Amendment_0001.pdf
PDF 997 KB Posted
- Attached to
- USACE Corpus Christi Ship Channel (CCSC), TX, Placement Area 10, Placement Area Improvements
- Solicitation number
- W912HY19B0009
About this file
BID OPENING DATE REMAINS ON 8 JULY 2019 @ 2:00 P.M. LOCAL TIME
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FINAL_ABSTRACT.pdf | ||
| Amend-0003_W912HY19B0009.pdf | ||
| Amendment_0002.pdf | ||
| W912HY19B0009-Plans-SIGNED.PDF | ||
| W912HY19B0009-Specs-SIGNED.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W45VAK90460973
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is: See revised sheet C 501 INSET - TYPICAL #2 EROSION PROTECTION DETAILS with reference to blanket stone thickness shown on the pages following:
THE BID OPENING DATE REMAINS ON 8 JULY 2019 AT 2PM LOCAL TIME.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 1
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HY19B0009
X 9B. DATED (SEE ITEM 11)
07-Jun-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Jul-2019
CODE
US ARMY CORPS OF ENGINEERS
2000 POINT FORT ROAD
P.O. BOX 1229
GALVESTON TX 77553-1229
W912HY 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
of Engineers U.S. Army Corps
Galveston District
G A
L V
E S
T O
N T
E X
A S
C O
R P
S O
F E
N G
IN
E E
R S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
G A
L V
E S
T O
N
A S S
H O
W N
C h ie f, G e o te c h /S tr u c tu re S e c ti o n
D a te
R e v
S u b m it te d b y
A p p ro v e d b y
A p p ro v a l R e c o m m e n d e d
S c a le
D ra w n b y
D e s ig n e d b y
C h e c k e d b y
D e s c ri p ti o n
D a te
R e v
B y
Drawing No.:
F il e
M o d e l
N a m e
C -5
T y p ic a ls A
M D -1
B y
M
O D
X M
A N
:5
:2
P
M D a te
T im e
W
C A
D D P ro je c ts N
U E
C E S -3
P
A -1
D ik e R a is e P la n s N
U E
C E S -8
-3
C O
N T
R A
C T -P
L A
N S T x S -8
.d g n
D A
V
ID
B
B O
O T
H B
Y P .E
C O
L O
N E
L
U .S
A R
M Y
C O
M M
A N
D
IN
G
L A
R S N Z
E T
T E
R S
T R
O M P .E
P R
E P
A R
E D U
N D
E R T
H E D
IR
E C
T
IO
N O
F
W
IL
L
IE
J
H O
N Z
A P .E
W912HY19B0009
SOLICITATION NO.:
NUECES 803-354SWG FILE NO.
C-501
C
O N
T A
IN
M E
N T D
IK
E R
A
IS
E P
L A
C E
M E
N T A
R E
A N
O
C O
R P
U S C
H R
IS
T I S
H
IP
C
H A
N N
E L T
E X
A S
M A
N
S H
X
A N
S
J U
N E
C h ie f, E n g in e e ri n g B ra n c h
A N
D R
E W N S
M
IT
H P .E
R e s id e n t E n g in e e r, C
C R
O
BACKFILL
SATISFACTORY
EXCAVATION
BLANKET STONE
RIPRAP
CL
0 20 40 60 80 100 120 140 160 180 200 220-20-40-60-80-100-120-140-160-180-200-220-240-260-280
<-- OUTSIDE - INSIDE --->
3 1
CL
BACKFILL
COHESIVE MATERIAL
TURF LIMITS
STRIPPING AND FOUNDATION PREPARATION
0-20-40-60-80-100-120-140-160-180 0 20 40 60 80 100 120 140 160
EL. 0.0'W.S.
CL
<-- OUTSIDE - INSIDE --->
EXCAVATION
STRIPPING AND FOUNDATION PREPARATION
TURF LIMITS
EXISTING GROUND
EL. 40'
EL. 35'
EL. 35'
EL. 40'
-10
-20
-10
-20
0-20-40-60-80-100 0 20 40 60 80 100 120 140 160
GROUND
EXISTING
80 80
-10
-20 -100-120-140 -90-110-130
-10
-20
1%1
LEGEND
3. TBD
CROSS SECTIONS.
2. PERIMETER CONTAINMET DIKE RAISE SHALL BE AS SHOWN ON THE
99+00
1. RIPRAP TOE EROSION PROTECTION SHALL BE STA. 65+00 TO STA.
NOTES:
EL. 37'
STRIPPING AND FOUNDATION PREPARATION
TO STA. 3+50
STA. 99+25 TO STA. 103+16.87=0+00
APPROXIMATE LOCATION
EXISTING EFFLUENT DITCH
TYPICAL TRAINING DIKE - STA. 7+50-A TO 7+25-A
-120-140
T Y
P
IC
A L S
E C
T
IO
N S
D
IK
E
15' 30'
30' BERM
15'
15'
GEOTEXTILES
STRIPPING
INSET - TYPICAL #2 EROSION PROTECTION DETAILS
-150-160-170-180-190-200-210
-200-220-240
-300-320-340
WITH TYPICAL EROSION PROTECTION
TYPICAL #2 PERIMETER DIKE STA. 64+15.50 TO 95+53.70
TYPICAL #1 DIKE STA. 0+00 TO STA. 63+15.50 AND 95+63.70 TO STA. 100+56.40=0+00
50' MIN. BERM
M A
X
BORROW AREA
ALLOWABLE
BORROW AREA
ALLOWABLE
M A
X
50' MIN. BERM
1%
30'
30'
50' MIN. BERM
M A
X .1
30'
BORROW AREA
ALLOWABLE
UNCOMPACTED SEMI-COMPACTED
EL. -2'
EL. +3'
EL. +7'
EL. +15' 1
15' GEOTEXTILE
7.5'
9'
32'
PROTECTION ALIGNMENT TABLE ON G-102
DISTANCE VARIES, SEE EROSION
THIS BASELINE
LENGTH BASED ALONG
EROSION PROTECTION
1% WHERE DIKE TURNS AWAY
DIKE SLOPE 1:4, TRANSITIONS TO
EXCAVATION
GROUND
EXISTING
GEOTEXTILE
SEMI-COMPACTED
BACKFILL
COHESIVE
BLANKET STONE
RIPRAP
WATER SURFACE ELEVATION.
GRANULAR MATERIAL BELOW
SEMI-COMPACTED MATERIAL. USE
BACKFILL WITH SATISFACTORY
FOR BORROW.
TOWARDS NEW DROP OUTLET STRUCTURE. MATERIAL MAY BE USED
ELEVATION, MAXIMUM EXCAVATION TO EL. +18', SLOPE TO DRAIN
DIKE, EXCAVATE EXISTING DIKE DOWN TO EXISTING GROUND
BETWEEN STA. 7+50 AND INTERSECTION WITH NORTH CONTAINMENT
PROTECTION DETAILS
SEE INSET FOR EROSION
SEMI-COMPACTED
NEW CONTAINMENT DIKE
UNCOMPACTED
NEW INTERIOR BERM
GROUND
EXISTING
DIKE RAISE
CONTAINMENT
SEMI-COMPACTED
NEW INTERIOR BERM
UNCOMPACTED
GROUND
EXISTING
UNCOMPACTED
DIKE RAISE
TRAINING
EXISTING GROUND
THIS BASELINE
LENGTH BASED ALONG
EROSION PROTECTION
1/
B S
H A
D D
E D
D
IM
E N
S
IO
N
SOLICITATION NO. W912HY19B0009.
AMENDMENT NO. 0001 TO
THIS DRAWING ACCOMPANIES
File details come from the government source that posted it.