This abstract of offers summarizes bids received for a federal construction contract solicited by the US Army Corps of Engineers Galveston District. The solicitation sought bids for construction of a containment dike along the Gulf Intracoastal Waterway in Brazoria County, Texas. Six bids were received by the August 27, 2021 deadline ranging from $5.8 million to $21.2 million. The apparent low bidder was Patriot Construction and Industrial, LLC at $9.3 million, which was 24.08% below the independent government cost estimate of $12.3 million. The scope of work involves construction of earthen dikes, placement of riprap stone, geotextile filters, and other materials across multiple schedule line items and options from station 0+00 to station 103+00.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIT ESTIMATED

PRICE AMOUNT

1 JOB SUM 574,884.00$

1 JOB SUM 145,108.00$

49,000 TON 117.05$ 5,735,450.00$

7,600 TON 107.42$ 816,392.00$

18,900 SY 14.66$ 277,074.00$

1 JOB SUM 237,880.00$

1,200 LF $ 6.09 $ 7,308.00

1 JOB SUM 56,691.00$

1 JOB SUM 6,504.00$

7,857,291.00$

1 JOB SUM 58,092.00$

5,600 TON 115.97$ 649,432.00$

900 TON 110.44$ 99,396.00$

2,000 SY 11.36$ 22,720.00$

1 JOB SUM 5,915.00$

300 LF 6.09$ 1,827.00$

1 JOB SUM $ 1,890.00

839,272.00$

8,696,563.00$

1 JOB SUM 61,450.00$

5,500 TON 116.01$ 638,055.00$

900 TON 110.44$ 99,396.00$

2,000 SY 11.36$ 22,720.00$

1 JOB SUM 23,789.00$

300 LF 6.09$ 1,827.00$

1 JOB SUM $ 1,890.00

849,127.00$

9,545,690.00$

Spartina Alternaflora Planting Plugs - STA. 32+00 to

STA. 44+00

g

67+00

Mobilization & Demobilization

TOTAL SCHEDULE 1

0004 Blanket Stone - STA.44+00 to STA. 82+00 0005 Geotextile Filter - STA. 44+00 to STA. 82+00 0006 Access Channel STA. 32+00 to 82+00

0009 Final As-Built Drawings - STA. 32+00 to 82+00

TOTAL OPTION 1

0011 Riprap Stone - STA. 82+00 to STA. 85+00

0012 Blanket Stone - STA. 82+00 to STA. 85+00 0013 Geotextile Filter - STA. 82+00 to STA. 85+00

Access Channel STA. 82+00 to 85+00 and STA.

29+00 to STA. 32+00

Spartina Alternaflora Planting Plugs - STA. 32+00 to

STA. 44+00

ABSTRACT OF OFFERS

Solicitation No.: W912HY21B0020 Date Issued: 28 July 2021 Date Opened: 27 August 2021 Issuing Office: USAED- Galveston Project Title: Unrestricted Procurement FY21 Gulf Intracoastal Waterway, Texas, Chocolate Bayou PA1A Containment Dike Construction, Brazoria County, Texas.

Number of Amendments Issued: 2 GOVERNMENT ESTIMATE (Without Profit)

NO.

ESTIMATED

DESCRIPTION QUANTITY

ITEM

Earthen Dike - STA. 32+00 to STA 44+00

Riprap Stone - STA. 44+00 to STA. 82+00

TOTAL SCHEDULE 1 AND OPTION 1

OPTION 2

0017 Earthen Dike - STA. 26+00 to STA 29+00

0018 Riprap Stone - STA. 85+00 to STA. 88+00

Final As-Built Drawings - STA. 82+00 to 85+00 and STA. 29+00 to 32+00

OPTION 1

0010 Earthen Dike - STA. 29+00 to STA 32+00

TOTAL OPTION 2

TOTAL SCHEDULE 1 AND OPTION 1 & 2

OPTION 3

0019 Blanket Stone - STA. 85+00 to STA. 88+00

0020 Geotextile Filter - STA. 85+00 to STA. 88+00

Access Channel STA. 85+00 to 88+00 and STA.

26+00 to STA. 29+00

Spartina Alternaflora Planting Plugs - STA. 26+00 to

STA. 29+00

Final As-Built Drawings - STA. 85+00 to 88+00 and STA. 26+00 to 29+00

1 JOB SUM 62,433.00$

6,000 TON 115.84$ 695,040.00$

900 TON 110.44$ 99,396.00$

2,000 SY 11.36$ 22,720.00$

1 JOB SUM 23,789.00$

300 LF 6.09$ 1,827.00$

1 JOB SUM $ 1,890.00

907,095.00$

10,452,785.00$

15,100 TON 116.94 1,765,794.00$

2,700 TON 111.76$ 301,752.00$

6,200 SY 11.36$ 70,432.00$

1 JOB SUM 47,577.00$

1 JOB SUM 3,780.00$

2,189,335.00$

12,642,120.00$

1 JOB SUM 320,726.00$

1 JOB SUM 91,188.00$

2,300 LF 6.09$ 14,007.00$

1 JOB SUM 9,451.00$

435,372.00$ 13,077,492.00$

*The apparent low bidder, Patriot Construction and Industrial, LLC is 24.08% lower than the Government Estimate.

Issuing Office: USAED-Galveston Offeror #1 : Rigid Constructors, LLC, 3861 Ambassador Caffery Pkwy, Ste. 175 Lafayette, LA 70503

Spartina Alternaflora Planting Plugs - STA. 23+00 to

STA. 26+00

Final As-Built Drawings - STA. 88+00 to 91+00 and STA. 23+00 to 26+00

TOTAL OPTION 3

TOTAL SCHEDULE 1 AND OPTION 1, 2, & 3

0024 Earthen Dike - STA. 23+00 to STA 26+00

0025 Riprap Stone - STA. 88+00 to STA. 91+00

0026 Blanket Stone - STA. 88+00 to STA. 91+00

0027 Geotextile Filter - STA. 88+00 to STA. 91+00

Access Channel STA. 88+00 to 91+00 and STA.

23+00 to STA. 26+00

TOTAL SCHEDULE 1 AND OPTION 1, 2, 3, & 4

OPTION 5

0036 Earthen Dike - STA. 0+00 to STA. 23+00

0034 Access Channel STA. 91+00 to 103+00

Final As-Built Drawings - STA. 91+00 to STA.

103+00

TOTAL OPTION 4

OPTION 4

0031 Riprap Stone - STA. 91+00 to STA. 103+00

0032 Blanket Stone - STA. 91+00 to STA. 103+00

0033 Geotextile Filter - STA. 91+00 to STA. 103+00

0037 Access Channel STA. 0+00 to 23+00

Spartina Alternaflora Planting Plugs - STA. 0+00 to 23+00

0039 Final As-Built Drawings - STA. 0+00 to STA. 23+00

TOTAL OPTION 5

TOTAL SCHEDULE 1 AND OPTION 1 thru 5

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED TO THIS

SOLICITATION.

Curtis Cole, Jr.

Contracting Officer

Solicitation No.: W912HY21B0020 Date Issued: 28 Jul 2021 Date Opened: 27 Aug 2021

UNIT ESTIMATED

PRICE AMOUNT

1 JOB SUM 462,200.00$

1 JOB SUM 352,000.00$

49,000 TON 73.00$ 3,577,000.00$

7,600 TON 69.00$ 524,400.00$

18,900 SY 5.00$ 94,500.00$

1 JOB SUM 345,000.00$

1,200 LF $ 7.00 $ 8,400.00

1 JOB SUM 77,036.00$

1 JOB SUM 75,000.00$

5,515,536.00$

1 JOB SUM 211,200.00$

5,600 TON 73.00$ 408,800.00$

900 TON 69.00$ 62,100.00$

2,000 SY 5.00$ 10,000.00$

1 JOB SUM 37,500.00$

300 LF 7.00$ 2,100.00$

1 JOB SUM $ 30,000.00

761,700.00$ 6,277,236.00$

1 JOB SUM 147,200.00$

5,500 TON 73.00$ 401,500.00$

900 TON 69.00$ 62,100.00$

2,000 SY 5.00$ 10,000.00$

1 JOB SUM 37,500.00$

300 LF 7.00$ 2,100.00$

1 JOB SUM $ 30,000.00

690,400.00$

6,967,636.00$

1 JOB SUM 220,800.00$

6,000 TON 73.00$ 438,000.00$

900 TON 69.00$ 62,100.00$

2,000 SY 5.00$ 10,000.00$

1 JOB SUM 37,500.00$

300 LF 7.00$ 2,100.00$

1 JOB SUM $ 30,000.00

800,500.00$

7,768,136.00$

15,100 TON 73.00 1,102,300.00$

2,700 TON 69.00$ 186,300.00$

6,200 SY 5.00$ 31,000.00$

1 JOB SUM 100,000.00$

1 JOB SUM 45,000.00$

Final As-Built Drawings - STA. 32+00 to 82+000009

Spartina Alternaflora Planting Plugs - STA. 32+00 to

STA. 44+00

Earthen Dike - STA. 29+00 to STA 32+00 Riprap Stone - STA. 82+00 to STA. 85+00

0012 Blanket Stone - STA. 82+00 to STA. 85+00 0013 Geotextile Filter - STA. 82+00 to STA. 85+00

Access Channel STA. 82+00 to 85+00 and STA.

OPTION 1

TOTAL SCHEDULE 1

DESCRIPTION

Mobilization & Demobilization

Business Size: SDB

ESTIMATED

QUANTITY

Earthen Dike - STA. 32+00 to STA 44+00 Riprap Stone - STA. 44+00 to STA. 82+00

0004 Blanket Stone - STA.44+00 to STA. 82+00 0005 Geotextile Filter - STA. 44+00 to STA. 82+00 0006 Access Channel STA. 32+00 to 82+00 0007 Spartina Alternaflora Planting Plugs - STA. 32+00 to

ITEM

NO.

Riprap Stone - STA. 85+00 to STA. 88+00 Blanket Stone - STA. 85+00 to STA. 88+00

0020 Geotextile Filter - STA. 85+00 to STA. 88+00

Access Channel STA. 85+00 to 88+00 and STA.

26+00 to STA. 29+00

Spartina Alternaflora Planting Plugs - STA. 26+00 to

STA. 29+00

OPTION 2

Earthen Dike - STA. 26+00 to STA 29+000017

0008 Stone Mattresses Leveling - STA. 56+00 to STA.

TOTAL SCHEDULE 1 AND OPTION 1

0016 Final As-Built Drawings - STA. 82+00 to 85+00 and

0024 Earthen Dike - STA. 23+00 to STA 26+00 0025 Riprap Stone - STA. 88+00 to STA. 91+00 0026 Blanket Stone - STA. 88+00 to STA. 91+00 0027 Geotextile Filter - STA. 88+00 to STA. 91+00

Access Channel STA. 88+00 to 91+00 and STA.

23+00 to STA. 26+00

Final As-Built Drawings - STA. 85+00 to 88+00 and STA. 26+00 to 29+00

TOTAL OPTION 2

TOTAL SCHEDULE 1 AND OPTION 1 & 2

OPTION 3

OPTION 4

0031 Riprap Stone - STA. 91+00 to STA. 103+00 0032 Blanket Stone - STA. 91+00 to STA. 103+00

Spartina Alternaflora Planting Plugs - STA. 23+00 to

STA. 26+00

Final As-Built Drawings - STA. 88+00 to 91+00 and STA. 23+00 to 26+00

TOTAL OPTION 3

TOTAL SCHEDULE 1 AND OPTION 1, 2, & 3

0033 Geotextile Filter - STA. 91+00 to STA. 103+00 0034 Access Channel STA. 91+00 to 103+00 0035 Final As-Built Drawings - STA. 91+00 to STA.

1,464,600.00$ 9,232,736.00$

1 JOB SUM 592,000.00$

1 JOB SUM 95,833.00$

2,300 LF 7.00$ 16,100.00$

1 JOB SUM 45,000.00$

748,933.00$ 9,981,669.00$

UNIT ESTIMATED

PRICE AMOUNT

1 JOB SUM 790,000.00$

1 JOB SUM 740,000.00$

49,000 TON 79.00$ 3,871,000.00$

7,600 TON 81.00$ 615,600.00$

18,900 SY 12.00$ 226,800.00$

1 JOB SUM 170,000.00$

1,200 LF $ 48.00 $ 57,600.00

1 JOB SUM 165,000.00$

1 JOB SUM 52,000.00$

6,688,000.00$

1 JOB SUM 195,000.00$

5,600 TON 79.00$ 442,400.00$

900 TON 81.00$ 72,900.00$

2,000 SY 12.00$ 24,000.00$

1 JOB SUM 20,000.00$

300 LF 48.00$ 14,400.00$

1 JOB SUM $ 23,000.00

791,700.00$

7,479,700.00$

1 JOB SUM 220,000.00$

5,500 TON 79.00$ 434,500.00$

900 TON 81.00$ 72,900.00$

2,000 SY 12.00$ 24,000.00$

1 JOB SUM 20,000.00$

300 LF 48.00$ 14,400.00$

1 JOB SUM $ 23,000.00

808,800.00$

8,288,500.00$

1 JOB SUM 220,000.00$

TOTAL SCHEDULE 1 AND OPTION 1, 2, 3, & 4

OPTION 5

0036 Earthen Dike - STA. 0+00 to STA. 23+00 0037 Access Channel STA. 0+00 to 23+00

TOTAL OPTION 4

Solicitation No.: W912HY21B0020 Date Issued: 28 Jul 2021 Date Opened: 27 Aug 2021 Issuing Office: USAED-Galveston Offeror #2 : Luhr Bros., Inc. PO BOX 50 Columbia, IL 62236 Business Size: Other than Small

ITEM ESTIMATED

NO. DESCRIPTION QUANTITY

Spartina Alternaflora Planting Plugs - STA. 0+00 to 23+00

0039 Final As-Built Drawings - STA. 0+00 to STA. 23+00

TOTAL OPTION 5

TOTAL SCHEDULE 1 AND OPTION 1 thru 5

0006 Access Channel STA. 32+00 to 82+00

Spartina Alternaflora Planting Plugs - STA. 32+00 to

STA. 44+00

g

67+00 0009 Final As-Built Drawings - STA. 32+00 to 82+00

TOTAL SCHEDULE 1

0001 Mobilization & Demobilization 0002 Earthen Dike - STA. 32+00 to STA 44+00 0003 Riprap Stone - STA. 44+00 to STA. 82+00 0004 Blanket Stone - STA.44+00 to STA. 82+00 0005 Geotextile Filter - STA. 44+00 to STA. 82+00

0011 Riprap Stone - STA. 82+00 to STA. 85+00 0012 Blanket Stone - STA. 82+00 to STA. 85+00 0013 Geotextile Filter - STA. 82+00 to STA. 85+00

Access Channel STA. 82+00 to 85+00 and STA.

29+00 to STA. 32+00

Spartina Alternaflora Planting Plugs - STA. 32+00 to

STA. 44+00

OPTION 1

0010 Earthen Dike - STA. 29+00 to STA 32+00

OPTION 2

0017 Earthen Dike - STA. 26+00 to STA 29+00 0018 Riprap Stone - STA. 85+00 to STA. 88+00 0019 Blanket Stone - STA. 85+00 to STA. 88+00

Final As-Built Drawings - STA. 82+00 to 85+00 and STA. 29+00 to 32+00

0024 Earthen Dike - STA. 23+00 to STA 26+00

0020 Geotextile Filter - STA. 85+00 to STA. 88+00

Access Channel STA. 85+00 to 88+00 and STA.

26+00 to STA. 29+00

Spartina Alternaflora Planting Plugs - STA. 26+00 to

STA. 29+00

Final As-Built Drawings - STA. 85+00 to 88+00 and STA. 26+00 to 29+00

TOTAL OPTION 2

6,000 TON 79.00$ 474,000.00$

900 TON 81.00$ 72,900.00$

2,000 SY 12.00$ 24,000.00$

1 JOB SUM 20,000.00$

300 LF 48.00$ 14,400.00$

1 JOB SUM $ 23,000.00

848,300.00$

9,136,800.00$

15,100 TON 79.00$ 1,192,900.00$

2,700 TON 81.00$ 218,700.00$

6,200 SY 12.00$ 74,400.00$

1 JOB SUM 23,000.00$

1 JOB SUM 23,000.00$

1,532,000.00$ 10,668,800.00$

1 JOB SUM 860,000.00$

1 JOB SUM 25,000.00$

2,300 LF 48,000.00$ 110,400,000.00$

1 JOB SUM 27,000.00$

1,022,400.00$ 11,691,200.00$

UNIT ESTIMATED

PRICE AMOUNT

1 JOB SUM 2,575,000.00$

1 JOB SUM 290,000.00$

49,000 TON 95.00$ 4,655,000.00$

7,600 TON 90.00$ 684,000.00$

18,900 SY 9.50$ 179,550.00$

1 JOB SUM 330,000.00$

1,200 LF $ 70.00 $ 84,000.00

1 JOB SUM 240,000.00$

1 JOB SUM 186,000.00$

9,223,550.00$

1 JOB SUM 130,000.00$

5,600 TON 95.00$ 532,000.00$

900 TON 125.00$ 112,500.00$

2,000 SY 28.00$ 56,000.00$

1 JOB SUM 70,000.00$

300 LF 250.00$ 75,000.00$

Final As-Built Drawings - STA. 88+00 to 91+00 and STA. 23+00 to 26+00

0026 Blanket Stone - STA. 88+00 to STA. 91+00 0027 Geotextile Filter - STA. 88+00 to STA. 91+00

Access Channel STA. 88+00 to 91+00 and STA.

23+00 to STA. 26+00

Spartina Alternaflora Planting Plugs - STA. 23+00 to

STA. 26+00

0034 Access Channel STA. 91+00 to 103+00 0035 Final As-Built Drawings - STA. 91+00 to STA.

TOTAL OPTION 4

TOTAL SCHEDULE 1 AND OPTION 1, 2, 3, & 4

OPTION 4

0031 Riprap Stone - STA. 91+00 to STA. 103+00 0032 Blanket Stone - STA. 91+00 to STA. 103+00 0033 Geotextile Filter - STA. 91+00 to STA. 103+00

0039 Final As-Built Drawings - STA. 0+00 to STA. 23+00

TOTAL OPTION 5

TOTAL SCHEDULE 1 AND OPTION 1 thru 5

Solicitation No.: W912HY21B0020 Date Issued: 28 Jul 2021 Date Opened: 27 Aug 2021

OPTION 5

0036 Earthen Dike - STA. 0+00 to STA. 23+00 0037 Access Channel STA. 0+00 to 23+00

Spartina Alternaflora Planting Plugs - STA. 0+00 to 23+00

0001 Mobilization & Demobilization 0002 Earthen Dike - STA. 32+00 to STA 44+00 0003 Riprap Stone - STA. 44+00 to STA. 82+00 0004 Blanket Stone - STA.44+00 to STA. 82+00 0005 Geotextile Filter - STA. 44+00 to STA. 82+00

Issuing Office: USAED-Galveston Offeror #3 : Texas Dewatering, LLC , 4691 FM 529 Bellville, TX 77418 Business Size: Other than Small Business

ITEM ESTIMATED

NO. DESCRIPTION QUANTITY

0006 Access Channel STA. 32+00 to 82+00

Spartina Alternaflora Planting Plugs - STA. 32+00 to

STA. 44+00

0008 Stone Mattresses Leveling - STA. 56+00 to STA.

0009 Final As-Built Drawings - STA. 32+00 to 82+00

TOTAL SCHEDULE 1

0011 Riprap Stone - STA. 82+00 to STA. 85+00 0012 Blanket Stone - STA. 82+00 to STA. 85+00 0013 Geotextile Filter - STA. 82+00 to STA. 85+00

Access Channel STA. 82+00 to 85+00 and STA.

29+00 to STA. 32+00

1 JOB SUM $ 115,000.00

1,090,500.00$

10,314,050.00$

1 JOB SUM 112,000.00$

5,500 TON 95.00$ 522,500.00$

900 TON 125.00$ 112,500.00$

2,000 SY 28.00$ 56,000.00$

1 JOB SUM 85,000.00$

300 LF 250.00$ 75,000.00$

1 JOB SUM $ 115,000.00

1,078,000.00$

11,392,050.00$

1 JOB SUM 115,000.00$

6,000 TON 95.00$ 570,000.00$

900 TON 125.00$ 112,500.00$

2,000 SY 28.00$ 56,000.00$

1 JOB SUM 85,000.00$

300 LF 250.00$ 75,000.00$

1 JOB SUM $ 115,000.00

1,128,500.00$

12,520,550.00$

15,100 TON 95.00$ 1,434,500.00$

2,700 TON 125.00$ 337,500.00$

6,200 SY 28.00$ 173,600.00$

1 JOB SUM 120,000.00$

1 JOB SUM 115,000.00$

2,180,600.00$ 14,701,150.00$

1 JOB SUM 480,000.00$

1 JOB SUM 191,000.00$

2,300 LF 250.00$ 575,000.00$

1 JOB SUM 115,000.00$

1,361,000.00$ 16,062,150.00$

UNIT ESTIMATED

PRICE AMOUNT

1 JOB SUM 6,400,000.00$

1 JOB SUM 800,000.00$

Final As-Built Drawings - STA. 82+00 to 85+00 and STA. 29+00 to 32+00

0020 Geotextile Filter - STA. 85+00 to STA. 88+00

Access Channel STA. 85+00 to 88+00 and STA.

26+00 to STA. 29+00

Spartina Alternaflora Planting Plugs - STA. 26+00 to

STA. 29+00

Final As-Built Drawings - STA. 85+00 to 88+00 and STA. 26+00 to 29+00

TOTAL OPTION 2

OPTION 2

0017 Earthen Dike - STA. 26+00 to STA 29+00 0018 Riprap Stone - STA. 85+00 to STA. 88+00 0019 Blanket Stone - STA. 85+00 to STA. 88+00

0025 Riprap Stone - STA. 88+00 to STA. 91+00 0026 Blanket Stone - STA. 88+00 to STA. 91+00 0027 Geotextile Filter - STA. 88+00 to STA. 91+00

Access Channel STA. 88+00 to 91+00 and STA.

23+00 to STA. 26+00

Spartina Alternaflora Planting Plugs - STA. 23+00 to

STA. 26+00

0024 Earthen Dike - STA. 23+00 to STA 26+00

OPTION 4

0031 Riprap Stone - STA. 91+00 to STA. 103+00 0032 Blanket Stone - STA. 91+00 to STA. 103+00 0033 Geotextile Filter - STA. 91+00 to STA. 103+00

Final As-Built Drawings - STA. 88+00 to 91+00 and STA. 23+00 to 26+00

0036 Earthen Dike - STA. 0+00 to STA. 23+00 0037 Access Channel STA. 0+00 to 23+00

Spartina Alternaflora Planting Plugs - STA. 0+00 to 23+00

0034 Access Channel STA. 91+00 to 103+00 0035 Final As-Built Drawings - STA. 91+00 to STA.

TOTAL OPTION 4

TOTAL SCHEDULE 1 AND OPTION 1, 2, 3, & 4

Issuing Office: USAED-Galveston Offeror #4 : Trade West Construction, Inc., 300 Whafen Ln. Mesquite, NV 89027 Business Size: WOSB

ITEM ESTIMATED

NO. DESCRIPTION QUANTITY

0039 Final As-Built Drawings - STA. 0+00 to STA. 23+00

TOTAL OPTION 5

TOTAL SCHEDULE 1 AND OPTION 1 thru 5

Solicitation No.: W912HY21B0020 Date Issued: 28 Jul 2021 Date Opened: 27 Aug 2021

0001 Mobilization & Demobilization 0002 Earthen Dike - STA. 32+00 to STA 44+00

49,000 TON 200.00$ 9,800,000.00$

7,600 TON 110.00$ 836,000.00$

18,900 SY 50.00$ 945,000.00$

1 JOB SUM 100,000.00$

1,200 LF $ 40.00 $ 48,000.00

1 JOB SUM 50,000.00$

1 JOB SUM 10,000.00$

18,989,000.00$

1 JOB SUM 150,000.00$

5,600 TON 40.00$ 224,000.00$

900 TON 20.00$ 18,000.00$

2,000 SY 10.00$ 20,000.00$

1 JOB SUM 50,000.00$

300 LF 15.00$ 4,500.00$

1 JOB SUM $ 10,000.00

476,500.00$

19,465,500.00$

1 JOB SUM 150,000.00$

5,500 TON 40.00$ 220,000.00$

900 TON 20.00$ 18,000.00$

2,000 SY 10.00$ 20,000.00$

1 JOB SUM 50,000.00$

300 LF 15.00$ 4,500.00$

1 JOB SUM $ 10,000.00

472,500.00$

19,938,000.00$

1 JOB SUM 150,000.00$

6,000 TON 40.00$ 240,000.00$

900 TON 20.00$ 18,000.00$

2,000 SY 10.00$ 20,000.00$

1 JOB SUM 50,000.00$

300 LF 15.00$ 4,500.00$

1 JOB SUM $ 10,000.00

492,500.00$

20,430,500.00$

15,100 TON 40.00$ 604,000.00$

2,700 TON 20.00$ 54,000.00$

6,200 SY 15.00$ 93,000.00$

1 JOB SUM 50,000.00$

1 JOB 10,000.00$ 10,000.00$

811,000.00$ 21,241,500.00$

0006 Access Channel STA. 32+00 to 82+00

Spartina Alternaflora Planting Plugs - STA. 32+00 to

STA. 44+00

0008 Stone Mattresses Leveling - STA. 56+00 to STA.

0009 Final As-Built Drawings - STA. 32+00 to 82+00

TOTAL SCHEDULE 1

0003 Riprap Stone - STA. 44+00 to STA. 82+00 0004 Blanket Stone - STA.44+00 to STA. 82+00 0005 Geotextile Filter - STA. 44+00 to STA. 82+00

0011 Riprap Stone - STA. 82+00 to STA. 85+00 0012 Blanket Stone - STA. 82+00 to STA. 85+00 0013 Geotextile Filter - STA. 82+00 to STA. 85+00

Access Channel STA. 82+00 to 85+00 and STA.

29+00 to STA. 32+00

OPTION 2

0017 Earthen Dike - STA. 26+00 to STA 29+00 0018 Riprap Stone - STA. 85+00 to STA. 88+00 0019 Blanket Stone - STA. 85+00 to STA. 88+00

Final As-Built Drawings - STA. 82+00 to 85+00 and STA. 29+00 to 32+00

0024 Earthen Dike - STA. 23+00 to STA 26+00

0020 Geotextile Filter - STA. 85+00 to STA. 88+00

Access Channel STA. 85+00 to 88+00 and STA.

26+00 to STA. 29+00

Spartina Alternaflora Planting Plugs - STA. 26+00 to

STA. 29+00

Final As-Built Drawings - STA. 85+00 to 88+00 and STA. 26+00 to 29+00

TOTAL OPTION 2

Final As-Built Drawings - STA. 88+00 to 91+00 and STA. 23+00 to 26+00

0027 Geotextile Filter - STA. 88+00 to STA. 91+00

Access Channel STA. 88+00 to 91+00 and STA.

23+00 to STA. 26+00

Spartina Alternaflora Planting Plugs - STA. 23+00 to

STA. 26+00

0034 Access Channel STA. 91+00 to 103+00 0035 Final As-Built Drawings - STA. 91+00 to STA.

TOTAL OPTION 4

TOTAL SCHEDULE 1 AND OPTION 1, 2, 3, & 4

OPTION 4

0031 Riprap Stone - STA. 91+00 to STA. 103+00 0032 Blanket Stone - STA. 91+00 to STA. 103+00 0033 Geotextile Filter - STA. 91+00 to STA. 103+00

1 JOB SUM 150,000.00$

1 JOB SUM 50,000.00$

2,300 LF 15.00$ 34,500.00$

1 JOB SUM 10,000.00$

244,500.00$ 21,486,000.00$

UNIT ESTIMATED

PRICE AMOUNT

1 JOB SUM 925,000.00$

1 JOB SUM 528,000.00$

49,000 TON 81.81$ 4,008,690.00$

7,600 TON 79.74$ 606,024.00$

18,900 SY 9.20$ 173,880.00$

1 JOB SUM 467,000.00$

1,200 LF $ 3.50 $ 4,200.00

1 JOB SUM 45,000.00$

1 JOB SUM 45,500.00$

6,803,294.00$

1 JOB SUM 132,000.00$

5,600 TON 81.81$ 458,136.00$

900 TON 79.74$ 71,766.00$

2,000 SY 9.20$ 18,400.00$

1 JOB SUM 21,000.00$

300 LF 3.50$ 1,050.00$

1 JOB SUM $ 15,600.00

717,952.00$

7,521,246.00$

1 JOB SUM 132,000.00$

5,500 TON 81.81$ 449,955.00$

900 TON 79.74$ 71,766.00$

2,000 SY 9.20$ 18,400.00$

1 JOB SUM 21,000.00$

300 LF 3.50$ 1,050.00$

1 JOB SUM $ 15,600.00

709,771.00$

8,231,017.00$

1 JOB SUM 132,000.00$

6,000 TON 81.81$ 490,860.00$

0039 Final As-Built Drawings - STA. 0+00 to STA. 23+00

TOTAL OPTION 5

TOTAL SCHEDULE 1 AND OPTION 1 thru 5

Solicitation No.: W912HY21B0020 Date Issued: 28 Jul 2021 Date Opened: 27 Aug 2021

OPTION 5

0036 Earthen Dike - STA. 0+00 to STA. 23+00 0037 Access Channel STA. 0+00 to 23+00

Spartina Alternaflora Planting Plugs - STA. 0+00 to 23+00

0001 Mobilization & Demobilization 0002 Earthen Dike - STA. 32+00 to STA 44+00 0003 Riprap Stone - STA. 44+00 to STA. 82+00 0004 Blanket Stone - STA.44+00 to STA. 82+00 0005 Geotextile Filter - STA. 44+00 to STA. 82+00

Issuing Office: USAED-Galveston Offeror #5 : Bertucci Contracting Company, LLC, PO BOX 10582 New Orleans, LA 70181 Business Size: Other than Small Business

ITEM ESTIMATED

NO. DESCRIPTION QUANTITY

0006 Access Channel STA. 32+00 to 82+00

Spartina Alternaflora Planting Plugs - STA. 32+00 to

STA. 44+00

0008 Stone Mattresses Leveling - STA. 56+00 to STA.

0009 Final As-Built Drawings - STA. 32+00 to 82+00

TOTAL SCHEDULE 1

Final As-Built Drawings - STA. 82+00 to 85+00 and STA. 29+00 to 32+00

0011 Riprap Stone - STA. 82+00 to STA. 85+00 0012 Blanket Stone - STA. 82+00 to STA. 85+00 0013 Geotextile Filter - STA. 82+00 to STA. 85+00

Access Channel STA. 82+00 to 85+00 and STA.

29+00 to STA. 32+00

Spartina Alternaflora Planting Plugs - STA. 32+00 to

STA. 44+00

0020 Geotextile Filter - STA. 85+00 to STA. 88+00

Access Channel STA. 85+00 to 88+00 and STA.

26+00 to STA. 29+00

Spartina Alternaflora Planting Plugs - STA. 26+00 to

STA. 29+00

Final As-Built Drawings - STA. 85+00 to 88+00 and STA. 26+00 to 29+00

TOTAL OPTION 2

OPTION 2

0017 Earthen Dike - STA. 26+00 to STA 29+00 0018 Riprap Stone - STA. 85+00 to STA. 88+00 0019 Blanket Stone - STA. 85+00 to STA. 88+00

0024 Earthen Dike - STA. 23+00 to STA 26+00

900 TON 79.74$ 71,766.00$

2,000 SY 9.20$ 18,400.00$

1 JOB SUM 21,000.00$

300 LF 3.50$ 1,050.00$

1 JOB SUM $ 15,600.00

750,676.00$

8,981,693.00$

15,100 TON 81.81$ 1,235,331.00$

2,700 TON 79.74$ 215,298.00$

6,200 SY 9.20$ 57,040.00$

1 JOB SUM 45,000.00$

1 JOB SUM 15,600.00$

1,568,269.00$ 10,549,962.00$

1 JOB SUM 1,012,000.00$

1 JOB SUM 161,000.00$

2,300 LF 3.50$ 8,050.00$

1 JOB SUM 20,930.00$

1,201,980.00$ 11,751,942.00$

UNIT ESTIMATED

PRICE AMOUNT

1 JOB SUM 547,000.00$

1 JOB SUM 238,000.00$

49,000 TON 72.00$ 3,528,000.00$

7,600 TON 80.00$ 608,000.00$

18,900 SY 4.25$ 80,325.00$

1 JOB SUM 789,600.00$

1,200 LF $ 3.20 $ 3,840.00

1 JOB SUM 14,000.00$

1 JOB SUM 7,600.00$

5,816,365.00$

1 JOB SUM 88,500.00$

5,600 TON 77.50$ 434,000.00$

900 TON 102.00$ 91,800.00$

2,000 SY 4.75$ 9,500.00$

1 JOB SUM 30,000.00$

300 LF 3.20$ 960.00$

1 JOB SUM $ 1,000.00

655,760.00$ 6,472,125.00$

1 JOB SUM 94,000.00$

0026 Blanket Stone - STA. 88+00 to STA. 91+00 0027 Geotextile Filter - STA. 88+00 to STA. 91+00

Access Channel STA. 88+00 to 91+00 and STA.

23+00 to STA. 26+00

Spartina Alternaflora Planting Plugs - STA. 23+00 to

STA. 26+00

OPTION 4

0031 Riprap Stone - STA. 91+00 to STA. 103+00 0032 Blanket Stone - STA. 91+00 to STA. 103+00 0033 Geotextile Filter - STA. 91+00 to STA. 103+00

Final As-Built Drawings - STA. 88+00 to 91+00 and STA. 23+00 to 26+00

0036 Earthen Dike - STA. 0+00 to STA. 23+00 0037 Access Channel STA. 0+00 to 23+00

Spartina Alternaflora Planting Plugs - STA. 0+00 to 23+00

0034 Access Channel STA. 91+00 to 103+00 0035 Final As-Built Drawings - STA. 91+00 to STA.

TOTAL OPTION 4

TOTAL SCHEDULE 1 AND OPTION 1, 2, 3, & 4

Solicitation No.: W912HY21B0020 Date Issued: 28 Jul 2021 Date Opened: 27 Aug 2021 Issuing Office: USAED-Galveston Offeror #6 : Patriot Construction and Industrial, LLC, 1026 Toby Mouton Road, Duson, LA 70539 APPARENT LOW BIDDER Business Size: Other than Small Business

ITEM ESTIMATED

NO. DESCRIPTION QUANTITY

0039 Final As-Built Drawings - STA. 0+00 to STA. 23+00

TOTAL OPTION 5

TOTAL SCHEDULE 1 AND OPTION 1 thru 5

0006 Access Channel STA. 32+00 to 82+00 0007 Spartina Alternaflora Planting Plugs - STA. 32+00 to 0008 Stone Mattresses Leveling - STA. 56+00 to STA.

0009 Final As-Built Drawings - STA. 32+00 to 82+00

TOTAL SCHEDULE 1

0001 Mobilization & Demobilization 0002 Earthen Dike - STA. 32+00 to STA 44+00 0003 Riprap Stone - STA. 44+00 to STA. 82+00 0004 Blanket Stone - STA.44+00 to STA. 82+00 0005 Geotextile Filter - STA. 44+00 to STA. 82+00

0011 Riprap Stone - STA. 82+00 to STA. 85+00 0012 Blanket Stone - STA. 82+00 to STA. 85+00 0013 Geotextile Filter - STA. 82+00 to STA. 85+00 0014 Access Channel STA. 82+00 to 85+00 and STA.

0015 Spartina Alternaflora Planting Plugs - STA. 32+00 to

OPTION 2

0017 Earthen Dike - STA. 26+00 to STA 29+00

0016 Final As-Built Drawings - STA. 82+00 to 85+00 and

5,500 TON 77.60$ 426,800.00$

900 TON 102.00$ 91,800.00$

2,000 SY 4.75$ 9,500.00$

1 JOB SUM 31,000.00$

300 LF 3.20$ 960.00$

1 JOB SUM $ 920.00

654,980.00$ 7,127,105.00$

1 JOB SUM 95,000.00$

6,000 TON 78.30$ 469,800.00$

900 TON 103.00$ 92,700.00$

2,000 SY 4.75$ 9,500.00$

1 JOB SUM 31,000.00$

300 LF 3.20$ 960.00$

1 JOB SUM $ 1,000.00

699,960.00$ 7,827,065.00$

15,100 TON 77.20$ 1,165,720.00$

2,700 TON 88.00$ 237,600.00$

6,200 SY 4.40$ 27,280.00$

1 JOB SUM 90,000.00$

1 JOB SUM 1,850.00$

1,522,450.00$ 9,349,515.00$

1 JOB SUM 416,500.00$

1 JOB SUM 151,600.00$

2,300 LF 3.20$ 7,360.00$

1 JOB SUM 3,500.00$

578,960.00$ 9,928,475.00$

0018 Riprap Stone - STA. 85+00 to STA. 88+00 0019 Blanket Stone - STA. 85+00 to STA. 88+00

0024 Earthen Dike - STA. 23+00 to STA 26+00

0020 Geotextile Filter - STA. 85+00 to STA. 88+00 0021 Access Channel STA. 85+00 to 88+00 and STA.

0022 Spartina Alternaflora Planting Plugs - STA. 26+00 to 0023 Final As-Built Drawings - STA. 85+00 to 88+00 and

TOTAL OPTION 2

0030 Final As-Built Drawings - STA. 88+00 to 91+00 and

0027 Geotextile Filter - STA. 88+00 to STA. 91+00 0028 Access Channel STA. 88+00 to 91+00 and STA.

0029 Spartina Alternaflora Planting Plugs - STA. 23+00 to

0034 Access Channel STA. 91+00 to 103+00 0035 Final As-Built Drawings - STA. 91+00 to STA.

TOTAL OPTION 4

TOTAL SCHEDULE 1 AND OPTION 1, 2, 3, & 4

OPTION 4

0031 Riprap Stone - STA. 91+00 to STA. 103+00 0032 Blanket Stone - STA. 91+00 to STA. 103+00 0033 Geotextile Filter - STA. 91+00 to STA. 103+00

0039 Final As-Built Drawings - STA. 0+00 to STA. 23+00

TOTAL OPTION 5

TOTAL SCHEDULE 1 AND OPTION 1 thru 5

OPTION 5

0036 Earthen Dike - STA. 0+00 to STA. 23+00 0037 Access Channel STA. 0+00 to 23+00 0038 Spartina Alternaflora Planting Plugs - STA. 0+00 to