AS-BUILTS_AFFF.pdf

PDF 39 MB Posted

Attached to
OMA Removal and Disposal AFFF Infrastructure, Various Camps, Okinawa
Solicitation number
W912HV23B0009
Issued by

About this file

This document provides details on a federal solicitation to remove and dispose of infrastructure containing aqueous film-forming foam at various military camps in Okinawa, Japan. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Japan under number W912HV23B0009. It seeks the removal and disposal of aqueous film-forming foam, or AFFF, infrastructure from various locations across Okinawa. Responses are due based on the standard solicitation timeline and award will be made to a single contractor responsible for the removal and disposal at all listed camps in Okinawa. The related file provides as-built drawings of the existing AFFF infrastructure to assist offerors with developing their proposals.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

j2ee9kh6 Typewritten Text "FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

"FOR INFORMATION ONLY (FIO) - AS-BUILT DRAWINGS ARE PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THESE AS-BUILT DRAWINGS ARE NOT PART OF THE SOLICITATION AND DO NOT AMEND

THE SOLICITATION PACKAGE. AS-BUILT DRAWINGS MAY NOT BE COMPLETE OR DEPICT EXISTING CONDITIONS. THE CONTRACTOR WILL BE RESPONSIBLE FOR VERIFYING ACTUAL CONDITIONS AT THE SITE.

File details come from the government source that posted it. Updated .