C.04.01 Bid Abtract W912HY21B0010_5 Options_20210427-PCO signed.pdf
PDF 289 KB Posted
- Attached to
- CEDAR BAYOU, TX CONSTRUCTION
- Solicitation number
- W912HY21B0010
About this file
This document summarizes bids received in response to Solicitation Number W912HY21B0010 from the Department of the Army Corps of Engineers Engineering District Galveston for construction services related to Cedar Bayou, Texas.
The apparent low bidder was Rigid Constructors, LLC at $26,276,454.30, which represents a 22.76% savings versus the government estimate. The solicitation sought bids for mobilization, pre-dredging surveys, demolition of existing structures, construction of new structures, clearing and grubbing, stripping, turfing, dredging, excavation, riprap installation, and other services across five option periods. Maloney Odin Joint Venture bid $39,389,262.00 while Orion Construction, L.P. bid $59,483,299.69 and Standard Constructors, Inc. bid $59,729,131.00. The contract was set aside for small businesses. Award is anticipated based on best value considering price and other factors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract W912HY21B0010_Cedar Bayou Channel Improvement-Corrected-17-May-2021-PCO signed.pdf | ||
| Bid Abtract W912HY21B0010_Cedar Bayou Improvements-Corrected-PCO signed-29-Apr-2021.pdf | ||
| W912HY21B0010-Amendment-0002.pdf | ||
| PA-1 LiDAR EG.txt | TXT text file | |
| Cedar Bayou Channel - North-1.txt | TXT text file | |
| Cedar Bayou Channel - South-1.txt | TXT text file | |
| Devils Elbow LiDAR 2018 - 2.txt | TXT text file | |
| PA-2 LiDAR EG.txt | TXT text file | |
| Ijams Lake 8-2020.txt | TXT text file | |
| Cedar Byaou Channel - South-2.txt | TXT text file | |
| Cedar Bayou Channel - North-2.txt | TXT text file | |
| Devils Elbow LiDAR 2018 - 4.txt | TXT text file | |
| W912HY21B0010 Amendment 1.pdf | ||
| W912HY21B0010 - PLANS.pdf | ||
| W912HY21B0010 - SPECS.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNIT
PRICE TOTAL
1 JB SUM $2,139,420.00
1 JB SUM $96,273.00
1 JB SUM $148,587.00
1 JB SUM $395,348.00
1 JB SUM $395,348.00
1 JB SUM $296,380.00
1 JB SUM $451,018.00
1 JB SUM $451,018.00
1 JB SUM $133,723.00
1 JB SUM $317,652.00
1 JB SUM $145,861.00
1 JB SUM $59,040.00
1 JB SUM $160,504.00
1 JB SUM $160,504.00
1 JB SUM $18,551.00
1 JB SUM $10,285.00
1 JB SUM $230,151.00
1 JB SUM $24,399.00
1 JB SUM $24,399.00
1 JB SUM $245,019.00
1 JB SUM $245,019.00
80 LF $54.85 $4,388.00
80 LF $54.85 $4,388.00
260,000 CY $11.63 $3,023,800.00
205,000 CY $11.78 $2,414,900.00
48,500 CY $8.30 $402,550.00
115,000 CY $5.65 $649,750.00
8,500 SF $12.82 $108,970.00
1,200 SY $9.56 $11,472.00
729,514 CY $7.36 $5,369,223.04
236,000 CY $5.34 $1,260,240.00
117 TON $109.38 $12,797.46
200 TON $109.38 $21,876.00
160 TON $109.38 $17,500.80
80 TON $104.50 $8,360.00
48,000 TON $109.38 $5,250,240.00
15,000 TON $104.50 $1,567,500.00
$26,276,454.30
4,612 CY $5.15 $23,751.80
$23,751.80
1,938 CY $8.14 $15,775.32
$15,775.32
1,914 CY $7.25 $13,876.50
$13,876.50
2,210 CY $7.48 $16,530.80
$16,530.80
1 JB SUM $60,490.00
$60,490.00
$26,406,878.72
Semi-Compacted Dike Ijams Lake
Uncompacted Berm Ijams Lake
Articulating Concrete Block
Geotextile
Pipeline Dredging Sections 1-5
Riprap PA-2
Riprap Ijams Lake
Blanket Stone Ijams Lake Dike
Riprap Devil's Elbow Cutoff
TOTAL OPTION NO. 4
TOTAL OPTION NO. 5
Stripping PA-1
Stripping PA-2
Stripping Devil's Elbow
Turfing PA-1
Turfing PA-2
Turfing Ijams Lake
Turfing at Devil's Elbow Cut
Mechanical Excavation
Riprap PA-1
Ijams Lake Site Management
Soil Laboratory Testing PA-1
Soil Laboratory Testing PA-2
Site Management PA-1
Site Management PA-2
Soil Boring PA-1
Soil Boring PA-2
Semi-Compacted Containment Dike Raise PA-1
Semi-Compacted Containment Dike Raise PA-2
OPTION NO. 2
OPTION NO. 5
TOTAL OPTION NO. 2
0042 Ijams Lake Breaches
Pipeline Dredging Section 5
TOTAL OPTION NO. 3
OPTION NO. 3
DESCRIPTION QUANTITY
SCHEDULE NO. 1ITEM
0004 New Drop-Outlet Structure PA1
Clearing and Grubbing PA-2
Clearing and Grubbing Devil's Elbow
New Drop-Outlet Structure PA-2
Pipeline Management
Clearing and Grubbing PA-1
ABSTRACT OF OFFERS Page 1 of 5
Solicitation No.: W912HY21B0010 Date Issued: 10 Mar 2021 Date Opened: 27 Apr 2021 Issuing Office: USAED-Galveston Project Title: Unrestricted Procurement for Cedar Bayou Navigation Channel, Chambers and Harris Counties, Texas, Pipeline Dredging
TOTAL OPTION NO. 1
0001 Mobilization and Demobilization
Pre-Dredging Hazard Survey
Demolition of Existing Drop-Outlet Structure PA-1
Blanket Stone Devil's Elbow Cutoff
Number of Amendments Issued: 0001 and 0002
Government Estimate (Without Profit)
NO.
* The apparent low bidder, Rigid Constructors, LLC is 22.76 % below the Government's Estimate.
I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.
ALDRICH NICHOLS
CONTRACTING OFFICER
TOTAL SCHEDULE NO. 1 & OPTION NOS. 1
THRU 5
Pipeline Dredging Section 3
0039 Pipeline Dredging Section 4
Pipeline Dredging Section 5
OPTION NO. 1
TOTAL SCHEDULE NO. 1
OPTION NO. 4
1 JB SUM $1,340,000.00
1 JB SUM $20,000.00
1 JB SUM $60,000.00
1 JB SUM $380,000.00
1 JB SUM $380,000.00
1 JB SUM $364,750.00
1 JB SUM $345,000.00
1 JB SUM $360,000.00
1 JB SUM $150,000.00
1 JB SUM $147,900.00
1 JB SUM $154,900.00
1 JB SUM $64,600.00
1 JB SUM $40,000.00
1 JB SUM $40,000.00
1 JB SUM $40,000.00
1 JB SUM $20,000.00
1 JB SUM $120,000.00
1 JB SUM $15,000.00
1 JB SUM $15,000.00
1 JB SUM $35,000.00
1 JB SUM $35,000.00
80 LF $200.00 $16,000.00
80 LF $200.00 $16,000.00
260,000 CY $7.50 $1,950,000.00
205,000 CY $5.50 $1,127,500.00
48,500 CY $4.50 $218,250.00
115,000 CY $3.00 $345,000.00
8,500 SF $6.00 $51,000.00
1,200 SY $5.00 $6,000.00
729,514 CY $7.00 $5,106,598.00
236,000 CY $13.78 $3,252,080.00
117 TON $65.00 $7,605.00
200 TON $65.00 $13,000.00
160 TON $65.00 $10,400.00
80 TON $60.00 $4,800.00
48,000 TON $65.00 $3,120,000.00
15,000 TON $60.00 $900,000.00
$20,271,383.00
4,612 CY $7.00 $32,284.00
$32,284.00
1,938 CY $7.00 $13,566.00
$13,566.00
1,914 CY $7.00 $13,398.00
$13,398.00
2,210 CY $7.00 $15,470.00
$15,470.00
1 JB SUM $50,000.00
$50,000.00
$20,396,101.00
Riprap Ijams Lake
Blanket Stone Ijams Lake Dike
0015 Turfing Ijams Lake
Clearing and Grubbing PA-2
Pre-Dredging Hazard Survey
0007 Clearing and Grubbing PA-1 0006 Pipeline Management
Semi-Compacted Containment Dike Raise PA-1
TOTAL OPTION NO. 1
Riprap Devil's Elbow Cutoff
Blanket Stone Devil's Elbow Cutoff
Articulating Concrete Block
OPTION NO. 1
OPTION NO. 5
TOTAL OPTION NO. 4
OPTION NO. 4
0040 Pipeline Dredging Section 5
TOTAL OPTION NO. 3
Pipeline Dredging Section 5
Mechanical Excavation
TOTAL SCHEDULE NO. 1
Riprap PA-1
OPTION NO. 2
0039 Pipeline Dredging Section 4
TOTAL OPTION NO. 2
OPTION NO. 3
Demolition of Existing Drop-Outlet Structure PA-1
Site Management PA-2
NO.
0012 Stripping Devil's Elbow
Semi-Compacted Dike Ijams Lake
0030 Pipeline Dredging Sections 1-5
Uncompacted Berm Ijams Lake
Soil Boring PA-2
Clearing and Grubbing Devil's Elbow
ABSTRACT OF OFFERS (CONT'D) Page 2 of 5
Offeror: Rigid Constructors, LLC Opelouses, LA Business Size:
Solicitation No.: W912HY21B0010 Date Issued: 10 Mar 2021 Date Opened: 27 Apr 2021
New Drop-Outlet Structure PA1
New Drop-Outlet Structure PA-2
Project Title: Unrestricted Procurement for Cedar Bayou Navigation Channel, Chambers and Harris Counties, Texas, Pipeline Dredging Issuing Office: USAED-Galveston
QUANTITY
Mobilization and Demobilization
DESCRIPTION
ITEM SCHEDULE NO. 1
0022 Soil Boring PA-1
0029 Geotextile
TOTAL OPTION NO. 5
Semi-Compacted Containment Dike Raise PA-2
Pipeline Dredging Section 3
TOTAL SCHEDULE NO. 1 & OPTION NOS. 1
THRU 5
Riprap PA-2
Ijams Lake Breaches
0018 Soil Laboratory Testing PA-1
Stripping PA-1
Stripping PA-2
0017 Ijams Lake Site Management
Turfing at Devil's Elbow Cut
Turfing PA-2 0013 Turfing PA-1
0019 Soil Laboratory Testing PA-2
0020 Site Management PA-1
Small Business
"Apparent Low Bidder"
M3CTXAAN
Highlight
M3CTXAAN
Highlight
M3CTXAAN
Highlight
M3CTXAAN
Highlight
1 JB SUM $2,650,000.00
1 JB SUM $185,000.00
1 JB SUM $60,000.00
1 JB SUM $950,000.00
1 JB SUM $950,000.00
1 JB SUM $100,000.00
1 JB SUM $600,000.00
1 JB SUM $535,000.00
1 JB SUM $150,000.00
1 JB SUM $600,000.00
1 JB SUM $535,000.00
1 JB SUM $150,000.00
1 JB SUM $25,000.00
1 JB SUM $25,000.00
1 JB SUM $25,000.00
1 JB SUM $5,000.00
1 JB SUM $250,000.00
1 JB SUM $5,500.00
1 JB SUM $5,500.00
1 JB SUM $150,000.00
1 JB SUM $150,000.00
80 LF $180.00 $14,400.00
80 LF $180.00 $14,400.00
260,000 CY $5.50 $1,430,000.00
205,000 CY $5.50 $1,127,500.00
48,500 CY $5.50 $266,750.00
115,000 CY $6.50 $747,500.00
8,500 SF $12.00 $102,000.00
1,200 SY $2.00 $2,400.00
729,514 CY $15.00 $10,942,710.00
236,000 CY $13.40 $3,162,400.00
117 TON $300.00 $35,100.00
200 TON $300.00 $60,000.00
160 TON $300.00 $48,000.00
80 TON $200.00 $16,000.00
48,000 TON $130.00 $6,240,000.00
15,000 TON $90.00 $1,350,000.00
$33,665,160.00
4,612 CY $15.00 $69,180.00
$69,180.00
1,938 CY $15.00 $29,070.00
$29,070.00
1,914 CY $15.00 $28,710.00
$28,710.00
2,210 CY $15.00 $33,150.00
$33,150.00
1 JB SUM $30,000.00
$30,000.00
$33,855,270.00
TOTAL OPTION NO. 2
OPTION NO. 1
Pipeline Dredging Section 3
TOTAL OPTION NO. 1
OPTION NO. 2
0039 Pipeline Dredging Section 4
0034 Riprap Ijams Lake
0035 Blanket Stone Ijams Lake Dike
0036 Riprap Devil's Elbow Cutoff
0037 Blanket Stone Devil's Elbow Cutoff
TOTAL SCHEDULE NO. 1
Turfing Ijams Lake
0032 Riprap PA-1
0029 Geotextile
0030 Pipeline Dredging Sections 1-5
TOTAL SCHEDULE NO. 1 & OPTION NOS. 1
THRU 5
OPTION NO. 5
0042 Ijams Lake Breaches
TOTAL OPTION NO. 5
0041 Pipeline Dredging Section 5
TOTAL OPTION NO. 4
OPTION NO. 3
0040 Pipeline Dredging Section 5
TOTAL OPTION NO. 3
OPTION NO. 4
0033 Riprap PA-2
0031 Mechanical Excavation
Semi-Compacted Containment Dike Raise PA-1
0026 Semi-Compacted Dike Ijams Lake
0027 Uncompacted Berm Ijams Lake
0028 Articulating Concrete Block
0018 Soil Laboratory Testing PA-1
0021 Site Management PA-2
0022 Soil Boring PA-1
0023 Soil Boring PA-2
0019 Soil Laboratory Testing PA-2
0012 Stripping Devil's Elbow
Turfing PA-2
Turfing at Devil's Elbow Cut
0017 Ijams Lake Site Management
0013 Turfing PA-1
0007 Clearing and Grubbing PA-1
0008 Clearing and Grubbing PA-2
0009 Clearing and Grubbing Devil's Elbow
0010 Stripping PA-1
0011 Stripping PA-2
0002 Pre-Dredging Hazard Survey
Demolition of Existing Drop-Outlet Structure PA-1
0004 New Drop-Outlet Structure PA1
0005 New Drop-Outlet Structure PA-2
0006 Pipeline Management
Business Size:
ITEM SCHEDULE NO. 1
NO. DESCRIPTION QUANTITY
0001 Mobilization and Demobilization
ABSTRACT OF OFFERS (CONT'D) Page 3 of 5
Solicitation No.: W912HY21B0010 Date Issued: 10 Mar 2021 Date Opened: 27 Apr 2021 Issuing Office: USAED-Galveston Project Title: Unrestricted Procurement for Cedar Bayou Navigation Channel, Chambers and Harris Counties, Texas, Pipeline Dredging
Offeror: Maloney Odin Joint Venture Novato, CA
Semi-Compacted Containment Dike Raise PA-2
0020 Site Management PA-1
Other than Small Business
1 JB SUM $4,600,000.00
1 JB SUM $75,000.00
1 JB SUM $150,000.00
1 JB SUM $700,000.00
1 JB SUM $700,000.00
1 JB SUM $850,000.00
1 JB SUM $800,000.00
1 JB SUM $850,000.00
1 JB SUM $850,000.00
1 JB SUM $290,000.00
1 JB SUM $230,000.00
1 JB SUM $100,000.00
1 JB SUM $230,000.00
1 JB SUM $200,000.00
1 JB SUM $270,000.00
1 JB SUM $100,000.00
1 JB SUM $400,000.00
1 JB SUM $15,000.00
1 JB SUM $15,000.00
1 JB SUM $200,000.00
1 JB SUM $80,000.00
80 LF $200.00 $16,000.00
80 LF $200.00 $16,000.00
260,000 CY $9.50 $2,470,000.00
205,000 CY $7.50 $1,537,500.00
48,500 CY $8.00 $388,000.00
115,000 CY $10.00 $1,150,000.00
8,500 SF $20.00 $170,000.00
1,200 SY $12.00 $14,400.00
729,514 CY $15.00 $10,942,710.00
236,000 CY $25.00 $5,900,000.00
117 TON $116.00 $13,572.00
200 TON $116.00 $23,200.00
160 TON $138.00 $22,080.00
80 TON $135.00 $10,800.00
48,000 TON $80.00 $3,840,000.00
15,000 TON $78.00 $1,170,000.00
$39,389,262.00
4,612 CY $15.00 $69,180.00
$69,180.00
1,938 CY $15.00 $29,070.00
$29,070.00
1,914 CY $15.00 $28,710.00
$28,710.00
2,210 CY $15.00 $33,150.00
$33,150.00
1 JB SUM $12,000.00
$12,000.00
$39,561,372.00
ABSTRACT OF OFFERS (CONT'D) Page 4 of 5
Solicitation No.: W912HY21B0010 Date Issued: 10 Mar 2021 Date Opened: 27 Apr 2021 Issuing Office: USAED-Galveston Project Title: Unrestricted Procurement for Cedar Bayou Navigation Channel, Chambers and Harris Counties, Texas, Pipeline Dredging
Offeror: Orion Construction, L.P Deer Park, TX Business Size:
ITEM
SCHEDULE NO. 1
NO. DESCRIPTION QUANTITY
Mobilization and Demobilization
Pre-Dredging Hazard Survey
Demolition of Existing Drop-Outlet Structure PA-1
New Drop-Outlet Structure PA1
New Drop-Outlet Structure PA-2
Pipeline Management
Clearing and Grubbing PA-1
Clearing and Grubbing PA-2
Clearing and Grubbing Devil's Elbow
Stripping PA-1
Stripping PA-2
Stripping Devil's Elbow
Turfing PA-1
Turfing PA-2
Turfing Ijams Lake
Turfing at Devil's Elbow Cut
Ijams Lake Site Management
Soil Laboratory Testing PA-1
Soil Laboratory Testing PA-2
Site Management PA-1
Site Management PA-2
Soil Boring PA-1
Soil Boring PA-2
Semi-Compacted Containment Dike Raise PA-1
Semi-Compacted Containment Dike Raise PA-2
Semi-Compacted Dike Ijams Lake
0027 Uncompacted Berm Ijams Lake 0028 Articulating Concrete Block 0029 Geotextile 0030 Pipeline Dredging Sections 1-5 0031 Mechanical Excavation 0032 Riprap PA-1 0033 Riprap PA-2 0034 Riprap Ijams Lake 0035 Blanket Stone Ijams Lake Dike 0036 Riprap Devil's Elbow Cutoff 0037 Blanket Stone Devil's Elbow Cutoff
TOTAL SCHEDULE NO. 1
OPTION NO. 1
0038 Pipeline Dredging Section 3
TOTAL OPTION NO. 1
OPTION NO. 2
0039 Pipeline Dredging Section 4
TOTAL OPTION NO. 2
OPTION NO. 3
0040 Pipeline Dredging Section 5
TOTAL OPTION NO. 3
OPTION NO. 4
0041 Pipeline Dredging Section 5
TOTAL OPTION NO. 4
OPTION NO. 5
0042 Ijams Lake Breaches
TOTAL OPTION NO. 5
TOTAL SCHEDULE NO. 1 & OPTION NOS. 1
THRU 5
Other than Small Business
1 JB SUM $10,063,338.05
1 JB SUM $78,394.11
1 JB SUM $20,124.45
1 JB SUM $334,919.45
1 JB SUM $334,919.45
1 JB SUM $1,672,407.64
1 JB SUM $440,966.86
1 JB SUM $384,836.68
1 JB SUM $133,269.98
1 JB SUM $905,941.39
1 JB SUM $794,685.44
1 JB SUM $216,150.38
1 JB SUM $64,186.34
1 JB SUM $64,186.34
1 JB SUM $406,100.28
1 JB SUM $392,134.37
1 JB SUM $261,313.70
1 JB SUM $326,642.12
1 JB SUM $326,642.12
1 JB SUM $78,644.34
1 JB SUM $78,644.34
80 LF $40.83 $3,266.40
80 LF $40.83 $3,266.40
260,000 CY $8.73 $2,269,800.00
205,000 CY $8.73 $1,789,650.00
48,500 CY $46.82 $2,270,770.00
115,000 CY $24.81 $2,853,150.00
8,500 SF $142.28 $1,209,380.00
1,200 SY $6.25 $7,500.00
729,514 CY $17.60 $12,839,446.40
236,000 CY $34.59 $8,163,240.00
117 TON $202.18 $23,655.06
200 TON $202.19 $40,438.00
160 TON $264.68 $42,348.80
80 TON $311.51 $24,920.80
48,000 TON $178.74 $8,579,520.00
15,000 TON $132.30 $1,984,500.00
$59,483,299.69
4,612 CY $20.91 $96,436.92
$96,436.92
1,938 CY $20.91 $40,523.58
$40,523.58
1,914 CY $20.91 $40,021.74
$40,021.74
2,210 CY $20.91 $46,211.10
$46,211.10
1 JB SUM $22,637.97
$22,637.97
$59,729,131.00
ABSTRACT OF OFFERS (CONT'D) Page 5 of 5
Solicitation No.: W912HY21B0010 Date Issued: 10 Mar 2021 Date Opened: 27 Apr 2021 Issuing Office: USAED-Galveston Project Title: Unrestricted Procurement for Cedar Bayou Navigation Channel, Chambers and Harris Counties, Texas, Pipeline Dredging
Offeror: Standard Constructors, Inc Houston, TX Business Size:
ITEM SCHEDULE NO. 1
NO. DESCRIPTION QUANTITY
0001 Mobilization and Demobilization 0002 Pre-Dredging Hazard Survey 0003 Demolition of Existing Drop-Outlet Structure PA-1 0004 New Drop-Outlet Structure PA1 0005 New Drop-Outlet Structure PA-2 0006 Pipeline Management 0007 Clearing and Grubbing PA-1 0008 Clearing and Grubbing PA-2 0009 Clearing and Grubbing Devil's Elbow 0010 Stripping PA-1 0011 Stripping PA-2 0012 Stripping Devil's Elbow 0013 Turfing PA-1 0014 Turfing PA-2 0015 Turfing Ijams Lake 0016 Turfing at Devil's Elbow Cut 0017 Ijams Lake Site Management 0018 Soil Laboratory Testing PA-1 0019 Soil Laboratory Testing PA-2 0020 Site Management PA-1 0021 Site Management PA-2 0022 Soil Boring PA-1 0023 Soil Boring PA-2 0024 Semi-Compacted Containment Dike Raise PA-1 0025 Semi-Compacted Containment Dike Raise PA-2 0026 Semi-Compacted Dike Ijams Lake 0027 Uncompacted Berm Ijams Lake 0028 Articulating Concrete Block 0029 Geotextile 0030 Pipeline Dredging Sections 1-5 0031 Mechanical Excavation 0032 Riprap PA-1 0033 Riprap PA-2 0034 Riprap Ijams Lake 0035 Blanket Stone Ijams Lake Dike 0036 Riprap Devil's Elbow Cutoff 0037 Blanket Stone Devil's Elbow Cutoff
TOTAL SCHEDULE NO. 1
OPTION NO. 1
0038 Pipeline Dredging Section 3
TOTAL OPTION NO. 1
OPTION NO. 2
0039 Pipeline Dredging Section 4
TOTAL OPTION NO. 2
OPTION NO. 3
0040 Pipeline Dredging Section 5
TOTAL OPTION NO. 3
OPTION NO. 4
TOTAL OPTION NO. 5
TOTAL SCHEDULE NO. 1 & OPTION NOS. 1
THRU 5
0041 Pipeline Dredging Section 5
TOTAL OPTION NO. 4
OPTION NO. 5
0042 Ijams Lake Breaches
Small Business
| 2021-04-27T20:52:39-0500 | |
| NICHOLS.ALDRICH.ANTONIA.1114683899 |
File details come from the government source that posted it. Updated .