Pre-Proposal Conference Slides_W912HV23R0006.pdf
PDF 4 MB Posted
- Attached to
- MCN P-039 Ship Handling and Combat Training Facilities, Commander Fleet Activities (CFA) Yokosuka, Japan
- Solicitation number
- W912HV23R0006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Proposal Conf Attendee List_W912HV23R0006.pdf | ||
| Site Visit Attendance Roster - W912HV23R0006.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
.59
“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”
Presented by 作成者 :
MCN P-039 SHIP HANDLING & COMBAT
TRAINING FACILITIES, CFA YOKOSUKA, JAPAN
W912HV23R0006
PRE-PROPOSAL CONFERENCE
DATE: 17 MAY 2023
MCN P-039 操船及び戦闘訓練施設の建設工事、米海軍横須賀基地
公示番号: W912HV23R0006
入札前会議 日時:2023年5月17日
Brandon Taira ブランドン ・ タイラ Project Manager プロジェクトマネージャー
Jennifer Knutson ジェニファー ・ クニットソン Contracting Officer 契約官
Ryan Marzetta ライアン ・マルゼッタ Contract Specialist 契約専門職
Frederick McNeely フレデリック ・マクニーリー Technical Lead 技術リード
本プレゼンテーションに含まれる見解、意見及び所見は著者のもので あり、他の公的な書類で指定されていない場合、公式な米陸軍省の見 解、方針又は決定と解釈されるべきではありません。
WELCOME
歓 迎
❑Virtual Roll Call
仮想上の参加者の点呼
❑Your Company name will be called. Please have one representative from your company identify themselves and identify who is on the line.
会社名をお呼びしましたら代表の方が今回参加されている全員の方のお名 前をお伝えください。
❑ Introduction of Government Personnel
米政府関係者紹介
❑USACE, Japan Engineer District
米陸軍工兵隊・日本地区
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
DISCUSSION OVERVIEW
説明会概要
❑Rules of Conference 説明会のルール
❑Changes 変更点
❑Quick tips for Solicitations 入札公告の参考情報
❑Contracting requirements 契約要件
❑Site location 敷地所在地
❑Scope of work 工事内容 ❑General construction requirements 一般工事要件
❑Site visit itinerary 現場視察の流れ
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
RULES FOR CONFERENCE
当説明会のルール
❑Conference will be presented in English. The Japanese translation is provided as a courtesy
本会議は英語で行われる。日本語の翻訳は厚意によるものである。
❑Please keep computers and phones on mute.
電話をミュートにすること。
❑Unofficial and non-binding
非公式で法的拘束力はない。
❑ If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern
当説明会で協議される情報と入札案内に矛盾がある場合は、入札案内の契約条件 が優先される。
❑All questions are to be submitted in writing via Projnet
質問/問合わせは全てPROJNETを通じ書面で提出すること。
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
File Name
CHANGES
変 更
Since the previous advertisement of this project, there have been changes. It is still the responsibility of the Offerors to perform a thorough review of the solicitation and design, we will also highlight the changes in the applicable sections, but some of the changes are as follows:
本事案の前回公示以降、いくつかの変更が行われた。入札案内と設計を徹底的に確認するこ
とは入札者の責任であるが、我々も該当するセクションの変更を目立たせる。変更の一部は
下記の通りである:
❑ Acquisition method changed from Invitation for Bid (IFB) to Request for Proposal (RFP)
契約方法が一般競争入札(IFB)から最低技術要件付き競争入札(RFP)へ変更になっ
た。
❑ Period of Performance: 1,140 Calendar Days after NTP – Previously 670 Calendar
Days after NTP
契約作業期間: 着工命令から1,140歴日-以前は着工命令から670暦日であった。 ❑ Acceptance period increased to 180 calendar days
受付期間が180暦日へ増加。
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
❑Review all the solicitation requirements
全ての入札要件を確認する。
❑Follow solicitation format as required
入札要件に指示されているフォーマットに従う。
❑Acknowledge all amendment(s)
全ての改訂(アメンドメント)を確認同意する。
❑Respond to every submission requirement
全ての提出要件に回答・対応する。
QUICK TIPS FOR ALL SOLICITATIONS
全ての入札公告に対する参考情報
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
RFP SOLICITATION FORMAT
フォーマット
❑Standard Form 1442 フォーム1442 ❑Section 00 10 00, Solicitation CLIN Schedule 契約項目一覧表 ❑Section 00 21 16, Instructions to Proposers 説明 ❑Section 00 22 00, Proposal Submission Requirements 入札書提出要件 ❑Section 00 22 16, Evaluation Factors for Award 評価基準 ❑Section 00 45 00, Representation and Certifications 表明と証明書 ❑Section 00 70 00, Conditions of the Contract 契約条件 ❑Section 00 73 00, Supplementary Conditions 補足条件 ❑Division 01, General Requirements 一般要件 ❑Divisions 02 thru 33, Technical Divisions 技術要件 ❑Drawings 図面
• Previously advertised as an Invitation for Bid (IFB)
以前は一般競争入札(IFB)として公示されていた
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
❑Make sure to note the proposal due date and time in Block 13A of SF1442.
SF1442のブロック13Aに記載された入札提出期日及び時間を必ず確認する。
❑Proposals are due August 16, 2023 at 1400 hrs JST
入札書類の提出期限は日本時間の2023年8月16日、午後2時
❑Period for acceptance of proposals shall be no less than 180 calendar days for
Government acceptance (see block 13D).
米政府が受諾するための入札価格の有効期間は180日間以上とする。 (ブロック13D参照)
❑Fill out Blocks 14, 15, 17, 19, 20A, 20B, and 20C.
ブロック14, 15, 17, 19, 20A, 20B, 20Cにもれなく記入する。
STANDARD FORM (SF) 1442
SF1442
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE
契約項目一覧
SECTION 00 10 00
SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE
ITEM
NO.
DESCRIPTION QUANTITY UNIT UNIT
PRICE
AMOUNT
BASE ITEMS
Construction of Primary and
Supporting Facilities
1 JB - ¥________
TOTAL BASE CLIN SCHEDULE ¥________
NOTES:
1. Failure of the offeror to propose prices for all items in the CLIN Schedule may be cause for rejection of the proposal as unacceptable.
2. See Section 01 20 00, for additional line item description.
3. Any reference to “bid”, bidder, or “bidding schedule” shall be construed to mean “offer”, “offeror”, and “CLIN schedule”
4. LEGEND: JB = Job
入札一覧表の項目全てに対し価格を提案しない入札者は、受付られない場合がある。
追加の項目詳細についてはセクション01 20 00を参照。
「bid 」、「bidder 」、「bidding schedule」は「入札」「入札者」「入札一覧表」と解釈されるものとする。
凡例:JB=作業
注記
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
❑Electronic delivery of proposals through PIEE Solicitation Module website – requires advance vendor registration on https://piee.eb.mil/. – see solicitation for specific instructions.
PIEEサイトを利用した電子的な入札(提案)書類の提出 – https://piee.eb.mil/.にて 事前に業者登録をしておく必要があります。 具体的な手順については入札案内書を ご覧ください。
❑Magnitude of the Proposed Project: 工事の規模:
► ¥2,500,000,000 and ¥10,000,000,000 25億円から100億円
SECTION 00 21 16
INSTRUCTIONS TO PROPOSERS - PROVISIONS
入札者への説明 –条件
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
https://piee.eb.mil/
❑Requests For Information (RFIs): ALL Questions / Inquiries shall be submitted via the PROJNET Bidder Inquiry Model at:
https://www.projnet.org/projnet/ . Please see the solicitation for additional details and instructions.
質問書(RFI):全ての質問/問い合わせはPROJNETのサイト
https://www.projnet.org/projnet/ を介して提出して下さい。追加の詳細および手 順に関しては入札案内書を参照して下さい。
❑Requests For Information (RFIs) Due: RFI(質問書)期日:
► 11:59 (midnight) on June 11, 2023 (JST)
日本時間2023年6月11日 23:59
► The Bidder Inquiry Key is: KNXFUE-NR847U
入札者の照会キー: KNXFUE-NR847U
SECTION 00 21 16
INSTRUCTIONS TO PROPOSERS - PROVISIONS
入札者への説明 –条件
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
https://www.projnet.org/projnet/ https://www.projnet.org/projnet/
❑ SIGNATURE ON OFFERS. . Offers must be signed by an officer of the company or an individual who is authorized to sign offers for and on behalf of the company. An individual, other than an officer of the company, who signs an offer must submit evidence of his authority to sign such offer. This evidence must accompany the offer. Failure to comply with this requirement may be cause for rejection of the offer.
入札書類の署名. 入札書類は、会社を代表して入札書類に署名する権限を持つ会社の役員ま
たは個人が署名しなければなりません。役員以外の個人が入札書類に署名する場合は、署名 する権限があることを示す証拠を入札書類に添付しなければなりません。この要件に従わない 場合は、入札が却下される可能性があります。
❑ JOINT VENTURE. In the event the offeror is a joint venture, the offer must be signed by an authorized representative of each participant in the joint venture. The joint venture as an entity shall also have an active System for Award Management registration – See FAR
52.204-7 System for Award Management. Failure to comply with this requirement may be cause for rejection of the offer.
合弁事業. 入札者が合弁事業である場合、入札書類は合弁事業構成企業全てからの署名権 限を持つ代表者によって署名されなければなりません。
SECTION 00 21 16
INSTRUCTIONS TO PROPOSERS - PROVISIONS
入札者への説明 –条件
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
❑ OFFEROR ELIGIBILITY. This contract will be performed in its entirety in the country of
Japan and is intended only for local sources. Only local sources will be considered under this solicitation. Local sources are sources that are physically located in Japan and authorized (i.e. licensed and registered) to perform in Japan, the type of construction work specific in this solicitation.
入札者資格. 本契約は全て日本国内で施工され、日本の業者のみを対象としています。日本
の業者のみが本入札の下で検討されます。日本の業者とは日本に物理的に所在し、本入札の 具体的な建設工事種類を日本で行う権限(すなわち建設業許可証を保有し登録している)を持 つ業者のことです。
❑ Construction license will be verified through the Government of Japan – Ministry of Land, Infrastructure, Transport, and Tourism (MILT) https://etsuran.mlit.go.jp/TAKKEN.
建設業許可証は国土交通省https://etsuran.mlit.go.jp/TAKKENを通じ確認します。
SECTION 00 21 16
INSTRUCTIONS TO PROPOSERS - PROVISIONS
入札者への説明 –条件
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
https://etsuran.mlit.go.jp/TAKKEN https://etsuran.mlit.go.jp/TAKKEN
❑ JAPANESE CONSUMPTION TAX. By virtue of Article XII of the Status of Forces
Agreement (SOFA), materials, supplies, equipment and services procured for official purposes in Japan by the United States armed forces, or its authorized procurement agencies are EXEMPT from various Japanese Taxes, including Consumption Tax. The exemption from the Japanese Consumption Tax applies not only to Japanese prime contractors, but also to Japanese subcontractors or suppliers at every level regardless of the nationality of the prime contractor whether a Japanese or a Foreign firm.
日本の消費税. 日米地位協定(SOFA)第12条により、米軍又はその権限を与えられた調達機
関が日本国内で公的な目的のために調達する材料、物資、機器及びサービスは、消費税を含 む日本の各種税金から免除されます。消費税の免除は、日本の元請業者だけでなく、元請業 者の国籍が日本か外国かにかかわらず、あらゆるレベルの日本の下請業者又は供給業者にも 適用されます。
❑ DFARS 252.229-7001 Tax Relief – Offeror shall complete as part of Section 00 45 00
Representations and Certifications submission requirements.
DFARS 252.229-7001 税金控除-入札者はセクション00 45 00 表明と証明書の提出要件の
一部として完了しなくてはなりません。
SECTION 00 21 16
INSTRUCTIONS TO PROPOSERS - PROVISIONS
入札者への説明 –条件
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
Electronic submission: 電子的提出 Electronic submission: Proposals shall be submitted electronically via Procurement
Integrated Enterprise Environment (PIEE) Solicitation Module. Proposals must be received by the due date and time for proposals set in the solicitation. The Government will only accept electronic proposals. Emailed, Physical or paper copy proposals will not be accepted. See Section 00 21 16.
電子的提出:入札書類は電子的に提出するものとし、入札書類提出の期日と時間までにPIEEモ
ジュール経由で米政府に受領されなければなりません。米政府は電子的な提案のみを受付けま
す。Eメール、物理的又は紙のコピーの入札書類は受理されません。セクション00 21 16を参照し
て下さい。
Electronic proposals shall be submitted in two (2) separate PDF files for two (2) separate volumes 電子的入札書は2つの別々のボリュームに対し、それぞれ異なる2つのPDFファイルを 提出するものとします。
Volume I – Technical Proposal 技術提案
Volume II – Price Proposal 価格提案
See solicitation for specific details and submission instructions. 詳細及び提出方法について は入札案内書を参照して下さい。
SECTION 00 22 00
PROPOSAL SUBMISSION REQUIREMENTS
入札書提出要件
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
16SECTION 00 22 00
PROPOSAL SUBMISSION REQUIREMENTS
入札書提出要件
Volume I – Technical Proposal ボリューム1-技術提案 one (1) Electronic PDF copy 電子版 1 部
Tab Documents to be Submitted
1 Cover Sheet. See Paragraph 2.3.1.3.1 below
カバーシート(表紙)
2 Construction Experience: Section 00 22 00, Attachment I “Construction Experience Sheet.” Submit one
Construction Experience sheet per project. Proposal shall include at least one (1) projects but not more than three (3) projects. See Paragraph 2.3.1.3.2.
添付I-要素1過去の経験に関するプロジェクト情報シート。1プロジェクト当たり1枚の情報シートを提出して下さ
い。最低1つのプロジェクト(最大で3つ)を提出してください。
3 Past Performance: Section 00 22 00, Attachment II “Past Performance Questionnaire (PPQ).” Submit one Past Performance Questionnaire for each project submitted under Factor 1 – Past Experience. See
Paragraph 2.3.1.3.3
添付II-米陸軍工兵隊の過去の実績質問票。別紙Aに記載した過去の実績のために提出された各プロジェクト
のPPQの1ページ目を記入し提出して下さい。
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
17SECTION 00 22 00
PROPOSAL SUBMISSION REQUIREMENTS
入札書提出要件 Volume II – Price Proposal ボリュームII -価格提案 one (1) Electronic PDF copy 電子版 1 部
Tab Documents to be Submitted
1 Cover Sheet. See Paragraph 2.3.2.2.1.
カバーシート(表紙)
2 Standard Form (SF) 1442. Front and back page. Back page completed and signed.
標準様式(SF) 1442 – 表と裏のページ – 裏は記入と署名
3 Section 00 10 00 – Proposal Schedule セクション00 10 00 – 契約項目一覧
4 Section 00 45 00 – Representations and Certifications.
セクション00 45 00 – 表明と証明書
5 Joint Venture Agreement (If proposing as a Joint Venture): If a Joint Venture (JV) is identified in Block 14 of the SF 1442, then a signed joint venture agreement must be submitted with the proposal.
合弁事業契約書(合弁事業の場合):SF1442のブロック14で合弁事業と特定された場合、署名された合弁事
業契約書を提案書とともに提出しなければならない。
6 SF30 – Front page for each amendment (if issued) – Completed and Signed
SF 30 - 各改訂(アメンドメント)の表紙(発行されている場合) - 記入・署名
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
18SECTION 00 22 16
EVALUATION FACTORS FOR AWARD
評価要素
Lowest Price Technically Acceptable Source Selection Process実施要領で要求された最低技 術要件をみたす入札の中で、最低価格の入札をした企業と契約を結ぶ方式。
A process used in competitive negotiated contracting where the best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price.
実施要領で要求された最低技術要件をみたす入札の中で、最低価格の入札を選択することで最高価 値をもららすと期待される企業と契約をする方式です。
The Government intends to evaluate proposals and award a contract without holding discussions; however, the Government reserves the right to conduct discussions if deemed necessary by the Contracting Officer.
米政府は、入札者と協議を行わずに価格および技術提案を評価し、契約を締結することを意図していま すが、契約担当官が必要と判断した場合、米政府は協議を行う権利を留保しています。
Contract award will be made to the responsible Offeror whose proposal represents the best value to the Government utilizing the Lowest Price Technically Acceptable (LPTA) source selection process.
実施要領で要求された最低技術要件をみたす入札の中で、最低価格の入札をした企業と契約を結ぶ
方式(LPTA)を利用して、米政府に最高価値を与える入札を提示した入札者と契約を締結します。
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
19SECTION 00 22 16
評価要素
❑ FACTOR 1 – Construction Experience 要素1-建設施工経験
Evaluation Criteria: The Government will evaluate the construction experience demonstrated by the
Offeror. The minimum requirements for this technical evaluation factor will be met if the Offeror demonstrates experience on a minimum of one (1) project that individually meets all of the below criteria for minimum acceptability::
評価基準:米政府は、入札者の建設施工経験を評価します。この技術的評価要素の最低要件は、最低限受入れ 可能な以下の基準の全てを個別に満たす、最低1件のプロジェクトに関する経験を提示した場合に満たされます:
(1) Offeror was the Prime Contractor of the project at time of completion;
入札者は完成時に当該事案の元請業者であったこと;
(2) New construction, repair, or renovation construction project;
新築、修繕、改修工事であること;
(3) Has a value of ¥500,000,000 ($5,000,000 equivalent) or more;
5億円(500万円相当)以上のものであること;
(4) Is completed and turned over no longer than ten (10) years preceding the date of this solicitation (project completion date shall be no older than 10 years preceding the solicitation issuance date); and
本募集日から10年以内に完成し引渡されたものであること(プロジェクトの完成日は、本募集の発行日から10年以上前で
あってはならない)。
(5) Completed in Japan.
日本で完成されたものであること。
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
20SECTION 00 22 16
評価要素
❑ FACTOR 1 要素1 – CONSTRUCTION EXPERIENCE 建設施工経験
If a proposal cannot demonstrate experience on at least one (1) project which individually meets all of the criteria (1) through (5), then the proposal will be considered "unacceptable" and rejected.
入札提案が基準(1)から(5)の全てを個別に満たす、少なくとも1件のプロジェクトについての経験を実証できない 場合、その入札提案は「受入不可能」と見なされ却下されます。
Construction Experience will be rated on an “Acceptable” or “Unacceptable” basis utilizing the rating method in Table 1.建設施工経験は表1の評価法を利用して、受入可能又は受入不可能に評価されます。
Table 1: Factor 1, Construction Experience, Rating Method
表1:要素1、建設施工経験、評価法
Adjectival Rating
評価 Description 詳細
Acceptable 受入可能 Proposal meets the requirements of the solicitation.
入札提案が入札要件を満たす
Unacceptable 受入不可能 Proposal does not meet the requirements of the solicitation.
入札提案が入札要件を満たさない
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
21SECTION 00 22 16
評価要素
❑ FACTOR 2 要素2 – PAST PERFORMANCE 過去の実績
Evaluation Criteria 評価基準:
Past performance will first be evaluated to determine whether the offeror’s past performance is recent and relevant, or not relevant, to the effort to be acquired. Only recent and relevant projects will be considered for this factor. Performance on a project is deemed recent and relevant if the project individually meets all the criteria listed in the Factor 1, Construction Experience evaluation criteria (see 2.1.1).
過去の実績は、まず、入札者の過去の実績が最近のものであり、かつ本プロジェクトに対して関連性があるかど うかを評価します。最近かつ関連性のあるプロジェクトのみがこの要素では考慮されます。プロジェクトが、要素1
「建設施工経験」の評価基準(2.1.1参照)に記載されているすべての基準を個別に満たしている場合、そのプロ ジェクトでの実績は最近かつ関連性があるとみなされます。
Second, the past performance evaluation will determine how well the offeror performed on recent and relevant projects. As a minimum, the offeror shall demonstrate overall satisfactory performance (to include a showing of adequate corrective action on adverse past performance information) on recent and relevant projects.
次に、過去の実績評価では、最近の関連するプロジェクトにおいて、入札者がどの程度の実績を残したかを判断 します。最低限、入札者は、最近の関連するプロジェクトにおいて、全体的に満足のいく工事内容(良くない実績 情報に対する適切な是正措置の提示を含む)を実証するものとします。
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
22SECTION 00 22 16
❑ FACTOR 2 要素 2 – PAST PERFORMANCE 過去の実績
Factor 2, Past Performance, will be rated on an acceptable / unacceptable basis utilizing the rating method in Table 2. 要素2、過去の実績を表2の評価法を利用して受入可能 / 受入不可能 で評価します。
Table 2: Factor 2, Past Performance, Rating Method 表2:要素2、過去の実績、評価法
Adjectival Rating 評 価
Description 内 容
Acceptable 受入可能
Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See note below).
入札者の実績記録に基づき、米政府はその入札者が必要な作業を首尾よく実施できると期待することが
妥当である、又は入札者の実績記録が不明である(下記の注意を参照)。
Unacceptable
受入不可能
Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.
入札者の実績記録に基づき、米政府はその入札者が必要な作業を首尾よく実施できると期待することは
妥当ではない。
Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or is so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)). Therefore, the offeror shall be determined to have “Unknown” or “Neutral” past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “Acceptable”.
注意: 関連する過去の実績記録が無い、又は入手不可能又は少なくて妥当で有意義な評価ができない入札者の場合、過去の実績に関
し有利にも不利にも評価してはならない(FAR 15.305(a)(2)(iv)を参照)。従って、この入札者は過去の実績に関して、「不明」又は「中立」と
判断されること。受入可能性/受入不可能性についての文脈では、中立という評価は「受入可能」とみなされること。
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
23SECTION 00 22 16
❑ FACTOR 3 要素3 – PRICE 価格 Evaluation of Price 価格の評価
A price analysis will be performed in accordance with FAR 15.404-1(b), to determine the fairness and reasonableness of the price, and the adequacy of the offer in fulfilling the requirements of the solicitation in their proposal. This analysis will also check for the appearance of unbalanced line item prices. The Government may utilize historical pricing data, price competition, the Independent Government Estimate (IGE) and/or any other pricing tools necessary to determine fairness and reasonableness.
価格分析は、FAR15.404-1(b)に従って行われ、価格の公正さと適正さ、及び提案が募集要件を満
たす妥当性を判断するために行われます。この分析では、不均衡な品目価格もチェックします。米 政府は、公正さ及び合理性を判断するために必要な過去の価格データ、価格競争、独立米政府見
積もり(IGE)及び/又はその他の価格ツールを利用することができます。
Offerors shall ensure the data in Section 00 10 00 is complete and accurate. Failure to provide all price/cost data requested may be cause for determination of proposals as unacceptable.
入札者はセクション00 10 00 のデータを全て正確に記入するものとします。要求される価格/コスト データの全てを記入していない提案は、受入れられないと判断される場合があります。
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
24SECTION 00 45 00
REPRESENTATIONS AND CERTIFICATIONS
表明と証明書 ❑Ensure the following is completed and submitted with proposal (as applicable)
以下の必要事項を全て記入し提案書とともに提出して下さい(該当する場合)。
▪ Completed Corporate Certificate 企業証明書
▪ If Joint Venture, Completed Certificate for each member of joint venture
合弁事業の場合は各メンバーの企業証明書
▪ FAR 52.204-8, Annual Representation and Certification
▪ FAR 52.204-24, Representation Regarding Certain Telecommunications and Video Surveillance or Equipment
▪ FAR 52.209-7, Information Regarding Responsibility Matters
▪ FAR 52.229-11, Tax on Foreign Procurements – Notice and
Representation (w/ completed IRS Form W-14, if applicable)
▪ DFARS 252.204-7017, Prohibition on the Acquisition of Covered Defense
Telecommunications Equipment or Services--Representation
▪ DFARs 252.229-7001, Tax Relief
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
❑FAR Clause 52.211-10, Commencement, Prosecution, and Completion of Work
連邦調達規則(FAR) 52.211-10 作業の開始、実行及び完了
❑Period of Performance: 1,140 Calendar Days after NTP (Change from previous solicitation)
契約作業期間:着工命令から1,140歴日(以前の入札案内からの変更)
❑FAR Clause 52.211-12, Liquidated Damages – Construction
連邦調達規則(FAR) 52.211-12 遅延損害-建設工事
¥384,000 for each Calendar Day of delay
遅延損害金1暦日につき384,000円
SECTION 00 70 00
CONDITIONS OF THE CONTRACT
契約要件
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
❑ DFARS 252.225-7045, Balance of Payments Program – Construction Material Under Trade Agreements
– Basic (Deviation 2020-O0019) – See solicitation for full clause.
DFARS 252.225-7045、国際収支プログラム-建設資材貿易合意-基本(逸脱 2020-O0019)-全項は入札
案内を参照。
(c) The contractor shall use only domestic (U.S.) or designated country construction material in performing this contract, except for –
業者は下記を除き、本契約の実施に際し、米国製又は指定された国で製造された建設資材のみを使用すること。
(1) Construction material valued at or below the simplified acquisition threshold in part 2 of the Federal
Acquisition Regulation;
連邦政府契約規則のパート2の単純契約限度額以下の建設資材
(2) Information Technology that is a commercial item;
市販品である情報技術
(3) The construction material or components listed by the Government as follows: See clause.
政府による建設資材又は構成部品リストは下記の通り:条項を参照
SECTION 00 70 00
CONDITIONS OF THE CONTRACT
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
❑ DFARS 252.225-7045, Balance of Payments Program – Construction Material
Trade Agreements – Basic (Deviation 2020-O0019) – continued
DFARS 252.225-7045、国際収支プログラム-建設資材貿易合意-基本(逸脱
2020-O0019)-続き
“Simplified Acquisition Threshold” means $250,000
「単純契約限度額」とは25万ドルです。
“Designated Country” includes Japan. See clause in solicitation for full list of designated countries.
「指定された国」には日本を含みます。指定された国の全リストは入札案内の 条項を参照して下さい。
SECTION 00 70 00
CONDITIONS OF THE CONTRACT
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
❑ DFARS 252.247-7023, Transportation of Supplies by Sea 海路による輸送
❑ Required to utilize U.S. ocean transportation
米国の海上輸送会社を利用することが必要。
❑ Submit any request for use of foreign-flag vessels in writing to the
Contracting Officer at least 45 days prior to the sailing date necessary to meet its delivery schedules
外国の海上輸送会社の使用を希望する場合は、納期を満たすために必要な 出航日の少なくとも45日前までに、契約担当官に書面で提出すること。
SECTION 00 70 00
CONDITIONS OF THE CONTRACT
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
Title: P-039 Ship Handling & Combat Training Facilities
事案名:P-039操船及び戦闘訓練施設の建設工事
Description 詳細:
❑ Construction of Two-Story Facility 2階建て施設の建設工事
❑ Construction of Supporting Facilities 支援施設の建設工事
Location : Command Fleet Activities Yokosuka, Japan
場 所 : 米海軍横須賀基地
PROJECT INFORMATION
事案についての情報
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
P-039 FACILITY RENDERING
P-039 施設 レンディング
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
VICINITY MAP / HAUL ROUTE / LAYDOWN AREA
付近地図 / 運搬経路 / 資材置き場
PROJECT SITE
事案現場
ONSITE
LAYDOWN
AREA
現場資材置き場
OFFSITE LAYDOWN
AREA
現場から離れた資材置き場
CONTRACTOR
SHALL USE
WOMBLE GATE
FOR ENTRY/EXIT
業者は出入りに Wombleゲートを使 用してください。
OFFSITE LAYDOWN
AREA
現場から離れた資材置き場 If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
SITE PLAN / CONSTRUCTION SUMMARY
敷地図 / 工事概要
NEW P-039 FACILITY
新規 P-039施設
NEW FIRE LANE
新規緊急車両アク セス車線
NEW PARKING LOT
新規駐車場
*FOR PHASING PLAN
REFER TO SHEETS
GC-801 TO GC-808
段階t的工事については、
シートGC-801 から GC-
808を参照。
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
FIRST FLOOR PLAN 1階平面図
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
SECOND FLOOR PLAN 2階平面図
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
BUILDING SECTION 建物断面図
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
GENERAL REQUIREMENTS
一般要件
Pre-Construction Submittals after NTP and prior to the preconstruction conference.
This list is not all inclusive; the Contractor shall review all the requirements prior to commencing work. 着工命令の発行後かつ着工前会議の前までに必要な着工前提出物の一 覧です。これが全てではないので、業者は着工前の要件を全て注意深く確認して下さい。
• Project Schedule プロジェクト日程 o SPEC Section 01 32 01.00 10
• Submittal Register 提出物登録 o SPEC Section 01 33 00-B
• Accident Prevention Plan 事故防止計画 o SPEC Section 01 35 26
• Contractor Quality Control Plan 業者品質管理計画 o SPEC Section 01 45 00.00 10
• Environmental Protection Plan 環境保護計画 o SPEC Section 01 57 19.01
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
CONSTRUCTION GENERAL REQUIREMENTS
工事の一般要件 Below is a summary of Pre-Construction Submittals required after Award and prior to the project kickoff conference. This list is not all inclusive; the contractor shall review all the requirements prior to commencing work. 以下は契約締結後かつプロジェクトのキックオフ会
議前までに必要な着工前提出物一覧です。これが全てではないので、業者は着工前の要件を全 て確認して下さい。
Preconstruction Submittals List
No. Submittals/Activities Submission Dates Specifications
1 Key Personnel Qualifications 5 days after NTP 01 11 00.00 10 1.6
2 Qualifications & Background History of Interpreter 15 days after Award 01 11 00.00 10 1.6.3
3 Contract Cost Breakdown 30 days after NTP 01 20 00 3.3
4 Preliminary Project Schedule 15 days after NTP 01 32 01.00 10 3.4.1
5 Initial Material Status Report 15 days after NTP 01 33 00 1.16
6 Accident Prevention Plan (APP) 15 days prior to PreCon 01 35 26 1.7
7 Contractor Quality Control Plan (CQC) 15 days after NTP 01 45 00.00 10 3.2
9 Environmental Protection Plan (EPP)
Within 15 days after NTP and Not Less than 10 days before Precon
01 57 19 1.11
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
CONSTRUCTION GENERAL REQUIREMENTS
工事の一般要件
• This project is required to complete documentation through the RMS Contractor Module system. 本プロジェクトはRMSの業者側モジュールを通して書類提出を完成させることが義務 付けられています。
• This contract is required to implement the Three Phase Inspection process for all features of work as part of the Contractor’s Quality Control Plan.
本契約は全ての工種項目において3段階検査プロセスに従うことが義務付けられています。
• Project schedule reviews and updates shall be made and submitted monthly with the requested progress payments.
工期全体のプロジェクト日程を作成、更新し、そして毎月の進捗に応じた支払いの請求時に提出 しなければなりません。
• The project will be required to follow EM 385-1-1 Nov 2014.
本プロジェクトは2014年11月バージョンのEM385-1-1に従わなくてはなりません。
• Contract regular working hours are Mon~ Fri 0700~1800. Weekend, federal holiday, and other than normal working hours may be arranged if coordinated 21 calendar days in advance and if approved by the government.
契約の通常の作業時間は平日午前7時から午後6時までです。もし21日前までに調整し承認さ れれば、週末、米国祭日及び他の通常の作業時間以外の作業時間を交渉しても構いません。
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
TYPICAL CHALLENGES FOR CONTRACTORS
業者が頻繁に直面する課題
• Communication (コミュニケーション)
• Lost in translation(通訳/翻訳の誤差により間違った理解をしてしまう)
• Do your research(下調べや準備を行なってください)
• Understand the differences between construction in Japan vs. US MILCON
(一般的な日本の工事と米国予算工事の違いを理解してください)
• Scheduling (日程)
• Understanding requirements(要求事項を理解すること)
• Impacts to project schedules on long lead items (調達に時間のかかる材料はプロジェクトの日 程に影響を与える)
• USACE uses P6 Primavera for all project scheduling (米陸軍工兵は全てのプロジェクトの日程 作成にP6 Primaveraソフトウエアを使用する)
• Submittal documentation(承認願提出物の書類化)
• Not reading and understanding the specifications(仕様書を読んでいない)
• Specification text rules over drawings during conflicts (矛盾があると図面よりも仕様書の文言が 優先する)
• Impacts to project schedules(プロジェクト日程に影響がある)
• U.S. manufactured products vs. Japanese manufactured products (米国製品vs. 日本製品)
• Base access(基地への出入り)
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
UNCLASSIFIED (FOUO)
SITE VISIT LOCATION 現場視察場所
1. BASE ENTRY LOCATION - CFA YOKOSUKA
MEET OUTSIDE CARNEY (MAIN GATE)
THURSDAY, 18 MAY 23, 0850
基地入門場所-米海軍横須賀基地 Carny(メインゲート)の外で集合
2023年5月18日(木)8時50分
2. WALK TO SITE
現場まで徒歩
*3. BUS SERVICES WILL BE PROVIDED
TO OFFSITE LAYDOWN AREA
現場から離れた資材置き場までバスで送迎If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.
THANK YOU
どうもありがとうございました
If there is any conflict between this information and the solicitation, the terms and conditions of the solicitation will govern.