ABSTRACT_W912HY21B0003_20201222.pdf

PDF 325 KB Posted

Attached to
FY21 CORPUS CHRISTI SHIP CHANNEL, TEXAS PLACEMENT AREA NO. 13 IMPROVEMENTS IN NUECES COUNTY, TEXAS
Solicitation number
W912HY21B0003
Issued by

About this file

This document contains an abstract of bids received in response to Solicitation Number W912HY21B0003 for the FY21 Corpus Christi Ship Channel, Texas Placement Area No. 13 Improvements in Nueces County, Texas project. The project involves containment dike raise, shore protection, and outfall structure replacement of Corpus Christi Ship Channel Placement Area 13. Specifically, it requires excavating approximately 192,000 cubic yards of on-site material to raise the containment dike, replacing the existing outfall structure, demolishing and removing the existing outfall structure, constructing 2,700 linear feet of training dike, and installing 15,500 linear feet of ditching. Six bids were received for Schedule 1 ranging from $4,033,225 to $10,445,200. The apparent low bidder was Texas Dewatering LLC at 1.45% below the government estimate of $4,092,490.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIT ESTIMATED

PRICE AMOUNT

1 LUMP SUM SUM 600,000.00$

1 LUMP SUM SUM 103,000.00$

1 LUMP SUM SUM 867,000.00$

1 LUMP SUM SUM 591,800.00$

195000 CY 7.69 1,499,550.00$

2700 LF 30.00 81,000.00$

1 LUMP SUM SUM 167,100.00$

7600 LF 21.65 164,540.00$

500 LF 27.00 13,500.00$

1 LUMP SUM SUM 5,000.00$

4,092,490.00$

The apparent low bidder is *Texas Dewattering LLC Bellville, TX at 1.45% below the Government's Estimate.

UNIT ESTIMATED

PRICE AMOUNT

1 LUMP SUM SUM 1,025,000.00$

1 LUMP SUM SUM 100,000.00$

1 LUMP SUM SUM 1,250,000.00$

1 LUMP SUM SUM 600,000.00$

195000 CY 7.00$ 1,365,000.00$

Demolish and Remove the Existing Drop-outlet Structure

0003 New Drop-outlet Structure

ITEM

Semi-compacted Containment Dike Construction

ESTIMATED

NO. DESCRIPTION QUANTITY

0001 Mobilization and Demobilization

Solicitation No.: W912HY21B0003 Date Issued: 22 SEP 2020 Date Opened: 22 DEC 2020 Issuing Office: USAED-Galveston Offeror: #1 Affolter Contracting Company, Inc , La Marque, TX Business Size: Small Business

0009 Lateral Ditch 0010 As-Built Drawings

0001 Mobilization and Demobilization

Demolish and Remove the Existing Drop-outlet Structure

0003 New Drop-outlet Structure

Existing Containment Dike Repair0004

0008 Perimeter Ditch

TOTAL SCHEDULE NO. 1

ABSTRACT OF OFFERS

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED IN

Semi-compacted Containment Dike Construction

0006 Uncompacted Training Dike Construction

0007 Turfing

Traci D. Robicheaux

GALVESTON EXECUTION BRANCH CONTRACTING OFFICER

0004 Existing Containment Dike Repair

GOVERNMENT ESTIMATE (Without Profit)

NO.

ESTIMATED

DESCRIPTION QUANTITY

ITEM

ABSTRACT OF OFFERS Page 1 Solicitation No.: W912HY21B0003 Date Issued: 22 SEP 2020 Date Opened: 22 DEC 2020 Issuing Office: USAED- Galveston

Project Title: FY21 CORPUS CHRISTI SHIP CHANNEL, TEXAS PLACEMENT AREA 13 IMPROVEMENTS IN NUECES COUNTY, TEXAS Unrestricted Procurement

Number of Amendments Issued: 6

22 Dec 2020

2700 LF 40.00 108,000.00$

1 LUMP SUM SUM 240,000.00$

7600 LF 16.00 121,600.00$

500 LF 16.00 8,000.00$

1 LUMP SUM SUM 5,000.00$

4,822,600.00$

UNIT ESTIMATED

PRICE AMOUNT

1 LUMP SUM SUM 900,000.00$

1 LUMP SUM SUM 227,000.00$

1 LUMP SUM SUM 1,300,000.00$

1 LUMP SUM SUM 495,000.00$

195000 CY 11.00$ 2,145,000.00$

2700 LF 35.00 94,500.00$

1 LUMP SUM SUM 225,000.00$

7600 LF 22.00 167,200.00$

500 LF 38.00 19,000.00$

1 LUMP SUM SUM 5,000.00$

5,577,700.00$

UNIT ESTIMATED

PRICE AMOUNT

1 LUMP SUM SUM 900,000.00$

1 LUMP SUM SUM 100,000.00$

1 LUMP SUM SUM 1,900,000.00$

1 LUMP SUM SUM 400,000.00$

195000 CY 9.9 1,930,500.00$

2700 LF 223.00 602,100.00$

1 LUMP SUM SUM 75,000.00$

7600 LF 40.00 304,000.00$

500 LF 30.00 15,000.00$

Solicitation No.: W912HY21B0003 Date Issued: 22 SEP 2020 Date Opened: 22 DEC 2020 Issuing Office: USAED-Galveston Offeror: #3 Herve Cody Contractor Robbinville, NC Business Size: Small Business

ITEM ESTIMATED

NO. DESCRIPTION QUANTITY

0001 Mobilization and Demobilization 0002 Demolish and Remove the Existing

0007 Turfing 0008 Perimeter Ditch 0009 Lateral Ditch 0010 As-Built Drawings

As-Built Drawings

TOTAL SCHEDULE NO. 1

0006 Uncompacted Training Dike Construction

0007 Turfing 0008 Perimeter Ditch

NO. DESCRIPTION QUANTITY

Offeror: #2 AquaTerra Contracting, LLC Business Size: Small Business

ITEM ESTIMATED

Semi-compacted Containment Dike Construction

0006 Uncompacted Training Dike Construction

0004 Existing Containment Dike Repair

Demolish and Remove the Existing Drop-outlet Structure

0003 New Drop-outlet Structure

TOTAL SCHEDULE NO. 1

0001 Mobilization and Demobilization

Solicitation No.: W912HY21B0003 Date Issued: 22 SEP 2020 Date Opened: 22 DEC 2020 Issuing Office: USAED-Galveston

0009 Lateral Ditch

New Drop-outlet Structure 0004 Existing Containment Dike Repair

Semi-compacted Containment Dike Construction

0006 Uncompacted Training Dike Construction

0007 Turfing 0008 Perimeter Ditch 0009 Lateral Ditch

1 LUMP SUM SUM 5,000.00$

6,231,600.00$

UNIT ESTIMATED

PRICE AMOUNT

1 LUMP SUM SUM 706,730.00$

1 LUMP SUM SUM 160,260.00$

1 LUMP SUM SUM 1,660,455.00$

1 LUMP SUM SUM 656,750.00$

195000 CY 10.76 2,098,200.00$

2700 LF 7.85 21,195.00$

1 LUMP SUM SUM 261,025.00$

7600 LF 0.00 117,040.00$

500 LF 15.40 7,700.00$

1 LUMP SUM SUM 5,000.00$

5,694,355.00$

UNIT ESTIMATED

PRICE AMOUNT

1 LUMP SUM SUM 688,000.00$

1 LUMP SUM SUM 45,000.00$

1 LUMP SUM SUM 774,800.00$

1 LUMP SUM SUM 200,000.00$

195000 CY 10.5 2,047,500.00$

2700 LF 85.00 229,500.00$

1 LUMP SUM SUM 195,000.00$

7600 LF 12.00 91,200.00$

500 LF 12.00 6,000.00$

1 LUMP SUM SUM 5,000.00$

4,282,000.00$

UNIT ESTIMATED

PRICE AMOUNT

1 LUMP SUM SUM 600,000.00$

1 LUMP SUM SUM 42,000.00$

1 LUMP SUM SUM 1,198,000.00$

QUANTITY

As-Built Drawings

TOTAL SCHEDULE NO. 1

NO. DESCRIPTION

Mobilization and Demobilization

0002 Demolish and Remove the Existing 0003 New Drop-outlet Structure

0001 Mobilization and Demobilization

0006 Uncompacted Training Dike Construction 0007 Turfing 0008 Perimeter Ditch

Turfing 0008 Perimeter Ditch

0003 New Drop-outlet Structure 0002 Demolish and Remove the Existing 0001 Mobilization and Demobilization

0009 Lateral Ditch

0005 Semi-compacted Containment Dike

Business Size: Small Bussines

0002 Demolish and Remove the Existing 0003 New Drop-outlet Structure 0004 Existing Containment Dike Repair

0010 As-Built Drawings

TOTAL SCHEDULE NO. 1

0004 Existing Containment Dike Repair 0005 Semi-compacted Containment Dike 0006 Uncompacted Training Dike Construction

0010 As-Built Drawings

TOTAL SCHEDULE NO. 1

Solicitation No.: W912HY21B0003 Date Issued: 22 SEP 2020 Date Opened: 22 DEC 2020 Issuing Office: USAED-Galveston

NO. DESCRIPTION QUANTITY

Offeror: #4 Harrison, Walker and Harper, LP (HWH) Pairs, TX+A192 Business Size: Large

ITEM ESTIMATED

0009 Lateral Ditch

Solicitation No.: W912HY21B0003 Date Issued: 22 SEP 2020 Date Opened: 22 DEC 2020 Issuing Office: USAED-Galveston Offeror: #5 Rigid Constructors, LLC Opelouses, LA

ITEM ESTIMATED

NO. DESCRIPTION QUANTITY

Solicitation No.: W912HY21B0003 Date Issued: 22 SEP 2020 Date Opened: 22 DEC 2020 Issuing Office: USAED-Galveston Offeror: #6 Orion Marine Group Deer Park, TX Business Size: Large

ITEM ESTIMATED

1 LUMP SUM SUM 680,000.00$

195000 CY 20.25$ 3,948,750.00$

2700 LF 128.00 345,600.00$

1 LUMP SUM SUM 393,000.00$

7600 LF 46.00 349,600.00$

500 LF 104.00 52,000.00$

1 LUMP SUM SUM 5,000.00$

7,613,950.00$

UNIT ESTIMATED

PRICE AMOUNT

1 LUMP SUM SUM 1,000,000.00$

1 LUMP SUM SUM 300,000.00$

1 LUMP SUM SUM 900,000.00$

1 LUMP SUM SUM 50,000.00$

195000 CY 9.00$ 1,755,000.00$

2700 LF 75.00 202,500.00$

1 LUMP SUM SUM 100,000.00$

7600 LF 23.00 174,800.00$

500 LF 22.00 11,000.00$

1 LUMP SUM SUM 5,000.00$

4,498,300.00$

UNIT ESTIMATED

PRICE AMOUNT

1 LUMP SUM SUM 1,250,000.00$

1 LUMP SUM SUM 74,500.00$

1 LUMP SUM SUM 625,000.00$

1 LUMP SUM SUM 157,000.00$

195000 CY 7.75$ 1,511,250.00$

2700 LF 22.25 60,075.00$

1 LUMP SUM SUM 185,000.00$

7600 LF 19.00 144,400.00$

500 LF 42.00 21,000.00$

1 LUMP SUM SUM 5,000.00$

4,033,225.00$

ITEM

NO. DESCRIPTION

0009 Lateral Ditch 0010 As-Built Drawings

0003 New Drop-outlet Structure 0004 Existing Containment Dike Repair 0005 Semi-compacted Containment Dike

Solicitation No.: W912HY21B0003 Date Issued: 22 SEP 2020 Date Opened: 22 DEC 2020 Issuing Office: USAED-Galveston

0006 Uncompacted Training Dike Construction 0005 Semi-compacted Containment Dike 0004 Existing Containment Dike Repair

Offeror: #9 Pontchartrain Partners, LLC New Orleans, LA Business Size: Large

TOTAL SCHEDULE NO. 1

0010 As-Built Drawings

0008 Perimeter Ditch 0009 Lateral Ditch

0001 Mobilization and Demobilization

0008 Perimeter Ditch 0007 Turfing

ITEM

NO. DESCRIPTION

Demolish and Remove the Existing

TOTAL SCHEDULE NO. 1

Solicitation No.: W912HY21B0003 Date Issued: 22 SEP 2020 Date Opened: 22 DEC 2020 Issuing Office: USAED-Galveston

0010 As-Built Drawings

0007 Turfing 0008 Perimeter Ditch 0009 Lateral Ditch

TOTAL SCHEDULE NO. 1

Offeror: #7 Dredgit Corporation Houston, TX Business Size: Small

ESTIMATED

QUANTITY

0001 Mobilization and Demobilization 0002 Demolish and Remove the Existing

Uncompacted Training Dike Construction

Solicitation No.: W912HY21B0003 Date Issued: 22 SEP 2020 Date Opened: 22 DEC 2020 Issuing Office: USAED-Galveston Offeror: #8 *Texas Dewattering LLC Bellville, TX Business Size: Large

ESTIMATED

QUANTITY

0003 New Drop-outlet Structure 0004 Existing Containment Dike Repair 0005 Semi-compacted Containment Dike 0006 Uncompacted Training Dike Construction 0007 Turfing

UNIT ESTIMATED

PRICE AMOUNT

1 LUMP SUM SUM 1,900,000.00$

1 LUMP SUM SUM 225,000.00$

1 LUMP SUM SUM 1,500,000.00$

1 LUMP SUM SUM 1,950,000.00$

195000 CY 17.00$ 3,315,000.00$

2700 LF 150.00 405,000.00$

1 LUMP SUM SUM 285,000.00$

7600 LF 102.00 775,200.00$

500 LF 170.00 85,000.00$

1 LUMP SUM SUM 5,000.00$

10,445,200.00$

End of Abstract

ITEM ESTIMATED

QUANTITY

0004 Existing Containment Dike Repair 0006 Uncompacted Training Dike Construction 0007 Turfing

NO. DESCRIPTION

0001 Mobilization and Demobilization 0002 Demolish and Remove the Existing 0003 New Drop-outlet Structure

Semi-compacted Containment Dike

0008 Perimeter Ditch 0009 Lateral Ditch 0010 As-Built Drawings

TOTAL SCHEDULE NO. 1

File details come from the government source that posted it. Updated .