AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorporate revised spec sections.

1. Section 00 73 00.00 45 Part 1.1 Commencement, Prosecution, and Completion of work has been revised.

2. Section 33 46 13.00 45 Part 1.3 References and Part 2.1.2 Acceptance Requirements have been revised.

3. Block 11 completion time has been revised per Section 00 73 00.00 45 Part 1.1

4. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 21

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Sep-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HY19B0035

X 9B. DATED (SEE ITEM 11)

05-Aug-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Sep-2019

CODE

US ARMY CORPS OF ENGINEERS

2000 FORT POINT ROAD

P.O. BOX 1229

GALVESTON TX 77553-1229

W912HY 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HY19B0035

A0006-2

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. THE SPECIFICATIONS FOR SOLICITATION NO. W912HY19B0035, GULF

INTRACOASTAL WATERWAY CHANNEL, TEXAS, PLACEMENT AREA NO. 64, 65, 105A

DIKE REHABILITATION, IN BRAZORIA AND MATAGORDA COUNTY, TEXAS, ARE

HEREBY AMENDED AS FOLLOWS:

a) Specifications.

(1) SF 1442 – SOLICITATION, OFFER, AND AWARD – The enclosed SF 1442 –

SOLICITATION, OFFER, AND AWARD, supersedes that issued with this Solicitation.

(2) SECTION 00 73 00.00 45 – PROCUREMENT AND CONTRACTING REQUIREMENTS -

The enclosed Section 00 73 00.00 45 - PROCUREMENT AND CONTRACTING

REQUIREMENTS, supersedes that issued with this Solicitation.

(3) SECTION 33 46 13.00 45 – GEOTEXTILES USED AS FILTERS – The enclosed Section 33

46 13.00 45 - GEOTEXTILES USED AS FILTERS, supersedes that issued with this

Solicitation.

b) Drawings.

(1) NONE.

2. This amendment shall be attached to and become a part of the solicitation.

3 Encls:

1. SF 1442 – SOLICITATION, OFFER, AND AWARD

2. SECTION 00 73 00.00 45 - PROCUREMENT AND CONTRACTING REQUIREMENTS

3. SECTION 33 46 13.00 45 - GEOTEXTILES USED AS FILTERS

Gulf Intracoastal Waterw ay, Texas Placement Area Nos. 64, 65, and 105a Shoreline Erosion Protection and Containment Dike Repairs, 100% Small Business Set-Aside

Completion Time: Complete the entire work ready for use not later than 31 January 2021. The time stated for completion shall include final cleanup of premises.

Estimated magnitude is betw een $10,000,000 - $25,000.00.

NAICS Code 237990, Other Heavy and Civil Engineering Construction. SB Size Standard is $36.5M.

Per AFARS 5132.702(a)(ii)(B) "Funds are not presently available for this acquisiion. No contract aw ard w ill be made until appropriated funds are made available."

X

DEBORA L WELLS 409 766 3943

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

05-Aug-2019

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time __ 19 Sept 2019__ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY CORPS OF ENGINEERS

2000 POINT FORT ROAD

P.O. BOX 1229

GALVESTON TX 77553-1229

W912HY

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

11. The Contractor shall begin performance w ithin 90 calendar days and complete the entire work ready for use NLT 31 January 2021.)

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: 409 766 3850 TEL: FAX:

W912HY19B0035 52

m3ct9dlw Highlight

SWG FILE NO.: IWW 1150-1139 SOLICITATION NO.: W912HY19B0035

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 73 00.00 45

SPECIAL CONTRACT REQUIREMENTS, STANDARD AMENDMENT 0006

PART 1 GENERAL

1.1 (AM#6) COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR

1984) (FAR 52.211-10)

1.2 LIQUIDATED DAMAGES - CONSTRUCTION (SEP 2000) (FAR 52.211-12)

1.3 PHYSICAL DATA (APR 1984) (FAR 52.236-4)

1.4 LIABILITY (APR 1984) (FAR 28.307-2)

1.5 WARRANTY OF CONSTRUCTION (MAR 1994) (FAR 52.246-21)

1.6 BASIS FOR SETTLEMENT OF PROPOSALS (MAR 1995) (UAI 52.249-5000)

1.7 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE(UAI 31.105-101

MAR 1995)

1.8 CFR PART 126 HUBZONE PROGRAM - SUBPART G - CONTRACT PERFORMANCE

REQUIREMENT

1.9 (SCR-S-102) CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR

PROCESSING DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS (April 2011)

1.10 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984) (52.236-1)

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Section Table of Contents --

DOCUMENT 00 73 00.00 45 Page 1

TO ACCOMPANY AMENDMENT 0006 OF SOLICITATION W912HY19B0035

THIS PAGE INTENTIONALLY LEFT BLANK

DOCUMENT 00 73 00.00 45 Page 2

SECTION 00 73 00.00 45

SPECIAL CONTRACT REQUIREMENTS, STANDARD

AMENDMENT 0006

PART 1 GENERAL

1.1 (AM#6) COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

(FAR 52.211-10)

The Contractor shall be required to:

(a) Commence work under this contract within 190 calendar days after the date the Contractor receives the Notice to Proceed;

(b) Prosecute the work diligently, and

(c) Complete the entire work ready for use not later than 31 Januar y 2021 260 calendar days after the date the Contractor receives the Notice to Proceed . The time stated for completion shall include final cleanup of the premises.

1.2 LIQUIDATED DAMAGES - CONSTRUCTION (SEP 2000) (FAR 52.211-12)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $3,450.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

1.3 PHYSICAL DATA (APR 1984) (FAR 52.236-4)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by land surveys.

(b) Weather Conditions. Under ordinary conditions, the mean tidal range is about 1.5 feet. The height of tide is largely dependent on the force, direction, and duration of the wind. Strong northerly winds may depress the water surface as much as, and in some instances more than 2 feet below Mean Lower Low Water (MLLW), while southerly winds may raise the water surface as much as, and in some instances more than 4 feet above MLLW.

(c) Transportation Facilities. The immediate vicinity is served by railroad, highway, and deep and shallow draft channels. The proposed work site is accessible by water via the Gulf Intracoastal Waterway.

DOCUMENT 00 73 00.00 45 Page 3

1.4 LIABILITY (APR 1984) (FAR 28.307-2)

(a) Workers' compensation and employer's liability. Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers. (See 28.305(c) for treatment of contracts subject to the Defense Base Act.)

(b) General liability.

(1) The contracting officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.

(2) Property damage liability insurance shall be required only in special circumstances as determined by the agency.

(c) Automobile liability. The contracting officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

(d) Aircraft public and passenger liability. When aircraft are used in connection with performing the contract, the contracting officer shall require aircraft public and passenger liability insurance.

Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability, and $200,000 per occurrence for property damage. Coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.

(e) Vessel liability. When contract performance involves use of vessels, the contracting officer shall require, as determined by the agency, vessel collision liability and protection and indemnity liability insurance.

1.5 WARRANTY OF CONSTRUCTION (MAR 1994) (FAR 52.246-21)

(a) In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (i) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.

DOCUMENT 00 73 00.00 45 Page 4

(b) This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.

(c) The Contractor shall remedy at the Contractor's expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor's expense any damage to Government-owned or controlled real or personal property, when that damage is the result of --

(1) The Contractor's failure to conform to contract requirements;

or

(2) Any defect of equipment, material, workmanship, or design furnished.

(d) The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor's warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.

(e) The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.

(f) If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor's expense.

(g) With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall--

(1) Obtain all warranties that would be given in normal commercial practice;

(2) Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer;

and

(3) Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.

(h) In the event the Contractor's warranty under paragraph (b) of this clause has expired, the Government may bring suit at its expense to enforce a subcontractor's manufacturer's, or supplier's warranty.

(i) Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.

(j) This warranty shall not limit the Government's rights under the Inspection and Acceptance Clause of this contract with respect to

DOCUMENT 00 73 00.00 45 Page 5 latent defects, gross mistakes, or fraud.

(k) Defects in design or manufacture of equipment specified by the Government on a "brand name and model" basis, shall not be included in this warranty. In this event, the Contractor shall require any subcontractors, manufacturers, or suppliers thereof to execute their warranties, in writing, directly to the Government.

1.6 BASIS FOR SETTLEMENT OF PROPOSALS (MAR 1995) (UAI 52.249-5000)

Actual costs will be used to determine equipment costs for a settlement proposal submitted on the total cost basis under FAR 49.206-2(b). In evaluating a terminations settlement proposal using the total cost basis, the following principals will be applied to determine allowable equipment costs:

(1) Actual costs for each piece of equipment, or groups of similar serial or series equipment, need not be available in the Contractor's accounting records to determine total actual equipment costs.

(2) If equipment costs have been allocated to a contract using predetermined rates, those charges will be adjusted to actual costs.

(3) Recorded job costs adjusted for unallowable expenses will be used to determine equipment operating expenses.

(4) Ownership costs (depreciation) will be determined using the Contractor's depreciation schedule (subject to the provisions of

FAR 31.205.11)

(5) License, taxes, storage, and insurance costs are normally recovered as an indirect expense and unless the Contractor charges these costs directly to contracts, they will be recovered through the indirect expense rate.

1.7 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE(UAI 31.105-101 MAR

1995)

(a) This special contract requirement does not apply to terminations.

See 52.249-5000, Basis for Settlement of Proposals, and FAR Part 49.

(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the con-tractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region VI. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For

DOCUMENT 00 73 00.00 45 Page 6 retroactive pricing, the schedule in effect at the time the work was performed shall apply.

(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36, Rental Costs. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.

(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the SAT, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.

NOTE: A copy of EP 1110-1-8, "CONSTRUCTION EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE," is available at the following website:

http://www.publications.usace.army.mil/USACEPublications/EngineerPamphlets.aspx

1.8 CFR PART 126 HUBZONE PROGRAM - SUBPART G - CONTRACT PERFORMANCE

REQUIREMENT

Sec. 126.700 What are the performance of work requirements for HUBZone contracts?

(a) A prime contractor receiving an award as a qualified HUBZone SBC must meet the performance of work requirements set forth in Sec.

125.6(c) of this chapter.

(b) In addition to the requirements set forth in Sec. 125.6(c), one or more qualified HUBZone SBCs must spend at least 50 percent of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs.

(1) A qualified HUBZone SBC prime contractor receiving a HUBZone contract for general construction may meet this requirement itself by expending at least 50 percent of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35 percent of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50 percent of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs.

(2) A qualified HUBZone SBC prime contractor receiving a HUBZone contract for specialty construction may meet this requirement itself by expending at least 50 percent of the cost of the contract incurred for personnel on its employees or it may subcontract at least 25 percent of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50 percent of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs.

(c) A contracting officer may waive the 50 percent requirement set forth in paragraph (b) of this section for a particular procurement after determining that at least two qualified HUBZone SBCs cannot meet the requirement. Where a waiver is granted, the qualified HUBZone SBC

DOCUMENT 00 73 00.00 45 Page 7 prime contractor must still meet the performance of work requirements set forth in Sec. 125.6(c) of this chapter.

(70 FR 51250, Aug. 30, 2005)

NOTE: THIS ACQUISITION IS CONSIDERED GENERAL CONSTRUCTION

1.9 (SCR-S-102) CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR

PROCESSING DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS (April 2011)

The contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Davis-Bacon Act as stated in FAR 52.222-8, PAYROLLS AND BASIC RECORDS and FAR 52.222-13, COMPLIANCE

WITH DAVIS-BACON AND RELATED ACT REGULATIONS.

If the contractor elects to use an electronic Davis-Bacon payroll processing system, then the contractor shall be responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the contractor to comply with Davis-Bacon and related Act regulations.

When the contractor uses an electronic Davis-Bacon payroll system, the electronic payroll service shall be used by the contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and the electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3 years after contract completion. If the contractor chooses to use an electronic Davis-Bacon payroll system, then the contractor shall obtain and provide electronic system access to the Government, as required to comply with the Davis-Bacon and related Act regulations over the duration of this construction contract. The access shall include electronic review access by the Government contract administration office to the electronic payroll processing system used by the contractor.

The contractor's provision and use of an electronic payroll processing system shall meet the following basic functional criteria: commercially available; compliant with appropriate Davis Bacon Act payroll provisions in the FAR; able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract; capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records (format at http://rms.usace.army.mil/) for export in an Excel spreadsheet to be imported into the contractor's Quality Control System (QCS) version of Resident Management System (RMS), that in turn shall export payroll data to the Government's Resident Management System (RMS); demonstrated security of data and data entry rights; ability to produce contractor-certified electronic versions of weekly payroll data;

ability to identify erroneous entries and track the data/time of all versions of the certified Davis Bacon payrolls submitted to the government over the life of the contract; capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic Davis-Bacon payroll processing system shall be provided to the Government during contract closeout.

All contractor-incurred costs related to the contractor's provision and use of an electronic payroll processing service shall be included in the

DOCUMENT 00 73 00.00 45 Page 8 contractor's price for the overall work under the contract. The costs for Davis-Bacon Act compliance using electronic payroll processing services shall not be a separately bid/proposed or reimbursed item under this contract.

1.10 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984) (52.236-1)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least 65 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Document --

DOCUMENT 00 73 00.00 45 Page 9

DOCUMENT 00 73 00.00 45 Page 10

SECTION TABLE OF CONTENTS

DIVISION 33 - UTILITIES

SECTION 33 46 13.00 45

GEOTEXTILES USED AS FILTERS AMENDMENT 0006

PART 1 GENERAL

1.1 SUMMARY

1.2 MEASUREMENT AND PAYMENT

1.3 (AM#6) REFERENCES

1.4 SUBMITTALS

1.5 DELIVERY, STORAGE, AND HANDLING

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 General

2.1.2 (AM#6) Acceptance Requirements

2.1.3 Securing Pins

2.2 INSPECTIONS, VERIFICATIONS, AND TESTING

2.2.1 Manufacturing and Sampling

2.2.1.1 Conformance Testing

2.2.1.2 Needle Punched Geotextile

2.2.1.3 Manufacturer Certification

PART 3 EXECUTION

3.1 MOBILIZATION AND DEMOBILIZATION

3.2 SURFACE PREPARATION

3.3 GEOTEXTILE INSTALLATION

3.3.1 General

3.3.2 Placement

3.4 PROTECTION

3.5 OVERLAPPING AND SEAMING

3.5.1 Overlapping

3.6 CONTRACTOR QUALITY CONTROL

3.6.1 Compliance Inspection

3.6.2 Reports

-- End of Section Table of Contents --

SECTION 33 46 13.00 45 Page 1

SECTION 33 46 13.00 45 Page 2

SECTION 33 46 13.00 45

GEOTEXTILES USED AS FILTERS

AMENDMENT 0006

PART 1 GENERAL

1.1 SUMMARY

The work covered in this Section consists of furnishing plant, labor, material, and equipment and performing the operations required for furnishing, hauling, and placing the geotextile, complete, as specified herein and as shown, and for maintaining the geotextile until placement of the stone protection is completed and accepted.

1.2 MEASUREMENT AND PAYMENT

Measurement and payment for geotextiles will be paid for in accordance with provisions of the SECTION 01 22 00.10 MEASUREMENT AND PAYMENT.

1.3 (AM#6) REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D123 (2015b; R 2017) Standard Terminology Relating to Textiles

ASTM D3786/D3786M (2018) Standard Test Method for Bursting Strength of Textile Fabrics-Diaphragm Bursting Strength Tester Method

ASTM D4354 (2012) Sampling of Geosynthetics for Testing

ASTM D4355/D4355M (2014) Deterioration of Geotextiles from Exposure to Light, Moisture and Heat in a Xenon-Arc Type Apparatus

ASTM D4491/D4491M (2015) Standard Test Methods for Water Permeability of Geotextiles by Permittivity

ASTM D4533/D4533M (2015) Standard Test Method for Trapezoid Tearing Strength of Geotextiles

ASTM D4632/D4632M (2015a) Grab Breaking Load and Elongation of Geotextiles

ASTM D4751 (2016) Standard Test Method for Determining Apparent Opening Size of a

SECTION 33 46 13.00 45 Page 3

Geotextile ASTM D4833/D4833M (2007; E 2013; R 2013) Index Puncture

Resistance of Geotextiles, Geomembranes, and Related Products

ASTM D4873/D4873M (2017) Standard Guide for Identification, Storage, and Handling of Geosynthetic Rolls and Samples

ASTM D4884/D4884M (2014a) Strength of Sewn or Thermally Bonded Seams of Geotextiles

ASTM D5261 (2010; R 2018) Standard Test Method for Measuring Mass Per Unit Area of Geotextiles

ASTM D6241 (2014) Standard Test Method for the Static Puncture Strength of Geotextiles and Geotextile-Related Products Using a 50-mm Probe U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 1110-2-1601 (1991; 1994 Change 1) Engineering and Design -- Hydraulic Design of Flood Control Channels

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-04 Samples

Geotextile Fabric

Submit two fabric samples measuring approximately 2 feet by 2 feet to the Area Office which will be forwarded to Geotechnical and Structures Section for materials files.

SD-06 Test Reports

Geotextiles

SD-07 Certificates

Geotextile ; G

A certificate of compliance attesting that the geotextile meets the chemical, physical, and manufacturing requirements specified herein.

1.5 DELIVERY, STORAGE, AND HANDLING

Synthetic geotextiles that are not to be installed immediately and during periods of shipment and storage, are to be protected from direct sunlight, ultra-violet rays, temperatures greater than 140 degrees F, mud, dirt, SECTION 33 46 13.00 45 Page 4 dust, and debris. To the extent possible, the fabric is to be maintained and wrapped in a heavy duty protective covering. All geotextile shall be labeled, shipped, stored, and handled in accordance with ASTM D4873/D4873M .

No hooks, tongs, or other sharp instruments shall be used for handling geotextile.

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 General

The geotextile shall be a needle-punched nonwoven made of 100% polypropylene staple filaments. The geotextile is to meet the physical requirements listed in the TABLE below. The geotextile fabric is to consist of polypropylene staple filaments that resists ultraviolet and biological deterioration, rotting, naturally encountered basics and acids. The edges of the geotextile are to be finished to prevent the outer fiber from pulling away from the geotextile.

2.1.2 (AM#6) Acceptance Requirements

Brands of geotextile to be used are to be accepted on the following basis. Submit in duplicate, a mill certificate or affidavit signed by a legally authorized official of the company manufacturing the geotextile.

The mill certificate or affidavit is to attest that the geotextile meets the chemical, physical, and manufacturing requirements specified in this Section.

TABLE 1 - PHYSICAL REQUIREMENTS

PROPERTY TEST METHOD UNIT MINIMUM TEST VALUE

Weight - Typical ASTM D5261 oz/sy 16

Tensile Strength ASTM D4632/4632M lbs 380

Elongation @ Break ASTM D4632/4632M % 50

Mullen Burst ASTM D-3786 psi 740

Puncture Strength ASTM D-4833 lbs 235

CBR Puncture ASTM D6241 lbs 1,025

Trapezoidal Tear ASTM D4533/4533M lbs 140

Apparent Opening Size ASTM D4751 U.S. Sieve 100

Permittivity ASTM D4491/4491M Sec-1 0.70

Water Flow Rate ASTM D4491/4491M g/min/sf 50

SECTION 33 46 13.00 45 Page 5

TABLE 1 - PHYSICAL REQUIREMENTS

PROPERTY TEST METHOD UNIT MINIMUM TEST VALUE

UV Resistance @ 500 Hours ASTM D4355/4355M % 70

2.1.3 Securing Pins

Secure the geotextile to the embankment or foundation soil by pins to prevent movement prior to placement of revetment materials. Other appropriate means to prevent movement such as staples, sand bags, and stone could also be used. Insert securing pins through both strips of overlapped geotextile along the line passing through midpoints of the overlap. Remove securing pins as placement of revetment materials are placed to prevent tearing of geotextile or enlarging holes. Maximum spacing between securing pins depends on the steepness of the embankment slope. The maximum pins spacing shall be equal to or less than the values listed in TABLE 2. When windy conditions prevail at the construction site, increase the number of pins upon the demand of the Contracting Officer. Anchor terminal ends of the geotextile with key trench or apron at crest, toe of the slope and upstream and downstream limits of installation.

TABLE 2

MAXIMUM SPACING FOR SECURING PINS

EMBANKMENT SPACING, feet

STEEPER THAN 1V ON 3H 2

1V ON 3H TO 1V ON 4H 3

FLATTER THAN 1V ON 4H 5

2.2 INSPECTIONS, VERIFICATIONS, AND TESTING

2.2.1 Manufacturing and Sampling

Geotextiles shall meet the requirements specified in TABLE 1.

2.2.1.1 Conformance Testing

Perform conformance testing in accordance with the manufacturers approved quality control manual. Submit manufacturer's quality control conformance test results.

SECTION 33 46 13.00 45 Page 6

2.2.1.2 Needle Punched Geotextile

For needle punched geotextile, provide manufacturer certification that the geotextile has been inspected using permanent on-line metal detectors and does not contain any needles.

2.2.1.3 Manufacturer Certification

Upon delivery of the geotextile , submit duplicate copies of the written certificate of compliance signed by a legally authorized official of the manufacturer. The certificate shall state that the geotextile shipped to the site meets the chemical requirements and exceeds the minimum average roll value listed in TABLE 1.

PART 3 EXECUTION

3.1 MOBILIZATION AND DEMOBILIZATION

Mobilize sufficient personnel and equipment at the worksite to begin required operations. Upon successful completion of the work required as specified herein, remove the construction equipment, materials, and supplies from the site after acceptance of the work by the Contracting Officer.

3.2 SURFACE PREPARATION

Prepare surface, on which the geotextile will be placed, to a relatively smooth surface condition in accordance with the applicable portion of this specification and shall be free from obstruction, debris, depressions, erosion feature, or vegetation. Remove any irregularities so as to ensure continuous, intimate contact of the geotextile with all the surface. Any loose material, soft or low density pockets of material, shall be removed;

erosion features such as rills, gullies etc. shall be graded out of the surface before geotextile placement.

3.3 GEOTEXTILE INSTALLATION

3.3.1 General

Place the geotextile in the manner and at the locations shown. At the time of installation, reject the geotextile if it has defects, rips, holes, flaws, deterioration or damage incurred during manufacture, transportation or storage.

3.3.2 Placement

Place the geotextile with the long dimension perpendicular to the shoreline and laid smooth and free of tension, stress, folds, wrinkles, or creases. Place the strips to provide a minimum width of 24 inches of overlap for each joint.

Adjust the actual length of the geotextile used based on initial installation experience. Perform trimming in such a manner that the geotextile is not damaged in any way.

SECTION 33 46 13.00 45 Page 7

3.4 PROTECTION

Protect the geotextile at all times during construction from contamination by surface runoff; remove any geotextile so contaminated and replaced with uncontaminated geotextile. Replace any geotextile damaged during its installation or during placement of blanket stone or riprap at no cost to the Government. Failure to comply shall require replacement of geotextile. Protect the geotextile from damage prior to and during the placement of blanket stone, riprap, or other materials. Before placement of blanket stone, riprap, or other materials, demonstrate that the placement technique will not cause damage to the geotextile. In no case shall any type of equipment be allowed on the unprotected geotextile.

3.5 OVERLAPPING AND SEAMING

3.5.1 Overlapping

The overlap of geotextile shall be 24 inches . Overlaps under water must be a minimum of 2 feet. Overlaps are required to ensure that all of the underlying soils are fully covered. Make sure blanket stone and riprap are resting on the top of the geotextile.

3.6 CONTRACTOR QUALITY CONTROL

3.6.1 Compliance Inspection

Prior to placement, inspect each section of geotextile for holes, tears, or other defects or deterioration.

3.6.2 Reports

Reports of the inspection activity and corrective action taken are to be submitted with the daily reports.

-- End of Section --

SECTION 33 46 13.00 45 Page 8

Amend 0006_Page 1_SF-30
Amend 0006_Page 2_Summary
Amend 0006_SF1442
Amend 0006_00 73 00.00 45
00 73 00.00 45 - SPECIAL CONTRACT REQUIREMENTS, STANDARD AMENDMENT 0006
00 73 00.00 45 - SPECIAL CONTRACT REQUIREMENTS, STANDARD
PART 1 GENERAL
1.1 AM#6 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK APR 1984
1.2 LIQUIDATED DAMAGES - CONSTRUCTION SEP 2000 FAR 52.211-12
1.3 PHYSICAL DATA APR 1984 FAR 52.236-4
1.4 LIABILITY APR 1984 FAR 28.307-2
1.5 WARRANTY OF CONSTRUCTION MAR 1994 FAR 52.246-21
1.6 BASIS FOR SETTLEMENT OF PROPOSALS MAR 1995 UAI 52.249-5000
1.7 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULEUAI 31.105-101 MAR
1.8 CFR PART 126 HUBZONE PROGRAM - SUBPART G - CONTRACT PERFORMANCE
1.9 SCR-S-102 CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR
1.10 PERFORMANCE OF WORK BY THE CONTRACTOR APR 1984 52.236-1
PART 2 PRODUCTS Not Used
PART 3 EXECUTION Not Used
Amend 0006_33 46 13.00 45
33 46 13.00 45 - GEOTEXTILES USED AS FILTERS AMENDMENT 0006
33 46 13.00 45 - GEOTEXTILES USED AS FILTERS
PART 1 GENERAL
1.1 SUMMARY
1.2 MEASUREMENT AND PAYMENT
1.3 AM#6 REFERENCES
1.4 SUBMITTALS
1.5 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 General
2.1.2 AM#6 Acceptance Requirements
2.1.3 Securing Pins
2.2 INSPECTIONS, VERIFICATIONS, AND TESTING
2.2.1 Manufacturing and Sampling
2.2.1.1 Conformance Testing
2.2.1.2 Needle Punched Geotextile
2.2.1.3 Manufacturer Certification
PART 3 EXECUTION
3.1 MOBILIZATION AND DEMOBILIZATION
3.2 SURFACE PREPARATION
3.3 GEOTEXTILE INSTALLATION
3.3.1 General
3.3.2 Placement
3.4 PROTECTION
3.5 OVERLAPPING AND SEAMING
3.5.1 Overlapping
3.6 CONTRACTOR QUALITY CONTROL
3.6.1 Compliance Inspection
3.6.2 Reports