This is a Sources Sought Capabilities Survey for a Design-Bid-Build construction project to develop hotel space at Yokota Air Base in Tokyo, Japan. The U.S. Army Corps of Engineers, Japan District is conducting market research to identify qualified contractors and inform acquisition strategy for this project. Responses are due by close of business on August 14, 2026, and should be submitted via email to Contracting Officer Dr. Nakiba S. Jackson and Contract Specialist Charles Qi. A tentative site visit is planned for January through March 2027 at the project location, with no government reimbursement for associated costs.
The survey requests company background information and detailed responses regarding construction experience, security qualifications, and project capability. Specific areas of interest include demonstrated experience constructing Intelligence Community Directive (ICD) 705 accredited facilities for the Department of State or Department of Defense within the last ten years; Controlled Unclassified Information (CUI) safeguarding capabilities; relevant project history; bonding levels; and interest in Secure Working Area projects. The project involves constructing an 85-square-meter hotel space within a secure compound with restricted access controls and specialized construction requirements. Key schedule considerations include a 540-day Period of Performance for design, construction, and accreditation readiness, and a 1,140 square-meter staging and laydown area allocated adjacent to the construction site. The survey specifically solicits feedback on schedule feasibility given import restrictions, material lead times, and whether the staging area is adequate or if alternative mitigation strategies such as just-in-time delivery would be necessary. This announcement is for planning purposes only and does not constitute a commitment for future solicitation or award.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912HV26Z0017, HOTEL SPACE, YOKOTA AIR BASE, JAPAN
W912HV26Z0017
SOURCES SOUGHT CAPABILITIES SURVEY
HOTEL SPACE, YOKOTA AIR BASE, JAPAN
Interested firms are requested to consider the following information and reply via email to Contracting Officer, Dr. Nakiba S. Jackson (nakiba.s.jackson@usace.army.mil) and Contract Specialist, Charles Qi (charles.l.qi@usace.army.mil) by close of business on 14 August 2026. We appreciate your honest feedback in assisting the government as we develop an effective acquisition strategy.
1. Company Information:
a. Name:
b. Address:
c. UEI/CAGE:
d. Point of Contact:
e. Phone Number:
f. e-mail Address:
2. Please describe your willingness to meet international travel requirements to participate in a site visit, tentatively planned in January to March of 2027 in Yokota Air Base, Tokyo, Japan. As with all site visits, the U.S. Government cannot reimburse potential offerors for any costs incurred in association with this site visit.
3. Describe your company’s capability and experience in constructing Intelligence Community Directive (ICD) 705 accredited facilities for the Department of State and/or Department of Defense in the last 10-years.
4. Describe your firm’s security qualifications and safeguarding capabilities to do with Controlled Unclassified Information (CUI) such as specifications and drawings relating to a construction project.
5. Provide a list of relevant or similar projects, including project title, location, completion date, and magnitude.
6. What is your firm’s level of interest relative to working Secure Working Area projects such as this one.
7. What are your company’s construction bonding levels:
a) Single contract amount:
b) Maximum Amount:
8. Please provide any comments that may increase your level of interest and will assist us with developing the solicitation for this project.
Project specific questions:
A. The project involves a building of 85-square-meter hotel space located inside a secure compound. Given the compound's daily access controls, restricted construction working hours, and the logistics associated with importing and securing specialized SCIF materials, is the proposed 540-day Period of Performance (PoP) adequate for complete design, construction, and accreditation readiness? Please identify any major schedule drivers or material lead times that could impact this timeline.
B. Due to the security requirements of the compound, draft drawings are not being publicly released. The designated secure construction laydown and staging area on the compound is approximately 1,140 square meters and is located adjacent to the hotel construction site within the project boundary fencing.
a) Is this allocated laydown area adequate for your construction staging, waste management, and secure material storage?
b) If not, what is the minimum square footage/meters required, or what mitigation strategies (such as just-in-time delivery of materials) would you propose to operate within this footprint?"