Abstract-W912HY22B0008-HSC-Redfish-Beacon-Hopper-Dredging-PCO-Signed.pdf

PDF 388 KB Posted

Attached to
Houston Ship Channel, Redfish to Beacon 78 with Bayport Flare in Chambers County, Texas Hopper Dredging
Solicitation number
W912HY22B0008
Issued by

About this file

This document is an abstract of offers for a federal contract solicitation to perform hopper dredging services in the Houston Ship Channel from Redfish to Beacon 78 including the Bayport Flare in Chambers County, Texas. The solicitation includes a base schedule and five option periods for dredging and placement of material in the Ocean Dredged Material Disposal Site located adjacent to the Galveston Entrance Channel. Cells D and F will be available for disposal. Three offers were received by the deadline with Curtin Maritime Corp providing the apparent low bid that was 37.82% below the government estimate. The contract will be awarded by the U.S. Army Corps of Engineers Galveston District.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

5. PROJECT TITLE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM

7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

Unrestricted Procurement for Houston Ship Channel, Texas, Redfish to Beacon 78 and Bayport Flare, in Chambers County, Texas, Hopper Dredging.

508/05/2022

Curtis Cole, Jr.

5 August 2022

& 0002

UNIT

PRICE TOTAL

1 JB SUM 2,500,000.00

1,197,900 CY 12.20 14,614,380.00

430,600 CY 12.89 5,550,434.00

1 JOB SUM 82,500.00

1 JOB SUM 143,000.00

22,890,314.00

607,200 CY 10.97 6,660,984.00

1 JB SUM 41,800.00

$6,702,784.00

474,700 CY 10.73 5,093,531.00

1 JB SUM 33,000.00

$5,126,531.00

809,100 CY 10.00 8,091,000.00

1 JB SUM 56,100.00

$8,147,100.00

635,900 CY 13.31 8,463,829.00

1 JB SUM 44,000.00

$8,507,829.00

1 JOB SUM 15,000.00

30 DAY 5,000.00 150,000.00

$165,000.00

$51,539,558.00

TOTAL OPTION NO. 4

TOTAL OPTION NO. 5

OPTION NO. 2

OPTION NO. 5

Sea Turtle Trawling and Relocation

QUANTITY

OPTION NO. 1

TOTAL SCHEDULE NO. 1

OPTION NO. 4

TOTAL OPTION NO. 3

SCHEDULE NO. 1ITEM

OPTION NO. 3

Dredging, HSC, Sections 6-9

Dredging HSC, Sections 10-11

TOTAL OPTION NO. 2

Dredging HSC1, Sections 12-16

ODMDS No. 1 Monitor Surveys

ABSTRACT OF OFFERS Page 2 of 5

Solicitation No.: W912HY22B0008 Date Issued: 1 July 2022 Date Opened: 5 August 2022

Issuing Office: USAED-Galveston Project Title: Unrestricted Procurement for Houston Ship Channel, Texas, Redfish to Beacon 78 and Bayport Flare, in Chambers County, Texas, Hopper Dredging.

TOTAL OPTION NO. 1

Mobilization and Demobilization

Dredging, Bayport Flare, Sections 1-4

Dredging, HSC Section 5

Number of Amendments Issued: 0001 & 0002

Government Estimate (Without Profit)

NO.

Sea Turtle Protection, Section Nos. 1-5

DESCRIPTION

* The apparent low bidder, Curtin Maritime Corp is -37.82% below the Government's Estimate.

TOTAL SCHEDULE NO. 1 & OPTION NOS. 1

THRU 5

Sea Turtle Protection, Section Nos. 6-9

Sea Turtle Protection, Section Nos. 10-11

Sea Turtle Protection, Section Nos. 12-16

Sea Turtle Protection, Section Nos. 17-19

Dredging HSC, Sections 17-19

Mobillization and Demobilization Sea Turtle Trawler & Relocation

1 JB SUM 4,350,000.00

1,197,900 CY 12.70 15,213,330.00

430,600 CY 15.00 6,459,000.00

1 JOB SUM 400,000.00

1 JOB SUM 100,000.00

26,522,330.00

607,200 CY 16.70 10,140,240.00

1 JB SUM 100,000.00

$10,240,240.00

474,700 CY 16.50 7,832,550.00

1 JB SUM 100,000.00

$7,932,550.00

809,100 CY 15.70 12,702,870.00

1 JB SUM 100,000.00

$12,802,870.00

635,900 CY 13.50 8,584,650.00

1 JB SUM 75,000.00

$8,659,650.00

1 JOB SUM 32,000.00

30 DAY 5,200.00 156,000.00

$188,000.00

$66,345,640.00

Dredging HSC, Sections 17-19

Mobillization and Demobilization Sea Turtle Trawler & Relocation

OPTION NO. 5

Sea Turtle Protection, Section Nos. 17-19

OPTION NO. 1

TOTAL OPTION NO. 1

TOTAL OPTION NO. 2

Dredging HSC, Sections 10-11

OPTION NO. 3

Sea Turtle Protection, Section Nos. 6-9

ITEM SCHEDULE NO. 1

TOTAL OPTION NO. 4

Sea Turtle Trawling and Relocation

OPTION NO. 4

TOTAL SCHEDULE NO. 1 & OPTION NOS. 1

THRU 5

Dredging, HSC, Sections 6-9

ABSTRACT OF OFFERS (CONT'D) Page 3 of 5

Offeror: #1 - Manson Construction Co., 5209 East Marginal Way S., Seattle, WA 98134 Business Size: Large Business

Solicitation No.: W912HY22B0008 Date Issued: 1 July 2022 Date Opened: 5 August 2022

ODMDS No. 1 Monitor Surveys

Sea Turtle Protection, Section Nos. 1-5

Project Title: Unrestricted Procurement for Houston Ship Channel, Texas, Redfish to Beacon 78 and Bayport Flare, in Chambers County, Texas, Hopper Dredging.

QUANTITY

Mobilization and Demobilization

DESCRIPTIONNO.

Dredging, HSC Section 5

Dredging, Bayport Flare, Sections 1-4

OPTION NO. 2

Dredging HSC1, Sections 12-16

Sea Turtle Protection, Section Nos. 10-11

TOTAL SCHEDULE NO. 1

Sea Turtle Protection, Section Nos. 12-16

TOTAL OPTION NO. 3

TOTAL OPTION NO. 5

1 JB SUM 3,257,000.00

1,197,900 CY 6.00 7,187,400.00

430,600 CY 6.00 2,583,600.00

1 JOB SUM 5,000.00

1 JOB SUM 0.00

13,033,000.00

607,200 CY 7.60 4,614,720.00

1 JB SUM 0.00

$4,614,720.00

474,700 CY 7.50 3,560,250.00

1 JB SUM 0.00

$3,560,250.00

809,100 CY 7.50 6,068,250.00

1 JB SUM 0.00

$6,068,250.00

635,900 CY 7.50 4,769,250.00

1 JB SUM 0.00

$4,769,250.00

1 JOB SUM 0.00

30 DAY 0.00 0.00

$0.00

$32,045,470.00

OPTION NO. 5

Sea Turtle Trawling and Relocation

Sea Turtle Protection, Section Nos. 10-11

Sea Turtle Protection, Section Nos. 12-16

Sea Turtle Protection, Section Nos. 17-19

Sea Turtle Protection, Section Nos. 6-9

Project Title: Unrestricted Procurement for Houston Ship Channel, Texas, Redfish to Beacon 78 and Bayport Flare, in Chambers County, Texas, Hopper Dredging.

NO.

TOTAL OPTION NO. 3

OPTION NO. 3

TOTAL OPTION NO. 2

DESCRIPTION

*Offeror: #2 - Curtin Maritime Corp., 1400 Pier C Street, Berth 57, Long Beach, CA 90813 **Apparent Low Bidder** Business Size: Small Business

QUANTITY

ODMDS No. 1 Monitor Surveys

Dredging, HSC Section 5

Mobilization and Demobilization

ABSTRACT OF OFFERS (CONT'D) Page 4 of 5

Solicitation No.: W912HY22B0008 Date Issued: 1 July 2022 Date Opened: 5 August 2022

Dredging, Bayport Flare, Sections 1-4

TOTAL SCHEDULE NO. 1 & OPTION NOS. 1

THRU 5

Sea Turtle Protection, Section Nos. 1-5

TOTAL OPTION NO. 1

Dredging, HSC, Sections 6-9

TOTAL SCHEDULE NO. 1

OPTION NO. 4

OPTION NO. 1

Dredging HSC, Sections 17-19

OPTION NO. 2

Dredging HSC1, Sections 12-16

TOTAL OPTION NO. 5

Dredging HSC, Sections 10-11

Mobillization and Demobilization Sea Turtle Trawler & Relocation

TOTAL OPTION NO. 4

ITEM SCHEDULE NO. 1

1 JB SUM 2,650,000.00

1,197,900 CY 10.85 12,997,215.00

430,600 CY 9.75 4,198,350.00

1 JOB SUM 25,000.00

1 JOB SUM 90,000.00

19,960,565.00

607,200 CY 8.00 4,857,600.00

1 JB SUM 25,000.00

$4,882,600.00

474,700 CY 7.50 3,560,250.00

1 JB SUM 20,000.00

$3,580,250.00

809,100 CY 7.00 5,663,700.00

1 JB SUM 28,000.00

$5,691,700.00

635,900 CY 12.95 8,234,905.00

1 JB SUM 42,000.00

$8,276,905.00

1 JOB SUM 10,000.00

30 DAY 4,000.00 120,000.00

$130,000.00

$42,522,020.00

Mobillization and Demobilization Sea Turtle Trawler & Relocation

Sea Turtle Trawling and Relocation

TOTAL SCHEDULE NO. 1 & OPTION NOS. 1

THRU 5

TOTAL OPTION NO. 5

Dredging HSC, Sections 17-19

TOTAL OPTION NO. 4

OPTION NO. 5

Sea Turtle Protection, Section Nos. 17-19

OPTION NO. 3

TOTAL OPTION NO. 3

OPTION NO. 4

Dredging HSC1, Sections 12-16

Sea Turtle Protection, Section Nos. 12-16

Dredging HSC, Sections 10-11

TOTAL OPTION NO. 2

OPTION NO. 2

Sea Turtle Protection, Section Nos. 10-11

OPTION NO. 1

Dredging, HSC, Sections 6-9

Sea Turtle Protection, Section Nos. 6-9

TOTAL OPTION NO. 1

Dredging, Bayport Flare, Sections 1-4

Dredging, HSC Section 5

ODMDS No. 1 Monitor Surveys

Sea Turtle Protection, Section Nos. 1-5

TOTAL SCHEDULE NO. 1

Business Size: Large Business

ITEM SCHEDULE NO. 1

NO. DESCRIPTION QUANTITY

Mobilization and Demobilization

Project Title: Unrestricted Procurement for Houston Ship Channel, Texas, Redfish to Beacon 78 and Bayport Flare, in Chambers County, Texas, Hopper Dredging.

Offeror: #3 - Great Lakes Dredge & Dock Company, LLC, 9811 Katy Freeway, Suite 1200, Houston, TX 77024

ABSTRACT OF OFFERS (CONT'D) Page 5 of 5

Solicitation No.: W912HY22B0008 Date Issued: 1 July 2022 Date Opened: 5 August 2022

File details come from the government source that posted it. Updated .