This abstract of offers summarizes five bids received in response to Solicitation Number W912HY22B0006 issued by the U.S. Army Corps of Engineers Galveston District. The solicitation seeks dredging and debris removal services along the Houston Ship Channel between Morgan's Point and Exxon and Barbour's Cut in Harris County, Texas. Callan Marine LTD submitted the apparent low bid of $19,960,500 to perform the base work and four option periods involving pipeline management, dredging, site management, sea turtle protection measures, and debris removal across sections 1-8 of the ship channel. The government estimate for the same work was $16,879,950. The other bids ranged from $18,368,220 to $33,786,600. Award is contingent upon available funding and no contract will be made until funds are appropriated.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS
2000 FT. POINT RD.
GALVESTON TX 77550
5. PROJECT TITLE
FY22 USACE Galveston District, Houston Ship Channel Texas - Morgans to Exxon & Barbour's Cut Dredging. Harris County, TX Pipeline Dredging, Deep Draft Unrestricted Procurement
SEE ATTACHMENT
0001, 0002, 0003, and 0004
W912HY22B0006
TRACI ROBICHEAUX Contracting Officer
SEE ATTACHMENT SEE ATTACHMENT
11 OCT 202226 AUG 2022
USACE Galveston District, Houston Ship Channel Texas-Morgans to Exxon & Harbor's Cut Dredging, Harris County, Texas, Pipeline Dredging, Deep Draft, Unrestricted Procurement
1 1
UNIT
PRICE TOTAL
1 JB 2,081,735.00$ $2,081,735.00
1 JB $525,640.00 $525,640.00
2,176,000 CY 5.04$ $10,967,040.00
300 TON $2,113.51 $634,053.00
1 JB $0.00 $0.00
1 JB $66,330.00 $66,330.00
$14,274,798.00
543,000 CY $4.96 $2,693,280.00
80 TON $1,796.48 $143,718.40
1 JOB $0.00 $0.00
$2,836,998.40
$17,111,796.40
OPTION NO. 2
190,000 CY 6.14 $1,166,600.00
50 TON $1,796.48 $89,824.00
1 JB $0.00 $0.00
$1,256,424.00
$18,368,220.40
226,000 CY $13.41 $3,030,660.00
35 TON $1,796.48 $62,876.80
1 JB $0.00 $0.00
$3,093,536.80
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2 & 3 $21,461,757.20
1 JOB $0.00 $0.00
30 DAYS $0.00 $0.00
1 JB $0.00 $0.00
$0.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2, 3, & 4 $21,461,757.20
ABSTRACT OF OFFERS Page 1 of 6
Solicitation No.: W912HY22B0006 Date Issued: August 26, 2022 Date Opened: October 11, 2022 Issuing Office: USACE-Galveston Project Title: FY22 USACE Galveston District, Houston Ship Channel Texas - Morgans to Exxon & Barbour's Cut Dredging. Harris County, TX Pipeline Dredging, Deep Draft Unrestricted Procurement
Mobilization and Demobilization
Pipeline Management
Dredging Houston Ship Channel, Sections 1-5
Number of Amendments Issued: 0001, 0002, 0003, 0004 Government Estimate (Without Profit)
TOTAL SCHEDULE NO. 1
SCHEDULE NO. 1ITEM
Tire and Debris Removal, Sections 1-5
Site Management
NO. DESCRIPTION
Sea Turtle Protection, Sections 1-5
QUANTITY
0007 Dredging Barbours Flare, Section 6
OPTION NO. 3
TOTAL SCHEDULE NO.1 & OPTION NO.1 & 2
TOTAL OPTION NO. 2
Sea Turtle Protection, Section 8
Dredging Barbours Turning Basin, Section 8 Tire and Debris Removal, Section 8
TOTAL OPTION NO. 3
OPTION NO. 1
Sea Turtle Protection, Section 70012
OPTION NO. 4
0016 Mobilization and Demobilization - Sea Turtle Trawling
0011 Tire and Debris Removal, Section 7
TOTAL SCHEDULE NO.1 & OPTION NO.1
Tire and Debris Removal, Section 6
TOTAL OPTION NO. 1
Sea Turtle Protection, Section 6
0010 Dredging Barbours Cut, Section 7
0017 Sea Turtle Trawling and Relocation, Sections 1 - 8
TOTAL OPTION NO. 4
*The apparent low bidder, Callan Marine LTD, is 21.35% lower than the Government Estimate.
1 JB 1,500,000.00 $1,500,000.00
1 JB $990,000.00 $990,000.00
2,176,000 CY 4.50$ $9,792,000.00
300 TON $2,300.00 $690,000.00
1 JB $0.00 $0.00
1 JB 131,450.00 $131,450.00
$13,103,450.00
543,000 CY $2.50 $1,357,500.00
80 TON $2,300.00 $184,000.00
1 JOB $0.00 $0.00
$1,541,500.00
$14,644,950.00
190,000 CY $3.30 $627,000.00
50 TON $2,300.00 $115,000.00
1 JB $0.00
$742,000.00
$15,386,950.00
226,000 CY $6.25 $1,412,500.00
35 TON $2,300.00 $80,500.00
1 JB $0.00 $0.00
$1,493,000.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2 & 3 $16,879,950.00
1 JOB $0.00 $0.00
30 DAYS $0.00 $0.00
$0.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2, 3, & 4 $16,879,950.00
NO. DESCRIPTION QUANTITY
0001 Mobilization and Demobilization
0002 Pipeline Management
SCHEDULE NO. 1
Dredging Houston Ship Channel, Sections 1-5
0006 Site Management
TOTAL SCHEDULE NO. 1
OPTION NO. 1
0007 Dredging Barbours Flare, Section 6
TOTAL SCHEDULE NO.1 & OPTION NO. 1
TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2
0005 Sea Turtle Protection, Sections 1-5
TOTAL OPTION NO. 2
Sea Turtle Protection, Section 8
TOTAL OPTION NO. 3
OPTION NO. 4
0008 Tire and Debris Removal, Section 6
0009 Sea Turtle Protection, Section 6
TOTAL OPTION NO. 1
Tire and Debris Removal, Sections 1-5
OPTION NO. 2
0010 Dredging Barbours Cut, Section 7
0011 Tire and Debris Removal, Section 7
Solicitation No.: W912HY22B0006 Date Issued: August 26, 2022 Date Opened: October 11, 2022 Issuing Office: USACE-Galveston Project Title: FY23 USACE Galveston District, Houston Ship Channel Texas - Morgans to Exxon & Barbour's Cut Dredging. Harris County, TX Pipeline Dredging, Deep Draft Unrestricted Procurement
ABSTRACT OF OFFERS (CONT'D) Page 2 of 6
Offeror 1: *CALLAN MARINE LTD 6800 Harborside DR, Galveston, Texas 77554-2830 Business Size: Small Business
0012 Sea Turtle Protection, Section 7
OPTION NO. 3
0013 Dredging Barbours Turning Basin, Section 8
0014 Tire and Debris Removal, Section 8
Mobilization and Demobilization - Sea Turtle Trawling
Sea Turtle Trawling and Relocation, Sections 1 - 8
1 JB 2,500,000.00 $2,500,000.00
1 JB $1,150,000.00 $1,150,000.00
2,176,000 CY 4.25$ $9,248,000.00
300 TON $1,500.00 $450,000.00
1 JB $0.00 $0.00
1 JB 120,000.00 $120,000.00
$13,468,000.00
543,000 CY $5.50 $2,986,500.00
80 TON $1,500.00 $120,000.00
1 JOB $0.00 $0.00
$3,106,500.00
$16,574,500.00
190,000 CY $5.85 $1,111,500.00
50 TON $1,500.00 $75,000.00
1 JB $0.00
$1,186,500.00
$17,761,000.00
226,000 CY $9.50 $2,147,000.00
35 TON $1,500.00 $52,500.00
1 JB $0.00 $0.00
$2,199,500.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2 & 3 $19,960,500.00
1 JOB $0.00 $0.00
30 DAYS $0.00 $0.00
$0.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2, 3, & 4 $19,960,500.00
Dredging Barbours Flare, Section 6
0008 Tire and Debris Removal, Section 6
TOTAL OPTION NO. 1
Sea Turtle Protection, Sections 1-5
0006 Site Management
OPTION NO. 1
TOTAL SCHEDULE NO. 1
TOTAL SCHEDULE NO.1 & OPTION NO. 1
0011 Tire and Debris Removal, Section 7
TOTAL OPTION NO. 2
SCHEDULE NO. 1
NO.
Sea Turtle Protection, Section 6
TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2
0014 Tire and Debris Removal, Section 8
Sea Turtle Protection, Section 8
0013 Dredging Barbours Turning Basin, Section 8
OPTION NO. 2
Dredging Barbours Cut, Section 7
TOTAL OPTION NO. 3
0012 Sea Turtle Protection, Section 7
OPTION NO. 3
Mobilization and Demobilization
Pipeline Management
Issuing Office: USACE-Galveston Project Title: FY22 USACE Galveston District, Houston Ship Channel Texas - Morgans to Exxon & Barbour's Cut Dredging. Harris
0004 Tire and Debris Removal, Sections 1-5
QUANTITY
0003 Dredging Houston Ship Channel, Sections 1-5
DESCRIPTION
Solicitation No.: W912HY22B0006 Date Issued: August 26, 2022 Date Opened: October 11, 2022 ABSTRACT OF OFFERS (CONT'D) Page 3 of 6
Offeror 2: ORION MARINE CONSTRUCTION, INC 1715 N West Shore BLVD STE 875 Tampa, Florida 33607-3919 Business Size: Other than small business
ITEM
OPTION NO. 4
Mobilization and Demobilization - Sea Turtle Trawling
1 JB 2,000,000.00 $2,000,000.00
1 JB $1,250,000.00 $1,250,000.00
2,176,000 CY 5.00$ $10,880,000.00
300 TON $500.00 $150,000.00
1 JB $0.00 $0.00
1 JB 100,000.00 $100,000.00
$14,380,000.00
543,000 CY $4.50 $2,443,500.00
80 TON $500.00 $40,000.00
1 JOB $0.00 $0.00
$2,483,500.00
$16,863,500.00
190,000 CY $5.00 $950,000.00
50 TON $500.00 $25,000.00
1 JB $0.00
$975,000.00
$17,838,500.00
226,000 CY $5.00 $1,130,000.00
35 TON $500.00 $17,500.00
1 JB $0.00 $0.00
$1,147,500.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2 & 3 $18,986,000.00
1 JOB $0.00 $0.00
30 DAYS $0.00 $0.00
$0.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2, 3, & 4 $18,986,000.00
0004 Tire and Debris Removal, Sections 1-5
TOTAL SCHEDULE NO. 1
ABSTRACT OF OFFERS Page 4 of 6
Pipeline Management
0003 Dredging Houston Ship Channel, Sections 1-5
ITEM SCHEDULE NO. 1
Solicitation No.: W912HY22B0006 Date Issued: August 26, 2022 Date Opened: October 11, 2022
Business Size: Other than small business
QUANTITYNO. DESCRIPTION
0001 Mobilization and Demobilization
Offeror 3:INLAND DREDGING COMPANY, L.L.C 103 N King Ave, Dyersburg, Tennessee 38024-4609
0006 Site Management
0011 Tire and Debris Removal, Section 7
TOTAL OPTION NO. 2
0009 Sea Turtle Protection, Section 6
0012 Sea Turtle Protection, Section 7
Tire and Debris Removal, Section 6
OPTION NO. 4
TOTAL SCHEDULE NO.1 & OPTION NO. 1
Issuing Office: USACE-Galveston
0005 Sea Turtle Protection, Sections 1-5
Dredging Barbours Flare, Section 6
OPTION NO. 2
Dredging Barbours Cut, Section 70010
TOTAL OPTION NO. 1
Sea Turtle Protection, Section 8
TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2
OPTION NO. 1
TOTAL OPTION NO. 3
Mobilization and Demobilization - Sea Turtle Trawling
OPTION NO. 3
0013 Dredging Barbours Turning Basin, Section 8
0014 Tire and Debris Removal, Section 8
Project Title: FY23 USACE Galveston District, Houston Ship Channel Texas - Morgans to Exxon & Barbour's Cut Dredging. Harris County, TX Pipeline Dredging, Deep Draft Unrestricted Procurement
1 JB 5,000,000.00 $5,000,000.00
1 JB $150,000.00 $150,000.00
2,176,000 CY 7.85$ $17,081,600.00
300 TON $4,000.00 $1,200,000.00
1 JB $0.00 $0.00
1 JB 150,000.00 $150,000.00
$23,581,600.00
543,000 CY $9.70 $5,267,100.00
80 TON $4,000.00 $320,000.00
1 JOB $0.00 $0.00
$5,587,100.00
$29,168,700.00
190,000 CY $9.55 $1,814,500.00
50 TON $4,000.00 $200,000.00
1 JB $0.00
$2,014,500.00 $31,183,200.00
226,000 CY $10.90 $2,463,400.00
35 TON $4,000.00 $140,000.00
1 JB 0.00
$2,603,400.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2 & 3 $33,786,600.00
1 JOB $0.00 $0.00
30 DAYS $0.00 $0.00
$0.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2, 3, & 4 $33,786,600.00
QUANTITY
TOTAL OPTION NO. 2
Dredging Barbours Flare, Section 6
0012 Sea Turtle Protection, Section 7
ABSTRACT OF OFFERS Page 5 of 6
DESCRIPTION
OPTION NO. 3
0013 Dredging Barbours Turning Basin, Section 8
0014 Tire and Debris Removal, Section 8
0015 Sea Turtle Protection, Section 8
Business Size: Other than small business
ITEM
Offeror 4: CROSBY DREDGING, LLC 17771 Highway 3235 Galliano, Louisiana 70354-3578
Mobilization and Demobilization
0008 Tire and Debris Removal, Section 6
Dredging Houston Ship Channel, Sections 1-5
0004 Tire and Debris Removal, Sections 1-5
0005 Sea Turtle Protection, Sections 1-5
TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2
TOTAL OPTION NO. 1
OPTION NO. 2
0010 Dredging Barbours Cut, Section 7
Sea Turtle Protection, Section 6
Tire and Debris Removal, Section 7
Solicitation No.: W912HY22B0006 Date Issued: August 26, 2022 Date Opened: October 11, 2022
Issuing Office: USACE-Galveston Project Title: FY23 USACE Galveston District, Houston Ship Channel Texas - Morgans to Exxon & Barbour's Cut Dredging. Harris
NO.
OPTION NO. 4
0016 Mobilization and Demobilization - Sea Turtle Trawling
TOTAL SCHEDULE NO.1 & OPTION NO. 1
0006 Site Management
TOTAL SCHEDULE NO. 1
OPTION NO. 1
0002 Pipeline Management
SCHEDULE NO. 1
TOTAL OPTION NO. 2
0017 Sea Turtle Trawling and Relocation, Sections 1 - 8
1 JB 3,975,000.00 $3,975,000.00
1 JB $500,000.00 $500,000.00
2,176,000 CY 8.50$ $18,496,000.00
300 TON $1,500.00 $450,000.00
1 JB $0.00 $0.00
1 JB 100,000.00 $100,000.00
$23,521,000.00
543,000 CY $5.00 $2,715,000.00
80 TON $1,500.00 $120,000.00
1 JOB $0.00 $0.00
$2,835,000.00
$26,356,000.00
$0.00
190,000 CY $6.25 $1,187,500.00
50 TON $1,500.00 $75,000.00
1 JB $0.00 $0.00
1 JB
$1,262,500.00
$27,618,500.00
226,000 CY $5.50 $1,243,000.00
35 TON $1,500.00 $52,500.00
1 JB 0.00 $0.00
$1,295,500.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2 & 3 $28,914,000.00
1 JOB $0.00 $0.00
30 DAYS $0.00 $0.00
$0.00
TOTAL SCHEDULE NO.1 & OPTION NO.1, 2, 3, & 4 $28,914,000.00
TOTAL OPTION 3
0011 Tire and Debris Removal, Section 7
TOTAL OPTION NO. 4
OPTION NO. 3
0014 Tire and Debris Removal, Section 8
Business Size: Other than small business
NO. DESCRIPTION
Mobilization and Demobilization
ITEM SCHEDULE NO. 1
Site Management
Sea Turtle Protection, Section 7
OPTION NO. 4
OPTION NO. 1
0002 Pipeline Management
0003 Dredging Houston Ship Channel, Sections 1-5
0004 Tire and Debris Removal, Sections 1-5
TOTAL SCHEDULE NO. 1
Dredging Barbours Flare, Section 6 0008 Tire and Debris Removal, Section 6
Mobilization and Demobilization - Sea Turtle Trawling
0017 Sea Turtle Trawling and Relocation, Sections 1 - 8
TOTAL OPTION NO. 1
OPTION NO. 2
0010 Dredging Barbours Cut, Section 7
TOTAL SCHEDULE NO.1 & OPTION NO. 1
0013 Dredging Barbours Turning Basin, Section 8
TOTAL OPTION NO. 2
TOTAL SCHEDULE NO.1 & OPTION NO. 1
0005 Sea Turtle Protection, Sections 1-5
Solicitation No.: W912HY22B0006 Date Issued: August 26, 2022 Date Opened: October 11, 2022 Issuing Office: USACE-Galveston Project Title: FY23 USACE Galveston District, Houston Ship Channel Texas - Morgans to Exxon & Barbour's Cut Dredging. Harris County, TX Pipeline Dredging, Deep Draft Unrestricted Procurement Offeror 5: WEEKS MARINE, INC. 304 Gaille DR Covington, Louisiana 70433-9125
ABSTRACT OF OFFERS Page 6 of 6
Sea Turtle Protection, Section 6
QUANTITY
TOTAL SCHEDULE NO.1 & OPTION NO. 1 & 2
Sea Turtle Protection, Section 7
0015 Sea Turtle Protection, Section 8
| C.04.01_Bid Abtract W912HY22B0006 without 1419 13OCT2022(1).pdf |