2. DATE ISSUED 3. DATE OPENED

18-Jun-12 1-Aug-12

I CERTIFY THAT I HAVE OPENED, READ AND

AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED

1-Aug-12

X C. REASONABLE CONTRACT

7A 7B 7C D. E. F. E. F. E. F.

ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT 1 Mob and Demob 1 LS 412,462.00$ 285,000.00$ 641,141.00$ 2 Dredging 34,000 CY 9.35$ 317,900.00$ 8.40$ 285,600.00$ 5.75$ 195,500.00$ 3 Topsoil 21,000 CY 4.51$ 94,710.00$ 4.80$ 100,800.00$ 4.00$ 84,000.00$ 4 Compacted Fill 230,000 CY 3.46$ 795,800.00$ 2.75$ 632,500.00$ 4.00$ 920,000.00$ 5 Stone for Riprap 1,400 TN 54.66$ 76,524.00$ 47.00$ 65,800.00$ 55.03$ 77,040.50$ 6 Geotextile 1,000 SY 3.05$ 3,050.00$ 3.00$ 3,000.00$ 3.50$ 3,500.00$ 7 Granular Filter 12,900 TN 24.82$ 320,178.00$ 32.20$ 415,380.00$ 22.00$ 283,825.03$ 8 Drainage Struture #1 1 LS 36,077.00$ 52,000.00$ 5,500.00$ 9 Drainage Structure #2 1 LS 46,403.00$ 66,000.00$ 5,500.00$ 10 Seeding 40 AC 1,138.00$ 45,520.00$ 3,300.00$ 132,000.00$ 995.00$ 39,800.00$ 11 All Remaining Work 1 LS 473,360.00$ 339,000.00$ 125,000.00$

Base Total Amount 2,621,984.00$ 2,377,080.00$ 2,380,806.53$ 12 Dredging 12A Dreding 10,000 CY 7.42$ 74,200.00$ 8.00$ 80,000.00$ 5.75$ 57,500.00$ 12B Dreding 10,000 CY 7.42$ 74,200.00$ 8.00$ 80,000.00$ 5.75$ 57,500.00$ 12C Dreding 10,000 CY 7.42$ 74,200.00$ 8.00$ 80,000.00$ 5.75$ 57,500.00$ 12D Dreding 10,000 CY 7.42$ 74,200.00$ 8.00$ 80,000.00$ 5.75$ 57,500.00$ 12E Dreding 10,000 CY 7.42$ 74,200.00$ 8.00$ 80,000.00$ 5.75$ 57,500.00$ 12F Dreding 10,000 CY 7.42$ 74,200.00$ 8.00$ 80,000.00$ 5.75$ 57,500.00$ 12G Dreding 10,000 CY 7.42$ 74,200.00$ 8.00$ 80,000.00$ 5.75$ 57,500.00$ 12H Dreding 6,000 CY 7.42$ 44,520.00$ 8.10$ 48,600.00$ 5.75$ 34,500.00$ 13 All Remaining Work for 0012 1 LS 76,032.00$ 60,000.00$ 55,000.00$

Option 1 Total Amount 639,952.00$ 668,600.00$ 492,000.00$ 14 Dredging 14A Dreding 10,000 CY 7.00$ 70,000.00$ 8.10$ 81,000.00$ 5.75$ 57,500.00$ 14B Dreding 10,000 CY 7.00$ 70,000.00$ 8.10$ 81,000.00$ 5.75$ 57,500.00$ 14C Dreding 10,000 CY 7.00$ 70,000.00$ 8.10$ 81,000.00$ 5.75$ 57,500.00$ 14D Dreding 10,000 CY 7.00$ 70,000.00$ 8.10$ 81,000.00$ 5.75$ 57,500.00$ 14E Dreding 10,000 CY 7.00$ 70,000.00$ 8.10$ 81,000.00$ 5.75$ 57,500.00$ 14F Dreding 6,800 CY 7.00$ 47,600.00$ 8.10$ 55,080.00$ 5.75$ 39,100.00$ 15 Topsoil 9,000 CY 4.53$ 40,770.00$ 3.75$ 33,750.00$ 4.00$ 36,000.00$ 16 Excess Excavation Material 120,000 CY 2.08$ 249,600.00$ 2.20$ 264,000.00$ 4.00$ 480,000.00$ 17 Seeding 10 AC 1,138.00$ 11,380.00$ 3,300.00$ 33,000.00$ 995.00$ 9,950.00$ 18 All Remaining work for 14-17 1 LS 181,290.00$ 52,000.00$ 45,000.00$

Option 2 Total Amount 880,640.00$ 842,830.00$ 897,550.00$ 19 Regrade Spillway Slopes & Riprap 19A Topsoil 600 CY 4.53$ 2,718.00$ 8.15$ 4,890.00$ 7.00$ 4,200.00$ 19B Compacted Fill for Grading 4,000 CY 5.31$ 21,240.00$ 3.15$ 12,600.00$ 6.00$ 24,000.00$ 19C Stone for Riprap 5,000 TN 53.57$ 267,850.00$ 45.00$ 225,000.00$ 55.00$ 275,000.00$ 19D Geotextile 3,000 SY 3.05$ 9,150.00$ 2.50$ 7,500.00$ 3.50$ 10,500.00$ 19E Seeding 1.5 AC 1,138.00$ 1,707.00$ 3,300.00$ 4,950.00$ 1,500.00$ 2,250.00$ 19F All Remaining Work 1 LS 61,164.00$ 12,000.00$ 35,000.00$ 20 Regrade Spillway Slopes & Riprap 20A Topsoil 1,300 CY 4.53$ 5,889.00$ 7.40$ 9,620.00$ 5.00$ 6,500.00$ 20B Compacted Fill for Grading 8,500 CY 5.31$ 45,135.00$ 2.80$ 23,800.00$ 5.50$ 46,750.00$ 20C Stone for Riprap 10,000 TN 53.57$ 535,700.00$ 45.00$ 450,000.00$ 52.00$ 520,000.00$ 20D Geotextile 7,000 SY 3.05$ 21,350.00$ 2.30$ 16,100.00$ 3.50$ 24,500.00$ 20E Seeding 3.0 AC 1,138.00$ 3,414.00$ 3,300.00$ 9,900.00$ 1,000.00$ 3,000.00$ 20F All Remaining Work 1 LS 93,119.00$ 17,000.00$ 60,000.00$ 21 Regrade Spillway Slopes & Riprap 21A Topsoil 1,300 CY 4.53$ 5,889.00$ 7.40$ 9,620.00$ 5.00$ 6,500.00$ 21B Compacted Fill for Grading 8,500 CY 5.31$ 45,135.00$ 2.80$ 23,800.00$ 5.50$ 46,750.00$ 21C Stone for Riprap 10,000 TN 53.57$ 535,700.00$ 45.00$ 450,000.00$ 52.00$ 520,000.00$ 21D Geotextile 7,000 SY 3.05$ 21,350.00$ 2.30$ 16,100.00$ 3.50$ 24,500.00$ 21E Seeding 3.0 AC 1,138.00$ 3,414.00$ 3,300.00$ 9,900.00$ 1,000.00$ 3,000.00$ 21F All Remaining Work 1 LS 93,119.00$ 17,000.00$ 50,000.00$ 22 Regrade Spillway Slopes & Riprap 22A Topsoil 1,300 CY 4.53$ 5,889.00$ 7.40$ 9,620.00$ 5.00$ 6,500.00$ 22B Compacted Fill for Grading 8,500 CY 5.31$ 45,135.00$ 2.80$ 23,800.00$ 5.50$ 46,750.00$ 22C Stone for Riprap 10,000 TN 53.57$ 535,700.00$ 45.00$ 450,000.00$ 55.00$ 550,000.00$ 22D Geotextile 7,000 SY 3.05$ 21,350.00$ 2.30$ 16,100.00$ 3.50$ 24,500.00$ 22E Seeding 3.0 AC 1,138.00$ 3,414.00$ 3,300.00$ 9,900.00$ 1,000.00$ 3,000.00$ 22F All Remaining Work 1 LS 93,119.00$ 14,000.00$ 45,000.00$ 23 Regrade Spillway Slopes & Riprap 23A Topsoil 700 CY 4.53$ 3,171.00$ 9.00$ 6,300.00$ 5.00$ 3,500.00$ 23B Compacted Fill for Grading 5,500 CY 5.31$ 29,205.00$ 3.00$ 16,500.00$ 6.50$ 35,750.00$ 23C Stone for Riprap 6,000 TN 53.57$ 321,420.00$ 45.00$ 270,000.00$ 54.00$ 324,000.00$ 23D Geotextile 5,000 SY 3.05$ 15,250.00$ 2.30$ 11,500.00$ 3.50$ 17,500.00$ 23E Seeding 1.5 AC 1,138.00$ 1,707.00$ 3,300.00$ 4,950.00$ 1,000.00$ 1,500.00$ 23F All Remaining Work 1 LS 65,269.00$ 17,000.00$ 70,000.00$

Option 3 Total Amount 2,913,672.00$ 2,169,450.00$ 2,790,450.00$

TOTALS 7,056,248.00$ 6,057,960.00$ 6,560,806.53$

6. NUMBER OF AMENDMENTS ISSUED

Dredging Emergency Spillway

Oahe Dam, Pierre, South Dakota Inlet Channel

20% B. BID SECURITY (Type & Amount)

20%

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

Road Builders, Inc. K&L Landscape & Construction

National City, CA 91950 Sergeant Bluff, IA 51054 B. BID SECURITY (Type & Amount)B. REASONABLE CONTRACT

(Without Profit)

(Including Profit)

A. OFFEROR 1UZ95 A. OFFEROR 4M0S7

241 West 35th Street, Suite C 501 South Ridge Road/P.O. Box 1040

A. HIRED LABOR

NO. 1 NO. 2

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER

W912HY-12-B-0012

4. ISSUING OFFICE

8. GOVERNMENT ESTIMATE

(Check A, B or C AND COMPLETE D, E AND F)

5. PROJECT TITLE 9. OFFERS

TO THIS SOLICITATION sara l jackets signed

SIGNATURE

NAME AND TITLE OF CERTIFYING OFFICIAL (Type) Sara Jackets, Contract Specialist

OMAHA, NE 68102-1618

1616 CAPITOL AVENUE

CONTRACTING DIVISION (CENWO-CT)

US ARMY CORPS OF ENGINEERS

l PAGES

B. BID SECURITY (Type & Amount)

A B C D. E. D. E. D. E. D. E.

ITEM # EST. QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT

1 1 LS 697,362.78$ 485,000.00$ 590,000.00$ 640,000.00$

2 34,000 CY 7.50$ 255,000.00$ 7.25$ 246,500.00$ 6.75$ 229,500.00$ 15.00$ 510,000.00$ 3 21,000 CY 8.29$ 174,090.00$ 2.50$ 52,500.00$ 5.00$ 105,000.00$ 7.50$ 157,500.00$ 4 230,000 CY 4.38$ 1,007,400.00$ 3.00$ 690,000.00$ 4.76$ 1,094,800.00$ 3.00$ 690,000.00$ 5 1,400 TN 58.38$ 81,732.00$ 53.35$ 74,690.00$ 60.00$ 84,000.00$ 65.00$ 91,000.00$

6 1,000 SY 5.15$ 5,150.00$ 3.00$ 3,000.00$ 3.30$ 3,300.00$ 3.00$ 3,000.00$

7 12,900 TN 43.13$ 556,377.00$ 35.00$ 451,500.00$ 42.00$ 541,800.00$ 50.00$ 645,000.00$

8 1 LS 94,751.70$ 50,000.00$ 43,000.00$ 68,000.00$

9 1 LS 104,628.55$ 50,000.00$ 51,000.00$ 60,200.00$

10 40 AC 1,704.16$ 68,166.40$ 1,000.00$ 40,000.00$ 2,000.00$ 80,000.00$ 1,750.00$ 70,000.00$

11 1 LS 217,491.45$ 133,500.00$ 890,000.00$ 260,000.00$

3,262,149.88$ 2,276,690.00$ 3,712,400.00$ 3,194,700.00$ 12A 10,000 CY 7.50$ 75,000.00$ 7.25$ 72,500.00$ 6.50$ 65,000.00$ 11.00$ 110,000.00$ 12B 10,000 CY 7.50$ 75,000.00$ 7.25$ 72,500.00$ 6.50$ 65,000.00$ 11.00$ 110,000.00$ 12C 10,000 CY 7.50$ 75,000.00$ 7.25$ 72,500.00$ 6.50$ 65,000.00$ 11.00$ 110,000.00$ 12D 10,000 CY 7.50$ 75,000.00$ 7.25$ 72,500.00$ 6.50$ 65,000.00$ 11.00$ 110,000.00$ 12E 10,000 CY 7.50$ 75,000.00$ 7.25$ 72,500.00$ 6.50$ 65,000.00$ 11.00$ 110,000.00$ 12F 10,000 CY 7.50$ 75,000.00$ 7.25$ 72,500.00$ 6.50$ 65,000.00$ 11.00$ 110,000.00$ 12G 10,000 CY 7.50$ 75,000.00$ 7.25$ 72,500.00$ 6.50$ 65,000.00$ 11.00$ 110,000.00$ 12H 6,000 CY 7.50$ 45,000.00$ 7.25$ 43,500.00$ 6.50$ 39,000.00$ 11.00$ 66,000.00$

13 1 LS 13,210.32$ 25,000.00$ 30,000.00$ 320,000.00$

583,210.32$ 576,000.00$ 524,000.00$ 1,156,000.00$ 14A 10,000 CY 7.50$ 75,000.00$ 7.25$ 72,500.00$ 6.00$ 60,000.00$ 11.00$ 110,000.00$ 14B 10,000 CY 7.50$ 75,000.00$ 7.25$ 72,500.00$ 6.00$ 60,000.00$ 11.00$ 110,000.00$ 14C 10,000 CY 7.50$ 75,000.00$ 7.25$ 72,500.00$ 6.00$ 60,000.00$ 11.00$ 110,000.00$ 14D 10,000 CY 7.50$ 75,000.00$ 7.25$ 72,500.00$ 6.00$ 60,000.00$ 11.00$ 110,000.00$ 14E 10,000 CY 7.50$ 75,000.00$ 7.25$ 72,500.00$ 6.00$ 60,000.00$ 11.00$ 110,000.00$ 14F 6,800 CY 7.50$ 51,000.00$ 7.25$ 49,300.00$ 6.00$ 40,800.00$ 11.00$ 74,800.00$

15 9,000 CY 6.78$ 61,020.00$ 2.50$ 22,500.00$ 5.00$ 45,000.00$ 5.00$ 45,000.00$

16 120,000 CY 3.23$ 387,600.00$ 3.00$ 360,000.00$ 1.50$ 180,000.00$ 3.00$ 360,000.00$ 17 10 AC 1,704.16$ 17,041.60$ 1,000.00$ 10,000.00$ 2,000.00$ 20,000.00$ 1,750.00$ 17,500.00$

18 1 LS 102,504.42$ 50,000.00$ 40,000.00$ 348,000.00$

994,166.02$ 854,300.00$ 625,800.00$ 1,395,300.00$

19A 600 CY 8.29$ 4,974.00$ 2.50$ 1,500.00$ 6.00$ 3,600.00$ 30.00$ 18,000.00$

19B 4,000 CY 9.14$ 36,560.00$ 5.00$ 20,000.00$ 8.00$ 32,000.00$ 10.00$ 40,000.00$ 19C 5,000 TN 60.45$ 302,250.00$ 53.35$ 266,750.00$ 55.00$ 275,000.00$ 65.00$ 325,000.00$

19D 3,000 SY 5.15$ 15,450.00$ 3.00$ 9,000.00$ 3.30$ 9,900.00$ 3.00$ 9,000.00$

19E 1.5 AC 1,704.16$ 2,556.24$ 1,000.00$ 1,500.00$ 5,000.00$ 7,500.00$ 1,750.00$ 2,625.00$

19F 1 LS 263,900.88$ 10,000.00$ 20,000.00$ 86,000.00$

20A 1,300 CY 6.78$ 8,814.00$ 2.50$ 3,250.00$ 6.00$ 7,800.00$ 30.00$ 39,000.00$

20B 8,500 CY 7.81$ 66,385.00$ 5.00$ 42,500.00$ 8.00$ 68,000.00$ 5.00$ 42,500.00$

20C 10,000 TN 60.11$ 601,100.00$ 53.35$ 533,500.00$ 55.00$ 550,000.00$ 65.00$ 650,000.00$

20D 7,000 SY 5.15$ 36,050.00$ 3.00$ 21,000.00$ 3.30$ 23,100.00$ 3.00$ 21,000.00$

20E 3.0 AC 1,704.16$ 5,112.48$ 1,000.00$ 3,000.00$ 5,000.00$ 15,000.00$ 1,750.00$ 5,250.00$

20F 1 LS 25,000.00$ 10,000.00$ 20,000.00$ 140,000.00$

21A 1,300 CY 3.23$ 4,199.00$ 2.50$ 3,250.00$ 6.00$ 7,800.00$ 30.00$ 39,000.00$

21B 8,500 CY 6.73$ 57,205.00$ 5.00$ 42,500.00$ 8.00$ 68,000.00$ 5.00$ 42,500.00$

21C 10,000 TN 60.04$ 600,400.00$ 53.35$ 533,500.00$ 55.00$ 550,000.00$ 65.00$ 650,000.00$

21D 7,000 SY 5.15$ 36,050.00$ 3.00$ 21,000.00$ 3.30$ 23,100.00$ 3.00$ 21,000.00$

21E 3.0 AC 1,704.16$ 5,112.48$ 1,000.00$ 3,000.00$ 5,000.00$ 15,000.00$ 1,750.00$ 5,250.00$

21F 1 LS 25,000.00$ 10,000.00$ 34,000.00$ 140,000.00$

22A 1,300 CY 3.23$ 4,199.00$ 2.50$ 3,250.00$ 6.00$ 7,800.00$ 30.00$ 39,000.00$

22B 8,500 CY 6.73$ 57,205.00$ 5.00$ 42,500.00$ 8.00$ 68,000.00$ 5.00$ 42,500.00$

22C 10,000 TN 60.11$ 601,100.00$ 53.35$ 533,500.00$ 55.00$ 550,000.00$ 65.00$ 650,000.00$

22D 7,000 SY 5.15$ 36,050.00$ 3.00$ 21,000.00$ 3.30$ 23,100.00$ 3.00$ 21,000.00$

22E 3.0 AC 1,704.16$ 5,112.48$ 1,000.00$ 3,000.00$ 5,000.00$ 15,000.00$ 1,750.00$ 5,250.00$

22F 1 LS 25,000.00$ 10,000.00$ 20,000.00$ 140,000.00$

23A 700 CY 3.23$ 2,261.00$ 2.50$ 1,750.00$ 6.00$ 4,200.00$ 30.00$ 21,000.00$

23B 5,500 CY 7.36$ 40,480.00$ 5.00$ 27,500.00$ 8.00$ 44,000.00$ 5.00$ 27,500.00$

23C 6,000 TN 59.93$ 359,580.00$ 53.35$ 320,100.00$ 55.00$ 330,000.00$ 65.00$ 390,000.00$

23D 5,000 SY 5.15$ 25,750.00$ 3.00$ 15,000.00$ 3.30$ 16,500.00$ 3.00$ 15,000.00$

23E 1.5 AC 1,704.16$ 2,556.24$ 1,000.00$ 1,500.00$ 3,000.00$ 4,500.00$ 1,750.00$ 2,625.00$

23F 1 LS 19,974.10$ 10,000.00$ 20,000.00$ 76,000.00$

3,275,386.90$ 2,524,350.00$ 2,832,900.00$ 3,706,000.00$

TOTALS 8,114,913.12$ 6,231,340.00$ 7,695,100.00$ 9,452,000.00$

C. AMENDMENTS ACKNOWLEDGED

701 NW 27th St./P.O. Box 81036 Lincoln, NE 68501

Base Total Amount

Option 1

Option 2

Option 3

C. AMENDMENTS ACKNOWLEDGED

P.O. Box 1162 Pierre, SD 57501

C. AMENDMENTS ACKNOWLEDGED

81 Millbury Road Oxford, MA 01540

B. BID SECURITY (Type & Amount)

20% B. BID SECURITY (Type & Amount)

20%

Inlet Channel

3. CONTRACT ITEMS

Oahe Dam, Pierre, South Dakota

4. OFFERS (Continued)

NO. 3

A. OFFEROR 47

ABSTRACT OF OFFERS -

CONTINUATION SHEET

CONSTRUCTION

Dredging Emergency Spillway

2. PROJECT TITLE

INSTRUCTIONS: Attach this form to Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation l PAGES

1. SOLICITATION NUMBER

W912HY-12-B-0012

sheet will accommodate 24 contract items to conform the number of items which can be entered . Use additional forms and continuation sheets as needed.

NO. 5

A. OFFEROR 8J

NO. 6

A. OFFEROR 09X

NO. 4

Commercial Contractors EquipMORRIS, Inc. DRL Corporation

A. OFFEROR 0E

ESI Contracting Corp

B. BID SECURITY (Type & Amount)

20%

C. AMENDMENTS ACKNOWLEDGED

20%

3001 E. 83rd Street Kansas City, MO 64132

B. BID SECURITY (Type & Amount)

A B C D. E. D. E. D. E. D. E.

ITEM # EST. QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT

1 1 LS 685,000.00$ 520,000.00$ 904,965.00$ 1,000,000.00$

2 34,000 CY 6.55$ 222,700.00$ 5.75$ 195,500.00$ 6.45$ 219,300.00$ 4.00$ 136,000.00$ 3 21,000 CY 5.70$ 119,700.00$ 9.00$ 189,000.00$ 4.00$ 84,000.00$ 3.50$ 73,500.00$ 4 230,000 CY 4.85$ 1,115,500.00$ 7.70$ 1,771,000.00$ 3.20$ 736,000.00$ 6.75$ 1,552,500.00$ 5 1,400 TN 60.75$ 85,050.00$ 56.15$ 78,610.00$ 49.80$ 69,720.00$ 50.00$ 70,000.00$

6 1,000 SY 3.45$ 3,450.00$ 10.75$ 10,750.00$ 2.65$ 2,650.00$ 3.00$ 3,000.00$

7 12,900 TN 40.50$ 522,450.00$ 42.90$ 553,410.00$ 37.00$ 477,300.00$ 50.00$ 645,000.00$

8 1 LS 107,700.00$ 90,000.00$ 12,300.00$ 550,000.00$

9 1 LS 119,950.00$ 90,000.00$ 12,300.00$ 500,000.00$

10 40 AC 8,700.00$ 348,000.00$ 7,750.00$ 310,000.00$ 9,400.00$ 376,000.00$ 3,000.00$ 120,000.00$

11 1 LS 210,000.00$ 900,000.00$ 103,725.00$ 20,000.00$

3,539,500.00$ 4,708,270.00$ 2,998,260.00$ 4,670,000.00$ 12A 10,000 CY 6.55$ 65,500.00$ 5.75$ 57,500.00$ 6.45$ 64,500.00$ 4.00$ 40,000.00$ 12B 10,000 CY 6.55$ 65,500.00$ 5.75$ 57,500.00$ 6.45$ 64,500.00$ 4.00$ 40,000.00$ 12C 10,000 CY 6.55$ 65,500.00$ 5.75$ 57,500.00$ 6.45$ 64,500.00$ 4.00$ 40,000.00$ 12D 10,000 CY 6.55$ 65,500.00$ 5.75$ 57,500.00$ 6.45$ 64,500.00$ 4.00$ 40,000.00$ 12E 10,000 CY 6.55$ 65,500.00$ 5.75$ 57,500.00$ 6.45$ 64,500.00$ 4.00$ 40,000.00$ 12F 10,000 CY 6.55$ 65,500.00$ 5.75$ 57,500.00$ 6.45$ 64,500.00$ 4.00$ 40,000.00$ 12G 10,000 CY 6.55$ 65,500.00$ 5.75$ 57,500.00$ 6.45$ 64,500.00$ 4.00$ 40,000.00$

12H 6,000 CY 6.55$ 39,300.00$ 5.75$ 34,500.00$ 6.45$ 38,700.00$ 4.00$ 24,000.00$

13 1 LS 15,000.00$ 99,300.00$ 95,885.00$ 20,000.00$

512,800.00$ 536,300.00$ 586,085.00$ 324,000.00$ 14A 10,000 CY 6.55$ 65,500.00$ 5.75$ 57,500.00$ 6.45$ 64,500.00$ 4.00$ 40,000.00$ 14B 10,000 CY 6.55$ 65,500.00$ 5.75$ 57,500.00$ 6.45$ 64,500.00$ 4.00$ 40,000.00$ 14C 10,000 CY 6.55$ 65,500.00$ 5.75$ 57,500.00$ 6.45$ 64,500.00$ 4.00$ 40,000.00$ 14D 10,000 CY 6.55$ 65,500.00$ 5.75$ 57,500.00$ 6.45$ 64,500.00$ 4.00$ 40,000.00$ 14E 10,000 CY 6.55$ 65,500.00$ 5.75$ 57,500.00$ 6.45$ 64,500.00$ 4.00$ 40,000.00$

14F 6,800 CY 6.55$ 44,540.00$ 5.75$ 39,100.00$ 6.45$ 43,860.00$ 4.00$ 27,200.00$

15 9,000 CY 5.70$ 51,300.00$ 3.54$ 31,860.00$ 4.10$ 36,900.00$ 10.00$ 90,000.00$

16 120,000 CY 3.20$ 384,000.00$ 4.05$ 486,000.00$ 3.15$ 378,000.00$ 2.00$ 240,000.00$ 17 10 AC 8,750.00$ 87,500.00$ 7,750.00$ 77,500.00$ 9,450.00$ 94,500.00$ 3,000.00$ 30,000.00$

18 1 LS 165,000.00$ 142,130.00$ 187,650.00$ 20,000.00$

1,059,840.00$ 1,064,090.00$ 1,063,410.00$ 607,200.00$

19A 600 CY 11.40$ 6,840.00$ 5.20$ 3,120.00$ 11.10$ 6,660.00$ 2.00$ 1,200.00$

19B 4,000 CY 6.65$ 26,600.00$ 13.00$ 52,000.00$ 3.70$ 14,800.00$ 2.00$ 8,000.00$

19C 5,000 TN 60.75$ 303,750.00$ 54.75$ 273,750.00$ 49.55$ 247,750.00$ 50.00$ 250,000.00$

19D 3,000 SY 3.45$ 10,350.00$ 1.75$ 5,250.00$ 2.65$ 7,950.00$ 3.00$ 9,000.00$

19E 1.5 AC 13,075.00$ 19,612.50$ 11,600.00$ 17,400.00$ 14,195.00$ 21,292.50$ 3,000.00$ 4,500.00$

19F 1 LS 51,900.00$ 66,540.00$ 82,175.00$ 20,000.00$

20A 1,300 CY 11.40$ 14,820.00$ 5.20$ 6,760.00$ 13.65$ 17,745.00$ 2.00$ 2,600.00$

20B 8,500 CY 6.65$ 56,525.00$ 13.50$ 114,750.00$ 3.70$ 31,450.00$ 2.00$ 17,000.00$ 20C 10,000 TN 60.75$ 607,500.00$ 48.50$ 485,000.00$ 49.55$ 495,500.00$ 50.00$ 500,000.00$

20D 7,000 SY 3.45$ 24,150.00$ 1.70$ 11,900.00$ 2.65$ 18,550.00$ 3.00$ 21,000.00$

20E 3.0 AC 12,700.00$ 38,100.00$ 11,250.00$ 33,750.00$ 13,765.00$ 41,295.00$ 3,000.00$ 9,000.00$

20F 1 LS 12,500.00$ 97,860.00$ 100,760.00$ 20,000.00$

21A 1,300 CY 11.40$ 14,820.00$ 5.20$ 6,760.00$ 11.55$ 15,015.00$ 2.00$ 2,600.00$

21B 8,500 CY 6.65$ 56,525.00$ 12.75$ 108,375.00$ 3.70$ 31,450.00$ 2.00$ 17,000.00$ 21C 10,000 TN 60.75$ 607,500.00$ 48.50$ 485,000.00$ 49.55$ 495,500.00$ 50.00$ 500,000.00$

21D 7,000 SY 3.45$ 24,150.00$ 1.70$ 11,900.00$ 2.65$ 18,550.00$ 3.00$ 21,000.00$

21E 3.0 AC 12,700.00$ 38,100.00$ 11,250.00$ 33,750.00$ 13,750.00$ 41,250.00$ 3,000.00$ 9,000.00$

21F 1 LS 12,500.00$ 97,860.00$ 100,000.00$ 20,000.00$

22A 1,300 CY 11.40$ 14,820.00$ 5.20$ 6,760.00$ 11.55$ 15,015.00$ 2.00$ 2,600.00$

22B 8,500 CY 6.65$ 56,525.00$ 12.50$ 106,250.00$ 3.70$ 31,450.00$ 2.00$ 17,000.00$ 22C 10,000 TN 60.75$ 607,500.00$ 48.50$ 485,000.00$ 49.55$ 495,500.00$ 50.00$ 500,000.00$

22D 7,000 SY 3.45$ 24,150.00$ 1.70$ 11,900.00$ 2.65$ 18,550.00$ 3.00$ 21,000.00$

22E 3.0 AC 12,700.00$ 38,100.00$ 11,250.00$ 33,750.00$ 13,750.00$ 41,250.00$ 3,000.00$ 9,000.00$

22F 1 LS 12,500.00$ 97,860.00$ 101,000.00$ 20,000.00$

23A 700 CY 11.40$ 7,980.00$ 5.20$ 3,640.00$ 11.90$ 8,330.00$ 2.00$ 1,400.00$

23B 5,500 CY 6.65$ 36,575.00$ 12.85$ 70,675.00$ 3.70$ 20,350.00$ 2.00$ 11,000.00$ 23C 6,000 TN 60.75$ 364,500.00$ 48.50$ 291,000.00$ 49.55$ 297,300.00$ 50.00$ 300,000.00$

23D 5,000 SY 3.45$ 17,250.00$ 1.75$ 8,750.00$ 2.65$ 13,250.00$ 3.00$ 15,000.00$

23E 1.5 AC 13,500.00$ 20,250.00$ 11,850.00$ 17,775.00$ 14,500.00$ 21,750.00$ 3,000.00$ 4,500.00$

23F 1 LS 16,000.00$ 72,830.00$ 81,700.00$ 20,000.00$

3,142,392.50$ 3,117,915.00$ 2,933,137.50$ 2,353,400.00$

TOTALS 8,254,532.50$ 9,426,575.00$ 7,580,892.50$ 7,954,600.00$

ABSTRACT OF OFFERS -

1. SOLICITATION NUMBER

2. PROJECT TITLE 4. OFFERS (Continued)

NO. 7

CONTINUATION SHEET sheet will accommodate 24 contract items to conform the number of items which can be entered . Use additional forms and continuation sheets as needed.

Base Total Amount

Option 1

Option 2

Option 3

Dredging Emergency Spillway A. OFFEROR 0GNA. OFFEROR 1EA. OFFEROR ICA A. OFFEROR 1Q0

W912HY-12-B-0012 l PAGES

CONSTRUCTION INSTRUCTIONS: Attach this form to Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation

P.O. Box 435 1437 Furneaux Road 3825 85th Avenue N P.O. Box 1739

NO. 8 NO. 9 NO. 10

B. BID SECURITY (Type & Amount) B. BID SECURITY (Type & Amount) B. BID SECURITY (Type & Amount)

Inlet Channel R.J. Zavoral & Sons, Inc. Nordic Industries, Inc. RLB Contracting, Inc.Ceres Environmental Services Oahe Dam, Pierre, South Dakota

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

East Grand Forks, MN 56721 Olivehurst, CA 95901 Brooklyn Park, MN 55443 Port Lavaca, TX 77979

3 3 3 3

20% 20% 20% 20