This document is an amendment to a federal solicitation for pipeline dredging services. The amendment provides revised bid schedule and measurement and payment sections, and updates the bid opening date and contact information. The solicitation is for pipeline dredging work along Reach 3 of the Freeport Harbor, Texas Channel Improvement Project in Brazoria County. Services include mobilization, pipeline management from the dredge to the placement area which requires the contractor to avoid damaging any levees, dredging approximately 1.45 million cubic yards of material, and final clean up. Bids are due on August 10, 2020 via teleconference. Payment will be made as lump sums for mobilization and pipeline management, and on a unit price basis per cubic yard for dredging. The amendment provides updated sections for bid schedule, payment methods including partial and final payments, material measurement processes, survey requirements, and removes a line item for dock standby time.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W45VAK01132052 006170
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Continued on Page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HY20B0029
X 9B. DATED (SEE ITEM 11)
08-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Freeport Harbor, Texas, Channel Improvement Project, Reach 3 Low er Stauffer Channel in Brazoria, County, Texas, Pipeline Dredging in which bid opening is scheduled for August 10, 2020 @ 2:00 PM(CDT) is hereby amended as follows:
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Jul-2020
CODE
US ARMY CORPS OF ENGINEERS
2000 FORT POINT ROAD
P.O. BOX 1229
GALVESTON TX 77553-1229
W912HY 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HY20B0029
A0002-2
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. THE SPECIFICATIONS FOR SOLICITATION NO.: W912HY19B0029, FREEPORT
HARBOR, TEXAS FREEPORT CHANNEL IMPROVEMENT PROJECT IN BRAZORIA
COUNTY, TEXAS PROJECT MANUAL FOR REACH 3 - LOWER STAUFFER, ARE
HEREBY AMENDED AS FOLLOWS:
* THE BID OPENING REMAINS SCHEDULED FOR AUGUST 10, 2020 AT 2:00 P.M. LOCAL
TIME VIA TELECONFERENCE.
THE TELECONFERENCE INFORMATION IS AS FOLLOWS:
PHONE NUMBER – (888) 675-2535
ACCESS CODE – 4757479
SECURITY CODE – 3845
a) Specifications.
(1) SECTION 00 11 00.00 45, BID SCHEDULE – The attached SECTION 00 11 00.00 45 entitled BID SCHEDULE supersedes that issued with this solicitation.
(2) SECTION 01 22 00.10, MEASUREMENT AND PAYMENT – The attached SECTION 01 22
00.10 entitled MEASUREMENT AND PAYMENT supersedes that issued with this solicitation.
b) Drawings.
(1) None
2. This amendment shall be attached to and become a part of the solicitation.
2 Encls:
1. SECTION 00 11 00.00 45, BID SCHEDULE
2. SECTION 01 22 00.10, MEASUREMENT AND PAYMENT
SWG FILE NO.: BRAZ 501-447 SOLICITATION NO.: W912HY20B0029
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 11 00.00 45
BID SCHEDULE AMENDMENT NO. 0002
PART 1 GENERAL
1.1 BID SCHEDULE
1.1.1 Schedule No. 1
-- End of Section Table of Contents --
DOCUMENT 00 11 00.00 45 Page 1
TO ACCOMPANY AMENDMENT NO. 0002 OF SOLICITATION: W912HY20B0029
THIS PAGE INTENTIONALLY LEFT BLANK
DOCUMENT 00 11 00.00 45 Page 2
SECTION 00 11 00.00 45
BID SCHEDULE
AMENDMENT NO. 0002
PART 1 GENERAL
1.1 BID SCHEDULE
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.1 Schedule No. 1
Item No. Description Estimated Quantity
Unit Unit Price Estimated Amount
SCHEDULE NO. 1
0001 Mobilization and Demobilization 1 JOB SUM $___________
0002 Pipeline Management, PA1 (this includes pipeline crossing)
1 JOB SUM $___________
0003 Dredging- Freeport, Lower Stauffer Reach #3 STA. 184+96.76 to
STA. 217+99.93
1,459,000 C.Y.
TOTAL SCHEDULE NO. 1 $___________
NOTE: Completion time stated in SECTION 00 73 00.01 45 SPECIAL CONTRACT REQUIREMENTS, STANDARD is for Schedule No. 1 work.
DOCUMENT 00 11 00.00 45 Page 3
BID SCHEDULE (CONT'D)
(TO BE ATTACHED TO STANDARD FORM 1442)
-- End of Document --
DOCUMENT 00 11 00.00 45 Page 4
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.10
MEASUREMENT AND PAYMENT AMENDMENT NO. 0002
PART 1 GENERAL
1.1 SUBMITTALS
1.2 LUMP SUM (JOB) PAYMENT ITEMS
1.2.1 Mobilization and Demobilization
1.2.1.1 Payment
1.2.1.2 Unit of Measure
1.2.2 Pipeline Management, Placement Area No. 1
1.2.2.1 Payment
1.2.2.2 Unit of Measure
1.3 UNIT PRICE PAYMENT ITEMS
1.3.1 Dredging
1.3.1.1 Payment
1.3.1.2 Dredging Partial Payment
1.3.1.3 Measurement
1.3.1.4 Frequencies
1.3.1.5 Government Surveys
1.3.1.6 Surveys During Progress of Work
1.3.1.7 Unit of Measurement
1.3.2 (AM#2) DELETED
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
SECTION 01 22 00.10 Page 1
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 01 22 00.10 Page 2
SECTION 01 22 00.10
MEASUREMENT AND PAYMENT
AMENDMENT NO. 0002
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Surveys ; G
1.2 LUMP SUM (JOB) PAYMENT ITEMS
Payment items for the work of this Contract for which Contract lump sum payments will be made are listed in the BID SCHEDULE and specified below.
All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, are included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed constitutes full compensation for furnishing plant, labor, materials, and equipment, and performing any associated Contractor Quality Control, administrative requirements, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.2.1 Mobilization and Demobilization
1.2.1.1 Payment
Payment will be made for costs associated with "Mobilization and Demobilization", as defined in the DOCUMENT 00 72 00 CONTRACT CLAUSES.
Payment for costs in connection with the plant necessary to perform the work, to include transportation and other costs incidental to delivery of the plant and other equipment to the general work area in condition ready for operation, and after completion of the work for removal of the plant and equipment from the work site.
1.2.1.2 Unit of Measure
Unit of measure: Job.
SECTION 01 22 00.10 Page 3
1.2.2 Pipeline Management, Placement Area No. 1
1.2.2.1 Payment
Payment for "Pipeline Management, Placement Area No. 1" in Schedule No. 1, will be made for costs associated with laying, handling of dredge pipelines, from the dredge to the Placement Area, procurement of materials, and for construction of ramps or installation of culvert pipes that may be necessary in connection with placing and removal of pipeline and final clean up of pipeline route, and work defined in SECTION 35 20 23.16 PIPELINE DREDGING. It is the contractor's responsibility to avoid damaging the Hurricane Flood Protection Levee (HFPL) during pipeline placement, and to restore the HFPL to its preconstruction state after pipeline removal. Monthly partial payments will be based on the estimates of work completed during the period up to 50 percent of the Contract price and the remaining 50 percent will be paid in the first monthly partial payment after removal of the pipeline and the final clean-up of the pipeline route. NOTE: Incidental to the work, contractor shall be advised pertaining to Easement in field for the proposed pipeline route-- Contractor shall be required to get a VDD permit for crossing the levee and wave barrier. See website:
https://velascodrainagedistrict.com/VDD%20Permit-070616.pdf . Contractor is advised that the purpose of this permit is to require them to repair any damage and if necessary dredging contractor build a limestone ramp over the pipeline so VDD mowers can cross over the top of the pipe during the course of the dredging operations.
1.2.2.2 Unit of Measure
Unit of Measure: Job.
1.3 UNIT PRICE PAYMENT ITEMS
Payment items for the work in this Contract on which the Contract unit price payments will be made are listed in the BID SCHEDULE and specified below. The unit price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor Quality Control, administrative requirements, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
1.3.1 Dredging
1.3.1.1 Payment
Payment for "Dredging- Freeport, Lower Stauffer Reach #3 STA. 184+96.76 to STA 217+99.93" in Schedule No. 1, will be made for costs associated with the removal of dredged material, transportation, placement at the Placement Area, (AM#2) any incidental dock standby (hours required at the port associated with idle time for ships to move from the dock to allow dredging), and work defined in SECTION 35 20 23.16 PIPELINE DREDGING. The dredging price shall also include any required dike maintenance in the placement site and spillway, and spillway management during placement operations.
1.3.1.2 Dredging Partial Payment
Partial payment will be based on approximate quantities determined by
SECTION 01 22 00.10 Page 4 fathometer soundings or sweepings taken behind the dredge. The Contractor may use its own hydrographic surveys to determine quantities for pay requests, but final quantities will be based on Government Before-Dredging and After-Dredging surveys.
1.3.1.3 Measurement
The material removed will be measured by cubic yard in place, by means of soundings taken before and after dredging. The total quantity of dredged material will be the theoretical quantity between the bottom surface shown by fathometer soundings of the last survey made "before-dredging" and the bottom surface shown by the fathometer soundings of a survey made "after-dredging", within the limits of the overdepth and side and end slopes, less deductions that may be required for misplaced material.
1.3.1.4 Frequencies
The total quantity of dredged material for which payment will be made will be the theoretical quantity between the bottom surface shown by fathometer soundings of the last survey made "before-dredging" (BD) and the bottom surface shown by the fathometer soundings of a survey made "after-dredging" (AD), within the limits of the overdepth and side and end slopes, less deductions that may be required for misplaced material.
Measurement shall normally be determined based on high frequency (200 kHz) data. Low frequency (40 kHz) data shall normally be used for acceptance/clearance purposes only.
Guidance as provided in hydro survey manual EM-1110-2-1003 Chapter 10 will apply for scheduling of BD and AD surveys. As provided in this guidance, the Government will allow a period of up to 5 calendar days, when controllable, to conduct an AD survey after the contractor indicates a section to be ready. However, if initial high frequency (200 kHz) AD surveys reflect a considerable amount of suspended material for any section, the Government may require up to 5 additional calendar days settling time prior to attempting AD surveys on any subsequent section.
If material still appears to be suspended after that time, a mutual decision between the contractor and the Government may be negotiated to determine if the low frequency data provides the best indication of the channel bottom. If agreement is reached to use low frequency (40 kHz) data for acceptance and also volume calculations, then low frequency (40 kHz) data must be used from before-dredging surveys for computations.
If low frequency data is to be used for acceptance and volume calculations, surveyors are to note that the appropriate manufacturer's recommended settings for both AD and BD surveys were in place.
1.3.1.5 Government Surveys
The Government will use the tide staffs shown on the drawings for vertical control. Real Time Kinematic (RTK) or Virtual Reference Station (VRS) will not be used. Differential Global Positioning System (DGPS) will be used for horizontal control.
Processing survey data will be performed with HYPACK 2016 software using the Kingfisher Method (updated 5/6/2016). Volumes will be computed by average end area using cross sectional survey lines. Before and After Dredge cross sections will be run on 100-foot stations and at changes in
SECTION 01 22 00.10 Page 5 the template. If the Contractor elects to use HYPACK 2016 software, the Government will provide the survey line files for the Contractor's use.
1.3.1.6 Surveys During Progress of Work
Contract depth will be determined by surveys taken behind the dredge as work progresses. The Contractor shall take progress soundings or sweepings and submit drawings of the surveys.
1.3.1.7 Unit of Measurement
Unit of measure: cubic yard.
1.3.2 Dock Standby (AM#2) DELETED
1.3.2.1 Payment
Payment for standby time will be made at the contract unit price for "Dock Standby" in Schedule No. 1. This will include the standby hours required at the port associated with idle time for ships to move from the dock to allow dredging. No separate payment will be made for standby or down time incurred while dredging the federal channels.
1.3.2.2 Measurement
Standby time shall be measured to the nearest 0.25 hour and recorded in the daily report.
1.3.2.3 Unit of Measure
Unit of measure: Hours.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section --
SECTION 01 22 00.10 Page 6
| Amend-0002-W912HY20B0029 |
| RVW--AMEND-0002_W912HY20B0029 |
| Amend 0002 page-2 |
| 00 11 00.00 45 |
| 00 11 00.00 45 - BID SCHEDULE AMENDMENT NO. 0002 |
| 00 11 00.00 45 - BID SCHEDULE |
| PART 1 GENERAL |
| 1.1 BID SCHEDULE |
| 1.1.1 Schedule No. 1 |
| 01 22 00.10 |
| 01 22 00.10 - MEASUREMENT AND PAYMENT AMENDMENT NO. 0002 |
| 01 22 00.10 - MEASUREMENT AND PAYMENT |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 LUMP SUM JOB PAYMENT ITEMS |
| 1.2.1 Mobilization and Demobilization |
| 1.2.1.1 Payment |
| 1.2.1.2 Unit of Measure |
| 1.2.2 Pipeline Management, Placement Area No. 1 |
| 1.2.2.1 Payment |
| 1.2.2.2 Unit of Measure |
| 1.3 UNIT PRICE PAYMENT ITEMS |
| 1.3.1 Dredging |
| 1.3.1.1 Payment |
| 1.3.1.2 Dredging Partial Payment |
| 1.3.1.3 Measurement |
| 1.3.1.4 Frequencies |
| 1.3.1.5 Government Surveys |
| 1.3.1.6 Surveys During Progress of Work |
| 1.3.1.7 Unit of Measurement |
1.3.2 Dock StandbyAM#2 DELETED
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION Not Used |