This document package includes specifications and bid schedules for a federal dredging contract opportunity with the U.S. Army Corps of Engineers Galveston District. The solicitation is for maintenance dredging of the Sabine-Neches Waterway in Jefferson County, Texas and Cameron Parish, Louisiana. The bid package outlines six schedules for dredging various sections of the waterway between 2020-2022, totaling over 5 million cubic yards of material. Bids are due by July 20, 2020. The schedules provide estimated dredging quantities for each section, unit rates for dredging and monitoring work, and total estimated amounts. The specifications require completion of Schedule 1 work within 141 calendar days of notice to proceed and include provisions for liquidated damages. The document amendments replace sections in the original solicitation and provide updated bid schedules, special contract requirements, and a quantity summary table detailing the dredging requirements for each section.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W45VAK00210056 015780
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Unrestricted Procurement f or Sabine-Neches Waterway, Texas (SNWW), Maintenance Dredging in Jefferson County, Te as and Cameron Parish, Louisiana in which bid opening is scheduled for 20 Jul 2020 @ 2:00 PM is hereby amended as follows:
Continued on Page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HY20B0016
X 9B. DATED (SEE ITEM 11)
18-Jun-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Jul-2020
CODE
US ARMY CORPS OF ENGINEERS
2000 FORT POINT ROAD
P.O. BOX 1229
GALVESTON TX 77553-1229
W912HY 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HY20B0016
A0003-2
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
THE SPECIFICATIONS FOR SOLICITATION NO. W912HY20B0016, Sabine-Neches Waterway, Texas (SNWW), Maintenance Dredging in Jefferson County, Texas and Cameron Parish, Louisiana ARE HEREBY AMENDED AS FOLLOWS:
a) Specifications.
(1) SECTION 00 11 00.00 45, BID SCHEDULE – The enclosed SECTION 00 11 00.00 45 entitled BID SCHEDULE supersedes that issued with this Solicitation.
(2) DOCUMENT 00 73 00.01 45 - SPECIAL CONTRACT REQUIREMENTS, STANDARD –
The enclosed DOCUMENT 00 73 00.01 45 entitled SPECIAL CONTRACT REQUIREMENTS, STANDARD supersedes that issued with this solicitation.
(3) SECTION 35 20 23.16 45, APPENDIX 1 – QUANTITY SUMMARY TABLE – The enclosed SECTION 35 20 23.16 45, entitled APPENDIX 1 – QUANTITY SUMMARY TABLE supersedes that issued with this solicitation.
b) Drawings. NONE
2. This amendment shall be attached to and become a part of the solicitation.
3 Encls:
1. SECTION 00 11 00.00 45, BID SCHEDULE
2. DOCUMENT 00 73 00.01 45 - SPECIAL CONTRACT REQUIREMENTS, STANDARD
3. SECTION 35 20 23.16 45, APPENDIX 1 – QUANTITY SUMMARY TABLE
SWG FILE NO.: SN 101-303 SOLICITATION NO. : W912HY20B0016
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 11 00.00 45
BID SCHEDULE
PART 1 GENERAL
1.1 BID SCHEDULE
1.1.1 Schedule No. 1
1.1.2 Option No. 1
1.1.3 Option No. 2
1.1.4 Option No. 3
1.1.5 Option No. 4
1.1.6 Option No. 5
1.1.7 Option No. 6
1.2 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)
-- End of Section Table of Contents --
DOCUMENT 00 11 00.00 45 Page 1
TO ACCOMPANY AMENDMENT NO. 0003 TO SOLICITATION W912HY20B0016
THIS PAGE INTENTIONALLY LEFT BLANK
DOCUMENT 00 11 00.00 45 Page 2
SECTION 00 11 00.00 45
BID SCHEDULE
AMENDMENT NO. 0003
PART 1 GENERAL
1.1 BID SCHEDULE
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.1 Schedule No. 1
Item No. Description Estimated Quantity
Unit Unit Price Estimated Amount
SCHEDULE NO. 1
0001 Mobilization and Demobilization 1 JOB SUM $___________
0002 Dredging Section Nos. 1, 2, 3, and 4 1,165,000 C.Y. $_________ $___________
0003 Dredging Section Nos. 5, 6, 7 and 8 2,350,000 C.Y. $_________ $___________
0004 ODMDS Monitor Surveys
1 JOB SUM $_________
0005 Turtle Deflector Device and Endangered Species Observers
1 JOB SUM $_________
TOTAL SCHEDULE NO. 1 $___________
NOTE: Completion time stated in SECTION 00 73 00.01 45 SPECIAL CONTRACT REQUIREMENTS, STANDARD is for Schedule No. 1 work.
DOCUMENT 00 11 00.00 45 Page 3
BID SCHEDULE (CONT'D)
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.2 Option No. 1
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 1
0006 Dredging Section Nos. 9 and 10 570,000 C.Y. $___________ $___________
0007 ODMDS Monitor Surveys 1 JOB SUM $___________
0008 Turtle Deflector Device and Endangered Species Observers
1 JOB SUM $___________
TOTAL OPTION NO. 1 $___________
TOTAL SCHEDULE NO. 1 AND OPTION NO. 1 $___________
NOTE FOR OPTION NO. 1: The Government may exercise this Option by written notice to the Contractor prior to completion of all authorized work. An additional time of 19 calendar days will be added to this Contract for completion of this Option.
DOCUMENT 00 11 00.00 45 Page 4
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.3 Option No. 2
Item No. Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 2
0009 Dredging Section Nos. 15, 16, and 17 505,000 C.Y. $__________ $___________
0010 ODMDS Monitor Surveys
1 JOB SUM $___________
0011 Turtle Deflector Device and Endangered Species Observers
1 JOB SUM $___________
TOTAL OPTION NO. 2 $___________
TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1 AND 2 $___________
NOTE FOR OPTION NO. 2: The Government may exercise this Option by written notice to the Contractor prior to completion of all authorized work. An additional time of 17 calendar days will be added to this Contract for completion of this Option.
DOCUMENT 00 11 00.00 45 Page 5
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.4 Option No. 3
Item No. Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 3
0012 Dredging Section Nos. 18, 19, and 20 365,000 C.Y. $__________ $___________
0013 ODMDS Monitor Surveys
1 JOB SUM $___________
0014 Turtle Deflector Device and Endangered Species Observers
1 JOB SUM $___________
TOTAL OPTION NO. 3 $___________
TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2 AND 3 $___________
NOTE FOR OPTION NO. 3: The Government may exercise this Option by written notice to the Contractor prior to completion of all authorized work. An additional time of 13 calendar days will be added to this Contract for completion of this Option.
DOCUMENT 00 11 00.00 45 Page 6
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.5 Option No. 4
Item No. Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 4
0015 Dredging Section Nos. 11, 12, 13, and
375,500 C.Y. $__________ $___________
0016 ODMDS Monitor Surveys
1 JOB SUM $___________
0017 Turtle Deflector Device and Endangered Species Observers
1 JOB SUM $___________
TOTAL OPTION NO. 4 $___________
TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1, 2, 3 AND 4 $___________
NOTE FOR OPTION NO. 4: The Government may exercise this Option by written notice to the Contractor prior to completion of all authorized work. An additional time of 19 calendar days will be added to this Contract for completion of this Option.
DOCUMENT 00 11 00.00 45 Page 7
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.6 Option No. 5
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 5
0018 Mobilization and Demobilization - Sea Turtle Trawling and Relocation
1 JOB SUM $___________
0019 Sea Turtle Trawling and Relocation
30 DAY $___________ $___________
TOTAL OPTION NO. 5 $___________
TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1 THROUGH 5 $___________
NOTE FOR OPTION NO. 5: The Government may exercise this Option by written notice to the Contractor prior to completion of all authorized work. No additional calendar days will be added to this Contract for completion of this Option.
DOCUMENT 00 11 00.00 45 Page 8
(TO BE ATTACHED TO STANDARD FORM 1442)
1.1.7 Option No. 6
Item No.
Description Estimated Quantity
Unit Unit Price Estimated Amount
OPTION NO. 6
0020 Mobilization and Demobilization - Sea Turtle Trawling and Relocation
1 JOB SUM $___________
0021 Sea Turtle Trawling and Relocation
30 DAY $___________ $___________
TOTAL OPTION NO. 6 $___________
TOTAL SCHEDULE NO. 1 AND OPTIONS NOS. 1 THROUGH 6 $___________
NOTE FOR OPTION NO. 6: The Government may exercise this Option by written notice to the Contractor prior to completion of all authorized work. No additional calendar days will be added to this Contract for completion of this Option.
DOCUMENT 00 11 00.00 45 Page 9
(TO BE ATTACHED TO STANDARD FORM 1442)
1.2 EVALUATION OF OPTIONS (July 1990) (FAR 52.217-5)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
-- End of Document --
DOCUMENT 00 11 00.00 45 Page 10
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DOCUMENT 00 73 00.01 45
SPECIAL CONTRACT REQUIREMENTS, STANDARD
PART 1 GENERAL
1.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) (FAR
52.211-10)
1.2 LIQUIDATED DAMAGES - CONSTRUCTION (SEPT 2000) (FAR 52.211-12)
1.3 PHYSICAL DATA (APR 1984) (FAR 52.236-4)
1.4 QUANTITY SURVEYS (APR 1984) (FAR 52.236-16)
1.5 LIABILITY (APR 1984) (FAR 28.307-2)
1.6 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE(MAR 1995)
1.7 (SCR-S-102) CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR
PROCESSING DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS (April 2011)
1.8 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984) (52.236-1)
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
DOCUMENT 00 73 00.01 45 Page 1
DOCUMENT 00 73 00.01 45 Page 2
DOCUMENT 00 73 00.01 45
SPECIAL CONTRACT REQUIREMENTS, STANDARD
AMENDMENT NO. 0003
PART 1 GENERAL
1.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) (FAR
52.211-10)
The Contractor shall be required to:
(a) Commence work under this contract within 10 calendar days after the date the Contractor receives the Notice to Proceed;
(b) Prosecute the work diligently, and
(c) Complete the entire work ready for use not later than 141 calendar days after the date the Contractor receives the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
1.2 LIQUIDATED DAMAGES - CONSTRUCTION (SEPT 2000) (FAR 52.211-12)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $3,614 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
1.3 PHYSICAL DATA (APR 1984) (FAR 52.236-4)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by USACE surveys.
(b) Weather Conditions. Under ordinary conditions, the mean tidal range is about 1.5 feet. The height of tide is largely dependent on the force, direction, and duration of the wind. Strong northerly winds may depress the water surface as much as, and in some instances more than 2.0 feet below Mean Lower Low Water (MLLW), while southerly winds may raise the water surface as much as, and in some instances more than 3.0 feet above MLLW.
(c) Transportation Facilities. The immediate vicinity is served by railroad, highway, and deep and shallow draft channels.
(d) Other Information. Channel traffic consists of deep draft ships, DOCUMENT 00 73 00.01 45 Page 3 small boats of various sizes, fishing vessels, tugs, tows consisting of a tug and one or more barges. Traffic will interfere with dredging operations to some extent.
The general shape of the existing section of channel to be dredged is shown by cross sections on the Contract drawings.
Contractor should expect to encounter strong currents in all the dredging sections.
1.4 QUANTITY SURVEYS (APR 1984) (FAR 52.236-16)
(a) Quantity surveys shall be conducted, and the data derived from these surveys shall be used in computing the quantities of work performed and the actual construction completed and in place.
(b) The Government shall conduct the original and final surveys and make the computations based on them. The Contractor shall conduct the surveys for any periods for which progress payments are requested and make the computations based on these surveys. All surveys conducted by the Contractor shall be conducted under the direction of the Contracting Officer, unless the Contracting Officer waives this requirement in a specific instance.
(c) Promptly upon completing a survey, the Contractor shall furnish the originals of all field notes and all other records relating to the survey or to the layout of the work to the Contracting Officer, who shall use them as necessary to determine the amount of progress payments. The Contractor shall retain copies of all such material furnished to the Contracting Officer.
1.5 LIABILITY (APR 1984) (FAR 28.307-2)
(a) Workmen's compensation and employer's liability. Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers. (See 28.305(c) for treatment of contracts subject to the Defense Base Act.)
(b) General liability.
(1) The contracting officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
(2) Property damage liability insurance shall be required only in special circumstances as determined by the agency.
(c) Automobile liability. The contracting officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in
DOCUMENT 00 73 00.01 45 Page 4 connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
(d) Aircraft public and passenger liability. When aircraft are used in connection with performing the contract, the contracting officer shall require aircraft public and passenger liability insurance.
Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability, and $200,000 per occurrence for property damage. Coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
(e) Vessel liability. When contract performance involves use of vessels, the contracting officer shall require, as determined by the agency, vessel collision liability and protection and indemnity liability insurance.
1.6 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE(MAR 1995)
(a) This special contract requirement does not apply to terminations.
See 52.249-5000, Basis for Settlement of Proposals, and FAR Part 49.
(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the con-tractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region VI. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.
(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36, Rental Costs. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the SAT, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
DOCUMENT 00 73 00.01 45 Page 5
NOTE: A copy of EP 1110-1-8, "CONSTRUCTION EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE," is available at the following website:
http://www.publications.usace.army.mil/USACEPublications/EngineerPamphlets.aspx.
1.7 (SCR-S-102) CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR
PROCESSING DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS (April 2011)
The contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Davis-Bacon Act as stated in FAR 52.222-8, PAYROLLS AND BASIC RECORDS and FAR 52.222-13, COMPLIANCE
WITH DAVIS-BACON AND RELATED ACT REGULATIONS.
If the contractor elects to use an electronic Davis-Bacon payroll processing system, then the Contractor shall be responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the contractor to comply with Davis-Bacon and related Act regulations.
When the contractor uses an electronic Davis-Bacon payroll system, the electronic payroll service shall be used by the contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and the electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3 years after contract completion. If the contractor chooses to use an electronic Davis-Bacon payroll system, then the Contractor shall obtain and provide electronic system access to the Government, as required to comply with the Davis-Bacon and related Act regulations over the duration of this construction contract. The access shall include electronic review access by the Government contract administration office to the electronic payroll processing system used by the contractor.
The contractor's provision and use of an electronic payroll processing system shall meet the following basic functional criteria: commercially available; compliant with appropriate Davis Bacon Act payroll provisions in the FAR; able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract; capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records (format at http://rms.usace.army.mil/ ) for export in an Excel spreadsheet to be imported into the contractor's Quality Control System (QCS) version of Resident Management System (RMS), that in turn shall export payroll data to the Government's Resident Management System (RMS); demonstrated security of data and data entry rights; ability to produce contractor-certified electronic versions of weekly payroll data;
ability to identify erroneous entries and track the data/time of all versions of the certified Davis Bacon payrolls submitted to the government over the life of the contract; capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic Davis-Bacon payroll processing system shall be provided to the Government during contract closeout.
All contractor-incurred costs related to the contractor's provision and use of an electronic payroll processing service shall be included in the contractor's price for the overall work under the contract. The costs for Davis-Bacon Act compliance using electronic payroll processing services shall not be a separately bid/proposed or reimbursed item under this
DOCUMENT 00 73 00.01 45 Page 6 contract.
1.8 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984) (52.236-1)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least 65 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Document --
DOCUMENT 00 73 00.01 45 Page 7
DOCUMENT 00 73 00.01 45 Page 8
SWG FILE NO.:SN 101-303 SOLICITATION NO.:W912HY20B0016
Section No.
From Station
To Station
Length of Station (Feet)
Required Depth
(CY)
Allowable Overdepth
(CY)
Total Estimated
(CY)
1 296+24 260+00 3,624 115,000 70,000 185,000 4
2 260+00 230+00 3,000 325,000 95,000 420,000 4
3 195+00 150+00 4,500 195,000 65,000 260,000 4
4 150+00 100+00 5,000 200,000 100,000 300,000 4
16,124 835,000 330,000 1,165,000
5 0+000 5+000 5,000 370,000 100,000 470,000 4
6 5+000 10+000 5,000 680,000 150,000 830,000 4
7 10+000 15+000 5,000 525,000 100,000 625,000 4
8 15+000 20+000 5,000 325,000 100,000 425,000 4
20,000 1,900,000 450,000 2,350,000
36,124 2,735,000 780,000 3,515,000
9 20+000 25+000 5,000 235,000 110,000 345,000 2
10 25+000 30+000 5,000 125,000 100,000 225,000 2
10,000 360,000 210,000 570,000
15 60+000 65+000 5,000 85,000 85,000 170,000 3
16 65+000 70+000 5,000 100,000 75,000 175,000 3
17 70+000 75+000 5,000 85,000 75,000 160,000 3
15,000 270,000 235,000 505,000
18 75+000 80+000 5,000 125,000 75,000 200,000 1
19 80+000 85+000 5,000 75,000 50,000 125,000 1
20 85+000 90+000 5,000 15,000 25,000 40,000 1
15,000 215,000 150,000 365,000
Ocean Dredge Material Disposal
Sites
(ODMDS)
QUANTITY SUMMARY TABLE
SECTIONS
Sabine Pass Channel - SCHEDULE NO. 1
QUANTITIES
SUBTOTAL, SCHEDULE NO. 1
Sabine Bank Channel - OPTION NO. 2
Sabine Outer Bar and Bank Channel - SCHEDULE NO. 1
SUBTOTAL, SCHEDULE NO. 1
TOTAL, SCHEDULE NO. 1
Sabine Bank Channel - OPTION NO. 3
Sabine Outer Bar and Bank Channel - OPTION NO. 1
SUBTOTAL, OPTION NO. 1
SUBTOTAL, OPTION NO. 3
SUBTOTAL, OPTION NO. 2
Section 35 20 23.12 45 - Page A-1
TO ACCOMPANY AMENDMENT 0003 TO W912HY20B0016
SWG FILE NO.:SN 101-303 SOLICITATION NO.:W912HY20B0016
Section No.
From Station
To Station
Length of Station (Feet)
Required Depth
(CY)
Allowable Overdepth
(CY)
Total Estimated
(CY)
Ocean Dredge Material Disposal
Sites
(ODMDS)
QUANTITY SUMMARY TABLE
SECTIONS QUANTITIES
11 -50+00 -100+00 5,000 75,000 30,000 105,000 4
12 -100+00 -150+00 103 5,000 10,000 15,000 4
13 -150+00 -180+00 3,000 25,000 20,000 45,000 4
14 -180+00 -214+89 3,489 130,000 80,000 210,000 4
11,592 235,000 140,000 375,000
87,716 3,815,000 1,515,000 5,330,000
TOTAL, SCHEDULE NO. 1,
OPTION NOS. 1 THROUGH 4
Jetty Channel - OPTION NO. 4
SUBTOTAL, OPTION NO. 4
The term “Required Depth” is synonymous with the term “Prescribed Depth” and “Required Dredging Prism” used elsewhere in the specifications.
Includes anticipated shoaling.
Section 35 20 23.12 45 - Page A-1
TO ACCOMPANY AMENDMENT 0003 TO W912HY20B0016
| Amend-0003 SF-30 |
| Amend 0003 page-2 |
| 00 11 00.00 45 |
| 00 11 00.00 45 - BID SCHEDULE |
| 00 11 00.00 45 - BID SCHEDULE |
| PART 1 GENERAL |
| 1.1 BID SCHEDULE |
| 1.1.1 Schedule No. 1 |
| 1.1.2 Option No. 1 |
| 1.1.3 Option No. 2 |
| 1.1.4 Option No. 3 |
| 1.1.5 Option No. 4 |
| 1.1.6 Option No. 5 |
| 1.1.7 Option No. 6 |
1.2 EVALUATION OF OPTIONS July 1990 FAR 52.217-5
| 00 73 00.01 45 |
| 00 73 00.01 45 - SPECIAL CONTRACT REQUIREMENTS, STANDARD |
| 00 73 00.01 45 - SPECIAL CONTRACT REQUIREMENTS, STANDARD |
| PART 1 GENERAL |
| 1.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK APR 1984 FAR |
| 1.2 LIQUIDATED DAMAGES - CONSTRUCTION SEPT 2000 FAR 52.211-12 |
| 1.3 PHYSICAL DATA APR 1984 FAR 52.236-4 |
| 1.4 QUANTITY SURVEYS APR 1984 FAR 52.236-16 |
| 1.5 LIABILITY APR 1984 FAR 28.307-2 |
| 1.6 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULEMAR 1995 |
| 1.7 SCR-S-102 CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR |
| 1.8 PERFORMANCE OF WORK BY THE CONTRACTOR APR 1984 52.236-1 |
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION Not Used |
Qty Summary Table_FY20_SNWW_rev_06302020