DEPARTMENT OF THE ARMY PERMIT

Pennittce _ _ _,_P---'o,,_rt_._o,,_f,__,_Po""n'-'-'-A...,rt...,h"'u""r _ __ _

Penn it No. __ S,,_W_,_,_,.Gw-2,.,.0u.l ..i.;l-'-"'0,,.03.,_,_0""'3 ___ _

Issuing Office Galveston District

NOTE: The tenn "you" and its derivatives, as used in this pcnnit, means the permittee or any future transferee. The tenn "this office" refers to the appropriate district or division office of the Corps of Engineers having jurisdiction over the pcnnitted activity or the appropriate official of that office acting under the authority of the commanding officer.

You are authorized to perfonn work in accordance with the terms and conditions specified below.

Project Description: To discharge fill material into 3.26 acres of open waters and 0.08 acres of wetlands during expansion of the existing Port of Port Arthur facilities. To construct a new 570-linear-foot culvert extension, approximately 124 linear feet of 7-foot by 8-foot reinforced concrete box culvert and outfalls. To construct a new 600-foot-loog by 63-foot-wide wharf with driven concrete pile supports that will incorporate an existing rail bridge and two additional railroad spurs. To install one new breasting dolphin and one new mooring dolphin and to construct a 398-foot-long sheet pile bulkhead. To straighten and annor I, 798 linear feet of shoreline, starting at the end of the existing wharf and ending near the State Highway 82 Bridge by contouring the shoreline Lo a 3: I slope and stabilizing with 3.05 acres of articulated concrete matting and 0.29 acres of stone riprap at the slope toe. To mechanically and/or hydraulically new work dredge 18.67 acres of the Sabine-Neches Canal to a depth of --48 feet mean low tide plus 2 feet overdredge plus I foot advanced maintenance removing 4 L6,200 cubic yards of material. To mechanically and/or hydraulically maintenance dredge 14.51 acres to a depth of -48 mean low tide plus 2 feet overdredgc plus I foot advanced maintenance removing 211,000 cubic yards of material annually for a period of five years. To place the dredged material into the following dredged material placement areas: 8, 9A, 98, and 11. The project will be conducted in accordance with the attached plans, in 19 sheets, and the attached mitigation plan, Attachment A, in 12 sheets.

Project Location: In the Sabine-Neches Canal and wetlands adjacent to the Sabine-Neches Canal, at 221 Houston Avenue (Port of Port Arthur), in Port Arthur, Jefferson County, Texas.

Permit Conditions:

General Conditions:

I. The time limit for completing the work authorized ends on 31 December 2019 . If you find that you need more time to complete the authorized activity, submit your request for a Lime extension to this office for consideration at least one month before the above date is reached.

2. You must maintain the activity authorized by this pennit in good condition and in confonnance with the tenns and conditions of this permit. You are not relieved of this requirement if you abandon the pem1itted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wisb to cease to maintain the authorized activity or should you desi re to abandon it without a good faith transfer, you must obtain a modification of this pennit from this of-fice, which may require restoration of the area.

3. If you discover any previously unknown historic or archcological remains while accomplishing the activity authorized by this pennit, you must immediately notify this office of what you have found. We will initiate the Federal and state coordination required to dctennine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places.

ENG FORM 172.1, Nov 86 EDITION OF SEP 82 IS OBSOLETE. (33 CFR 325 (Appe11dix A))

4. If you sell the property associated with this pennit, you must obtain the signature of the new owner in the space provided and forward a copy of the pennit to this office to validate the transfer of this authorization.

5. If a conditioned water quality certification has been issued for your project, you must comply with the conditions specified in the certification as special conditions to this permit. For your convenience, a copy of the certification is attached if it contains such conditions.

6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the tenns and conditions of your permit.

Special Conditions:

I. The pennittee understands and agrees that if future operations by the United States (U.S.) require the removal, relocation or other alteration of the structure or work herein authorized, or if, in the opinion of the Secretary of the Anny or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the pennittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby without expense to the U.S. No claim shall be made against the U.S. on account of any such removal or alteration.

2. The area subject to this permit is being studied by the U.S. for possible improvements or modifications. The pennittee is hereby notified that if these or future operations occur and require any facility, pipeline or other structure to be moved to accommodate a Federal navigation or flood control improvement in navigable waters, the owners of said facility, pipeline or other structure will be required to remove or relocate the facility, pipeline or other structure at the owner's expense.

3. The permittee must install and maintain, at their own expense, any safety lights and signals prescribed by the U.S. Coast Guard (USCG) through regulations or otherwise on the authorized facilities. In addition, no bright lights that may be erected on the permitted structure shall be directed toward a navigable waterway in a manner that could hinder nighttime users of this waterway. The USCG may be reached at the following address: Commander (dpb), Eighth Coast Guard District, Hale Boggs Federal Building, 501 Magazine Street, New Orleans, Louisiana 70130-3396, or by telephone at 504-589-6198.

4. Prior to the performance of hydraulic dredging, the permittee will obtain a Section 401 water quality certification from the Texas Commission on Environmental Quality for the effluent or return water associated with the upland dredged material placement areas to be utilized. The pennittee will submit a copy of the Section 401 certification to the Corps of Engineers, Galveston District, Regulatory Division, Chief, Compliance Branch, prior to perfonning hydraulic dredging.

5. Upon completion of construction, the permittee must submit as-built drawings to the Corps of Engineers, Operations-Navigation Division and Port Arthur Area Office within 60 days. The as-built drawings must include distances of the constructed structures relative to the adjacent Federal channel.

6. All construction of mitigation, including planting, must be complete within 12 months after start of construction within jurisdictional areas. The pennittee will notify the Corps of Engineers, Galveston District, Regulatory Division, Chief, Compliance Branch, in writing, when the work begins in jurisdictional areas. Monitoring and maintenance will proceed according to the mitigation plan.

7. The mitigation success criteria, as indicated in the mitigation plan included in Attachment A, must be achieved for the mitigation requirement to be considered complete.

8. Should mitigation be determined to be unsuccessful by Corps personnel at the end of the monitoring period, the permittee will be required to take necessary corrective measures, as approved by the Corps. Once the corrective measures are completed, the pennittee will notify the Corps and a determination will be made regarding success of the mitigation.

Further Information:

I . Congressional Authorities: You have been authorized to undertake the activity described above pursuant to:

(X) Section IO of the Rivers and Harbors Act of 1899 (33 U.S.C. 403 ).

(X) Section 404 of the Clean Water Act (33 U.S.C. 1344).

( ) Section I 03 of the Marine Protection, Research and Sanctuaries Act of I 972 (33 U.S.C. 1413).

2. Limits of this authorization.

a. This pem1it does not obviate the need to obtain other Federal, state, or local authorizations required by law.

b. This permit docs not grant any property rights or exclusive privileges.

c. This permit docs not authorize any injury to the property or rights of others.

d. This permit does not authorize interference with any existing or proposed Federal project.

3. Limits of Federal Liability. In issuing this pem1it, the Federal Govemme~t does not assume any liability for the following:

a. Damages to the pennitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes.

b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest.

c. Damages to persons, property, or to other permitted or unpenn itted activities or structures caused by the activity authorized by this perrnit.

d. Design or construction deficiencies associated with the permitted work.

e. Damage claims associated with any future modification, suspension, or revocation of this permit

4. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provided.

5. Reevaluation of Penni! Decision. This office may reevaluate its decision on this permit at any time the circumstances warrant.

Circumstances that could require a reevaluation include, but are not limited to, the following:

a. You fail to comply with the terms and conditions of this permit.

b. The information provided by you in support of your pennit application proves to have been false, incomplete, or inaccurate (See 4 above).

c. Significant new infom1ation surfaces which this office did not consider in reaching the original public interest decision.

Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requiring you to comply with the terms and conditions of your pem1it and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost.

6. Extensions. General condition I establishes a time limit for the completion of the activity authorized by this permit. Unless there are circumstances requiring either a prompt completion of the authorized activity or a reevaluation of the public interest decision, the Corps will normally give favorable consideration to a request for an extension of this time limit.

Your signature below, as pem1ittcc, indicates that you accept and agree to comply with the terms and conditions of this pem1it.

~ER-Jk;t Afrcu[:JA!d f~~vX ~a1~~R-P~<-+.P•r-e ~ f 1,~E D

(D '£)

This permit becomes effective when the Federal official, designated to act for the Secretary of the Anny, has signed below.

1:~,~A ~

JANET THOMAS BOTELLO, LEADER

NORTH EVALUATION UNIT

FOR COLONEL RICHARD P. PANNELL

When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date below.

(TRANSFEREE - Typed/Primed Name) (DATE)

(TRANSFEREE - Signalllre) (Mailing Address)

JUL 1 8 2014

SWG-2011-00303

Port of Port Arthur

07/22/2014 Page I of 19 c:::J Project Location

N Sheet 1 of 19 w@~ Project Location Port of Port Arthur s

Shoreline Stabilization and 1:24,000 Wharf Construction Project

0 1,000 2,000 Jefferson County, Texas I I I File No. SWG-2011-00303 Feet

,o Mop ZOIZ Gooolt Eoro, 111100•,yJolf•""• CO<lnty Tu,,.

□ Project Area

- - Mean Higher High Water

Emergent WeUand

I u•t)i s

1:7,200

I

Feet

I

JUL 1 8 2014

SWG-2011 -00303

Port of Por t Arthur 07/22/2014

Shoreline Stabilization anc Wharf Construction Projec

Jefferson County, Texas File No. SWG-2011-0030~

~:s:) F ) . = "" ~ ,. ,': ,, / ·- .. ,, I l ! , V', C y/, ✓ /\ I

1·- 2 :1• Ii, ~ i'lC7f DREDGE MATERIAL _.._.___ ' ' S PI.ACfMENT AAf.>. NO. 11 a.. ...._~ ,' ~ ~!#ENT DISCHARGE /

IS!n Lockwood, Andrews & Newnam, Inc.

A LFO A DALY CO M PANY

DREDGE MATERIAL

PlACEM ENT AAE"A

NO 9B

DREDGE MATERIAL •

PLACOAENT AAE"A NO.

9A/98 EFFLUENT

DISCl'i'.RCE POINT

'' DREDGE IAATER!.o.L PLACEMENT .o.RE"A NO. 8

EFFLUENT DISCHARGE

POINT

~ DREDGE MATERIAL

PLACEMENT AAE"A

EFFLUENT DISCH.tjiCE CtiANNa

DREDGE W.TERIAL

PLACEMENT .o.RE"A

EFFLUENT WEIR TO

DISCliARGE CHANNEL

~ ~ ~ . . ---· ~ ---y-- -~--·~---... -,-. ... -.aa-, PORT OF PORT ARTHUR

SHORELINE STABILIZATION & WHARF DREDGING

DREDGED MATERIAL DISPOSAL

o·

RT\-1fTIED PLANS

10.000· 20,000· _.,..,_ -:--·

'1:i O '1:i Cl) Pl -.J O <!

C1Q -- ,... <;

C'D N .-+ Q t.,.) !:::: 0 I

N >-+, N 0 O '"o 0 ......, ...... 0

\0 ~ g .... w ::r 0 C: w

F,le;L\120-10849 ·001'• 0 Producl,on\4-0l-Dro•1nos\Perm,l\PR004-EXIST PLAN.d•Q Plotted By Barber, Jared 7/14/20 14

COASTAi DATUM £'" r

.,, n

••J n I l ll n

~tOOOO,•TDl'(ltffll} Mt.AN r,Qi WA'EG: i,IHiWl lift.N4Sf.Al.f\,C.1_(WSI.._ l,tu\'( UJ'N 11Al!lf ( lril:l.~l l,O,HlDM'.J? tOll~(illJ.ltl

·r M(Nj lOW TO£ IW'l Tl

(L£~ATIONS ~ ,,_R[ W-'ID88 \N.[SS

O~• Sl:uotm

.NQIES;

1. TEMPORARY DRAINAGE PIPE TO BE ABANDONED ONCE THE

GRANNIS OUTFAU DITCH IS F'ILLED IN. ft

-"ET1.ANDS (0 004 AC)

PLAN V1EW t------------------------- (5 OF' 5) --------------------4 I NON-WETI.AND \'14fERS (1.<2 AC) t

0 0 ~~

I PLAN VIEW _J_ PLAN VIEW I PLAN VIEW J

(1 Of 5) (2 Of 5) -+-- (3 OF 5)

't_ SABINE - NECHES SHIP CHANNEL mn Lockwood, Andrews & Newnam, Inc.

A I F0 A nAI V C:O 1.APAN Y

PORT OF PORT ARTHUR

SHORELINE STABILIZATION & WHARF DREDGING

OVERALL EXISTING SITE

r~~~,,;:~::0"0,,::t:i~~ ~~ OA~l AC'

EX1S TING BUILDING

/J~ARI="

rx1STINC RUil nit-.:~

EXISTING WHARF

o· 500

"'00 $:I) '-3

(JQ N

o N .i::.N 0 O ,-..,,_.

.i:,.

1,000'

"'t:1 C/)

0 ::E 0 9 '""'N "'00 0 - ;i::,- o .., 0 ..... w ;::T'o E; w file.L \120-10649-001' 4-0-Proaocl,on\4-01-0row,ngs\Perm,t\PR005-PROP Pt1\/,1.o·•q Plolteo By Borcer, Jared 7 /14/201◄

COASTAL DATUM

[ 001, n ~l't()U10!~(1ttiif1 t.lCN, HOt ~;,JtR l lltfftl ----,-~-" cj,1 M{,\ll~l!vll.1"51.)

I.II.A\ l.0'#1 'IIIA1Ut !lllil\l U.II ,, ""' IJ)Jl{I L()JI '.rot {\l.LIII 022j,,::J .-n IIA"'81> J J_ '-'EA'- LOlir hUt 111tll fl.{\Af(l,MS ~"-i AA:1 MAV068 ytd5$

~([D r.T:T:l L.:..!..:J..;J

D n

TOTAL PRO..E:CT

FILL 'MTHIN EXISTING

WATERS (CONVERTED TO

UPLAND)

NEW WORK DREDGING

WETLANDS TO BE FIUED

(CONVERTIED TO UPLAND)

PROPOSED ARTICULA TEO

CONCRETE MAT (ACM)

PROPOSED RIP RAP

AREA (AC)

FILL BELOW CUT BELOW

MHHW (CY) MHHW (CY)

3.26 19,700 -

18.67 - 416,200

0.08 - -

3.05 5,000 -

0.29 1,000 -r2J

ESTIMA TEO ANNUAL

AREA (AC)

MAINTENANCE

DREDGING VOLUME

(CY/YR)

PROPOSED MAINTENANCE

14.51 211,000 DREDGING

1. THIS PORTION OF THE GRANNIS OUTFALL DITCH HAS

BEEN FILLED AS A PART OF USACE PERMIT NO

SWG-2012-00319.

2. TEMPORARY DRAINAGE PIPE TO BE ABANDONED ONCE

THE GRANNIS OUTFALL DITCH IS FILLED IN.

t1f

,.-,.: tY OU1fALL

PLAN VIEW

t-----------------L-IN_EA_R_WET __ LA_N_D-FEA_TU_R_E __ (5 OF 5) -------------------!

I I

WETLAND TO BE FILLED (0.004 AC)

NON-WETLAND WATERS TO BE

FILLED ( 1.42 AC)

PLAN VIEW I I I PLAN VIEW ---1--- PLAN VIEW

(1 Of 5) If (2 OF 5) (3 OF 5)

PROPOSED

RIP RAP

LIMITS OF NEW

WORK DRFDGING

TO BE FILLED (0.026 AC)

NON-WETLAND WATERS TO

BE FILLED ( 1.84 AC)

EXISTING BUILOING

EX1SnNG BUILDING

"""'-"°"" 5H,e C""'NEl~ o· 500' · .ooo·

'"d O '"O C/)

PORT OF PORT ARTHUR . ~ ~ g_ ~ Lockwood Andrews SHORELINE STABILIZATION & WHARF DREDGING l'L•R\11 T1 [D PLA":S va ~ g_, N

, ___________________ Oo'"do

Newnam, Inc. OVERALL PLAN ~ ~ g_ :::

mn A LEO A DALY COMPANY = \0 ► b

~8 ~ 8

File:l \ 120--10849-001 \4-0-Product.on\4-0 I -Drow,nqs\Perm,t\PR006-PtAN I .d•Q

COASTAL DAllJM r<tta n

1:

__:i_ t.1,n

·9 . , rt

~~~II); W.l{R {IHIM l,lfHi H:Qi 1¥,'J(" (Wl-f#' i,fH< SLJI IML M>.

~ LOW 'til'AttP (u._.-) l(M LOIO u:~ ill'l,'tlf •ltl'lt I.If.A.-. lO'A fll)f tM!TI

Il.[v.MLNS '910WN AR( ~rl068 lltoi.CSS OfHCR'I& IIOTEO

•SEE ' SHEET 11 FOR PROPOSED

PRO.tcr FEATURES ANO DIMENSl()ijS.

Plotteo B, Barner. Jared 7/14/2014

S£E SHEET 9 FOR CON1JNUATION

FOLEY OUTFALL

MEAN HIGHER

HIGH WATER (+1.27)

EXISTING WATERS EDGE

11-+00

-------19s· I ,?/#A'

Ill

PROPOSED WATERS EDGE

42' 130"

I'• J ~· .. ~~~ ·~•w~" I I 464'---------------------i

_ _ EDGE OF SABINE-NECHES SHIP CHANNEL SIDE SLOPE

o· 60"

EDGE ~!NE-NECHES SHIP CHANNEL BOTTOM - 1-- - --- -- - - - - -- -- --

ISln Lockwood, Andrews & Newnam, Inc.

A LEO A DALY COMPANY

PORT OF PORT ARTHUR

SHORELINE STABILIZATION & WHARF DREDGING

PROPOSED EARTHWORK

PLAN VIEW (1 OF 5)

WiEtll2.

~ fill WITHIN EX1S1JNC WA TrRS

~OREDCINC

~ WETLANDS TO BE FILLED

.,, 0 '"Ci Cl)

'• <fJ ~ g ~ oN-C) O\t;:O I

N 1-T) N 0 O ""lj 0 ...., ..... 0

.:::; """"' ~ ::l. ~ -· \0 0

~8 ::r 0 I:; w

Fil•l \120-10849 001\4 -0- Produclion\4-0I-Drow,ngs\Perm,t\P~009 -PLAN4.a~g Plottea By; Barber, Jared 7/14/2014 ro,06 n

:t onnj~ liOHt«Hlt Jt'Ji Wll'DI ~ IICNi>tlt>< • '1fR (- )

~W SU.LML l~l

~ LOO ••10! t• L~) \(HI ltll!Y tC. \W!JI (IIJ•)

'-'t.A-. LOW IIOE (!ill) tu:\'ATl()l,"S SJi()lwN AAf ~~ tJMrc.<.

OMRWlSC NOTtD

•SEE SHEET 14 FOR PROPOSED

PROJECT FEATURES ANO DIMENSIONS

I I I I I I

I I I

I

I

//j ; i

/ i

; I / l

/ t I '

[ X1ST1NC DRfj\'<AGt CULV£R1

I

I

I

I

EXIS"T\NC HlAOWAlL ro BE Rf\AOV[D i l

"-=-J' \ I l I l WETLAND TO BE FILLED

-.,_ (0.004 ACRES)

I

NON-WETLAND WATERS TO

BE FILLED (1 .42 AC)

EMERGENT WETLAND TO BE

FILLED (0.05 ACRES)

r- FOLEY OUTFALL F'X1~flNG OF'iA!NACF r.:rn vrRr

EXISTING WATE\EDGf

/. -h

MEAN HIGHER HIGH

WATER ( + 1.27)

I- I I I/--/;____;__;/--//~

PROPOSED CUL VERT

EXTENSION

o· 60'

1?0'

•an LE.ww. '"O O '"O CZ)

Lockwood Andrews SHORELINE STABILIZATION & WHARF DREDGING r,T:,:i ., . .....;i ~ 8.., N I:: PORT OF PORT ARTHUR I rn D Pl ~ FILL WITHIN EXISTING WATERS I ~ 8 §. ~

' ____________________ l..'..!.!.LJDREOCING :••~., 8.., 0 '"O 0

& Newnam Inc. PROPOSED EARTHWORK ~ .:..~ ...... ~ ~ ;:::

' N ( ) WETLANDS lO BE FIUEO -· I..O ...... I _A_L_E_O_ A_ D_A_L _Y ~C_O_M_P_A_N_Y_ PLA VIEW 4 OF 5 - >- 0

::t.8 ;::;-0 E w

File.L \ 1,0-10849-001\4 0 Produchon\4-01-0ro~,ngs\Prrm,t\PROl l-i'l,\Nl.doq

COA,5TAL DAJUM

r'°• rt

J°n t •Sn mn

"'"1 ~ti n

-C.N. 1(>0! ,0 'Ml[li! (litHIII') l,l£N4 HICH 111',t,T[q (Mtftft'I

1/fJ.~ 'j(J,l.{l.{l ("4SI.

fJ0/4 LOW 'IIAl!R (ML'A' ILNI l1WO I.CW .nJI' lc.111 j

,LJ,,.'1 LCIW riot.. \~LTl [U"Jil ll)t,S ~h .1,i;f ,a~ UM f~11;:

Ot~ SC l«Jft:D

88'

15.

Plotted Bi Boroer, Jared 1/14/2014

SEE SHEET 14 FOR CONTINUATION

220·

FOLEY OUTf ALL

MEAN HIGHER

HIGH WATER (+1.27)

EXISTING WATERS EDGE

PROPOSED ACM

11+00

3~· 38' ~ "l _ \ r '. } --,_ ?"=a _ _:__:_ .:_ I ~, .. ::'i ,4

--n--+--------+----------4------~-------l-561 '

END ACM

BEGIN RIP RAP

STA. 15154, 10' LT

357D233.54 13892743.83

EXISTING STA TE

HIGHWAY 82

BR.ID.G£... FElll!)ER

87'

PROPOSED WATERS EDGE

X: 357D575.26

Y: 13893188.85

19•

L I( ·-

EDGE o, ""'" ~,ccaES SH<P CHNS,Q ODE SCOPES -- -- ---- -- - - -- -- ·-- -- -- -- --o· 60' 120·

EDGE OF SABINE-NECHES SHIP CHANNEL 8O"--TT'-=O:.:.:M ___ _

'"OO '"O CI)

l.£Wlj)_ ~~ Q :E

PORT oF PORT ARTHUR r;rn~ PROPOSED RIP RAP (11 ~ ~ o Lockwood, Andrews SHORELINE STABILIZATION & WHARF DREDGING □' PROPOSED ARTicuLArro ~ ~ :; ~ & Newnam, Inc. PROPOSED PROJECT FEATURES coNCRETE MAT (ACM) : ~ g_ ::

mn A LEO A DAL y CO t,1 PAN y PLAN VIEW ( 1 OF 5) = '° ~ b ~--'---'--'-'-~;:..;....:;...;;;..;.;.;.;.....:.:.:.:.....:...._ _________ :..=....._:__.:.....:..~-- ---------------------~ .. -=. 8

0 Ei t,.)

r;1e:L\12J-t0849-001\4-0-Proouct,on\4-01 -Drow,nqs\Pc,m,t\PR014-PLM4.dwq Plotted By: Barber, Jo,ed 7/14/201 4

//1 '-..._/' ---y- - H'Qj WAT[I! (IIH'A')

·+:- IIEA'I so Ll\U (VSU o•:. n __J__ WN, ,ow w,10< (~t• I tl tlJn WA'4ul'f ll)li1'1UER (\wl)

I t "T .. \ll88

. ,. n I _j_

16\ U)O IC)( (~'11 I

tu::\AIICHS SHO'I\~ AR! M\1)68 UN~

I OltiER'M5£ MJIID

I I

I I I

I t I l I I I

I I

' l ' l ' l ' l I I

,n, ,v ourr ALL

10 8£ ABANDONED

EXISTING DRAINAGE CULVERT ~

MEAN HIGHER HIGH n

WATER ( + 1.27)

/--l/--l/--//--//--//-1/--I/ II l -~ I 1 ~ I f

PROPOSED 570 LF --+ A ljlj r _ CULVERT EXTENSION --= __/ :;--/' -~ - --===- ~ -- u mn Lockwood, Andrews & Newnam, Inc.

A I •n A nA l V CO l,I P A NY

[XISTING DRAl~ AO[ C_,, \OH, ( x ,STINC HEADWALL ·r , TO BE ~£>,tOVED

I

I l :

L _ - - - -~_j

I

----c:.

PORT OF PORT ARTHUR

SHORELINE STABILIZATION & WHARF DREDGING

PROPOSED PROJECT FEATURES

PLAN VIEW (4 OF 5)

350' '

~ z F V

\.EGEtil2.

lk~--~ PROPOSED RIP RAP

~ PROPOSED AR11CULAT£O

L_Ll CONCRElE 1,iAT (ACM)

O' 60'

-,a,-,. ---

170'

'"ti O '"O (/.)

~ -..J O -<'.'!

(JQ --- .... <;

n N ...+ 0 \0 ~ 0 t

0 ~:;~ ...., ...... 0 -

- +>-::1 - \0 ~ g

E; vJ e t.., .., File:L \ 120 10849-001 \4 0 Product,oo\4-01 -0row,nos\Perm,t\PR007-P\.J\N2.dwQ Plotted Sy: Barber, Jared 7 /14/201 4 r---~~= -,=~---~•SEE SHEET 12 FOR PROPOSED I COASTAL DATUM IPRO.£CT FEAT\JRES AND DIMEN5iONS.

r G,O& n li(J.11' fOtJil -40-I • itR {lftlllr) -- 11£JH 1104 t1mut r1.1tiw1 u,n

WU,, SU. INl (vst

PROPOSED RAIL TRESTLES

o.,)n

,,, n MEA~ UM WAT[R jilritl.W) I(,. IOIC.• lCM .m (IU,) .. ..,.,, MEAN HIGHER HIGH WATER (+1.27)

"T ,,. n

~ I - ;11- i - I O i I _; I ' ' ;,~T WH,~ I -

I O I . I PROPOSED ~REASTING D+PHIN I EXISTIN~ WATERS ED~E : I I I • . I

I I I I I 81

• I I I I I I I I ~ I I I I I ~ ~ I I I

· -1 °1- r-1 ---i -1 11.1.,J..esr, J,.;,r-1"0 '1 ---i -1 i-·1 / 618' l . I . I I I I DREdGF I IUIT<; I . ' . I

I . I . I/ I . I . I . I . -1 . I . I ; I j I I . I , I . I . I . I , I · l. 1 I 160' I 120·

17-'' lliE-NECHES SHIP I CHANNEL BOTTOM lftn !l~'.•,irnc1, PL \N , WiEtlll. ;,c ~ 'v (/) I: PORT OF PORT ARTHUR r :::i ~ FILL 'MTHIN EXJSllNC WATERS °8 N :i ~ Lockwood Andrews SHORELINE STABILIZATION & WHARF DREDGING r.D1 - ~ 0 9 , ------=-:::-::-:::-=-===-------------- l..!..!...'...! OREOC.NG O N ...., N

& Newnam, Inc. PROPOSED EARTHWORK - ··· ~ s ? s I A LEO A DALY CO MPAN Y PLAN VIEW (2 OF 5) ~WETLANOSTOBEf1LLEO .=.-; ....... ~ .... ";""'

\0 ► 0

- 0 ...;. \.,.)

::::r o E; \.,.)

File:L\120-10849-001\4-0-Proocclion\4-01-0row,nqs\Perm,t\PR012-PLAN2.owq Plotted By. Barber. Jared 7/14/2014

[o.i» n

Uln

+ cu n I tr~ n

""' ,oor 11,, "'-"" l" HI) Ml'A, tlOt WA1£A (-)

'°"' SCA uvtL M•l

~ ... lOlll'fl'Jt,T(R (lilL'll) li(.tl. l~ i \ OW 111)1' l'URl

I l.(.AN tJ'JNIO(flit.1) El.IVAJl(~'S SHOWN ~qi: f,;,A."1)58 \INL£S5 011-4('1'ff/$l N()T(O

PROPOSED MOORING

DOLPHIN

STA. 9+88. 35' RT

Pl ACM

STA. 8+98, 116' RT

PROPOSED ACM

3570550.99 13893374.05

E:X•S T RAIL. SPUR

PROPOSED WA TERS EDGE

Sn'

MEAN HIGHER HIGl1 -+- WA TF'..'.:; + ~ --r- - 1~

RT

B+OO 7+00

- -----113'------ - ---

"""'" ooce•\

102'

92'

PROPOSED ACM

n

TO BE REMOVED ('TYP)

PROPOSED RAIL TRESTIES

6+.00.

REMOVE ANO DISPOSE

EXIST. CONC. SLAB

429'

10'

PROPOSED BREASTING DOLPHIN

STA. 6+90, 33' LT

APPROX. 320 LF EXISTING

DETERIORATED SHEET PILE

TO BE REMOVED

PROPOSED RIP RAP

SLOPE TOE

EDGE OF SABINE-NECHES SHIP CHANNEL SIDE SLOPES

mn Lockwood, Andrews & Newnam, Inc.

A LEO A D A LY C OMP A N Y

FnGF Of SABINE- NECHES SHIP CHANNEL BOTTOf.A

PORT OF PORT ARTHUR

SHORELINE STABILIZATION & WHARF DREDGING

PROPOSED PROJECT FEATURES

PL.AN VIEW (2 OF 5)

WiWl,_ m PROPOSEO RIP RAP

1--:Jl PROPOSED ARllCULA TEO l2:._j CONCRETE MAT (ACM) o'

END BULKHEAD

BEGIN ACM

STA. 3+98. 116' RT

~I ' 26' -

END WHARF

BEGIN RAIL DECK I !

-~ STA. 3+98. 5' RT 2

73'

END WHARF

STA. 3+98, 33' LT

X: 3570935.43 Y: 13893682.57

60'

1?0'

'i:I 0 'i:I Cl)

~ ~Q~ N-Q ...,. ~ 0 I

N....,N O O'i:10

,........ 0 - ~~::l 7" \D ~ 8

::ro file:L \ 11.0-10849-001\4-0-Produc11on\4-01 -Oro1,,nos\Perm,1\PROl 6-SEC l.dwQ PI01ted Bv Barber. Jared 7/14/2014

W JO

IEMtOA tOIWAiDf{',1-tl'III) WCAA HO, ""ltR (I.MW)

"IA< SlA U\'(j_ ll!SL)

VIAi, '°" ~,!ER '" '~) W"M lOtU la.' illlllilm N.dt) ,....,.

MUN to• rKiE(ll\.ij Uf\'ATll'\'S ~ ARE: W.V098 UNl(SS Ol~tlSE ,.oru, I>

0SECTION STA 14+80 D •

SEE PL.-.N SHEETS 6 & 11

,0

1D

MEAN HIGHFR HIGH WATER (+1.27)

EL. +6.0

PROPOSED ACM

6" BEDDING LAYER

EL -5.0

iD I!> 10 U JO .» --0 . , ~ )•, AO e:. 1U t~ 60 ~~ go la) 100 117.11 110 I!:! t?O J:2!>

EL. +6.0

PROPOSffi ACM

MEAN HIGHER HIGH

WATER ( + 1.27)

fl . -5.0

6" BEDDING LA YER

EXISTING GROUNO

©SECTION STA 10+65

~ !I HI I~ 10 11:J la ~ &Cl 45 'JG ~3 60 I~ 10 t) flO ~ !IO ~ 100

3 SE£ PL.-.N SHEETS 6 & 11

APPROX EXISTING GROUND

6 " ,, GEOTEXTILE

'° FILTER FABRIC

-J~ .. . , •o

,o

-20

PROPOSED ACM

PROPOSED CULVERT EXTENSION

MEAN HIGHER HIGH j

WATER (+1.27)

PROPOSED CONCRETE

OUTFALL STRUCTURE

, 10 t!> 70 1$ JD J:i 40 , ,. ~ -') eo ~ 10 ,,. no a) ., ~ I03

© SECTION STA 13+10 2 SEE PL.-.N SHEETS 6 & 11

MEAN HIGHER HIGH

WATER (+1.27)

© SECTION STA 9+00 4 tc=-=---,--,,---,,=,- 170 11~ I 10 •()'. 100 ~ 9G 6~ i,Q 1r, 10 6:1, 60 ~ ~ 4~ ~ .).~ JD 2'5 W I) 10 ' SEE PL.-.N SHEETS 7 & 12 0 10 1, 20 2) .1iO .» 40 4~ ~ ~S &O ~ 10 )'~ Ml S!i 90 '9,S 1 00 I~ 110 II) 110 1~ 1,0 mn Lockwood, Andrews & Newnam, Inc.

A I FO A OAt V l.O ~ P AN V

PORT OF PORT ARTHUR

SHORELINE STABILIZATION & WHARF DREDGING

SECTIONS (1 OF 4)

WiEl:ID.

~ PROPOSED FILL 17771 PROPOSED CUT

[LLd ( '16,200 CY TO BE REMOVED)

'i:l O 'i:l {/.)

~-...JO~

(]Q ----- ... o N ,.... Q ,._. ~ 0 I

N N....., N 0 '"O 0 _,.,,.. 0 ......... 0 _..

-'-::!:!.."!'~ ....., .j::. ::I- - ....- I

'° ?o ""'I 0

- I.,.)

~ 8

,;1e:L\ 120 10849- 001\4-0-Product;on\4- 0I - Orow,nqs\Pe,m,t\PROI 7-S£C2.dwq Plotted Bv. Batber, Jo,eo 7/1 4/2014 r"(4 n ""' """' '°'"'""(""" """' '""' W,'0/ 1- 1 ,l n I

1 o.,:. n l£A'< SlA I.ML Ci/Sll l ~ • 11 WEA't LC#i ~A1'tfl' (lrillW)

'™ llllll lO. ""'lll(lll.ll)

0.2' ... web

••~ n

_j__ ...,,. LOW ID! (• .q !l.C\'1QIIS si,o,,,, ARf NA~ UlilSS 01H£R\fr,![" MJ({f)

APPROX. EXISTING GROUND

" 6" BEDDING LA YER

" PROPOSED ACM

• D

MEAN HIGHER HIGH

WATER ( +1.27)

100 ~ 90 8!1. ~ 1) 10 e?i 60 ~ ,a · ~ 40 J~ JO ~ ,a 1~ 10 5, 0 } 10 1~ ~o 2!. JO J!I 40 45 ~ 5,~ 60 ,~ 10 ,~ 80 M 'iO 9~ !0(1 10'!1, ,,c II\ 120 12) 1.JO 1J~ HO 140 14~

G)SECTION STA 7+20

5 SEE PL~N SHEETS 7 .!< 12

PROPOSED RAIL TRESTLE ,,

.ID

" .. PROPOSED ACM

-,0

100 ')!, 110 &, !Ill I!. .,a E.. 60 !,.. ~ 4!'. ~ .i!I, 10 ~ ,0 I!, to 'J, ©SECTION STAS+OO

S SEE PLAN SHEETS 7 .!< 12

IS!n Lockwood, Andrews & Newnam, Inc.

A LE_O A DA LY CO MPAN Y

PORT OF PORT ARTHUR

SHORELINE STABILIZATION & WHARF DREDGING

SECTIONS (2 OF 4)

EXISTING GROUND

MEAN HIGHER HIGH

WATER (+1.27)

') IC I!. 20 )'!:, lei .J'!I. '4 4!!. ~ l,'.l, 613 .'!I, ltJ 'l!J at) &!. 9!0 'l!i 100 10!. I 10 lti t,-,, 12!1 1J0 !J:, w.tliil.

~ PROPOSEO FILL

17771 PROPOSEO CVT

[LL..,-j ( 416,200 CY TO BE REM0'-£0)

'"O O '"O Cl) lll--.JO:E oq --- ;:i G N C) ,..... ~ 0 I wN-+,N O 0'"00

...... 0 -...., ~ ;:i ,_. I

'° e8 _, .. ,. - ,...;. w -·-· ::J""o

File:1 \ 12C-10849-00 l \ 4 -0 Production\ 4-01-Drow,nQS \Perm,t\PR008-PLANJ.dwq Plotted By: Barber, Jared 7/14/2014

COASTA! PATYM

~ .._., H06 •<>< "''" i""•I i- "'"' "'°' w.rr• '"'"I ~ un -I-- ION SL< U\fl (\'SL)

•. ! n

0.'i n Uf.4'\ ~ WATER (l,HW) 0-~ ~ (OifRtall'MJUI llJ.ill)

I "'"'811 n~ n

~.JN LOW 110( (I.Ill') Q!\'At~ SH(W.N AR£ M'f{IM UN.ESS 0Ttt0Nrl1~ r-D1£D.

(ff

EXIST,NG ASPHAd PAV1NG

PROPOSED WA TERS EDGE PR

• i..---/ _/1---1;----l;---l1

~ BULKHEAD J.='A'',,l,t

[XIST RAIL BENT (TYP)

35 .

.• ~u--+---1-~.!ilewl ,~ ~,...,..dHittit)I 1)d1tJ l, 1~,,,.,1 ,,!,,,, .,1 lflllll~lf1n1 .. r;,,1~~J1 l,11 m~ilr "~~ ' l~!llllfl1,JtJ1p1~~d!UIJdH•t1•~·w1,, Ill !11.~ht i,4 ,1111 11, .. u1:;mt

0 0 0

OP

r , - - ___ , I °"'-· I - I

I I I

. I I EXISTIN~

, , o/ 1•oeos:o """' ..,.,, I · I I I I I I I I I I I I I I I I I I I I I I I I I

175' ""

---1- - t -1- ---1- - t 1- -1- - t -1-

1. I I I I I I I 1· =t====' ~ I I I I 1 574'-'----+--I -'-----+------'------+----'---+--l .....,,_-'--t---_,___ l---'----!-....-44'

' . ' ' .. ' 7

· ·I- I ., I I l I I I

I . a _ ,<' I I r o' ~ · 1so· ··I 120' I ,;" , I ,,- DREDGE LIMITS ' ' I

I I

I I I I I I I I I I I I I I 11 . I I I I

EDGE OF SABINE-NECHES SHIP CHANNEL BOTTOM

'"O O '"O Cl.)

PORT OF Po ······ 11.,11n .. a ~ ~ ~ ;5. ~ RT ARTHUR ~ FIL!. WITHIN El<ISTING WATERS (1) l:j o

Lockwood Andrews SHORELINE STABILIZATION & WHARF DREDGING r,T:T:7 :; i0 g, N , _____________________ ~ DREDGING O O '°O 0

& Newnam, Inc. PROPOSED EARTHWORK ...., ~ Q ::::::

agn A LEO A DAL y CO M p AN y PLAN VIEW (3 OF 5) ~ WEllANDS TO BE flLJ.ED =~ '-0 ; b

;:i 0 _ w

File:l \170-10849-001\4-0-Prnauc1,on\4-0\-0raw,nos\Perm,I\PR01.l-PlANJ.d;,Q Piotled By: Barber, Jared 7/14/2014 on n

COAST,'J,, DATUM

1 -ILllOn un o.~ n iuin o.n n

~ ,oorw•rut(\t-t-lJI 1-w,a toGl1 \!AllR I""")

""'· sum,,, '"'" N T ...... '°" ~•IOI (OLW) I ,e,-J '- ,,,,._ :::~-.. I T &" ~ -~ ... ,, I. \I. {,,,f j

--- --- V \?' .

Cs:

PROPOSED 8'x51' JUNCTION BOX-' /

PROPOSED 124 LF OF s·xs· RCB _/

OIHl~• & N0l[0, A

MEAN HIGHER HIGH ~ PROPOSED BU

WATER ( + 1.27) / ~ -+-r--i---r

124 ' w.,,;

I PROPOSED 124 LF OF 7'X8' RCB

EXISTING BUU<HEAD

ASPHALT PAVING

BEGIN WHARF I

STA. -2+02, 30' RT /L, PROPOSED~ATE J EDGE BEGIN SHEET PILE BULK~EAD

STA. 0+00, 30 RT ,

-=- I;--- I •

~ =Lt::::=! I-/;------- E XISl ~All B0'1 (TYP) EXIS r1NG v.ttARf 7 202' I A-+ [ 1ST. qAlL BENI (TYP) _ 372' -f-:---W-'+•- ·-· .. --.J.f 2+J i I t3~~-~ ~BF:;~:H-i-1413£' '•tt f'. f--ff·-4□-•+t.-~-:++--~·-· ~ 4•~ ... ,o.n.J~ -'~ O ' Jin. '

,I I 11 I 111 ::::: :::::::::::9 : ::::::::::r:::ir:::::::::::::::::;:::: :::::::::::::::::::~=-- -~ -r " . I . · · 1 ----- .' , ~ Q . 0 0 0 0 I \ ,1 \ ~\ •l:n1 ,111 11ol~73•, II J 1•~••1•·• " t I /5 • "!"''' . ) ~ ~-•.........J• ~ _ . c--< __ '\ ,- r I a a o/ _o

~ ~( '::_"< All

EXISTING WATERS1

EDGE

\ t:XIST DOLPHIN/ ~

\_ EXIST RN, BENT TO BE PILE CLUSITR (TYP) 1 0' BEGIN WHARF

PROPOSED RAIL D[I/OUSHED (NP) TO BE R[MOV[D STA. - 2+02, 33' LT

EXTENSION PROPOSED OUTFALL X: 35 71 300. 77

Y: 13894158.62

• EXIST BREASIINC DOLP><IN PROPOSED ACM EXISTING

TO BE DE..,OUSHED PROPOSED RIP RAP PROPOSED WHARF WHARF

mn Lockwood, Andrews & Newnam, Inc.

A LEO A D A LY COM P ANY

EDGE OF SABINE- NECHES SHIP CHANNEL SIDE SLOPE

EDGE OF SABINE-NECHES SHIP CHANNEL BOTTOM

PORT OF PORT ARTHUR

SHORELINE STABILIZATION & WHARF DREDGING

PROPOSED PROJECT FEATURES

PLAN VIEW (3 OF 5)

SLOPE TOE

WiEtill.

l~j PROPOSED RIP RAP r:'f'] PROPOSED ARTIC\.ILAT£0 L::_j CONCRCTE MAT (ACM) o·

60' 1 ?O'

'"O o '"Ci en s::,:,......, 0 ~

(JO --- ::I. et> N Q >-- !::2. 0 I Vl N ..+, N O 0'"00

- 0 ...... ::~::1. 7' ~ CZ>

.:= '° ~ g .:

::r- l,.)

E; 8

Flie;L \ 120-10849-001\4-0-Product,on\4-01 -0row,nos\Perm,t\PR010-PLAN5.dwg Plotted By: Sorber. Jared 7 /14/201 l

IOII l«>OI HI)! "'1ll (IH"') ,~ n Mf.AN N01 WAJ£R (Wtfi'I

,.J n tlJ n

0J1"7 n; n

\ltN-t'SlALMl (\&1

MIA', LOW >•lDI t• LW) ilJl, LOlOIOIIWl•IIIJ.w)

I .'41."' L(IW Tilt (MLI)

£1.CVArOl'Si Stt()WN AAf M~ lJ~ Olttffii& NOlfD

• SEE SHEET 15 FOR PROPOSEO

PROJECT FEATURES ANO DIMENSIONS.

MEAN HIGHER HIGH WATER ( +1.27)

If

9'!S11[G TEMPORARY

RAINAGf PIPE

GRANNIS OUTFALL

z f ~ISllNG 48" Pu~P SlATLON OUTfALL PLPE

LINEAR WC:TLAND FEATURE

TO BE FILLED (0.026 ACRES)

NON-WETLAND WATER<; Tn

BE FILLED (1 .84 AC)

~ · - - ~ - · EXLSllNG 8\JLLOINC [XIST,NG BULLOINC

EDGE Of SABINE-NECHES SHIP CHANNEL SIDE SLOPE

EbGE OF SABINE-NECAES SHIP CHANNFl BOTTOM agn Lockwood, Andrews & Newnam, Inc.

A LEO t, [)Al Y CO M PANY

PORT OF PORT ARTHUR

SHORELINE STABILIZATION & WHARF DREDGING

PROPOSED EARTHWORK

PLAN VIEW (5 OF 5)

_L

SABINE-NECHES SHIP CHANNEL

400' sno·

~ FIU WITHIN EXISTING WATERS

~DREDGING

~ WETLANDS TO BE flUED

'"tj O '"O C/.)

~ -...) 0 ~

C1Q ~ 4 ' (1) 0

....... ~ 0 ' °' l'J ......, 1--) O O'"tl O -o-......, ~ 4 -_,,;ll' • .- I ;:~ '° ;.,. o

.., 0 ~ L,.)

C"" 0 E; L,.)

F,le:L\ 170- 10849-001\4-0-Proouct,on\4-01-0row,nos\Permil\PR018-SEC3.dwo Plotteo By: Sorber. Jared 7/14/2014

COASTAi PAIVM E"" .J,, nl n

..,...,..,c,;.ll)l {IH<w\ •LAN l9CI< OAfCR ('"'111

• U,N SL<. INL (1<5ll

~ LOW •AllJ! (Ml~) liJft lt1li IOO ,wot (\ill} ... .,..

"""' LOW IV( 10/ln UC'VAtOCS 9mN AR£ ""-~ ~l.{S.5 OMJNtl~ t,fJf£D ,.

-J<, PROPOSED CONCRETE SLAB

PROPOSED 600' LONG WHARF BULKHEAD

PR/lP/l<;Fn f\nrl' I ClNC': 'M-iARF DECK

PROPOSED

MATCH ELEV. EXIST. WHARF

'M-iARF FENDER

@ 25'-0" SPACING

MEAN HIGHER HIGH

WATER (+1.27)

(TYP)

APPROX. EXISTING GROUND

FLOW

PROPOSED CONCRETE SLAB

PROPOSED 6'X5' BOX CULVERT

600' LONG 'M-iARF BULKHEAD

~~ ., /"" PROPOSED 600' LONG WHARF DECK

~t. ~ MATCH ELEV. EXIST.

..J1 WHARF (+13.36)

WHARF FENDER

~ MEAN HIGHER HIGH

WATER (+1.27)

DRIVEN CONCRETE PILE {TYP)

APPROX. EXISTING GROUND

PROPOSED POPA FACILITY BOTTC _.,.

-'il 7R ~ -411( +2)( + 1) Ml T -76 .58 ..

-<O

6" BEDDING LA YER

II 11 11

SLOPE TOE

o ~ ,o ,~ -:a :--) ,o .!~ 4Q -'5 '° Y-i '° e ,c ,~ 10 s, i,,o ~ ,oo 10-, ,10 11!> l10 ,~

©SECTION STA 2+60

] S£E PLAN 9-IEETS 8 & I J

•10

-'.10

MEAN HIGHER HIGH WATER (+1.27)

EL. +6.0

PROPOSED 570' CULVERT EXTENSION

, •n. ,.. ,n ~ \l'l \'i .. o • ., -.a ~ r.o M m 1!> 11n 11,~ iao 45 100 10!!1, 110 II) ,:o 0 2!1

,0 I ...

6" BEDDING LAYER

111 11 1~ 10 !i ll !lo 10 l~ 70 ~ jQ j!, ~ .a• !IQ ~~ 00 6:l 10 1! 90 ~ 90 1), IOQ 10~ 110 ll!i I)'(> 11~

©SECTION STA 0+10

8 SEE PLAN SHEETS 6 & 1 J ,,,

-1!', .,o

-JO

MEAN HIGHER HIGH

WATER (+1.27l PROPOSFD Fill

EXISTING GROUND _/ l

EXISTING 48• PUMP

STATION OUTFALL PIPE

0 SECTION FOLEY OUTFALL

5£E PLAN SHEETS 9 & 14

0 )SECTION GRANNIS OUTFALL O • '° ,, ,0 ,. )0 JS . , .. "' .. "' ., 70 r., "" ... .. •• , ..

l SEE PLAN SHEETS 10 & 15 agn Lockwood, Andrews & Newnam, Inc.

A L EO A DALY CO MPANY

PORT OF PORT ARTHUR

SHORELINE STABILIZATION & WHARF DREDGING

SECTIONS (3 OF 4)

t.EWill.

~ PROPOSED FILL

17771 PROPOSED CUT

~ {416,200 CY TO SE REMOVED)

""O O "'O Ul ~ -i O ~

(JQ ..._ .... <:;

C'D N .-+ 0 ..... ~0 I -iN...., N

0'"00 ~ 0 ..-

....., J::,. "'1

\0 ~8 0- 0 E; l,..)

.'00

Q

AMEND-0001_W912HY19B0011
SF30 PAGE 2
W912HY19B0011-SPECS
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 00 00 - SOLICITATION, OFFER AND AWARD, SF-1442
00 11 00.00 45 - BID SCHEDULE
00 21 00 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
00 45 00 - REPRESENTATION AND CERTIFICATIONS
00 72 00 - CONTRACT CLAUSES
00 73 00.01 45 - SPECIAL CONTRACT REQUIREMENTS, STANDARD
00 73 46 - WAGE RATES
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00.01 45 - NON-REGULATED SPECIAL CONTRACT REQUIREMENTS
01 22 00.10 - MEASUREMENT AND PAYMENT
01 32 01.01 45 - PROJECT SCHEDULE
01 33 00 - SUBMITTAL PROCEDURES
SUBMITTAL REGISTER
FORM ENG-4025-R
01 35 26.01 45 - GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 - SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 - RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 45 01.00 - QUALITY CONTROL
01 57 20.00 45 - ENVIRONMENTAL PROTECTION
01 58 13.04 45 - BULLETIN BOARD
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 23.17 45 - PIPELINE DREDGING FOR SABINE NECHES WATERWAY
APPENDIX 1 - QUANTITY SUMMARY TABLE

35 20 23.33 - NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM

APPENDIX A
APPENDIX A - Port of Port Arthur Permit SWG-2011-00303