W912HV22R0008 Preproposal Final.pdf

PDF 3 MB Posted

Attached to
FY22 DLA DESC20UX Add/Rpr Additive Injection System, Misawa Air Base, Japan
Solicitation number
W912HV22R0008
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

.59

“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”

Presented by 作成者 :

FY22 DLA DESC20UX ADD/RPR ADDITIVE INJECTION SYSTEM

MISAWA AB, JAPAN

SOLICITATION #: W912HV22R0008

PRE-PROPOSAL CONFERENCE

DATE: SEPTEMBER 7, 2022

2022年度国防兵站局 DESC20UX 添加剤射出設備の追加/修理工事、三沢空軍基地

公示番号:W912HV22R0008

入札前会議 日時:2022年9月7日

Jason Takimoto ジェイソン・タキモト Project Manager プロジェクトマネージャー

Brian Grogan ブライアン・グローガン Technical Team Lead テクニカルリーダー

Jennifer Knutson ジェニファー・クヌットソン Contracting Officer 契約官

Ryan Marzetta ライアン・マルツェッタ Contract Specialist 契約専門職

Guillermo Provencio ギレルモ・プロベンチオ Acting Misawa Resident Engineer 三沢工事監理所長代理

David Flynn デビッド・フリン Project Engineer プロジェクトエンジニア

WELCOME

歓 迎

❑Virtual Roll Call

仮想上の参加者の点呼

❑ Your Company name will be called. Please have one representative from your company identify themselves and identify who is on the line.

会社名をお呼びしましたら代表の方が今回参加されている全員の方のお名前をお 伝えください。

❑ Introduction of Government Personnel

米政府関係者紹介

❑ USACE, Japan Engineer District

米陸軍工兵隊・日本地区

DISCUSSION OVERVIEW

説明会概要

❑Rules of Conference 説明会のルール

❑Quick tips for Solicitations 入札公告の参考情報

❑Contracting requirements 契約要件

❑Site location 現場所在地

❑Scope of work 工事内容

❑General construction requirements 一般工事要件

❑Site visit itinerary 現場視察の流れ

RULES FOR CONFERENCE

当説明会のルール

❑Unofficial and non-binding

非公式で法的拘束力はない。

❑ If there is any conflict between the information discussed during this conference and the solicitation, the terms and conditions of the solicitation will govern

当説明会で協議される情報と入札案内に矛盾がある場合は、入札案内の契約条件 が優先される。

❑All questions are to be submitted in writing via Projnet.

質問/問合わせは全てPROJNETを通じ書面で提出すること。

❑Review all the solicitation requirements

全ての入札要件を確認する。

❑Follow solicitation format as required

入札要件に指示されているフォーマットに従う。

❑Acknowledge all amendment(s)

全ての改訂(アメンドメント)を確認同意する。

❑Respond to every submission requirement

全ての提出要件に回答・対応する。

QUICK TIPS FOR ALL SOLICITATIONS

全ての入札公告に対する参考情報

RFP SOLICITATION FORMAT

入札案内フォーマット

❑Standard Form 1442 フォーム1442 ❑Section 00 10 00, Solicitation CLIN Schedule 契約項目一覧表 ❑Section 00 21 16, Instructions to Proposers 説明 ❑Section 00 22 00, Proposal Submission Requirements 入札書提出要件 ❑Section 00 22 16, Evaluation Factors for Award 評価基準 ❑Section 00 45 00, Representation and Certifications 表明と証明書 ❑Section 00 70 00, Conditions of the Contract 契約条件 ❑Section 00 73 00, Supplementary Conditions 補足条件 ❑Division 01, General Requirements 一般要件 ❑Divisions 02 thru 34, Technical Divisions 技術要件 ❑Drawings 図面

❑Make sure to note the proposal due date and time in Block 13A of SF1442.

SF1442のブロック13Aに記載された入札提出期日および時間を必ず確認する。

❑Proposals due January 18, 2023 at 1400 hrs JST

入札書類の提出期限は日本時間2023年1月18日午後2時

❑Period for acceptance of proposals shall be no less than 120 calendar days for

Government acceptance (see block 13D).

米政府が受諾するための入札価格の有効期間は120日間以上とする。 (ブロック13D参照)

❑Fill out Blocks 14, 15, 17, 19, 20A, 20B, and 20C.

ブロック14, 15, 17, 19, 20A, 20B, 20Cにもれなく記入する。

STANDARD FORM (SF) 1442

SF1442

CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

契約項目一覧

SECTION 00 10 00

SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

契約項目一覧

NOTES 注記:

1. Failure of the offeror to propose prices for all items in the CLIN Schedule may be cause for rejection of the proposal as unacceptable. 契約項目一覧表の全ての項目に対し金額を提案しない入札者は入札が認められない場合があります。

2. See Section 01 20 00, for additional line item description. 追加の契約項目内容についてはセクション01 20 00を参照。

3. In accordance with FAR 52.217-4, Evaluation of Options Exercised at Time of Contract Award, the Government will evaluate the total price for the basic requirement together with any option(s) exercised at the time of award. Evaluation of options will not obligate the Government to exercise the option(s). FAR 52.217-4に従い、米政府は基本項目の合計金額と、 契約時に行使されるオプション項目を合わせた価格を評価します。オプションを評価しますが、米政府にはオプションを実施する義 務はありません。

4. The Government reserves the right to exercise the option item(s) by written notice to the Contractor either singularly or in any combination at time of contract award of the Base Schedule at the prices stated in the CLIN Schedule. Completion of the added option(s) shall continue at the same schedule as the Base Schedule unless otherwise noted in Section 00 70

00, 52.211-10, COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK. 米政府は契約者へ書面で通知し、

基本契約時に契約項目一覧表に記載された金額でいかなるオプションの組合せでも実施する権利を保有します。追加のオプション の完了は、セクション00 70 00, 52.211-10「作業の開始、実施及び完了」に記載がない場合、基本契約と同じ日程で継続するもの とします。

5. LEGEND 凡例: JB = Job 作業

❑Magnitude of the Proposed Project: 工事の規模:

► ¥100,000,000 and ¥500,000,000 1億円から5億円

❑Requests For Information (RFIs): ALL Questions / Inquiries shall be submitted via the PROJNET Bidder Inquiry Model at: https://www.projnet.org/projnet/ .

Please see the solicitation for additional details and instructions.

質問書(RFI):全ての質問/問い合わせはPROJNETのサイト

https://www.projnet.org/projnet/ を介して提出する。追加の詳細および手順に関し ては入札案内書を参照。

❑Requests For Information (RFIs) Due: RFI(質問書)期日:

► 1159PM on October 3, 2022 (JST) 日本時間2022年10月3日午後11時59分

► The Bidder Inquiry Key is: X9NGG6-Y4UEKW

入札者の照会キー

SECTION 00 21 16

INSTRUCTIONS TO PROPOSERS

説 明 https://www.projnet.org/projnet/ https://www.projnet.org/projnet/

❑ SIGNATURE ON OFFERS. Offers must be signed by an officer of the company or an individual who is authorized to sign offers for and on behalf of the company. An individual, other than an officer of the company, who signs an offer must submit evidence of his authority to sign such offer. This evidence must accompany the offer. Failure to comply with this requirement may be cause for rejection of the offer.

入札書類の署名--入札書類は、会社を代表して入札書類に署名する権限を持つ会社の役員ま

たは個人が署名しなければなりません。役員以外の個人が入札書類に署名する場合は、署名 する権限があることを示す証拠を入札書類に添付しなければなりません。この要件に従わない 場合は、入札が却下される可能性があります

❑ JOINT VENTURE. In the event the offeror is a joint venture, the offer must be signed by an authorized representative of each participant in the joint venture. The joint venture as an entity shall also have an active System for Award Management registration – See FAR

52.204-7 System for Award Management. Failure to comply with this requirement may be cause for rejection of the offer.

ジョイントベンチャー—入札者がジョイントベンチャーである場合、入札書類はジョイントベン チャー構成企業全てからの署名権限を持つ代表者によって署名されなければなりません。

SECTION 00 21 16

INSTRUCTIONS TO PROPOSERS - PROVISIONS

説 明 –条 件

Electronic submission: 電子的提出 Electronic submission: Proposals shall be submitted electronically via Procurement Integrated

Enterprise Environment (PIEE) Solicitation Module by the due date and time for submission of proposals. The Government will only accept electronic proposals. Physical or paper copy proposals will not be accepted. See Section 00 21 16.

電子的提出:入札書類は電子的に提出するものとし、入札書類提出の期日と時間までにPIEEモ

ジュール経由で米政府に受領されなければなりません。米政府は電子的な提案のみを受け付けま

す。物理的または紙のコピーの入札書類は受理されません。セクション00 21 16を参照して下さ

い。

Electronic proposals shall be submitted in two (2) separate PDF files for two (2) separate volumes

電子的入札書は2つの別々のボリュームに対しそれぞれ異なる2つのPDFファイルを提出するもの

とします。

Volume I – Technical Proposal 技術提案

Volume II – Price Proposal 価格提案

See solicitation for specific details and submission instructions. 詳細及び提出指示法については入 札案内書を参照して下さい。

SECTION 00 22 00

PROPOSAL SUBMISSION REQUIREMENTS

入札書提出要件

13SECTION 00 22 00

入札書提出要件

技術提案 電子版1部

カバーシート(表紙)

添付I-要素1過去の経験に関する事案情報シート。1事案当たり1枚の情報シートを提出する。最 低1つの事案(最大で3つ)を提出してください。2.3.1.3.2項を参照。

添付II-過去の実績質問票。別紙1に記載した過去の実績のために提出された各事案のPPQの1ページ

目を記入し提出して下さい。2.3.1.3.3項を参照。

14SECTION 00 22 00

提出物要件

価格提案 電子版1部

カバーシート(表紙)

標準様式(SF) 1442 --表と裏のページ -記入と署名

セクション00 10 00 –提案日程

セクション00 45 00 -表明と証明書 -記入・署名

合弁事業契約書(合弁事業の場合)

SF 30 -各改訂(アメンドメント)の表紙(発行されている場合) -記入・署名

15SECTION 00 22 16

EVALUATION FACTORS FOR AWARD

評価要素 ❑ Lowest Price Technically Acceptable Source Selection Process

実施要領に要求された最低技術要件をみたす入札の中で最低価格の入札をした企業と契約をする方式。

A process used in competitive negotiated contracting where the best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price.

実施要領に要求された最低技術要件をみたす入札の中で最低価格の入札を選択することで最高価 値をもららすことが期待される企業と契約をする方式です。

The Government intends to evaluate proposals and award a contract without holding discussions; however, the Government reserves the right to conduct discussions if deemed necessary by the Contracting Officer.

米政府は、入札者と協議を行わずに価格および技術提案を評価し、契約を締結することを意図してい ますが、契約担当官が必要と判断した場合、政府は協議を行う権利を留保しています。

Contract award will be made to the responsible Offeror whose proposal represents the best value to the Government utilizing the Lowest Price Technically Acceptable (LPTA) source selection process.

実施要領に要求された最低技術要件をみたす入札の中で最低価格の入札をした企業と契約をする方

式(LPTA)を利用して、米政府に最高価値を与える入札を提示した入札者と契約を締結します。

16SECTION 00 22 16

❑ FACTOR 1 要素1 – CONSTRUCTION EXPERIENCE 建設施工経験

Evaluation Criteria: The Government will evaluate the construction experience demonstrated by the Offeror. The minimum requirements for this technical evaluation factor will be met if the Offeror demonstrates experience on a minimum of one (1) project that individually meet all of the below criteria for minimum acceptability:

評価基準:米政府は入札者が証明した建設施工経験を評価します。技術評価要素の最低要件は、 入札者が下記の最低許容能力の基準を全て満たす元請業者としての工事事案を1件以上実施した 経験を証明できることです。

(1) Offeror was the Prime Contractor of the project at time of completion;

入札者が元請として完成したものであること。

(2) Project was completed no longer than fifteen (15) years preceding the date of this solicitation;

この募集の日に先立つ 15 年以内に完成したものであること。

(3) At time of project completion, the project had a total contract value greater than or equal to ¥100,000,000 (or $1,000,000 U.S. dollars equivalent); and

1億円(すなわち100万ドル相当)以上の金額の契約であること。

(4) Project was for new construction, repair, or renovation of a liquid petroleum fuel project.

Liquid petroleum fuel includes, but is not limited to, the following types of fuel: Jet A, JP-5, JP-8, diesel.

液体石油燃料(ジェット燃料 Jet A、JP-5、JP-8、ディーゼル等)事案の新規建設、修理又は改修 であること。

17SECTION 00 22 16

❑ FACTOR 1 要素 1 – CONSTRUCTION EXPERIENCE 建設施工経験

If a proposal cannot demonstrate experience on at least one (1) project which individually meets all of the criteria (1) through (4), then the proposal will be considered "unacceptable" and rejected.

入札者が、評価基準(1)から(4)までのすべてを満たす少なくとも1件の事案により、建設施工経験 を示すことができない場合、その入札提案は「入札要件を満たさない」と判断され、却下されます。

Construction Experience will be rated on an “Acceptable” or “Unacceptable” basis utilizing the rating method in Table 1. 建設施工経験は表1の評価法を利用して、許容可能又は許容不 可能に評価されます。

Table 1: Factor 1, Construction Experience, Rating Method

表1:要素1、建設施工経験、評価法

Adjectival Rating 評価 Description 内 容

Acceptable 許容可能 Proposal meets the requirements of the solicitation.

入札提案が入札要件を満たす

Unacceptable 許容不可能 Proposal does not meet the requirements of the solicitation.

入札提案が入札要件を満たさない

18SECTION 00 22 16

❑ FACTOR 2 要素 2 – PAST PERFORMANCE 過去の実績

Evaluation Criteria 評価基準:

Past performance will first be evaluated to determine whether the offeror’s past performance is recent and relevant, or not relevant, to the effort to be acquired. Only recent and relevant projects will be considered for this factor. Performance on a project is deemed recent and relevant if the project individually meets all the criteria listed in the Factor 1, Construction Experience evaluation criteria.

過去の実績は、まず、入札者の過去の実績が最近のものであり、かつ関連性があるかどうかが評価されます。 最近のもので、かつ関連性のある事案のみが本要素に対し検討されます。提出された事案が個別に要素1「建設 施工経験」の評価基準に記載されているすべての基準を満たしている場合、最近の実績であり、関連性があると みなされます。

Second, the past performance evaluation will determine how well the offeror performed on recent and relevant projects. As a minimum, the offeror shall demonstrate overall satisfactory performance (to include a showing of adequate corrective action on adverse past performance information) on recent and relevant projects.

次に、過去の実績評価では、最近のものでかつ関連性のある事案において、入札者がどの程度の実績を残した かを判断します。入札者は提出した事案において、全体的に満足いく施工をしたことを証明するものとします(過 去の不良な状況に対し適切な是正措置を実施した情報を含む)。

19SECTION 00 22 16

❑ FACTOR 2 要素2 – PAST PERFORMANCE 過去の実績

Factor 2, Past Performance, will be rated on an acceptable / unacceptable basis utilizing the rating method in Table 2.

要素2、過去の実績では表2の評価法を利用して許容可能/許容不可能に評価します。

Table 2: Factor 2, Past Performance, Rating Method

表2:要素2、過去の実績、評価法

Adjectival Rating

評 価 Description 内 容

Acceptable

許容可能

Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.

(See note below).

入札者の実績記録に基づき、政府はその入札者が必要な作業を首尾よく実施できると期待することが妥

当である、又は入札者の実績記録が不明である(下記の注意を参照)。

Unacceptable

許容不可能

Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.

入札者の実績記録に基づき、政府はその入札者が必要な作業を首尾よく実施できると期待することは妥

当ではない。

Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or is so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)). Therefore, the offeror shall be determined to have “Unknown” or “Neutral” past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “Acceptable”.

注意: 関連する過去の実績記録が無い又は入手不可能又は少なく妥当で有意義な評価ができない入札者の場合、過去の実績に関し有利に

も不利にも評価されない(FAR 15.305(a)(2)(iv)を参照)。従って、この入札者は過去の実績に関して、「不明」又は「中立」と判断されるものとす

る。許容可能性/許容不可能性についての文脈では、中立という評価は「許容可能」とみなされること。

20SECTION 00 22 16

❑ FACTOR 3 要素3 – PRICE 価格

Evaluation of Price 価格評価

In accordance with FAR 52.217-4, Evaluation of Options Exercised at Time of

Contract Award, the Government will evaluate the total price for the basic requirement together with any option(s) exercised at the time of award.

FAR 52.217-4に従い、米政府は入札者の基本項目の合計金額と、契約時に行使されるオプション

の価格を合わせて価格評価を決定します。

Offerors shall ensure the data in Section 00 10 00 is complete and accurate. Failure to provide all price/cost data requested may be cause for determination of proposals as unacceptable.

入札者はセクション00 10 00 へデータを全て正確に記入するものとします。要求される価格/コスト の全てを記入していない提案は、受入れられないと判断される場合があります。

❑Ensure the following is completed and submitted with proposal (as applicable)

以下も必要事項を全て記入し提出して下さい。

▪ Completed Corporate Certificate 企業証明書

▪ If Joint Venture, Completed Certificate for each member of joint venture

ジョイントベンチャーの場合は各メンバーの企業証明書

▪ FAR Provision 52.204-8, Annual Representation and Certification

▪ FAR Provision 52.204-24, Representation Regarding Certain

Telecommunications and Video Surveillance or Equipment

▪ FAR Provision 52.204-26, Covered Telecommunications Equipment or

Services - Representation

SECTION 00 45 00

REPRESENTATIONS AND CERTIFICATIONS

表明と証明書

❑Ensure the following is completed and submitted with proposal (as applicable)

以下も必要事項を全て記入し提出して下さい。

▪ FAR Provision 52.209-7, Information Regarding Responsibility Matters

▪ FAR 52.229-11, Tax on Foreign Procurements – Notice and

Representation (w/ completed IRS Form W-14)

▪ DFARS 252.204-7017, Prohibition on the Acquisition of Covered Defense

Telecommunications Equipment or Services--Representation

▪ DFARs Clause 252.229-7001, Tax Relief

SECTION 00 45 00

REPRESENTATIONS AND CERTIFICATIONS

表明と証明書

❑FAR Clause 52.211-10, Commencement, Prosecution, and Completion of Work

連邦調達規則(FAR) 52.211-10 作業の開始、実行及び完了

❑Period of Performance: 361 Calendar Days after NTP

契約期間:着工命令から361歴日

❑FAR Clause 52.211-12, Liquidated Damages – Construction

連邦調達規則(FAR) 52.211-12 遅延損害-建設工事

¥390,000 for each Calendar Day of delay

遅延損害金1暦日につき390,000円

SECTION 00 70 00

CONDITIONS OF THE CONTRACT

契約要件

❑ DFARS 252.247-7023, Transportation of Supplies by Sea 海路による輸送

❑ Required to utilize U.S. ocean transportation

米国の海上輸送会社を利用する必要がある。

❑ Submit any request for use of foreign-flag vessels in writing to the

Contracting Officer at least 45 days prior to the sailing date necessary to meet its delivery schedules

外国の海上輸送会社の使用を希望する場合は、納期を満たすために必要な 出航日の少なくとも45日前までに、契約担当官に書面で提出すること。

SECTION 00 70 00

CONDITIONS OF THE CONTRACT

契約要件

SITE LOCATION

現場所在地

Reference: Drawing C-103

Please use Apple Gate to enter base and Main Gate to exit base using haul route as shown.

図示された通り基地に入る際にはアッ プルゲートから入り、運搬ルートを使 用し、基地から出る際はメインゲート から退出して下さい。

Project Area

事案区域

Apple Gate

アップルゲート

Main Gate

メインゲート

GENERAL SCOPE OF WORK

全般的工事内容

Laydown Areas 資材置き場区域

Please discuss desired laydown areas with Contracting

Officer after award

発注後契約官と望ましい資材置き 場について話合って下さい。

Reference: Drawing C-103

Site Plan 配置図

Fuel Additive Tanks (FSII), 2 EA

燃料添加剤タンク(FSII)、2EA

Fuel Additive Tanks (SDA & CI/LI)

燃料添加剤タンク(SDA & CI/LI)

Building 1150 Addition (Fire

Riser Room, Electrical Room)

建物1150追加(スプリンクラー立 上り配管部屋、電気室)

Additive Injectors and piping modifications (B1150 Interior)

添加剤射出機及び配管修正 (B1150の屋内)

Reference: Drawing CS-101

Additive Storage Area 添加剤保管区域

Additive Storage Canopy (Option)

添加剤保管張出屋根(オプション)

Fuel Additive Tanks (FSII)

燃料添加剤タンク(FSII)

Additive Tank (SDA)

添加剤タンク(SDA)

Additive Tank (CI/LI)

添加剤タンク(CI/LI)

Reference: Drawing M-102

B1150 Interior Modifications B1150 室内改修 SDA Mix Tank

SDA混合タンク

Additive

Injector 1

添加剤射出機1

CI/LI Mix Tank

CI/LI混合タンク

Additive

Injector 2

添加剤射出機2

Building Addition

(Fire Riser Room)

追加建物(スプリンク ラー立上り配管部屋)

Building Addition

(Electrical Room)

追加建物(電気室)

Commissioning

Tees

コミッショニング試 験用の接続

Reference: Drawing M-101

As of

5Sep17

GENERAL

REQUIREMENTS

一般要件

Pre-Construction Submittals after NTP and prior to the project kickoff conference.

This list is not all inclusive; the Contractor shall review all the requirements prior to commencing work.

工事開始指示書の発行後かつ着工前会議の前までに必要な着工前提出物の一覧です。これが全てでは ないので、業者は着工前の要件を全て注意深く確認して下さい。

• Project Schedule プロジェクト日程 o SPEC Section 01 32 01

• Submittal Register 提出物登録 o SPEC Section 01 33 00

• Accident Prevention Plan 事故防止計画 o SPEC Section 01 35 26

• Contractor Quality Control Plan業者品質管理計画 o SPEC Section 01 45 00

• Environmental Protection Plan環境保護計画 o SPEC Section 01 57 19

CONSTRUCTION GENERAL

REQUIREMENTS

工事の一般要件

Below is a summary of Pre-Construction Submittals required after Award and prior to the project kickoff conference. This list is not all inclusive; the contractor shall review all the requirements prior to commencing work.以下は契約締結後かつプロジェクトのキックオフ会議前までに必要な着工 前提出物一覧です。これが全てではないので業者は着工前の要件を全て確認して下さい。

Preconstruction Submittals List

No Submittals/Activities Submission Dates Specifications

1 Organization Chart with key personnel qualifications 5 days after NTP 01 11 00.00 10 1.7

2 Qualifications & background history of interpreter 15 days afterAward 01 11 00.00 10 1.7.3

3 Contract cost breakdown 30 days after NTP 01 20 00 3.3

4 Preliminary Project Schedule 15 days after NTP 01 32 01.00 10 3.4.1

5 Initial Material Status Report 15 days after NTP 01 33 00 1.16

6 Accident Prevention Plan (AAP) 15 days prior to PreCon 01 35 26 1.7

7 Contractor Quality Control Plan (CQC) 15 days after NTP 01 45 00.00 10 3.2

8 Environmental Protection Plan (EPP) 15 days afterAward 01 57 19.01 1.9

CONSTRUCTION GENERAL

REQUIREMENTS

工事の一般要件

• This project is required to complete documentation through the RMS Contractor Module system. New

Project now uses RMS 3.0. https://rmsdocumentation.com/

(本プロジェクトはRMSの業者側モジュールを通して書類提出を完成させることが義務付けられています。)

• This contract is required to implement the Three Phase Inspection process for all features of work as part of the Contractor’s Quality Control Plan.

(本契約は全ての工種項目において3段階検査プロセスに従うことが義務付けられています。)

• Project schedule reviews and updates shall be made and submitted monthly with the requested progress payments.

(工期全体のプロジェクト日程を作成、更新し、そして毎月の進捗に応じた支払いの請求時に提出しなければなり ません。)

• The project will be required to follow EM 385-1-1 Nov 2014.

(本プロジェクトは2014年11月バージョンのEM385-1-1に従わなくてはなりません。)

• Contract regular working hours are Mon~ Fri 0700~1700. Weekend, federal holiday, and other than normal working hours may be arranged if coordinated in advance and if approved by the government.

(契約の通常の作業時間は平日午前7時から午後5時までです。もし事前に調整し承認されれば、週末、米国の祭

日及び他の通常の作業時間以外の作業時間を交渉しても構いません。) https://rmsdocumentation.com/

TYPICAL CHALLENGES FOR CONTRACTORS

業者が頻繁に直面する課題

• Communication (コミュニケーション)

• Lost in translation(通訳/翻訳の誤差により間違った理解をしてしまう)

• Do your research(下調べや準備を行なってください)

• Understand the differences between construction in Japan vs. US MILCON

(一般的な日本の工事と米国予算工事の違いを理解してください)

• Scheduling (日程)

• Understanding requirements(要求事項を理解すること)

• Impacts to project schedules on long lead items

(調達に時間のかかる材料はプロジェクト日程に影響を与える)

• Submittal documentation(承認願い提出物の書類化)

• Not reading and understanding the specifications(仕様書を読んでいない)

• Impacts to project schedules(プロジェクト日程に影響がある)

• U.S. manufactured products vs. Japanese manufactured products

(米国製品vs.日本製品)

• Working with multiple stakeholders at Misawa Air Base (三沢空軍基地の多数の 関係者と働く必要があるということ)

• Using Form AF103(書式AF103を使うこと)

• Airfield/Base access(滑走路/基地への出入り)

UNCLASSIFIED (FOUO)

SITE VISIT LOCATION 現場視察

DRIVE ROUTE

THANK YOU