W45VAK91332927 007140
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Unrestricted Procurement for Gulf Intracoastal Waterw ay, Texas, Across San Antonio Bay in Calhoun County, Texas, Pipeline Dredging in w hich the response date is 23 Sep 19 @ 2:00 PM (CDT) is hereby amended as follow s:
Continued on Page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HY19B0025
X 9B. DATED (SEE ITEM 11)
23-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Sep-2019
CODE
US ARMY CORPS OF ENGINEERS
2000 FORT POINT ROAD
P.O. BOX 1229
GALVESTON TX 77553-1229
W912HY 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HY19B0025
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - CONTINUATION PAGE
The following have been added by full text:
AMEND 0003
1. Any reference to “Aransas County” should be changd to “Calhoun County”.
2. Section 00 21 00 – The following clause replaces the one issued in the solicitation.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
Calhoun County – 27.4%
6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours
W912HY19B002
5 Page 3 of 4 performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is NON-SMSA Calhoun County, Texas.
(End of provision)
2. Drawings.
(1) DRAWING NO. G-002 - The enclosed Drawing No. G-002, supersedes that issued with this Solicitation.
3. This amendment shall be attached to and become a part of the solicitation.
1 Encl:
DRAWING NO. G-002
(End of Summary of Changes) of Engineers U.S. Army Corps
Galveston District
G A
L V
E S
T O
N T
E X
A S
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
G A
L V
E S
T O
N
A S S
H O
W N
D a te
R e v
S u b m it te d b y
A p p ro v e d b y
A p p ro v a l R e c o m m e n d e d
S c a le
D ra w n b y
D e s ig n e d b y
C h e c k e d b y
D e s c ri p ti o n
D a te
R e v
B y
Drawing No.:
F il e
M o d e l
N a m e
G -0
L
O C
A T
IO
N A
M D -3
B y
M
O D
X M
A N
:4
:5
P
M D a te
T im e
W
C A
D D P ro je c ts
IW
W -1
A c ro s s S a n A n to n io B a y
P la n s -S
C
IW
W -1
-1
C O
N T
R A
C T -P
L A
N S T x S c .d g n
G-002
W
IL
L
IE
J
O E H
O N
Z A P .E
IWW 1150-1141SWG FILE NO. W912HY19B0025
SOLICITATION NO.:
J L
M
M D
G
A N
S
C h ie f, E n g in e e ri n g B ra n c h
P A
B L
O H
E R
N A
N D
E Z P .E
A re a E n g in e e r
R e s id e n t E n g in e e r
A N
D R
E W S
M
IT
H P .E
P
IP
E L
IN
E D
R E
D G
IN
G G
IW
W A
C R
O S
S S
A N A
N T
O N
IO
B
A Y
G U
L F I
N T
R A
C O
A S
T A
L W
A T
E R
W A
Y T
E X
A S
C O
L O
N E
L E
N
U .S
A R
M Y
C O
M M
A N
D
IN
G
T
IM
O T
H Y R
V A
IL
P R
E P
A R
E D U
N D
E R T
H E D
IR
E C
T
IO
N O
F
J U
L Y
Fe rry La nd ing
Air Fo rce
St oc k Pe ns
W at er W el l a nd
TE
S T
C E
LL
P
LA
N
TI
N G
0'
0'
0'
-3+55
-3+55-3+00
-2+00
-1+00
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
8+00
9+00
10+00
11+00
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+1
0+00
PLACEM
ENT
AREA
NO.
C
PLACEMENT
AREA
NO.
9 B
(N
OT
AVAI
LABLE
T
HI
S
CONTRACT)
BOTTOM LIMITS OF CHANNEL
... TO BE DREDGED
CHANNEL STATIONING & CENTERLINE
LOCATION OF CROSS SECTION
DREDGE PIPELINE ROUTE
EXISTING DIKE
WEIR SPILLWAY
DROP OUTLET STRUCTURE
TIDE STAFF
EXIST. DIKE TO REPAIR
EXIST. DIKE BY OTHERS
MOUND
COMBO
REDGREEN
DISCHARGE CORRIDOR
C .S
(SOME ELEMENTS SHOWN BELOW MAY NOT BE IN THIS PROJECT)
LOCATION OF PERMIT/PIPELINE CROSSING
NEW DIKE TO BE BUILT
TO BE USED
PLACEMENT AREA
OR OCEAN DREDGED MATERIAL DISPOSAL SITE (ODMDS)
PLACEMENT AREA (UNCONFINED PLACEMENT)
LIMITS OF OPEN WATER
HORIZONTAL CONTROL POINT
CHANNEL MARKER BEACON:
LIGHT BEACON
RANGE TOWER AND RANGE
SOIL BORING LOCATION CONE PENETROMETER (CPT) LOCATION
LIMITS OF RIPRAP
PLAN LEGEND GENERAL NOTES
6. NO REFERENCE LINE WILL BE ESTABLISHED BY THE GOVERNMENT.
AREA, AS DESCRIBED IN THE SPECIFICATIONS.
SHOULD BE MADE TO VERIFY ANY CURRENT OBSTRUCTIONS IN THE WORK
THE WORK, AS THOSE OBSTRUCTIONS MAY HAVE BEEN MOVED. SITE VISIT
VISIBLE IN THE IMAGES MAY NOT BE IN THAT LOCATION AS OF THE TIME OF
PROGRAM (NAIP), DATED 2016, UNLESS OTHERWISE NOTED. OBSTRUCTIONS
5. AERIAL IMAGERY SOURCED FROM THE NATIONAL AGRICULTURE IMAGERY
SLOPES.
4. ALL CHANNEL END SLOPES SHALL BE EQUAL TO ADJACENT CHANNEL SIDE
BE FURNISHED TO THE CONTRACTOR UPON REQUEST IN WRITING.
3. ADDITIONAL CONTROL POINTS AND ALIGNMENT DATA (IF AVAILABLE) WILL
PLANE, NAD83, TEXAS SOUTH - CENTRAL ZONE, U.S. SURVEY FEET.
2. HORIZONTAL DATUM AND DISTANCES ARE REFERENCED TO TEXAS STATE
(MLLW), UNLESS SPECIFIED.
1. ELEVATIONS ARE REFERENCED TO MEAN LOWER LOW WATER DATUM
SCALE IN FEET
0 6,000 12,000 18,000
PLAN
A N
D G
E N
E R
A L N
O T
E S
L O
C A
T
IO
N M
A P L E
G E
N D
J L
B C
O R
R E
C T
S H
E E
N U
M B
E R
IN
G
O
L
C A
T
IO
P
A N
J L
B C
O R
R E
C
S H
E
U
M B
E R
IN
G
C A
T
IO
P
A N
SCALE OF MILES
10 10 20
ARANSAS
NATIONAL
WILDLIFE
REFUGE
S A
N J
O S E I S L
CORPUS
CHRISTI
INGLESIDE
ARANSAS
PASS
ROCKPORT
PORT
ARANSAS
M
ATAG
O
RDA
IS
LAND
SEADRIFT
O'CONNOR
PORT
MATAGORDA
PENI
NSULA
MATAGORDA
BEACH
MAGNOLIA
VICTORIA
RIVER
P A
D R
IS
A N
D
HARLINGEN
PORT ISABEL
IS
L
A N
D
P A
D R
M E X I C O
M U S T
A N
G I S L A
N D
RAYMONDVILLE
PORT
MANSFEILD
KINGSVILLE
G
ULF
O
F M
EXI
CO
RIO GRANDE
A R
R O
Y O
COLORADO
W A
T E
R W
A Y
IN
T
R A
C O
A S
T A
L
L A
G U
A
M A
D R
E
G U
L F
BAFFIN BAY
L A
G U
N A M
A D
R E
G U
L F I
N T
R A
C O
A S
T A
L W
A T E
R W
A Y
BAY
CORPUS
BAY
NUECES
RIVER
BAY
COPANO
N U
E C
E S
A R
A N S
A S
MISS
ION
R
IV
E R
BLANCO
C R
EEK
B A Y
S A N A
N
TO
N
IO
ES
PI
RI
TU
SANTO
BAY
RIVER
ANTONIO
SAN
R
IV
E R
G U
A D
A L U P E
L A
V A
C A
B
A Y
MATAGORDA B
AY
EAST
MATAGORDA BAY
LOCATION
PROJECT
C-106
C-105
C-104
C-103
C-102
C-101
C-
C-
C -1
C-110
C-111
SOLICITATION NO. W912HY19B0025
AMENDMENT NO. 0003 TO
THIS DRAWING ACCOMPANIES
| AMEND-0003_W912HY19B0025-PLANS.pdf |
| G-0 |
| IWW-1150-1141_CONTRACT-PLANS_TxSc83 |
File details come from the government source that posted it.