t i me wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Option.

1.1.5 Option No. 4

Item No.

Description Estimated Quantity

Unit Unit Price Estimated Amount

OPTION NO. 4

Placement of Dredged Material at DMPA No. 1

108,250 C.Y. $_________ $___________

Placement of Dredged Material at DMPA No. 2

324,750 C.Y. $_________ $___________

Endangered Species Monitoring - Beach Placement South Padre Island

JOB SUM $___________

TOTAL OPTION NO. 4 $___________

TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, 3, AND 4 $___________

NOTE FOR OPTI ON NO. 4: The Gover nment may exer ci se Opt i on No. 4 pr i or t o i ssui ng t he Not i ce t o Pr oceed. An addi t i onal t i me of 14 cal endar days wi l l be added t o t hi s cont r act i f t hi s Opt i on i s exer ci sed.

DOCUMENT 00 11 00.00 45 Page 6

1. 1. 6 Opt i on No. 5

Item No.

Description Estimated Quantity

Unit Uni t Pr i ce Est i mat ed Amount

OPTI ON NO. 5

0012 Sea Tur t l e Tr awl i ng and Relocation

15 DAY $_________ $___________

TOTAL OPTI ON NO. 5 $___________

TOTAL SCHEDULE NO. 1 AND OPTI ONS NOS. 1, 2, 3, 4, AND 5 $___________

NOTE FOR OPTI ON NO. 5: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or pr i or t o compl et i on of al l aut hor i zed wor k. No addi t i onal t i me wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Opt i on.

-- End of Document --

DOCUMENT 00 11 00.00 45 Page 7

DOCUMENT 00 11 00.00 45 Page 8

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.10 45

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 SUBMITTALS

1.2 LUMP SUM (JOB) PAYMENT ITEMS

1.2.1 Mobilization and Demobilization

1.2.1.1 Payment

1.2.1.2 Unit of Measure

1.2.2 Mobilization and Demobilization - Sea Turtle Trawling and

Relocation

1.2.2.1 Payment

1.2.2.2 Unit of Measure

1.2.3 Turtle Deflector Device and Endangered Species Observers

1.2.3.1 Payment

1.2.3.2 Unit of Measure

1.2.4 Endangered Species Monitoring -- Beach Placement South Padre

Island

1.2.4.1 Payment

1.2.4.2 Unit of Measure

1.3 UNIT PRICE PAYMENT ITEMS

1.3.1 Dredging

1.3.1.1 Payment (AM#1)

1.3.1.2 Dredging Partial Payment

1.3.1.3 Measurement

1.3.1.4 Frequencies

1.3.1.5 Electronic Positioning

1.3.1.6 Government Surveys

1.3.1.7 Surveys During Progress of Work

1.3.1.8 Unit of Measurement

1.3.2 Sea Turtle Trawling and Relocation

1.3.2.1 Payment (AM#1)

1.3.2.2 Measurement

1.3.2.3 Unit of Measure

1.3.3 Beach Placement DMPA No. 1 and DMPA No. 2

1.3.3.1 Payment (AM#1)

1.3.3.2 Measurement

1.3.3.3 Unit of Measure

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Section Table of Contents --

SECTION 01 22 00.10 45 Page 1

SECTION 01 22 00.10 45 Page 2

SECTION 01 22 00.10 45

MEASUREMENT AND PAYMENT

AMENDMENT NO. 0001

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Surveys ; G

1.2 LUMP SUM (JOB) PAYMENT ITEMS

Payment items for the work of this Contract for which Contract lump sum payments will be made are listed in the BID SCHEDULE and described below.

All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, are included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed constitutes full compensation for furnishing plant, labor, materials, and equipment, and performing any associated Contractor Quality Control, administrative requirements, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.2.1 Mobilization and Demobilization

1.2.1.1 Payment

The Contract price for "Mobilization and Demobilization", in Schedule No.1 will include the costs in connection with mobilization and demobilization of the plant necessary to perform work under the various bid items. The Contract price shall include transportation and other costs incidental to delivery of the plant and other equipment to the general work area in condition ready for operation and, after the completion of the work, for removal of the plant and equipment from the work site(s). Payment for mobilization and demobilization will be pursuant to the conditions as defined in the DOCUMENT 00 72 00 CONTRACT CLAUSES.

1.2.1.2 Unit of Measure

Unit of measure: Job.

SECTION 01 22 00.10 45 Page 3

1.2.2 Mobilization and Demobilization - Sea Turtle Trawling and Relocation

1.2.2.1 Payment

The Contract price for "Mobilization and Demobilization - Sea Turtle Trawling and Relocation" in Schedule No. 1 will include the cost in connection with mobilization and demobilization of one Trawler. Payment for mobilization and demobilization will be made pursuant to the conditions of the DOCUMENT 00 72 00 CONTRACT CLAUSES.

1.2.2.2 Unit of Measure

Unit of measure: Job.

1.2.3 Turtle Deflector Device and Endangered Species Observers

1.2.3.1 Payment

Payment for fabrication of Turtle Deflector Device will be made for "Turtle Deflector Device and Endangered Species Observers" in Schedule No.

1, which will include the costs of materials and other execution requirements for Turtle Deflector Device and Endangered Species Observers associated with the protection and monitoring of sea turtles as specified in, the SECTION 35 20 23.14 45 PROTECTION OF SEA TURTLES.

1.2.3.2 Unit of Measure

Unit of measure: Job.

1.2.4 Endangered Species Monitoring -- Beach Placement South Padre Island

1.2.4.1 Payment

Payment for "Endangered Species Monitoring -- Beach Placement South Padre Island" in Option No. 4, will be made for costs associated with providing monitoring for endangered species at the South Padre Island Beach discharge corridors DMPA No. 1 and DMPA No. 2. The Contract price shall include all costs incidental to providing trained monitoring personnel at the discharge corridors while dredge disposal operations are ongoing and all incidentals to complete monitoring in accordance with SECTION 35 20

23.12 45 HOPPER DREDGING. Monthly partial payments will be based on the estimates of work completed.

1.2.4.2 Unit of Measure

Unit of Measure: Job

1.3 UNIT PRICE PAYMENT ITEMS

Payment items for the work in this Contract on which the Contract unit price payments will be made are listed in the BID SCHEDULE and described below. The unit price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor Quality Control, administrative requirements, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.

SECTION 01 22 00.10 45 Page 4

1.3.1 Dredging

1.3.1.1 Payment (AM#1)

Payment for "Dredging Entrance and Jetty Channel Sections 1 and 2 (STA.

-13+000 to STA. 0+000) Sect i ons 1, 2, and 3 ( STA. - 13+000 t o STA 0+000 and STA 2+400 t o 4+400) " in Schedule No. 1, will be made for costs associated with the removal of dredged material, transportation, and placement at Nearshore Berm BU Site 1A and 2A, and/or Nearshore Berm BU Site 2A and 2B, "Section 3 (2+400 to 4+400)" in Schedule No. 1, will be made for costs associated with the removal of dredged material, transportation, and placement at ODMDS Brazos Island Harbor Maintenance, and the National Dredging Quality Management Program for the hopper dredge.

1.3.1.2 Dredging Partial Payment

Partial payment will be based on approximate quantities determined by fathometer soundings or sweepings taken behind the dredge. The Contractor may use its own hydrographic surveys to determine quantities for pay requests, but final quantities will be based on Government Before-Dredging and After-Dredging surveys. Current cross sections and quantities must be submitted for each submitted progress payment request that include incomplete sections.

1.3.1.3 Measurement

The material removed will be measured by cubic yard in place, by means of soundings taken before and after dredging. The total quantity of dredged material will be the theoretical quantity between the bottom surface shown by fathometer soundings of the last survey made "before-dredging" and the bottom surface shown by the fathometer soundings of a survey made "after-dredging", within the limits of the overdepth and side and end slopes, less deductions that may be required for misplaced material.

1.3.1.4 Frequencies

The total quantity of dredged material for which payment will be made will be the theoretical quantity between the bottom surface shown by fathometer soundings of the last survey made "before-dredging" (BD) and the bottom surface shown by the fathometer soundings of a survey made "after-dredging" (AD), within the limits of the overdepth and side and end slopes, less deductions that may be required for misplaced material.

Measurement shall normally be determined based on high frequency (200 kHz) data. Low frequency (40 kHz) data shall normally be used for acceptance/clearance purposes only.

Guidance as provided in Hydrographic Survey Engineering Manual EM-1110-2-1003 Chapter 10 will apply for scheduling of BD and AD surveys.

As provided in this guidance, Government will allow a period of up to 5 calendar days to conduct an AD survey after the Contractor indicates a section to be ready. However, if initial high frequency (200 kHz) AD surveys reflect considerable amount of suspended material for any section, the Government may require up to five (5) additional calendar days settling time prior to attempting AD surveys on any subsequent section.

If the Government chooses to use low frequency (40 kHz) data for acceptance and also volume calculations, then low frequency (40kHz) data must be used for before-dredging surveys for computations. If low

SECTION 01 22 00.10 45 Page 5 frequency data is to be used for acceptance and volume calculations, surveyors are to note that the appropriate manufacturer's recommended settings for both AD and BD surveys were in place.

1.3.1.5 Electronic Positioning

The horizontal control points shown are the control points the Government will use to perform electronic surveys on the waterway. The Government does not guarantee permanent access to these control points, therefore, it may be necessary for the Contractor to establish its own network of survey points from these survey points or from other National Geodetic Survey (NGS) monuments. Location and description of the horizontal control points which the Government plans to use to perform electronic surveys on the channels are available at the Rio Grande Resident Office. The Contractor shall be responsible for establishing its own reference line to conduct hydrographic surveys and dredging operations if electronic positioning equipment is not used.

1.3.1.6 Government Surveys

Real Time Kinematic (RTK) or Virtual Reference Station (VRS) will be used for positioning. The Government will use the tide staffs shown on the drawings to verify vertical control. Tide staffs are referenced to MLLW correction for this Contract.

Processing survey data will be performed with the most recent HYPACK software at the time of award, using the Kingfisher Method (updated 5/6/2016). Data will be post-processed using POSpac to perform quality checks of results when necessary. Volumes will be computed by average end area using cross sectional survey lines. Before and After Dredge cross sections will be run on 100-foot stations and at changes in the template unless otherwise specified in the Contract drawings. The Government will provide the survey line files at the Contractor's request.

1.3.1.7 Surveys During Progress of Work

Contract depth will be determined by surveys taken behind the dredge as work progresses. The Contractor shall take progress soundings or sweepings and submit drawings of the surveys.

1.3.1.8 Unit of Measurement

Unit of measure: cubic yard.

1.3.2 Sea Turtle Trawling and Relocation

1.3.2.1 Payment (AM#1)

Payment for "Sea Turtle Trawling and Relocation" in Schedule No. 1, and Options No. 1, Option No. 2, and Option No. 3 Opt i ons No. 1, Opt i on No. 2, Opt i on No. 3, and Opt i on No 5, will be made for costs associated with trawling ahead of the hopper dredge and relocation of turtles.

1.3.2.2 Measurement

Sea Turtle trawling and relocation will be measured by the day utilized for trawling and relocation as specified in the SECTION 35 20 23.14 45

PROTECTION OF SEA TURTLES.

SECTION 01 22 00.10 45 Page 6

1.3.2.3 Unit of Measure

Unit of measure: Day.

1.3.3 Beach Placement DMPA No. 1 and DMPA No. 2

1.3.3.1 Payment (AM#1)

The contract unit price for "Placement of Dredged Material at DMPA No. 1" and "Placement of Dredged Material at DMPA No. 2" in Option No. 4, will include the difference in cost for removal of dredged material, for sections 1 - 3 STA -13+000 to STA 0+000 and STA 2+400 to STA 4+400,transportation to the Beach Placement Areas DMPA No. 1 and DMPA No.

2 and all equipment necessary to pump out and construct the beach to the lines and grades, including onshore and offshore pipeline management, beach monitoring surveys, offshore pipeline corridor monitoring surveys, beach safety, security, and access as specified in lieu of removal of dredged material, transportation to Nearshore Berm BU Site 1A & 1B and ODMDS Brazos Island Harbor Maintenance, and placement into Nearshore Berm BU Site 1A & 1B and ODMDS Brazos Island Harbor Maintenance .

1.3.3.2 Measurement

The total quantity of dredged material for which payment will be made will be the theoretical quantity between the bottom surface shown by the fathometer soundings of the last survey made "before-dredging" and the bottom surface shown by the fathometer soundings of a survey made "after-dredging", within the limits of the overdepth and side and end slopes, less deductions that may be required for misplaced material.

1.3.3.3 Unit of Measure

Unit of measure: cubic yard.

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Section --

SECTION 01 22 00.10 45 Page 7

SECTION 01 22 00.10 45 Page 8

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

SECTION 35 20 23.12 45

HOPPER DREDGING

PART 1 GENERAL

1.1 SUMMARY

1.2 REFERENCES

1.3 MEASUREMENT AND PAYMENT

1.4 WORK COVERED BY THE CONTRACT PRICE

1.4.1 Existing Conditions

1.5 SUBMITTALS

1.6 MATERIAL TO BE REMOVED

1.6.1 Debris Within the Dredging Limits

1.7 SIGNAL LIGHTS

1.8 UTILITIES ACROSS THE LIMITS OF DREDGING

1.8.1 Known Pipeline/Utility Crossings

1.9 ORDER OF WORK

1.10 OBSTRUCTION OF CHANNEL

1.11 TEMPORARY REMOVAL OF AIDS TO NAVIGATION

1.12 NOTIFICATION PRIOR TO COMMENCEMENT OF DREDGING OPERATIONS

1.13 SIGNAL LIGHTS

1.14 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM

1.15 CORPS OF ENGINEERS RESERVE FLEET

1.16 INSPECTION

1.16.1 Equipment

1.16.2 Transportation

1.17 QUANTITY SURVEYS

1.17.1 General

1.17.2 Surveys

1.17.3 Submittals

1.18 FINAL EXAMINATION AND ACCEPTANCE

1.18.1 Acceptance

1.19 SHOALS

1.20 UNANTICIPATED SHOALING

1.21 VARIATION IN ESTIMATED QUANTITIES - DREDGING

1.22 CONTINUITY OF WORK

PART 2 PRODUCTS

2.1 BRIDGE-TO-BRIDGE RADIOTELEPHONE EQUIPMENT

2.2 LOOKOUTS AND RADIO COMMUNICATIONS

PART 3 EXECUTION

3.1 ESTIMATED QUANTITY OF MATERIAL

3.1.1 Quantity Summary

3.1.2 Required Dredging Prism

3.1.3 Allowable Overdepth

3.1.4 Side And End Slopes

SECTION 35 20 23.12 45 Page 1

3.1.5 Excessive Dredging

3.1.6 Surveys

3.2 AREAS TO BE DREDGED

3.3 BED LEVELING

3.4 CONDUCT OF DREDGING WORK

3.4.1 Pre-Operations Safety Coordination Meeting

3.4.2 Protection of Existing Waterways

3.4.3 Adjacent Property and Structures

3.5 PLACEMENT OF EXCAVATED MATERIAL

3.5.1 General

3.5.2 Nearshore Berm Placement

3.5.2.1 Nearshore Berm BU Site 1A and 1B (AM#1)

3.5.2.2 Nearshore Berm BU Site 2A and 2B

3.5.2.3 Nearshore Berm Monitor Surveys

3.5.3 (AM#1) DELETED

3.5.4 Beach Placement

3.5.4.1 Misplaced Material

3.5.4.2 Placement Operations Inspections

3.5.4.3 Placement Area Drainage

3.5.4.4 Beach Placement Area DMPA No. 1 (AM#1)

3.5.4.5 Beach Placement Area DMPA No. 2 (AM#1)

3.5.4.6 Materials

3.5.4.7 Nourishment Operations

3.5.4.8 Beach Operation and Access Plan

3.5.4.9 Pipeline Route

3.5.4.10 Beach Operations

3.5.4.11 Grade Stakes

3.5.4.12 Debris within the Beach Placement Area

3.5.4.13 Beach Placement Surveys

3.6 ENDANGERED SPECIES MONITORING

3.6.1 Endangered Species Protection Plan

3.6.1.1 Content of Endangered Species Protection Plan

3.6.2 Sea Turtles

3.6.2.1 Training

3.6.2.2 Methodology

3.6.2.3 Daily Surveys

3.6.2.4 Equipment Staging Area

3.6.2.5 Lighting

3.6.2.6 Notification

3.6.3 Piping Plovers and Red Knots

3.6.3.1 Training

3.6.3.2 Monitoring

3.6.3.3 Notification

3.7 PRESERVATION OF PUBLIC AND PRIVATE PROPERTY

3.7.1 Damages

3.7.2 Accountability and Restoration

3.8 ALTERNATE PLACEMENT AREA(S) PROPOSED BY CONTRACTOR WITH BID AFTER

AWARD OF CONTRACT

3.8.1 Data Submittal

3.9 UNAUTHORIZED PLACEMENT OF MATERIAL

3.9.1 Debris Disposal

3.10 DREDGE PIPELINES

3.10.1 Submerged Pipelines

3.10.2 Submerged Pipeline Lightning Requirements

3.10.3 Floating Pipe

3.10.4 Pipeline Leaks

3.11 DREDGING AND DREDGE RELATED MARINE WORK (CESWG)

3.12 AUTOMATIC IDENTIFICATION SYSTEM

3.13 DREDGE PLANT INSTRUMENTATION

SECTION 35 20 23.12 45 Page 2

ATTACHMENTS:

Appendix 1 - QUANTITY SUMMARY TABLE

-- End of Section Table of Contents --

SECTION 35 20 23.12 45 Page 3

SECTION 35 20 23.12 45 Page 4

SECTION 35 20 23.12 45

HOPPER DREDGING

AMENDMENT NO. 0001

PART 1 GENERAL

1.1 SUMMARY

The work in this Section consists of furnishing plant, labor, materials, and equipment and performing the work required by these specifications, schedules, and drawings as specified herein for dredging this project.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

1.3 MEASUREMENT AND PAYMENT

Measurement and payment for hopper dredging will be paid for in accordance with provisions of the SECTION 01 22 00.10 MEASUREMENT AND PAYMENT.

1.4 WORK COVERED BY THE CONTRACT PRICE

Base bids on the quantity of dredging indicated. If the total quantity of dredging varies from that specified as the basis for bidding, the Contract price will be adjusted in accordance with the CONTRACT CLAUSE 52.211.18 VARIATION IN ESTIMATED QUANTITY. The dredging conditions specified and indicated describe conditions which are known. However, the Contractor is responsible for other conditions encountered which are not unusual when compared to the conditions recognized in the dredging business as usual in dredging activities such as those required under this Contract. The Contract price for dredging will include the cost of removal and placement of the material as specified in the Paragraphs: MATERIAL TO BE REMOVED and PLACEMENT OF EXCAVATED MATERIAL.

1.4.1 Existing Conditions

The drawings already prepared as specified in the CONTRACT CLAUSE 252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS represent conditions existing as of the date of their preparation using average existing conditions. However, to reflect anticipated shoaling or scour occurring between the dates of preparation of the drawings and the dates of the "before-dredging" sections, the estimated dredging quantities shown in the Bid Schedule have been adjusted accordingly. The depths and elevations shown thereon will be verified and corrected by fathometer soundings taken by the Government before dredging. The Government normally uses a frequency of 200 kHz to conduct hydrographic surveys. If the surveys

SECTION 35 20 23.12 45 Page 5 indicate the presence of fluff in the channel, a frequency of 40 kHz will be used. Determination of quantities removed and the deductions made from them to determine quantities by in-place measurement to be paid for in the area specified, after having once been made will not be reopened, except on evidence of collusion, fraud, or obvious error.

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

Government acceptance is required for submittals with a "G, A" designation.

SD-01 Preconstruction Submittals

Notification Prior To Commencement of Dredging Operations ; G, A

Indicate commencement of dredging operations, and location of dredge(s)

Temporary Removal of Aids To Navigation ; G, A

Indicate temporary removal or changes in locations of channel markers required to facilitate dredging operations.

Endangered Species Protection Plan ; G

Submit an Endangered Species Protection Plan to include the name and qualifications of the consultant that will be conducting training along with training documentation.

"Before And After" Dredging Beach Profile Cross Sections ; G

The Contractor shall provide "Before" dredge beach profiles prior to the start of disposal operations at DMPA No. 1 and DMPA No. 2 Placement corridor. No later than 14 working days after completion of disposal operations at the DMPA No. 1 and DMPA No. 2 Placement corridor, the Contractor shall submit "After" dredge beach profiles.

Beach Operation And Access Plan ; G, The Contractor shall submit a Beach Operation and Access Plan for approval 14 days prior to placement.

SD-02 Shop Drawings

Surveys ; G

Submit drawings of surveys during progress of work by soundings or sweepings.

Nearshore Berm Monitor Surveys ; G

SECTION 35 20 23.12 45 Page 6

Surveys are to be submitted in ASCII XYZ format on electronic file promptly upon completion. Cross sections and color coded Isopach map displaying the difference between before placement and after placement surveys shall be submitted.

Submerged Pipelines ; G

Indicate pipeline location and installation details as outlined in the Subparagraph: Submerged Dredge Pipeline.

Pipeline Route ; G

A detailed pipeline diagram for each Placement Area detailing the pipeline route and anchor locations are to be submitted prior to commencing work on this project.

Drag Bar ; G

Shop Drawings and one photograph showing drag bar equipment used for final leveling work is to be submitted as part of the Contractor's Quality Control (CQC)Report.

Bed Leveling - Reporting and Documenting; G

Document the bed leveling activity including date and time for initiation and completion of bed leveling on the CQC Report.

SD-06 Test Reports

Drag Head And Dredge Calibration Results ; G

Results of dredge calibration tests including but not limited to drag head paint test, dye tests, and any other calibrations that may be required prior to dredging to be approved by Contracting Officer or Contracting Officer's representative.

1.6 MATERIAL TO BE REMOVED

The material to be removed is shoals which have accumulated over a period of time. However, some virgin material may be encountered in allowable overdepth, or side slope dredging. Bidders are expected to examine the worksite, and after investigation decide for themselves the character of materials.

1.6.1 Debris Within the Dredging Limits

Debris, including but not limited to metal bands, pieces of broken cable, rope, stumps, and broken piles of wood or concrete may be encountered.

The Government has no knowledge of existing wrecks, wreckage, or other material of this size or character that will require the use of explosives or special or additional plant for economical removal. Debris removed from the dredged area is to be removed from the water. Disposal is to be the responsibility of the Contractor and disposal is to be conducted in accordance with subparagraph entitled Debris Disposal, below. If the actual conditions differ from those stated or shown, an adjustment in Contract price, time of completion, or both will be made in accordance with the CONTRACT CLAUSE 52.236-2 DIFFERING SITE CONDITIONS.

SECTION 35 20 23.12 45 Page 7

1.7 SIGNAL LIGHTS

The Contractor is to display signal lights and conduct its operations in accordance with the General Regulations of the Department of the Army and of the U.S. Coast Guard governing the:

i) lights and day signals to be displayed by towing vessels with tows on which no signals can be displayed, vessels working on wrecks, dredges, and vessels engaged in laying cables or pipe or in submarine or bank protection operations;

ii) lights to be displayed on dredge pipe lines;

iii) day signals to be displayed by vessels of more than 65 feet in length moored or anchored in a fairway or channel;

iv) and the passing by other vessels of floating plant working in navigable channels as set forth in United States Coast Guard publication entitled Navigation Rules and Regulations Handbook. Web site location:

https://www.navcen.uscg.gov/?pageName=NavRulesAmalgamated

1.8 UTILITIES ACROSS THE LIMITS OF DREDGING

It is the Contractor's responsibility to investigate the location of utility crossings. Take precautions against damages which might result from dredging operations in the vicinity of the utility crossings. If any damage occurs as a result of dredging operations, the Contractor will be required to suspend dredging until the damage is repaired and approved.

Costs of these repairs and downtime of the dredge and attendant plant will be at the Contractor's expense. There are no known bridges, tunnels, overhead lines, or submerged lines which are within the dredging limits.

1.8.1 Known Pipeline/Utility Crossings

The Government does not have any information regarding pipelines and/or utility crossing within the work limits, but it is the Contractor's responsibility to ensure that there are no pipelines and/or utilities within the work limits.

1.9 ORDER OF WORK

The Contractor may commence dredging in Schedule No. 1 in the order it desires. The Government reserves the right to change the order of work at any time and at no additional cost to the Government. The assigned Dredge Plant shall not be pemitted to leave the project without prior approval by the Contracting Officer until final acceptance of all awarded dredging work.

1.10 OBSTRUCTION OF CHANNEL

The Government will not undertake to keep the Channel free from vessels or other obstructions, except to the extent of applicable regulations, if any, as may be prescribed by the Secretary of the Army, in accordance with

SECTION 35 20 23.12 45 Page 8 the provisions of Section 7 of the River and Harbor Act approved 8 August 1917. The Contractor will be required to conduct the work using a method that will obstruct navigation as little as possible, and if the Contractor's plant does obstruct the Channel and makes the passage of vessels difficult or endangers them, the plant is to be promptly moved on the approach of a vessel as far as may be necessary to afford a practicable passage. Upon completion of the work, the Contractor's plant is to promptly be removed, including ranges, buoys, piles, and other marks placed under this Contract.

1.11 TEMPORARY REMOVAL OF AIDS TO NAVIGATION

The temporary removal or changes in locations of channel markers may be required to facilitate dredging operations. Notify the Contracting Officer at least 21 days prior to the date that the removal or change in location of channel markers will be required so the U.S. Coast Guard can perform the work and so navigation interests may be informed sufficiently in advance of the proposed removal or change in location.

The Contractor is not to remove, change the location of, obstruct, willfully damage, make fast to, or interfere with aids to navigation.

1.12 NOTIFICATION PRIOR TO COMMENCEMENT OF DREDGING OPERATIONS

Notify the Resident Engineer, Rio Grande Valley Resident Office, in writing, at least 10 days prior to commencement of dredging operations, include the Local Notice to Mariners sent to the United States Coast Guard, and the starting location or locations at which a dredge or dredges will be placed on the work. This information is required in addition to the progress charts and schedule provided for in the CONTRACT CLAUSE

52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS.

1.13 SIGNAL LIGHTS

The Contractor and subcontractors are to display signal lights and conduct operations in accordance with the General Regulations of the Department of the Army and of the Coast Guard governing lights and day signals to be displayed by towing vessels with tows on which no signals can be displayed, vessels working on wrecks, dredges, and vessels engaged in laying cables or pipe or in submarine or bank protection operations, lights to be displayed on dredge pipelines, and day signals to be displayed by vessels of more than 65 feet in length moored or anchored in the fairway or channel, and the passing of other vessels of floating plant working in navigable channels, as set forth in Commandant U.S. Coast Guard Instruction M16672.2, Navigation Rules: International-Inland (COMDTINST M16672.2), or 33 CFR 81 Appendix A (International) and 33 CFR 84 through 33 CFR 89 (Inland) as applicable. Navigation Center website location http://www.navcen.uscg.gov/?pageName=navRuleChanges .

1.14 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM

The work under this Contract requires use of the National Dredging Quality Management Program (DQM), formerly known as Silent Inspector (SI) to monitor the dredge's status at all times during this Contract in accordance with the SECTION 35 20 23.23 NATIONAL DREDGING QUALITY

MANAGEMENT PROGRAM, HOPPER DREDGE.

SECTION 35 20 23.12 45 Page 9

1.15 CORPS OF ENGINEERS RESERVE FLEET

If the work specified in this Contract is performed by hopper dredge(s), the owner shall have an active Basic Ordering Agreement (BOA) for the hopper dredge(s) on file with the Corps. The Contractor shall be obligated to make the hopper dredge(s) available to serve in the Corps of Engineers Reserve Fleet (CERF) at any time that the hopper dredge(s) is performing work under this Contract. When the Contracting Officer is notified of the decision to activate this dredge(s) into the CERF, it shall take appropriate action to release the dredge(s). The Contracting Officer may then extend or terminate the Contract to implement the action in the best interest of the Government. The CERF Contractor shall also be subject to the following conditions:

a. The Director of Civil Works may require the Contractor to perform emergency dredging at another CONUS (48 contiguous states) site for a period of time equal to the remaining time under this Contract at the date of notification plus up to 90 days at the previously negotiated rate which appears on the schedule of prices in the BOA.

b. The Chief of Engineers may require the Contractor to perform emergency dredging at a OCONUS (Outside CONUS which includes Alaska, Hawaii, Puerto Rico, the Virgin Islands, or U.S. Trust Territories site for a period of time equal to the time remaining under this Contract at the date of notification plus up to 180 days at the negotiated rate which appears on the schedule of prices in the BOA.

c. The CERF shall be activated by the Chief of Engineers or the Director of Civil Works; then the Ordering Contracting Officer will notify the Contractor. From the time of notification, the selected hopper dredge(s) shall depart for the emergency assignment within 72 hours for CONUS or 10 days for OCONUS assignments.

d. A confirming delivery order will be issued pursuant to the BOA by the Ordering Contracting Officer. This delivery order shall utilize the schedule of rates in the BOA for the specific hopper dredge(s).

e. If during the time period specified in a, b, or c, above, a CERF vessel(s) is still required, the Contract performance may be continued for additional time by mutual agreement.

1.16 INSPECTION

The Government may direct the maintenance of the gages, ranges, location marks, and limit marks in proper order and position; but the presence of the inspector shall not relieve the Contractor of responsibility for the proper execution of the work in accordance with the specifications. The Contractor will be required to furnish the following items.

1.16.1 Equipment

At the request of the Government, the Contractor shall furnish the use of boats, boatmen, laborers, and material forming a part of the ordinary and usual equipment and crew of the dredging plant as may be reasonably necessary in inspecting and supervising the work. However, the Contractor

SECTION 35 20 23.12 45 Page 10 will not be required to furnish facilities for the surveys, specified in the Paragraph: FINAL EXAMINATION AND ACCEPTANCE.

1.16.2 Transportation

Furnish throughout the Contract period, for the exclusive use of the Government: The contractor shall furnish transportation for a minimum of 8 government personnel from all points on shore designated by the Contracting Officer to all project work site locations. The transportation shall protect all onboard personnel from all weather conditions. The transportation time to and from the designated-on shore points and project work site locations shall be reasonable.

Transportation shall be equipped with safety equipment and meet all USCG requirements and all safety requirements of USACE EM 385-1-1. If a difference in safety requirements exist, the most stringent requirement shall apply. The performance of the transportation section shall be acceptable to the Contracting Officer. Furnish fuel, oil, and maintenance for the motorboat throughout the Contract period. Assume full responsibility for the storage and security of the motorboat when not in use by the Government employees. There will be no separate payment for these items and the cost will be distributed throughout the existing bid items. Equipment which fails to perform because of insufficient power or other mechanical deficiencies are to be replaced and inexperienced operators unable to operate the equipment is to be replaced within 12 hours after the Contractor is directed to do. No smoking is to be allowed inside the. cabin and operator's space while occupied by Government personnel. No Smoking signs are to be posted.

1.17 QUANTITY SURVEYS

1.17.1 General

Quantity surveys shall be conducted, and the data derived from these surveys shall be used in computing the quantities of work performed and the actual construction completed and in place.

1.17.2 Surveys

The Contractor shall conduct the original and final surveys and surveys for any periods for which progress payments are requested. These surveys shall be conducted under the direction of a representative of the Contracting Officer, unless the Contracting officer waives this requirement in a specific instance. The Government will make the computations that are necessary to determine the quantities of work performed or finally in place. The Contractor shall make the computations based on the surveys for any periods for which progress payments are requested.

1.17.3 Submittals

Promptly upon completing a survey, the Contractor shall submit the originals of field notes and other records relating to the survey or to the layout of the work to the Contracting Officer, who will use them as necessary to determine the amount of progress payments. The Contractor shall retain copies of the material submitted to the Contracting Officer.

SECTION 35 20 23.12 45 Page 11

1.18 FINAL EXAMINATION AND ACCEPTANCE

As soon as practicable after the completion of the entire work or any section thereof, if the work is divided into sections and in the opinion of the Contracting Officer will not be subject to damage by further operations under this Contract, this work will be thoroughly examined at the expense of the Government by sounding or by sweeping, or both, as directed. If shoals, lumps, or other lack of Contract depth are disclosed by this examination, the Contractor will be required to remove same by dragging the bottom or by dredging at the Contract rate for dredging but, if the bottom is soft and the shoal areas are small and form no material obstruction to navigation, the removal of the shoal may be waived at the discretion of the Contracting Officer. The Contractor or its authorized representative will be notified when soundings or sweepings are to be made and will be permitted to accompany the survey party. When the area is found to be in a satisfactory condition it will be accepted finally. If more than two sounding or sweeping operations by the Government over an area are necessary, by reason of work for the removal of shoals disclosed at a prior sounding or sweeping, the cost of the third and any subsequent sounding or sweeping operations will be charged against the Contractor at the rate of $13,567.00 per day for each day in which the Government plant is engaged in sounding or sweeping or is enroute to or from the site or held at or near the site for these operations.

1.18.1 Acceptance

Final acceptance of the whole or a part of the work and the deductions or corrections of deductions made thereon will not be reopened after having once been made, except on evidence of collusion, fraud, or obvious error, and the acceptance of a completed section will not change the time of payment of the retained percentages of the whole or any part of the work.

1.19 SHOALS

If, before this Contract is completed, shoals occur in a section previously accepted, redredging at the Contract price, within the limit of available funds, may be done if agreeable to both the Contractor and the Contracting Officer.

1.20 UNANTICIPATED SHOALING

During the course of this Contract, unanticipated dredging requirements may develop that require the use of the Contractor and Contractor's plant. The dredging required would be similar in scope to that required under the current Contract. Dredging would consist of limited portions of a section of channel, intended to remove critical shoals hindering commercial navigation. If such a need arises, the Contracting Officer may issue a Request for Proposal for the work under the CONTRACT CLAUSE 52.243-4 CHANGES, and the work performed upon the execution of a bilateral contract modification.

1.21 VARIATION IN ESTIMATED QUANTITIES - DREDGING

Where the quantity of a pay item in this Contract is an estimated quantity and where the actual quantity of material within the required dredging prism varies, an equitable adjustment will be processed in accordance with CONTRACT CLAUSE 52.211-18, VARIATION IN ESTIMATED QUANTITY (April 1984).

The equitable adjustment applies only to the quantity within the required dredging prism, which does not include the allowable overdepth.

SECTION 35 20 23.12 45 Page 12

If the total quantity of material to be paid for and actually removed under this Contract exceeds the limit established by CONTRACT CLAUSE 52.211-18, VARIATION IN ESTIMATED QUANTITY (April 1984), an additional time will be allowed at the rate of 1 calendar day for each 16,000 cubic yards in excess of the established limit. The Contractor is not to exceed the estimated quantities in the Contract Line Items without prior authorization and only with a signed modification issued by the Contracting Officer.

1.22 CONTINUITY OF WORK

No payment will be made for work done in an area designated by the Contracting Officer until the full depth required under this Contract is secured in the whole of this area, unless prevented by ledge rock, nor will payment be made for excavation in an area not adjacent to and in prolongation of areas where full depth has been secured except by decision of the Contracting Officer. If a non-adjacent area is excavated to full depth during the operations carried on under this Contract, payment for the work therein may be deferred until the required depth has been reached in the area intervening. The Contractor may be required to suspend dredging when the gages or ranges cannot be seen or properly followed.

PART 2 PRODUCTS

2.1 BRIDGE-TO-BRIDGE RADIOTELEPHONE EQUIPMENT

Dredge and self-propelled attendant floating plant is to be radiotelephone equipped to comply with the provisions of the Vessel Bridge-to-Bridge Radiotelephone Act (Public Law 92-63). This will require, as a minimum, the radiotelephone equipment capable of transmitting and receiving on

156.65 MHz (Channel 13). Multi-channel equipment will also require 156.8 MHz (Channel 16). Dredge tugs and tenders will be considered towing vessels within the meaning of the Act.

2.2 LOOKOUTS AND RADIO COMMUNICATIONS

Have a lookout person posted in the dredge control room at all times to visually monitor the movement of vessels around the dredge plant and to perform radio communications with company work boats and to deliver passing arrangements with other commercial, fishing, and recreational vessels. The lookout is to be competent in U.S. Coast Guard and Federal Communications Commission radio communication procedures and requirements, and also trained in the Vessel Bridge to Bridge Radiotelephone Act. The lookout is to maintain up to the minute information on the status of each company work boat as well as approaching vessels and will communicate this information as required to prevent collisions. Each company work boat is to check in with the lookout when arriving at the dredge and is to receive radio clearance from the lookout before departing the dredge.

Failure to comply with this requirement will be considered a violation of the safety protocol established herein. Pursuant to the direction of the Contracting Officer, the Contractor may be required to cease operations until this provision is complied with.

This is the start of the file's text. The full file is on GovTribe.