W912HV-22-B-0003 AM-0001.pdf

PDF 166 KB Posted

Attached to
FY22 Airfield Damage Repair (ADR) Storage Facilities Kadena
Solicitation number
W912HV-22-B-0003
Issued by

About this file

This document is an amendment to a federal solicitation for construction services. The amendment provides revised specifications and drawings for three airfield damage repair storage facilities to be constructed at Kadena Air Base in Okinawa, Japan. The facilities will include concrete structures, utilities, site improvements, and demolition of an existing building. The bid due date is extended to March 11, 2022. Only local Japanese contractors registered with the Government of Japan and holding the necessary construction licenses may bid. The work must comply with all Japanese laws and labor standards. No small business set-aside applies. The government intends to award a firm-fixed-price construction contract for between 2.5 and 10 billion yen.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912HV22B0003

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

FY2022 LXEZ1069456 Airf ield Damage Repair (ADR) Storage Facilities, Kadena AB

Provide Government Responses to Contractor Request for Information. See continuation page.

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Feb-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HV22B0003

X 9B. DATED (SEE ITEM 11)

21-Oct-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Feb-2022

CODE

CONTRACTING DIVISION

USACE-JAPAN DISTRICT

RM. 116, BLDG. 364

CAMP FOSTER

CHATAN-CHO, NAKAGAMI-GUN OKINAWA

JAPAN

W912HV 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AM-0001 CONTINUATION PAGE

14. DESCRIPTION OF AMENDMENT (continued)

A. CHANGES TO SPECIFICATIONS – The amendment mark “(AM-0001)” is shown on each page of the amended specification section(s).

(1) Revised Section(s) and Revised Section Attachment(s) to Project Specifications. Attached hereto are the following revised section(s) and revised section attachment(s) to the specifications. Revised section(s) replace like numbered section(s) in the subject solicitation specifications, though some existing section attachment(s) pertaining to these sections remain in effect, as identified below. Revised section attachment(s) replace like-numbered section attachment(s) in the subject solicitation specifications.

Changes are indicated by a red line in the left margin of revised areas. All portions of the revised section(s) and revised section attachment(s) shall apply whether or not changes have been indicated.

Revised Section(s):

Section 01 11 00.00 10 (existing Attachment 01 11 00.00 10-A remains in effect and is not attached to this Amendment) Section 01 45 00.00 10 Section 02 82 13.00 10 Section 03 30 00 Section 07 22 10 Section 07 56 00 Section 08 11 16 Section 08 33 23 Section 08 71 00 Section 09 29 00 Section 09 90 00 Section 10 14 00.20 Section 26 05 48.00 10 Section 26 20 00 Section 26 41 00 Section 31 32 40 Section 33 40 00 Section 33 71 02

Revised Attachment(s): (None)

(2) Added Section(s). The following section(s) are attached hereto and added to the specifications:

Added Section(s): (None)

(3) Deleted Section(s). The following section(s) are deleted entirely from the specifications:

Deleted Section(s): (None)

B. CHANGES TO DRAWINGS (ISSUED) – The amendment mark “(AM-0001)” is shown on each sheet of the amended drawing sheet(s).

(1) Revised Sheet(s) to Drawings. Attached hereto are the following revised sheets to the drawings. Revised sheets will replace like-numbered sheets in the subject solicitation drawings. Changes are indicated in revision clouds. All portions of the revised sheet(s) shall apply whether or not changes have been indicated.

Revised Sheet(s) to Drawing:

A-001 A-311 A-312 A-531 A-532 C-504

CD101B

CG101B

CG201B

CG202B

CS101B

CU101B

E-001 E-101A E-101B E-101C E-102A E-102B E-102C E-103A E-103B E-103C E-104A E-104B E-104C E-105A E-105B E-105C E-106A E-106B E-106C

E-401A E-401C E-501 E-502 E-503 E-505 E-601A E-601B E-601C E-602A E-602B E-602C

ES101A

ES101B

ES101C

GC103B

M-601 S-001 S-801 S-802 S-803 S-804 T-401A T-401B T-501

VF101B

(2) Added Sheet(s) to Drawings. Attached hereto are the following added sheets to the drawings:

Added Sheet(s) to Drawings:

A-100

(3) Deleted Sheet(s). The following sheet(s) are deleted entirely from the drawings:

Deleted Sheet(s) to Drawings: (None)

C. All questions and the Government responses regarding this solicitation are to be viewed through the web-based program “Bidder Inquiry Module”. This program is located on the internet and can be accessed at https://www.projnet.org/projnet. Answers provided to the respective questions through the ProjNet do not amend the solicitation (specifications, drawings, etc.) unless revision to the specifications or drawings is specifically noted and incorporated into the solicitation via an amendment.

D. "As-Built" drawings are provided for informational purposes only. These "As-builts" drawings are not part of the solicitation (and will not become part of the contract) and do not amend the solicitation (specifications, drawings, etc.). "As-builts" drawings may not be complete or depict existing conditions. The contractor will be responsible for verifying actual conditions at the site.

E. The bid due date and time is hereby changed to March 11, 2022 at 2:00 PM.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 04-Feb-2022 02:00 PM to 11-Mar-2022 02:00 PM.

The 'issued by' organization has changed from

CONTRACTING DIVISION

USACE-JAPAN DISTRICT

RM 147, BLDG. 250

CAMP ZAMA

ZAMA-CITY, KANAGAWA 252-8511

JAPAN

to

CONTRACTING DIVISION

USACE-JAPAN DISTRICT

RM. 116, BLDG. 364

CAMP FOSTER

CHATAN-CHO, NAKAGAMI-GUN OKINAWA

JAPAN

(End of Summary of Changes)

(1) Revised Section(s) and Revised Section Attachment(s) to Project Specifications. Attached hereto are the following revised section(s) and revised section attachment(s) to the specifications. Revised section(s) replace like numbered section(s) in th...
Revised Section(s):
Section 01 11 00.00 10 (existing Attachment 01 11 00.00 10-A remains in effect and is not attached to this Amendment)
Section 01 45 00.00 10
Section 02 82 13.00 10
Section 03 30 00
Section 07 22 10
Section 07 56 00
Section 08 11 16
Section 08 33 23
Section 08 71 00
Section 09 29 00
Section 09 90 00
Section 10 14 00.20
Section 26 05 48.00 10
Section 26 20 00
Section 26 41 00
Section 31 32 40
Section 33 40 00
Section 33 71 02
Revised Attachment(s): (None)
(2) Added Section(s). The following section(s) are attached hereto and added to the specifications:
Added Section(s): (None)
(3) Deleted Section(s). The following section(s) are deleted entirely from the specifications:
Deleted Section(s): (None)
B. CHANGES TO DRAWINGS (ISSUED) – The amendment mark “(AM-0001)” is shown on each sheet of the amended drawing sheet(s).
(1) Revised Sheet(s) to Drawings. Attached hereto are the following revised sheets to the drawings. Revised sheets will replace like-numbered sheets in the subject solicitation drawings. Changes are indicated in revision clouds. All portions of th...
(2) Added Sheet(s) to Drawings. Attached hereto are the following added sheets to the drawings:
(3) Deleted Sheet(s). The following sheet(s) are deleted entirely from the drawings:
Deleted Sheet(s) to Drawings: (None)