Amend 0002 - W912HY20B0027.pdf
PDF 4 MB Posted
- Solicitation number
- W912HY20B0027
About this file
This document contains an amendment to a federal solicitation and related contract opportunity. The U.S. Army Corps of Engineers Engineering District Galveston issued Amendment 0002 on 5 August 2020 to Solicitation Number W912HY20B0027 for pipeline dredging services along the Gulf Intracoastal Waterway in Galveston and Chambers Counties, Texas. The amendment supersedes three drawings and corrects notes on two other drawings provided with the original solicitation. It leaves the bid opening date of 18 August 2020 at 2:00 pm Central Time unchanged. The opportunity is for maintenance dredging of the waterway to be conducted between the Rollover to Causeway and the Bolivar Flare areas.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W45VAK01572933 007140
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Continue on Page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HY20B0027
X 9B. DATED (SEE ITEM 11)
17-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Gulf Intracoastal Waterway (GIWW), Texas, Rollover to Causeway and Bolivar Flare in Galveston and Chambers Counties, Texas, Pipeline Dredging in which bid opening is scheduled for August 18, 2020 at 2:00 PM (CDT) is hereby amended as follows:
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Aug-2020
CODE
US ARMY CORPS OF ENGINEERS
2000 FORT POINT ROAD
P.O. BOX 1229
GALVESTON TX 77553-1229
W912HY 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HY20B0027
A0002-2
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. THE SPECIFICATIONS FOR SOLICITATION NO. W912HY20B0027, GULF
INTRACOASTAL WATERWAY, TEXAS ROLLOVER TO CAUSEWAY AND BOLIVAR
FLARE IN GALVESTON AND CHAMBERS COUNTIES, TEXAS PROJECT MANUAL FOR
PIPELINE DREDGING, ARE HEREBY AMENDED AS FOLLOWS:
**(THE BID DUE DATE IS TO REMAIN SCHEDULED FOR AUGUST 18, 2020 AT 2:00 PM
LOCAL TIME.)
a) Specifications.
(1) None
b) Drawings.
(1) DRAWINGS NO. G-002, C-413, and C-501 – The enclosed Drawings No. G-002, C-413, and C-501, supersedes that issued with this Solicitation.
2. This amendment shall be attached to and become a part of the solicitation.
03 Encls:
1. DRAWING NO. G-002
2. DRAWING NO. C-413
3. DRAWING NO. C-501
of Engineers U.S. Army Corps
Galveston District
G A
L V
E S
T O
N T
E X
A S
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
G A
L V
E S
T O
N
A S S
H O
W N
D a te
R e v
S u b m it te d b y
A p p ro v e d b y
A p p ro v a l R e c o m m e n d e d
S c a le
D ra w n b y
D e s ig n e d b y
C h e c k e d b y
D e s c ri p ti o n
D a te
R e v
B y
Drawing No.:
F il e
M o d e l
N a m e
G -0
I
N D
E X
A M
D
B y m a o x tw
:3
:4
A
M D a te
T im e
W
C A
D D p ro je c ts
IW
W -2
R o ll o v e r to C a u s e w a y a n d B o li v a r
F la re F
Y P L A
N S -S
C
IW
W -1
-2
C O
N T
R A
C T -P
L A
N S T x S c
A M
D .d g n
G-002
D A
T E
W912HY20B0000
SOLICITATION NO.:
C O
L O
N E
L
U .S
A R
M Y
C O
M M
A N
D
IN
G
T
IM
O T
H Y R
V A
IL
P R
E P
A R
E D U
N D
E R T
H E D
IR
E C
T
IO
N O
F
C h ie f, E n g in e e ri n g B ra n c h
W
IL
L
IE
J
O E H
O N
Z A P .E
R A
L P
H E S
T E
IN
E R P .E P
M P
A re a E n g in e e r
R e s id e n t E n g in e e r
L A
U R
A L
Y N
N V
E R
A P .E
IWW 1101-298SWG FILE NO.
P
IP
E L
IN
E D
R E
D G
IN
G
R O
L L
O V
E R T
O C
A U
S E
W A
Y A
N D B
O L
IV
A R F
L A
R E
G U
L F I
N T
R A
C O
A S
T A
L W
A T
E R
W A
Y T
E X
A S
T .B .W
S .A .C
A .H
A N
D C
O N
T R
O L T
A B
L E
S G
E N
E R
A L N
O T
E S L E
G E
N D
IN
D
E X O
F D
R A
W
IN
G S
LOCATION OF PIPELINE CROSSINGS
BOTTOM LIMITS OF CHANNEL
... TO BE DREDGED
CHANNEL STATIONING & CENTERLINE
LOCATION OF CROSS SECTIONS
NEW DIKES TO BE BUILT
DREDGE PIPELINE ROUTE
EXISTING DIKES
WEIR SPILLWAY
DROP OUTLET STRUCTURE
TIDE STAFF
HORIZONTAL CONTROL POINTS
LIGHT BEACONS
RANGE TOWERS AND RANGES
CHANNEL MARKER BEACONS:
INTERIOR DISCHARGE POINTS (ODMDS)
EXIST. DIKES TO REPAIR
EXIST. DIKES BY OTHERS
GREEN RED
COMBO
MOUNDSTO BE USED
PLACEMENT AREAS
C .S
SOIL BORING LOCATIONS CONE PENETROMETER (CPT) LOCATIONS
(SOME ELEMENTS SHOWN BELOW MAY NOT BE IN THIS PROJECT)
OR OCEAN DREDGED MATERIAL DISPOSAL SITE (ODMDS)
PLACEMENT AREA (UNCONFINED PLACEMENT)
LIMITS OF OPEN WATER
POINTS (ODMDS)
PERIMETER DISCHARGE
DISCHARGE CORRIDOR
BORROW AREA
LIMITS OF RIPRAP
PLAN LEGEND
FLASHBOARD RISER
DITCH FLOW
DISCHARGE POINT WITH GRADE CONTROL MARKER
GENERAL NOTES
FOR ACCURACY.
NEED TO BE VERIFIED FREQUENTLY AGAINST THE PHYSICAL TIDE STAFFS
TIME TIDE READINGS USE PHYSICAL TIDE STAFFS. AUTO GAUGE READINGS
PRELIMINARY (FT) ONLY. AUTO GAUGE TIDES HAVE A DELAY. FOR REAL
DATUM. CLICK EITHER PLOT OR DATA ONLY UNDER UPDATE. UTILIZE
FROM AND TO DATE, STANDARD UNITS, LST/LSD TIME ZONE, AND MLLW
CLICK MORE DATA PULL DOWN MENU AND SELECT WATER LEVELS. SELECT
THE APPROPRIATE STATION ID CAN BE SEARCHED IN SEARCH WINDOW.
https://tidesandcurrents.noaa.gov/map/index.shtml?region=Texas
CURRENTS WEBSITE.
7. AUTO GAUGE TIDE STAFF DATA CAN BE LOCATED ON NOAA TIDE AND
6. NO REFERENCE LINE WILL BE ESTABLISHED BY THE GOVERNMENT.
SPECIFICATIONS.
OBSTRUCTIONS IN THE WORK AREA, AS DESCRIBED IN THE
MOVED. SITE VISIT SHOULD BE MADE TO VERIFY ANY CURRENT
OF THE TIME OF THE WORK, AS THOSE OBSTRUCTIONS MAY HAVE BEEN
OBSTRUCTIONS VISIBLE IN THE IMAGES MAY NOT BE IN THAT LOCATION AS
PROGRAM (NAIP), DATED 2016, UNLESS OTHERWISE NOTED.
5. AERIAL IMAGERY SOURCED FROM THE NATIONAL AGRICULTURE IMAGERY
SLOPES.
4. ALL CHANNEL END SLOPES SHALL BE EQUAL TO ADJACENT CHANNEL SIDE
BE FURNISHED TO THE CONTRACTOR UPON REQUEST IN WRITING.
3. ADDITIONAL CONTROL POINTS AND ALIGNMENT DATA (IF AVAILABLE) WILL
PLANE, NAD83, TEXAS SOUTH-CENTRAL ZONE, U.S. SURVEY FEET.
2. HORIZONTAL DATUM AND DISTANCES ARE REFERENCED TO TEXAS STATE
(MLLW) UNLESS SPECIFIED OTHERWISE.
1. ELEVATIONS ARE REFERENCED TO MEAN LOWER LOW WATER DATUM
S .A .C
U P
D A
T E
D
IN
D E
X
O F
R
A W
IN
G S
SOLICITATION NO. W912HY20B0027.
AMENDMENT NO. 0002 TO
THIS DRAWING ACCOMPANIES
Galveston District
G A
L V
E S
T O
N T
E X
A S
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
G A
L V
E S
T O
N
A S S
H O
W N
D a te
R e v
S u b m it te d b y
A p p ro v e d b y
A p p ro v a l R e c o m m e n d e d
S c a le
D ra w n b y
D e s ig n e d b y
C h e c k e d b y
D e s c ri p ti o n
D a te
R e v
B y
Drawing No.:
F il e
M o d e l
N a m e
C -4
P
IE
R C
E M
A R S
H O
P T A
N D P
L A
N
A M
D
B y m a o x tw
:2
:5
A
M D a te
T im e
W
C A
D D p ro je c ts
IW
W -2
R o ll o v e r to C a u s e w a y a n d B o li v a r
F la re F
Y P L A
N S -S
C
IW
W -1
-2
C O
N T
R A
C T -P
L A
N S T x S c
A M
D .d g
C-413
T E
W912HY20B0000
SOLICITATION NO.:
C O
L O
N E
L
U .S
A R
M Y
C O
M M
A N
D
IN
G
T
IM
O T
H Y R
V A
IL
P R
E P
A R
E D U
N D
E R T
H E D
IR
E C
T
IO
N O
F
C h ie f, E n g in e e ri n g B ra n c h
W
IL
L
IE
J
O E H
O N
Z A P .E
R A
L P
H E S
T E
IN
E R P .E P
M P
A re a E n g in e e r
R e s id e n t E n g in e e r
L A
U R
A L
Y N
N V
E R
A P .E
E L
IN
E D
R E
D G
IN
G
R O
L L
O V
E R T
O C
A U
S E
W A
Y A
N D B
O L
IV
A R F
L A
R E
G U
L F I
N T
R A
C O
A S
T A
L W
A T
E R
W A
Y T
E X
A S
T .B .W
S .A .C
A .H
(NOT AVAILABLE)
NO. 58-A
PLACEMENT AREA
ZONES
AVOIDANCE
C E
LL
2"
C E L L
(A
VAI
LABLE
PI
ER
C E
M
AR
SH
RISER STRUCTURES
LOCATION OF FLASH BOARD
50' WIDE
CORRIDOR
DREDGE PIPELINE ROUTE
W
ID
E
C O
R R
ID
O R
D R
E D
G E P
IP
E L
IN
E R
O U
T E
50' WIDE
CORRIDOR
DREDGE PIPELINE ROUTE
W
ID
E
E Q
U
IP
M E
N T T
R A
N S
IT
R
O U
T E
50'
50'
SCALE IN FEET
0 500 1,000 1,500
PLAN
,2
,5
X
,2
,0
X
,2
,5
X
,2
,0
X
,2
,5
X
,2
,0
X
13,680,000Y=
13,682,500Y=
13,685,000Y=
13,687,500Y=
M A
T C
H L
IN
E S
H E
E T C -1
BAYOU VISTA
P L
A N
O P
T
IO
N N
O A
N D N
O
P
IE
R C
E M
A R
S H
NOTES
9. SEE LEGEND ON SHEET G-002.
MANNER THAT MINIMIZES IMPACT TO EXISTING MARSH.
8. DREDGED MATERIAL SHALL BE PUMPED IN CONTAINMENT CELLS IN A
NECESSARY DURING PLACEMENT OF MATERIAL.
7. EXISTING CONTAINMENT CELLS SHALL BE MAINTAINED AND REPAIRED AS
POINT.
POINT AND SHALL BE INSTALLED WITHIN 20 FEET FROM THE DISCHARGE
6. ONE (1) GRADE CONTROL MARKER SHALL BE SETUP AT EACH DISCHARGE
NEXT DISCHARGE POINT.
ELEVATION RANGE IS REACHED, CONTRACTOR SHALL MOVE THE PIPE TO
FEET NAVD 88 AT THE CENTER OF EACH DISCHARGE POINT. ONCE TARGET
ELEVATION RANGE OF +1.6 FEET NAVD88 TO A MAXIMUM ELEVATION OF +2.5
5. CONTRACTOR SHALL DISCHARGE DREDGED MATERIAL TO A TARGET
INSTALLED AS SPECIFIED IN THE SPECIFICATIONS.
4. PRE-FABRICATED FLASH BOARD RISER STRUCTURES SHALL BE
WORK SHALL BE CONSTRUCTED AS SPECIFIED IN THE SPECIFICATIONS.
3. EXISTING PERIMETER BERM RAISING WORK AND NEW PERIMETER BERM
PLANE, NAD83, TEXAS SOUTH-CENTRAL ZONE, U.S. SURVEY FEET.
2. HORIZONTAL DATUM AND DISTANCES ARE REFERENCED TO TEXAS STATE
OF 1988 (NAVD88) USING GEOID12B.
1. ELEVATIONS ARE REFERENCED TO NORTH AMERICAN VERTICAL DATUM
S .A .C
C O
R R
E C
T
N
T
N
SOLICITATION NO. W912HY20B0027.
Galveston District
G A
L V
E S
T O
N T
E X
A S
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
G A
L V
E S
T O
N
A S S
H O
W N
D a te
R e v
S u b m it te d b y
A p p ro v e d b y
A p p ro v a l R e c o m m e n d e d
S c a le
D ra w n b y
D e s ig n e d b y
C h e c k e d b y
D e s c ri p ti o n
D a te
R e v
B y
Drawing No.:
F il e
M o d e l
N a m e
C -5
P
IE
R C
E M
A R S
H T
Y P
IC
A L D
E T
A
IL
S
A M
D
B y m a o x tw
:3
:2
A
M D a te
T im e
W
C A
D D p ro je c ts
IW
W -2
R o ll o v e r to C a u s e w a y a n d B o li v a r
F la re F
Y P L A
N S -S
C
IW
W -1
-2
C O
N T
R A
C T -P
L A
N S T x S c
A M
D .d g
C-501
T E
W912HY20B0000
SOLICITATION NO.:
C O
L O
N E
L
U .S
A R
M Y
C O
M M
A N
D
IN
G
T
IM
O T
H Y R
V A
IL
P R
E P
A R
E D U
N D
E R T
H E D
IR
E C
T
IO
N O
F
C h ie f, E n g in e e ri n g B ra n c h
W
IL
L
IE
J
O E H
O N
Z A P .E
R A
L P
H E S
T E
IN
E R P .E P
M P
A re a E n g in e e r
R e s id e n t E n g in e e r
L A
U R
A L
Y N
N V
E R
A P .E
E L
IN
E D
R E
D G
IN
G
R O
L L
O V
E R T
O C
A U
S E
W A
Y A
N D B
O L
IV
A R F
L A
R E
G U
L F I
N T
R A
C O
A S
T A
L W
A T
E R
W A
Y T
E X
A S
T .B .W
S .A .C
A .H
ELEV. +2.5'
ELEV. +2.3'
ELEV. +1.8'
ELEV. +1.6'
MOUND ALIGNMENT POINT'
(SEE NOTE 3)
ORANGE COLLARS
(ELEV. VARIES)
EXISTING GRADE
APPROXIMATE
(M
I N
(ELEV. VARIES)
EXISTING GRADE
APPROXIMATE
TYPICAL DETAIL - GRADE CONTROL MARKER
SCALE: NOT TO SCALE
TYPICAL SECTION
PERIMETER BERM
SCALE IN FEET
PLAN
1 2 3
3FT
FOR MARSH MOUND)
ELEV. +3.5' (TOP OF MARKER
ELEV. +2.2'
APPROX.
GRADE CONTROL MARKER
MIN. ELEV. +3.5'
HOURS TO ENSURE DREDGED MATERIAL DOES NOT EXCEED ELEVATION OF +2.5 FT NAVD88.
4- CONTROL MARKERS SHALL BE MONITORED A MINIMUM OF ONCE EVERY FOUR (4)
3- PAINTED RINGS AND/OR TAPE SHALL NOT BE SUBSITUTED FOR COLLARS.
2- COLLARS SHALL NOT BE FLUSH WITH PVC PIPE.
1- COLLARS ON GRADE MARKERS SHALL HAVE A MINIMUM THICKNESS OF 1/4".
NOTES:
1- THE CONTRACTOR SHALL CONSRUCT THE BERM SLOPES TO ANGLE OF REPOSE.
NOTES:
O P
T
IO
N N
O S -5
D E
T A
IL
S P
IE
R C
E M
A R
S H
S .A .C
C O
R R
E C
T
G
A
C
N T
R
L
M
R K
L
E V
A T
IO
N S
SOLICITATION NO. W912HY20B0027.
| Amend-0002-W912HY20B0027 |
| Amend 0002 page-2 |
| 2020-08-05-IWW-1101-298-PLANS_AMD#2 |
| 002-IWW-1101-298-PLANS_AMD#2 |
| 048-IWW-1101-298-PLANS_AMD#2 |
| 051-IWW-1101-298-PLANS_AMD#2 |
File details come from the government source that posted it. Updated .