Amend-0004_W912HY21B0006-Final.pdf
PDF 4 MB Posted
- Solicitation number
- W912HY21B0006
About this file
This solicitation is for hopper dredging services for Galveston Harbor and Channel, Texas and Houston Ship Channel, Texas, Galveston Entrance and Bolivar to Redfish. The solicitation includes a base schedule and six options for additional dredging work. Bids are due by April 6, 2021 for the base schedule, which includes dredging sections of the Galveston Entrance Channel, Inner Bar Channel, Bolivar Roads Channel, and Houston Ship Channel. Option 1 adds dredging of the Galveston Extended Entrance Channel. Options 2 and 3 add sea turtle trawling and relocation services. Option 4 provides for alternative disposal of material at the Galveston Island Beach discharge corridor. Option 5 includes dredging of Galveston Harbor Channel. Option 6 adds dredging of the Texas City Ship Channel. Completion times for the options range from 15 to 27 additional days. The Army Corps of Engineers Galveston District is the issuing agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
006340
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HY21B0006
X 9B. DATED (SEE ITEM 11)
18-Feb-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Unrestricted Procurement for Galveston Harbor and Channel, Texas, and Houston Ship Channel, Texas, Galveston Entrance and Bolivar to Redfish, Hopper Dredging in Galveston County, Texas in which the response date is scheduled for 1 April 2021 @ 2:00 PM (CDT) is hereby amended as follow s:
Continue on Page 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE:
26-Mar-2021
CODE
US ARMY CORPS OF ENGINEERS
2000 FORT POINT ROAD
P.O. BOX 1229
GALVESTON TX 77553-1229
W912HY 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HY21B0006
A0004-2
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
THE SPECIFICATIONS FOR SOLICITATION NO. W912HY21B0006, GALVESTON
HARBOR AND CHANNEL, TEXAS, AND HOUSTON SHIP CHANNEL, TEXAS,
GALVESTON ENTRANCE AND BOLIVAR TO REDFISH, IN GALVESTON COUNTY,
TEXAS, PROJECT MANUAL FOR HOPPER DREDGING ARE HEREBY AMENDED AS
FOLLOWS:
*THE BID DUE DATE IS HEREBY RESCHEDULED FOR 06 APRIL 2021 AT 2:00 P.M. LOCAL
TIME.
a) Changes by narrative.
(1) SECTION 01 22 00.10 45, MEASUREMENT AND PAYMENT –
(a) 1.2.3 Sea Turtle Protection
1.2.3.1 Payment
Payment for fabrication of Turtle Deflector Device will be made for “Sea Turtle Protection, Section Nos. 5, 6, 7, 8, 9, 10, 11, and 12” in Schedule No. 1, “Sea Turtle Protection, Section Nos. 13-23” in Schedule No. 1 and for “Sea Turtle Protection, Section Nos. 1, 2, 3, and 4” in Option No. 1, "Sea Turtle Protection, Section No. 24” in Option No. 5 and “Sea Turtle Protection, Section Nos. 25 and 26” in Option No. 6 “, which will include the costs of materials and other execution requirements for Turtle Deflector Device and Endangered Species Observers associated with the protection and monitoring of sea turtles as specified in, the SECTION 35 20 23.14 45 PROTECTION
OF SEA TURTLES.
(2) SECTION 35 20 23.12 45, HOPPER DREDGING –
(a) 3.1.1 Quantity Summary The quantities listed in Appendix 1 - QUANTITY SUMMARY TABLE include the volumes present at the time of the surveys indicated on the Contract drawings, plus anticipated shoaling before dredging begins. For the purpose of acceptance, the dredging work in the Contract Line Item Number (CLIN) of the Bid Schedule is divided into Sections.
Section No. 24 will be dredged by others prior to start of work under this contract. Quantity listed in Appendix 1 - QUANTITY SUMMARY TABLE for Section No. 24 is based on anticipated shoaling occurring between completion of that pipeline dredging and award of Option No. 5.
b) Specifications.
(1) SECTION 00 11 00.00 45, BID SCHEDULE – The enclosed SECTION 00 11 00.00 45 entitled BID SCHEDULE supersedes that issued with this Solicitation.
c) Drawings.
(1) DRAWINGS NO. G-002, C-317, C-318, C-319 - The enclosed drawings no. supersedes that issued with this Solicitation.
W912HY21B0006
A0004-3
d) Government Bidder Inquiry Responses
(1) Bidder Inquiry - Amendment 1; Section No. 24, Option No. 5; Plan sheets C-110 & C-317, C-318, C-319. Cross sections indicate a varying required slope, with a vertical slope starting at -40’ to daylight. The existing grade’s natural angle of repose appears to be a much flatter slope than the permitted 1:5 and 0:1. The dredging of a vertical slope is not constructible. To dredge all material within the required template, Contractors will be required to dredge a large amount of non-pay material in order. Can the USACE please revise the construction drawings with the inclusion of constructible side slopes for the indicated reaches?
Government Response: Shelves are currently in the channel reach but not included in this dredging contract. The shelves will be dredged by others prior to the start of work under this contract. Work in this section will consist of removal of shoaling following completion of separate pipeline dredging contract. Current slopes in dredging template will remain the same.
(2) Bidder Inquiry - The options for Galveston Harbor and Texas City do not include CLINS to address sea turtle protections for those sections.
Government Response: Sea Turtle Protection will be added to the Bid Schedule for Section No. 24 in Option No. 5 and for Section Nos 25 and 26 in Option No. 6.
2. This amendment shall be attached to and become a part of the solicitation.
5 Encls:
1. SECTION 00 11 00.00 45, BID SCHEDULE
2. DRAWINGS NO. G-002
3. DRAWINGS NO. C-317
4. DRAWINGS NO. C-318
5. DRAWINGS NO. C-319
SWG File No.: GALV 301-415 Solicitation No.: W912HY21B0006
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 11 00.00 45
BID SCHEDULE AMENDMENT NO. 0004
PART 1 GENERAL
1.1 BID SCHEDULE
1.1.1 Schedule No. 1 AM#1
1.1.2 Option No. 1 AM#1
1.1.3 Option No. 2
1.1.4 Option No. 3
1.1.5 Option No. 4 AM#1
1.1.6 Option No. 5 AM#4
1.1.7 Option No. 6 AM#4
1.2 MODIFICATIONS (CESWG)
1.3 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)
-- End of Section Table of Contents --
DOCUMENT 00 11 00.00 45 Page 1
TO ACCOMPANY AMENDMENT NO. 0004 OF SOLICITATION W912HY21B0006
THIS PAGE INTENTIONALLY LEFT BLANK
DOCUMENT 00 11 00.00 45 Page 2
SECTION 00 11 00.00 45
BID SCHEDULE
AMENDMENT NO. 0004
PART 1 GENERAL
1.1 BID SCHEDULE
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.1 Schedule No. 1 AM#1
Item No. Description
Estimated Quantity Unit
Unit Price Estimated Amount
SCHEDULE NO. 1
0001 Mobilization and Demobilization 1 JOB SUM $______________
0002 Dredging -Galveston Entrance Channel, Section Nos. 5,6,7 and 8
1,136,000 C.Y.
0003 Dredging - Inner Bar Channel and Bolivar Roads Channel, Section Nos. 9, 10, 11, and 12
890,000 C.Y. $_________ $______________
0004 Dredging - Houston Ship Channel, Bolivar Roads to Redfish Reef, Section Nos. 13-18
200,000 C.Y. $_________
0005 Dredging - Houston Ship Channel, Bolivar Roads to Redfish Reef, Section Nos. 19-23
482,000 C.Y. $_________
DOCUMENT 00 11 00.00 45 Page 3
Item No. Description
Estimated Quantity Unit
Unit Price Estimated Amount
SCHEDULE NO. 1
0006 ODMDS No. 1 Monitor Surveys 1 JOB SUM $______________
0007 Sea Turtle Protection, Section Nos. 5, 6, 7, 8, 9, 10, 11, and 12
1 JOB SUM $______________
0008 Sea Turtle Protection, Section Nos. 13-23
1 JOB SUM $______________
TOTAL SCHEDULE NO. 1 $______________
NOTE: Completion time stated in SECTION 00 73 00.01 45 SPECIAL CONTRACT REQUIREMENTS, STANDARD is for Schedule No. 1 work.
DOCUMENT 00 11 00.00 45 Page 4
BID SCHEDULE (CONT'D)
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.2 Option No. 1 AM#1
Item No. Description
Estimated Quantity Unit
Unit Price Estimated Amount
OPTION NO. 1
0009 Dredging - Galveston Extended Entrance Channel, Section Nos. 1, 2, 3, and 4
434,000 C.Y. $_________ $______________
0010 Sea Turtle Protection, Section Nos. 1, 2, 3, and 4
1 JOB SUM $______________
TOTAL OPTION NO. 1 $______________
TOTAL SCHEDULE NO. 1 AND OPTION NO. 1 $______________
NOTE FOR OPTI ON NO. 1: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or pr i or t o compl et i on of al l aut hor i zed wor k.
Awar d of t hi s Opt i on i s cont i ngent upon avai l abi l i t y of f unds. An addi t i onal t i me of 15 cal endar days wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Opt i on.
DOCUMENT 00 11 00.00 45 Page 5
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.3 Option No. 2
Item No. Description
Estimated Quantity Unit
Unit Price Estimated Amount
OPTION NO. 2
0011 Mobilization and Demobilization - Sea Turtle Trawling and Relocation
1 JOB $_________ $______________
0012 Sea Turtle Trawling and Relocation 30 DAY $_________ $______________
TOTAL OPTION NO. 2 $______________
TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1 AND 2 $______________
NOTE FOR OPTI ON NO. 2: The Gover nment may exer ci se t hi s Opt i on by wr i t t en not i ce t o t he Cont r act or pr i or t o compl et i on of al l aut hor i zed wor k.
Awar d of t hi s Opt i on i s cont i ngent upon avai l abi l i t y of f unds. No addi t i onal t i me wi l l be added t o t hi s Cont r act f or compl et i on of t hi s Option.
DOCUMENT 00 11 00.00 45 Page 6
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.4 Option No. 3
Item No. Description
Estimated Quantity Unit
Unit Price Estimated Amount
OPTION NO. 3
0013 Mobilization and Demobilization - Sea Turtle Trawling and Relocation (One Trawler Additional to Option No. 2)
1 JOB SUM $______________
0014 Sea Turtle Trawling and Relocation (One Trawler Additional to Option No. 2)
30 DAY $_________ $______________
TOTAL OPTION NO. 3 $______________
TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, AND 3 $______________
NOTE FOR OPTION NO. 3: The Government may exercise this Option by written notice to the Contractor prior to completion of all authorized work.
Award of this Option is contingent upon availability of funds. No additional time will be added to this Contract for completion of this Option.
DOCUMENT 00 11 00.00 45 Page 7
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.5 Option No. 4 AM#1
Item No. Description
Estimated Quantity Unit
Unit Price Estimated Amount
OPTION NO. 4
(Additional Cost for Dredge Material Disposal at the Galveston Island Beach discharge corridor for Section Nos. 9-12 and Nos. 14-20, in lieu of Ocean Dredged Material Disposal Site No. 1)
0015 Pipeline Management - Beach Placement Galveston
1 JOB SUM $______________
0016 Beach Placement Galveston 950,000 C.Y. $______________$______________
0017 Endangered Species Monitoring -- Beach Placement Galveston
1 JOB SUM $______________
0018 Depth of Closure Survey
1 JOB SUM $______________
TOTAL OPTION NO. 4 $______________
TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, 3, AND 4 $______________
NOTE FOR OPTI ON NO. 4: Bi d I t em No. 0016 shal l r ef l ect onl y t he di f f er ence i n cost wi t h r espect t o Bi d I t em Nos. 0003, 0004, and 0005 t o pl ace mat er i al r emoved f r om Sect i on Nos. 9 t hr ough 12 and Sect i ons Nos. 14 t hr ough 20 at t he Gal vest on I s l and Beach di schar ge cor r i dor by hopper pump out i n l i eu of i nt o ODMDS No. 1. Opt i on 4 may be exer ci sed at any t i me pr i or t o AM#1i ssuance of Not i ce t o Pr oceed. An addi t i onal t i me of 60 cal endar days wi l l be added t o t hi s Cont r act i f Opt i on 4 i s exer ci sed.
DOCUMENT 00 11 00.00 45 Page 8
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.6 Option No. 5 AM#4
Item No. Description
Estimated Quantity Unit
Unit Price Estimated Amount
OPTION NO. 5
0019 Dredging - Galveston Harbor Channel Only, Section No. 24
220,000 C.Y. $_________ $______________
0020 Sea Turtle Protection Section No. 24
1 JOB SUM $______________
TOTAL OPTION NO. 5 $______________
TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, 3, 4, AND 5
NOTE FOR OPTION NO. 5: The Government may exercise this Option by written notice to the Contractor prior to completion of all authorized work.
Award of this Option is contingent upon availability of funds. An additional time of 15 calendar days will be added to this Contract for completion of this Option.
DOCUMENT 00 11 00.00 45 Page 9
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.7 Option No. 6 AM#4
Item No. Description
Estimated Quantity Unit
Unit Price Estimated Amount
OPTION NO. 6
0021 Dredging - Texas City Ship Channel, Section Nos. 25 and
392,000 C.Y. $_________ $______________
0022 Sea Turtle Protection Nos. 25 and 26
1 JOB SUM_________ $_________
TOTAL OPTION NO.6 $______________
TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, 3, 4, 5, AND 6
NOTE FOR OPTION NO. 6: The Government may exercise this Option by written notice to the Contractor prior to completion of all authorized work.
Award of this Option is contingent upon availability of funds. An additional time of 27 calendar days will be added to this Contract for completion of this Option.
DOCUMENT 00 11 00.00 45 Page 10
(TO BE ATTACHED TO STANDARD FORM 1442)
1.2 MODIFICATIONS (CESWG)
If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment of each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.
1.3 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
-- End of Document --
DOCUMENT 00 11 00.00 45 Page 11
THIS PAGE INTENTIONALLY LEFT BLANK
DOCUMENT 00 11 00.00 45 Page 12 of Engineers U.S. Army Corps
Galveston District
G A
L V
E S
T O
N T
E X
A S
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
G A
L V
E S
T O
N
A S S
H O
W N
D a te
R e v
S u b m it te d b y
A p p ro v e d b y
A p p ro v a l R e c o m m e n d e d
S c a le
D ra w n b y
D e s ig n e d b y
C h e c k e d b y
D e s c ri p ti o n
D a te
R e v
B y
Drawing No.:
M A
R C
H
W912HY21B0006
SOLICITATION NO.:
GALV 0301-0415SWG FILE NO.
F il e
M o d e l
N a m e
G -0
B y m a o x tw
:1
:4
P
M D a te
T im e
W
C A
D D p ro je c ts G
A L V -4
G a lv E n t a n d H
S C B o li v a r to R e d fi s h
P la n s -S
C G
A L V -0
-0
G -0
IN
D E
X T x S c -8
A M
D .d g n
G-002
C O
L O
N E
L E
N
U .S
A R
M Y
C O
M M
A N
D
IN
G
T
IM
O T
H Y R
V A
IL
P R
E P
A R
E D U
N D
E R T
H E D
IR
E C
T
IO
N O
F R
A L P
H E S
T E
IN
E R P .E P
M P
A re a E n g in e e r
R e s id e n t E n g in e e r
L A
U R
A L
Y N
N V
E R
A P .E
W
IL
L
IE
J
O E H
O N
Z A P .E
C h ie f, E n g in e e ri n g B ra n c h
H O
P P
E R D
R E
D G
IN
G
G A
L V
E S
T O
N E
N T
R A
N C
E A
N D B
O L
IV
A R T
O R
E D
F
IS
H
A N
D H
O U
S T
O N S
H
IP
C
H A
N N
E L T
E X
A S
G A
L V
E S
T O
N H
A R
B O
R A
N D C
H A
N N
E L T
E X
A S
T B
W
J T
D
R K
H
BOTTOM LIMITS OF CHANNEL
... TO BE DREDGED
CHANNEL STATIONING & CENTERLINE
LOCATION OF CROSS SECTION
(ODMDS)
NO DISCHARGE ZONE
POINT (ODMDS)
INTERIOR DISCHARGE
POINT (ODMDS)
PERIMETER DISCHARGE
TIDE STAFF
DISCHARGE CORRIDOR
TO BE USED
ODMDS
COMBO
GREEN RED
C .S
(SOME ELEMENTS SHOWN BELOW MAY NOT BE IN THIS PROJECT)
LOCATION OF PERMIT/PIPELINE CROSSING
SITE (ODMDS)
MATERIAL DISPOSAL
LIMITS OF OCEAN DREDGED
HORIZONTAL CONTROL POINT
CHANNEL MARKER BEACON:
LIGHT BEACON
RANGE TOWER AND RANGE
CONE PENETROMETER (CPT) LOCATIONSOIL BORING LOCATION
PLAN LEGEND
A N
D C
O N
T R
O L T
A B
L E
S G
E N
E R
A L N
O T
E S L E
G E
N D
IN
D
E X O
F D
R A
W
IN
G S
GENERAL NOTES
REQUIRED AND SHOULD BE NO MORE THAN 150 FT IN LENGTH.
LONGITUDINAL DIKES MAY BE EMPLOYED BUT ARE NOT
TEMPLATE ABOVE EL. +2 FT ON THE BEACH.
BELOW EL. +2 FT ON THE BEACH. CLEAN SAND SHOULD BE PLACED IN THE
14. CONTRACTOR SHALL MAKE EVERY ATTEMPT TO PLACE SHELL HASH
MATERIAL ABOVE THE BEACH TYPICAL DETAIL.
DO NOT DISTURB DUNE VEGETATION OR NATURALLY ACCRETING DUNE
UNAVAILABLE.
LEVEL DATA, IS A TEMPORARY ALTERNATE IF INTERNET SERVICE IS
FOR ACCURACY. A PHONE CALL TO 866-447-6787, PRESS 1 FOR WATER
NEED TO BE VERIFIED FREQUENTLY AGAINST THE PHYSICAL TIDE STAFFS
TIME TIDE READINGS USE PHYSICAL TIDE STAFFS. AUTO GAUGE READINGS
PRELIMINARY (FT) ONLY. AUTO GAUGE TIDES HAVE A DELAY. FOR REAL
DATUM. CLICK EITHER PLOT OR DATA ONLY UNDER UPDATE. UTILIZE
FROM AND TO DATE, STANDARD UNITS, LST/LSD TIME ZONE, AND MLLW
CLICK MORE DATA PULL DOWN MENU AND SELECT WATER LEVELS. SELECT
THE APPROPRIATE STATION ID CAN BE SEARCHED IN SEARCH WINDOW.
https://tidesandcurrents.noaa.gov/map/index.shtml?region=Texas
TIDE AND CURRENTS WEBSITE.
16. SECONDARY AUTO GAUGE TIDE STAFF DATA CAN BE LOCATED ON NOAA
15. TEMPORARY
13.
12. NO OPERATIONS WITHIN 500' OF THE 91ST STREET PIER.
PONDING ON THE BEACH BERM DUE TO THEIR OPERATIONS.
CONTRACTOR SHALL MAKE ALL EFFORTS TO MINIMIZE THE LIKELIHOOD OF
FOR THE BEACH PLACEMENT AREA IS INTENDED TO AVOID PONDING. THE
11. REFER TO DRAWING C-501 FOR BEACH TYPICAL. THE TYPICAL SECTION
MINIMUM OF 3 FT OF FILL.
STONE PROTECTION UNLESS STONE PROTECTION IS COVERED BY A
10. CONSTRUCTION EQUIPMENT SHALL NOT OPERATE ON THE SEAWALL
AND DECREASE UNIFORMLY FROM 300 FT TO 0 FT OVER FINAL 500 LF.
SHALL INCREASE UNIFORMLY FROM 0 FT TO 300 FT OVER INITIAL 500 LF
CREATE TRANSITION AREAS AT LIMITS OF CONSTRUCTION. BERM WIDTH
9. CONTRACTOR SHALL BLEND BEACH FILL WITH EXISTING BEACH TO
BEGIN AT EAST LIMIT AND PROCEED WESTWARD.
ACTUAL VOLUME DREDGED. FILL PLACEMENT AT STA. 0+00 TO 98+25 SHALL
8. ACTUAL LENGTH OF FILL PLACEMENT AREA MAY VARY DEPENDING ON
FOR BEACH PLACEMENT ONLY.
7. VERTICAL DATUM FOR BEACH PLACEMENT IS NAVD88. NAVD88 = +0.6 MLLW
6. NO REFERENCE LINE WILL BE ESTABLISHED BY THE GOVERNMENT.
SPECIFICATIONS.
OBSTRUCTIONS IN THE WORK AREA, AS DESCRIBED IN THE
MOVED. SITE VISIT SHOULD BE MADE TO VERIFY ANY CURRENT
OF THE TIME OF THE WORK, AS THOSE OBSTRUCTIONS MAY HAVE BEEN
OBSTRUCTIONS VISIBLE IN THE IMAGES MAY NOT BE IN THAT LOCATION AS
PROGRAM (NAIP), DATED 2018, UNLESS OTHERWISE NOTED.
5. AERIAL IMAGERY SOURCED FROM THE NATIONAL AGRICULTURE IMAGERY
SLOPES.
4. ALL CHANNEL END SLOPES SHALL BE EQUAL TO ADJACENT CHANNEL SIDE
BE FURNISHED TO THE CONTRACTOR UPON REQUEST IN WRITING.
3. ADDITIONAL CONTROL POINTS AND ALIGNMENT DATA (IF AVAILABLE) WILL
PLANE, NAD83, TEXAS SOUTH-CENTRAL ZONE, U.S. SURVEY FEET.
2. HORIZONTAL DATUM AND DISTANCES ARE REFERENCED TO TEXAS STATE
(MLLW).
1. ELEVATIONS ARE REFERENCED TO MEAN LOWER LOW WATER DATUM
M J
G U
P D
A T
E D
IN
D E
X
F
D R
A W
IN
G S
A N
T
ID
A F F S
A D
D
H
A N
N
L
L
IG
N M
E N
T S
M J
G U
P D
A T
E D
IN
D
X
F
A W
IN
G S
SOLICITATION NO. W912HY21B0006
AMENDMENT NO. 0004 TO
THIS DRAWING ACCOMPANIES
Galveston District
G A
L V
E S
T O
N T
E X
A S
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
G A
L V
E S
T O
N
A S S
H O
W N
D a te
R e v
S u b m it te d b y
A p p ro v e d b y
A p p ro v a l R e c o m m e n d e d
S c a le
D ra w n b y
D e s ig n e d b y
C h e c k e d b y
D e s c ri p ti o n
D a te
R e v
B y
Drawing No.:
M A
R C
H
W912HY21B0006
SOLICITATION NO.:
GALV 0301-0415SWG FILE NO.
F il e
M o d e l
N a m e
C -3
B y m a o x tw
:1
:3
P
M D a te
T im e
W
C A
D D p ro je c ts G
A L V -4
G a lv E n t a n d H
S C B o li v a r to R e d fi s h
P la n s -S
C G
A L V -0
-0
C -3
-T x S c -8
A M
D .d g
C-317
L O
N E
L E
N
U .S
A R
M Y
C O
M M
A N
D
IN
G
T
IM
O T
H Y R
V A
IL
P R
E P
A R
E D U
N D
E R T
H E D
IR
E C
T
IO
N O
F R
A L P
H E S
T E
IN
E R P .E P
M P
A re a E n g in e e r
R e s id e n t E n g in e e r
L A
U R
A L
Y N
N V
E R
A P .E
W
IL
L
IE
J
O E H
O N
Z A P .E
C h ie f, E n g in e e ri n g B ra n c h
H O
P P
E R D
R E
D G
IN
G
G A
L V
E S
T O
N E
N T
R A
N C
E A
N D B
O L
IV
A R T
O R
E D
F
IS
H
A N
D H
O U
S T
O N S
H
IP
C
H A
N N
E L T
E X
A S
G A
L V
E S
T O
N H
A R
B O
R A
N D C
H A
N N
E L T
E X
A S
T B
W
J T
D
R K
H
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 700-200-400-600-800-1000-1200-1400-1600-1700
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 700-200-400-600-800-1000-1200-1400-1600-1700
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 700-200-400-600-800-1000-1200-1400-1600
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 700-200-400-600-800-1000-1200-1400
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 700-200-400-600-800-1000-1200-1300
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 700-200-400-600-800-1000-1100
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 700-200-400-600-800-1000
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 700-200-400-600-800-1000
<-- GREEN - RED --->
1+400 2+600
1+048 2+400
1+047 2+000
1+000 1+600
5 SKEWED 3
408'1289.45'
46' FED. AUTH. DEPTH
48' REQ'D DEPTH
1' ALLOWABLE OVERDEPTH
5 SKEWED
1222.14' 408'
408'1220.72'
408'725.36'
46' FED. AUTH. DEPTH
48' REQ'D DEPTH
1' ALLOWABLE OVERDEPTH
408'682.17'
408'595.78'
408'509.4'
408'466.22'
SURVEYS ARE LOW FREQUENCY (40KH)
SURVEYED JANUARY 2021
S T
A T
O S
T A
G A
L V
E S
T O
N H
A R
B
O S
S S
E C
T
IO
N S
EASTERLY LIMIT
OF DREDGING
OPTION NO. 5
CHANNEL WILL BE DREDGED BY SEPARATE PIPELINE DREDGING CONTRACT AND WILL CONSIST
OF REMOVAL OF SHOALING ONLY. FUTURE DREDGING IS NOT DEPICTED ON TEMPLATES.
NO DREDGING REQ'D
NO DREDGING REQ'D NO DREDGING REQ'D
SHELVES ARE FOR FULL TEMPLATE ILLUSTRATION ONLY
AND ARE NOT A REQUIREMENT TO DREDGE ON THIS CONTRACT.
M J
G A
D D
E D
G
IN
G
A D
D
E E
T
M J
G A
D D
E L
V
M P
L A
T
T E S
R E P
L A
C
T
IR
E E
T
SOLICITATION NO. W912HY21B0006
Galveston District
G A
L V
E S
T O
N T
E X
A S
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
G A
L V
E S
T O
N
A S S
H O
W N
D a te
R e v
S u b m it te d b y
A p p ro v e d b y
A p p ro v a l R e c o m m e n d e d
S c a le
D ra w n b y
D e s ig n e d b y
C h e c k e d b y
D e s c ri p ti o n
D a te
R e v
B y
Drawing No.:
M A
R C
H
W912HY21B0006
SOLICITATION NO.:
GALV 0301-0415SWG FILE NO.
F il e
M o d e l
N a m e
C -3
B y m a o x tw
:1
:3
P
M D a te
T im e
W
C A
D D p ro je c ts G
A L V -4
G a lv E n t a n d H
S C B o li v a r to R e d fi s h
P la n s -S
C G
A L V -0
-0
C -3
-T x S c -8
A M
D .d g
C-318
L O
N E
L E
N
U .S
A R
M Y
C O
M M
A N
D
IN
G
T
IM
O T
H Y R
V A
IL
P R
E P
A R
E D U
N D
E R T
H E D
IR
E C
T
IO
N O
F R
A L P
H E S
T E
IN
E R P .E P
M P
A re a E n g in e e r
R e s id e n t E n g in e e r
L A
U R
A L
Y N
N V
E R
A P .E
W
IL
L
IE
J
O E H
O N
Z A P .E
C h ie f, E n g in e e ri n g B ra n c h
H O
P P
E R D
R E
D G
IN
G
G A
L V
E S
T O
N E
N T
R A
N C
E A
N D B
O L
IV
A R T
O R
E D
F
IS
H
A N
D H
O U
S T
O N S
H
IP
C
H A
N N
E L T
E X
A S
G A
L V
E S
T O
N H
A R
B O
R A
N D C
H A
N N
E L T
E X
A S
T B
W
J T
D
R K
H
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 700-200-400-600-800-1000
2+869.57
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 700-200-400-600-800-1000
2+974.53
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 700-200-400-600-800-1000
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 700-200-400-600-800-1000
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 700-200-400-600-800-1000
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 700-200-400-600-800-1000
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 800-200-400-600-800-900
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T 0 200 400 600 800-200-400-600-800-900
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 800-200-400-600-800-900
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 800-200-400-600-800-900
<-- GREEN - RED --->
3+010
4+000 5+0003+009
4+6003+600
4+4003+400
SURVEYED JANUARY 2021
SURVEYS ARE LOW FREQUENCY (40KH)
46' FED. AUTH. DEPTH
48' REQ'D DEPTH
1' ALLOWABLE OVERDEPTH
46' FED. AUTH. DEPTH
48' REQ'D DEPTH
1' ALLOWABLE OVERDEPTH
408'408'
408'408'
407.4' 407.4'
407.37'407.38'
400.56'400.57'
397.07'397.08'
390.09'390.08'
383.09'383.1'
379.6'379.6'
372.62'372.61'
S T
A .5
T
O S
T A
G A
L V
E S
T O
N H
A R
B
O S
S S
E C
T
IO
N S
CHANNEL WILL BE DREDGED BY SEPARATE PIPELINE DREDGING CONTRACT AND WILL CONSIST
OF REMOVAL OF SHOALING ONLY. FUTURE DREDGING IS NOT DEPICTED ON TEMPLATES.
NO DREDGING REQ'D NO DREDGING REQ'D NO DREDGING REQ'D
NO DREDGING REQ'D NO DREDGING REQ'D
SHELVES ARE FOR FULL TEMPLATE ILLUSTRATION ONLY
AND ARE NOT A REQUIREMENT TO DREDGE ON THIS CONTRACT.
M J
G A
D D
E D
G
IN
G
A D
D
E E
T
M J
G A
D D
E L
V
M P
L A
T
T E S
R E P
L A
C
T
E E
T
SOLICITATION NO. W912HY21B0006
Galveston District
G A
L V
E S
T O
N T
E X
A S
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
G A
L V
E S
T O
N
A S S
H O
W N
D a te
R e v
S u b m it te d b y
A p p ro v e d b y
A p p ro v a l R e c o m m e n d e d
S c a le
D ra w n b y
D e s ig n e d b y
C h e c k e d b y
D e s c ri p ti o n
D a te
R e v
B y
Drawing No.:
M A
R C
H
W912HY21B0006
SOLICITATION NO.:
GALV 0301-0415SWG FILE NO.
F il e
M o d e l
N a m e
C -3
B y m a o x tw
:1
:4
P
M D a te
T im e
W
C A
D D p ro je c ts G
A L V -4
G a lv E n t a n d H
S C B o li v a r to R e d fi s h
P la n s -S
C G
A L V -0
-0
C -3
-T x S c -8
A M
D .d g
C-319
L O
N E
L E
N
U .S
A R
M Y
C O
M M
A N
D
IN
G
T
IM
O T
H Y R
V A
IL
P R
E P
A R
E D U
N D
E R T
H E D
IR
E C
T
IO
N O
F R
A L P
H E S
T E
IN
E R P .E P
M P
A re a E n g in e e r
R e s id e n t E n g in e e r
L A
U R
A L
Y N
N V
E R
A P .E
W
IL
L
IE
J
O E H
O N
Z A P .E
C h ie f, E n g in e e ri n g B ra n c h
H O
P P
E R D
R E
D G
IN
G
G A
L V
E S
T O
N E
N T
R A
N C
E A
N D B
O L
IV
A R T
O R
E D
F
IS
H
A N
D H
O U
S T
O N S
H
IP
C
H A
N N
E L T
E X
A S
G A
L V
E S
T O
N H
A R
B O
R A
N D C
H A
N N
E L T
E X
A S
T B
W
J T
D
R K
H
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 800-200-400-600-800-900
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 800-200-400-600-800-900
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 700-200-400-600-800-1000
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 700-200-400-600-800-1000
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 700-200-400-600-800-1000
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 700-200-400-600-800-1000
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 700-200-400-600-800-1000
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 700-200-400-600-800-1000
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T 0 200 400 600 700-200-400-600-800-1000
<-- GREEN - RED --->
-60
-40
-20
E L E
V A
T
IO
N I
N U .S F
E E
T
0 200 400 600 700-200-400-600-800-1000
<-- GREEN - RED --->
6+400 7+600
6+000 7+400
5+600 7+000 7+869
5+400 6+600 7+761
SURVEYED DECEMBER 2020
SURVEYS ARE LOW FREQUENCY (40KH)
46' FED. AUTH. DEPTH
48' REQ'D DEPTH
1' ALLOWABLE OVERDEPTH
46' FED. AUTH. DEPTH
48' REQ'D DEPTH
1' ALLOWABLE OVERDEPTH
365.63'365.62'
362.13'362.13'
348.15'348.15' 327.18'327.19'
330.68'330.68'
337.66'337.67'
344.65'344.66' 325'323.98'
325'331.25'
S T
A T
O S
T A
G A
L V
E S
T O
N H
A R
B
O S
S S
E C
T
IO
355.14'355.14'
WESTERLY LIMIT
OF DREDGING
OPTION NO. 5
CHANNEL WILL BE DREDGED BY SEPARATE PIPELINE DREDGING CONTRACT AND WILL CONSIST
OF REMOVAL OF SHOALING ONLY. FUTURE DREDGING IS NOT DEPICTED ON TEMPLATES.
NO DREDGING REQ'D NO DREDGING REQ'D
NO DREDGING REQ'D
NO DREDGING REQ'D NO DREDGING REQ'D
NO DREDGING REQ'D
SHELVES ARE FOR FULL TEMPLATE ILLUSTRATION ONLY
AND ARE NOT A REQUIREMENT TO DREDGE ON THIS CONTRACT.
M J
G A
D D
E D
G
IN
G
A D
D
E E
T
M J
G A
D D
E L
V
M P
L A
T
T E S
R E P
L A
C
T
E E
T
SOLICITATION NO. W912HY21B0006
| Amend-0004_SF-30 |
| Amend 0004 page-2 (W-narratives) |
| 00 11 00.00 45 |
| 00 11 00.00 45 - BID SCHEDULE AMENDMENT NO. 0004 |
| 00 11 00.00 45 - BID SCHEDULE |
| PART 1 GENERAL |
| 1.1 BID SCHEDULE |
| 1.1.1 Schedule No. 1 AM#1 |
| 1.1.2 Option No. 1 AM#1 |
| 1.1.3 Option No. 2 |
| 1.1.4 Option No. 3 |
| 1.1.5 Option No. 4 AM#1 |
| 1.1.6 Option No. 5 AM#4 |
| 1.1.7 Option No. 6 AM#4 |
| 1.2 MODIFICATIONS CESWG |
| 1.3 EVALUATION OF OPTIONS July 1990 FAR 52.217-5 |
| Amend No.4-GALV-0301-0415-PLANS |
| 002-GALV-0301-0415-PLANS-AMD#4 |
| 030-GALV-0301-0415-PLANS-AMD#4 |
| 031-GALV-0301-0415-PLANS-AMD#4 |
| 032-GALV-0301-0415-PLANS-AMD#4 |
File details come from the government source that posted it. Updated .