A.1.9 - AM-0002_Rev DWG_20B0007 Waterslide.pdf
PDF 789 KB Posted
- Attached to
- FY20 O&M Repair Torii Beach Waterslide, Okinawa
- Solicitation number
- W912HV20B0007
About this file
This solicitation package includes specifications and drawings for repair work to a waterslide structure and associated facilities at Torii Station in Okinawa, Japan. The project scope involves structural repair of the waterslide, staircase, and drainage system; replacement of the lightning protection system; and repair of footbaths and spalled concrete surfaces. The estimated contract value is between 100 million and 500 million Japanese Yen. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Japan. The solicitation number is W912HV20B0007 and the project title is FY20 O&M Repair Torii Beach Waterslide, Okinawa. Responses are due as indicated on the standard solicitation form.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DMH
X
X
X X
X X
X
X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X X
X X
X X
XXX
XXXXXX
X
X
X
X
X
X
X
X X
X
DMH
DMH
BLDG
BLDG 316
G
G
G R
G R
G R
D
G G
G R
G
G D
G
G G
D
D
GR
G R G
R
GR
G R
G R
GR
GR
GR
G
G
X
X
X X
X X
X
X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X X
X X
X X
XXX
XXXXXX
X
X
X
X
X
X
X
X X
X
BLDG
DMH
BLDG 316
G
G
G
G G
G
G G
G
1 : 100
REMOVAL ELECTRICAL PLANC2
SCOPE OF WORK
GRAPHIC SCALE
10m510
1 : 100
1 : 100
MODIFIED ELECTRICAL PLANC7
LEGEND AND ABBREVIATION
D
ES
C R
IP
TI
O N
D
AT
E
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N
AM
E:
SI
ZE
A
D R
AW
IN
G C
O D
E:
-W
2H
V-
-D -0
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
JA
PA
N D
IS
TR
IC
T
AP
O
A P
3-
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
M
AR
K
US Army Corps of Engineers
IS
SU
E D
AT
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
M
AY
SU
ST
AI
N M
EN
T, R
ES
TO
R
AT
IO
N , A
N D
M O
D
ER
N
IZ
AT
IO
N (S
R M
FY
O
&M R
EP
AI
R T
O R
II
BE
AC
H
W
AT
ER
SL
ID
E, TO
R
II
ST
AT
IO
N , O
KI
N
AW
A, J
AP
AN
RTA
M .N
FI
LE
P
AT
H
Z:
\1
D
ES
IG
N \0
JE
D _O
AO
\1
R
EP
AI
R T
O R
II
BE
AC
H
W
AT
ER
SL
ID
E\
D
W G
\0
EL
EC
\E -1
R
EM
O
VA
L
AN
D
M O
D
IF
IE
D
E
LE
C
TR
IC
AL
P
LA
N
C O
PY
PL
TT
ED
: 2
Ju ly
:3
PM
BY
: D -0
C
TB
: A
EC
ST
D
BA
N
D W
5.
C
TB
G U
S H
IK
EN
A R
C H
IT
EC
TU
R
A L
EN
G
IN
EE
R
IN
G C
O
LT
D
O
K
IN
A W
A , J
A P
A N
E-101
E-
1.
dw g
IS
O A
Y.
K
M .P
PC
S
R
EM
O
VA
L
AN
D M
O D
IF
IE
D E
LE
C
TR
IC
AL
P
LA
N
S
1. REMOVE EXISTING WATER SLIDE STRUCTURE'S BONDING
CONDUCTORS, GROUND WIRES AND GROUND RODS.
2. PROVIDE NEW BONDING/GROUNDING WIRES FOR METAL PARTS OF
THE NON-ELECTRICAL METAL PARTS OF THE WATER SLIDER
STRUCTURE. ALL METALLIC PARTS OF THE WATER SLIDER
STRUCTURE, INCLUDING REINFORCING METAL SUPPORT SHALL BE
BONDED TOGETHER USING STRANDED COPPER CONDUCTOR.
3. PROVIDE A LIGHTNING PROTECTION SYSTEM DESIGNED TO
PROTECT THE WATER SLIDER, STAIR TOWER AND THE POOL
STRUCTURE THRU INSTALLATION OF A 25 METER POLE COMPLETE
WITH BUT NOT LIMITED TO LIGHTNING AIR TERMINAL, TWO COPPER
DOWN CONDUCTORS (180 DEGREES APART) CONNECTED TO
SEPARATE GROUND RODS.
COPPER CRIMP TEE SPLICER
G
DOWN CONDUCTOR, #2/0 AWG BARE COPPER WIRE (BCW)
4" x 4" GROUNDING PLATE FOR STRUCTURE GROUNDING POINTS, CAST BRONZE
MAIN CONDUCTOR, #2AWG W/ GREEN INSULATION
CONTINUATION OF DOWN CONDUCTOR TO GROUND ROD DIRECT BURIED (NO CONDUIT)
GROUND ROD 19mm DIA x 3050mm LENGTH
D
GROUND RING, #2/0 AWG BARE COPPER WIRE (BCW) DIRECT BURIED (NO CONDUIT)GR
LIGHTNING AIR TERMINAL
PLAN NORTH
REPLACEMENT/NEW WORK
LIGHTNING PROTECTION
CONCRETE POLE W/
LIGHTNING
AIR TERMINAL
(HEIGHT:25m)
C3 E-501
REMOVE BOND
TO EXIST WATER PIPE
REMOVE EXIST
BONDING CONDUCTORS &
GROUND WIRES (TYP)
REMOVE EXIST
GROUND ROD
BOND TO STEEL RAILING
BOND TO EXIST WATER PIPE
BOND TO NEW
STAIR TOWER
STEEL FRAME
BOND TO WATER SLIDE
STEEL SUPPORT (TYP)
BONDING
BOND TO WATER SLIDE
NEW STEEL SUPPORT
(TYP)
REMOVE BOND
TO WATER SLIDE
STEEL SUPPORT
(TYP)
REMOVE BOND
TO WATER SLIDE
STEEL SUPPORT
(TYP)
GROUNDING TEST WELL
(TYP)
B9 E-501
GENERAL NOTES:
1. PROVIDE GROUNDING ELECTRODE SYSTEM CONSISTING OF BARE STRANDED COPPER
CONDUCTORS AND GROUND RODS AROUND THE FACILITY FOR CONNECTION TO THE NEW
LIGHTNING PROTECTION SYSTEM DOWN CONDUCTORS.
2. PROVIDE GROUND TEST WELL (ACCESSIBLE TEST POINT WHERE THE CONTINUITY AND FALL OF
POTENTIAL GROUND TEST LEADS MAYBE CONNECTED) FOR PERIODIC TESTING OF GROUNDING
ELECTRODE SYSTEM.
3. GROUNDING SYSTEM TEST SHALL BE PERFORMED TO ENSURE CONTINUITY AND THAT THE
RESISTANCE TO GROUND IS NOT EXCESSIVE PER CODE REQUIREMENTS.
4. ANY DOWN CONDUCTOR SUBJECT TO MECHANICAL DAMAGE OR DISPLACEMENT SHALL BE
PROTECTED WITH PROTECTIVE MOLDING OR COVERING A MINIMUM OF 2400mm ABOVE GRADE
LEVEL.
5. GROUND RODS MUST BE AT LEAST 0.91 METER (3 FEET) FROM BUILDING WALLS OR FOOTING
AND MUST BE DRIVEN TO FULL LENGTH PLUS 0.31 METER (1 FOOT) BELOW GRADE LEVEL.
6. UNLESS OTHERWISE INDICATED ALL GROUND CONNECTIONS UNDERGROUND SHALL BE BY
EXOTHERMIC WELD. ALL GROUND CONNECTIONS ABOVE GROUND LEVEL SHALL USE
COMPRESSION TYPE CONNECTORS.
7. RESTORE PAVED AREAS TO ORIGINAL CONDITION AND OTHER AREAS DISTURBED BY
TRENCHING, STORING OF DIRT, CABLE LAYING, AND OTHER WORK.
F9 E-501
F6 E-501
F6 E-501
AD
DE
D C
OP
PE
R S
PL
ICE
R &
FA
ST
EN
ER
TY
PE
HO
LD
ER
, R
EV
ISE
D H
EIG
HT
O
F C
ON
DU
IT
LE
GE
ND
/2
9/
COPPER CRIMP PARALLEL SPLICER
CABLE HOLDER (FASTENER TYPE)
D6 E-501
COPPER CRIMP
PARALLEL SPLICER
(TYP)
D6 E-501
CABLE HOLDER
(FASTENER TYPE)
(TYP) D9
E-501
COPPER CRIMP
TEE SPLICER
(TYP) C9
E-501 j2ee9sag Text Box
(AM-0002)
SODDING AREA 1-WAY
NOT TO SCALEF6
GROUNDING CONDUCTOR
WARNING TAPE
COMPACTED BACKFILL
SOD WITH TOPSOIL
GL
(M
IN
230 230
CONC PAVEMENT AREA 1-WAY
NOT TO SCALEF9
(M
IN
GL
CONCRETE PAVEMENT
(BY STRUCTURAL WORK)
TOP AND BOTTOM BARS
(BY STRUCTURAL WORK)
COMPACTED BACKFILL
WARNING TAPE
GROUNDING CONDUCTOR
230 230
D
ES
C R
IP
TI
O N
D
AT
E
D
ES
IG
N
ED
B
Y:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N
AM
E:
SI
ZE
A
D R
AW
IN
G C
O D
E:
-W
2H
V-
-D -0
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
JA
PA
N D
IS
TR
IC
T
AP
O
A P
3-
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
M
AR
K
US Army Corps of Engineers
IS
SU
E D
AT
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
M
AY
SU
ST
AI
N M
EN
T, R
ES
TO
R
AT
IO
N , A
N D
M O
D
ER
N
IZ
AT
IO
N (S
R M
FY
O
&M R
EP
AI
R T
O R
II
BE
AC
H
W
AT
ER
SL
ID
E, TO
R
II
ST
AT
IO
N , O
KI
N
AW
A, J
AP
AN
RTA
M .N
FI
LE
P
AT
H
Z:
\1
D
ES
IG
N \0
JE
D _O
AO
\1
R
EP
AI
R T
O R
II
BE
AC
H
W
AT
ER
SL
ID
E\
D
W G
\0
EL
EC
\E -5
L
IG
H
TN
IN
G P
R O
TE
C
TI
O
N A
N D
G R
O U
N D
IN
G
S
YS
TE
M
D
ET
AI
LS
C
PY
PL
TT
ED
: 2
Ju ly
:2
PM
BY
: D
-0
C
TB
: A
EC
ST
D
BA
N D
W 5.
C
TB
G U
S H
IK
EN
A R
C H
IT
EC
TU
R
A L
EN
G
IN
EE
R
IN
G C
O
LT
D
O
K
IN
A W
A , J
A P
A N
350mm DIA POLE TOP
CONCRETE POLE
WEIGHT: 10420kg
LENGTH: 28.3 METER
CALCULATED DEMAND FOR MOMENT AT POLE BASE
ALLOWABLE STRESS DESIGN LOAD OF CONCRETE POLE (kN-m)
LIMIT OF CRACKING MOMENT AT THE BOTTOM OF POLE
Mcr = ( 25.0 - 0.25 ) x 30.0 Mcr = 742.5 kN-m
FINISHED GRADE
IRON STEPS
(PROVIDE QTY PER
MANUFACTURER'S STANDARDS)
POLE BAND (TYP)
AWG #2/0(G) BCW
IN PVC 27mm CND
19mm x 457mm
COPPER BLUNT TIP AIR TERMINAL
MOUNT BASE AND BONDING STRAP
BONDING PLATE
SECURED TO MAST
CONCRETE POLE FOUNDATION,
PILE AND PAVEMENT
(FOR DETAILS REFER TO
STRUCTURAL DRAWING S-102)
GROUNDING RESISTANCE
LESS THAN 25 OHMS
0m m
0m m m m
700mm DIA
1200mm
AWG #2/0(G) BCW
DOWN CONDUCTOR
180DEGREES APART
POLE MOUNTED LIGHTNING PROTECTION SYSTEM DETAIL
SCALE : NTSC3
GROUND
GROUNDING TEST WELL ACCESS BOX DETAIL
SCALE : NTSB9
FINISHED GRADE
GROUNDING TEST WELL
ACCESS BOX
GROUND LOOP
#2/0 AWG BARE COPPER WIRE
GROUND ROD
19mm DIAMETER 3,050mm LENGTH
#2/0 AWG BCW
(TO NEXT GROUND ROD)
GROUND ROD
19mm DIAMETER 3,050mm LENGTH
GROUND ROD
19mm DIAMETER 3,050mm LENGTH
GROUNDING TEST WELL
ACCESS BOX
E-501
E-
1.
dw g
IS
O A
Y.
K
M .P
PC
S
LI
G
H
TN
IN
G
P R
O
TE
C
TI
O N
A N
D G
R O
U N
D
IN
G D
ET
AI
LS
m m
PROTECTIVE
COVERING (TYP)
0m m
0m m
0m m m m
EXOTHERMIC WELD
#2/0 AWG BCW
(TO NEXT GROUND ROD)
0m m
AD
DE
D P
OL
E D
ES
CR
IPT
IO
N &
BO
ND
ING
DE
TA
IL,
RE
VIS
ED
SE
TT
ING
DE
PT
H &
HE
IG
HT
O
F C
ON
DU
IT
/2
9/
COPPER CRIMP TEE SPLICER
SCALE : NTSC9
CABLE HOLDER (FASTENER TYPE)
SCALE : NTSD9
CAST BRONZE BONDING PLATE
SCALE : NTSC6
BOND TO BUILT-UP STEEL SUPPORT
SCALE : NTSD6
GROUNDING PLATE FOR
STRUCTURE GROUNDING
POINTS
COPPER CRIMP
PARALLEL SPLICER
CAST BRONZE
BONDING LUG
MAIN CONDUCTOR
EXISTING WATERSLIDE
CABLE HOLDER CONNECT TO
EXISTING WATERSLIDE JOINTS
MAIN CONDUCTOR
j2ee9sag
N
R
T
H
D E
S C
R I P
T I O
N D
A T
E
D E
S I G
N E
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
C T
F I L E
A M
E
S I Z
E
A
D R
A W
I N
G
C
O D
E
-W
H V
D
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
A P
O
A
P
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
M A
R K
US Army Corps of Engineers
I S
S U
E
D
A T
E
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
M A
Y
S U
S T
A I N
M E
N T
R
E S
T O
R A
T I O
N
A
D
M
D
E R
N I Z
A T
I O
N
S
R M
F Y
R
P
A I
R
I I
B
E A
H
W
T
E R
S L
I D
E
T O
R I I
S
T A
T I O
N
O
K I N
A W
A
J A
P A
N
RTA
M N
F I
T
H
U
S E
R S
L D
E S
K T
O P
T
E M
P W
A T
S
I D
E R
E V
I S
I O
N S
J U
Y D
R A
W I N
G S
J U
L Y
S
O
T T
E D
J u l y
B
Y
L
B
G U
S H
IK
EN
A R
C H
IT
EC
TU
R
A L
EN
G
IN
EE
R
IN
G C
O
LT
D
O
K
IN
A W
A , J
A P
A N
S-102
S d w g
I S
O
A
M N
J P
M F
L I G
H T
N I N
G
P
R O
T E
C T
I O
N
P
O
F
U
N D
A T
I O
N
D
E T
A I L
REFERENCE POINT
(NORTH-WEST CORNER OF B319
1000800
P-1
NTS
A1
LIGHTNING PROTECTION POLE FOUNDATION
Ø1200
CONCRETE POLE,
REFER TO 10/S-001
FOR SPECIFICATION
Ø1200 PHC PILE (PC-1)
SCALE 1:30
A4
PC-1 ELEVATION DETAIL
SCALE 1:30
E4
PILE AND PAVEMENT LAYOUT
Ø1200
Ø700 100
Ø1200 PHC PILE
(INSTALLATION BY INNER EXCAVATION
METHOD BY MANUFACTURER)
CONCRETE FILL
CONCRETE POLE
PAVEMENT
D13 TOP AND BOTTOM BARS
@ 200mm OC, EW.
0.20mm THK POLYETHYLENE SHEET
300MM THK IMPORTED ENGINEERED
GRANULAR FILL MATERIAL, COMPACTED TO
A MINIMUM OF 95% COMPACTION AS
DETERMINED BY ASTM D1557 OR EQUIVALENT
JIS A 1210.
Ø700
Ø350
150 Ø900
TO MATCH EXISTING PAVEMENT LEVEL
STOP CONCRETE PLACING ONCE AT THE
BOTTOM OF CONCRETE POLE. SET THE
CONCRETE POLE AND PLACE CONCRETE
AFTER PUMPING OUT OF STANDING WATER.
NOTE:
STATEMENT OF WORK:
CUT AND REMOVE THE EXISTING ANGLE BAR SUPPORT UP TO 10mm DEEP
FROM THE CONCRETE SURFACE, CLEAN AND APPLY ANTI-RUST PROTECTIVE
COATING, SEAL WITH EPOXY MORTAR, PAINT TO MATCH THE EXISTING
FINISH, AND INSTALL NEW STEEL SUPPORT ASSEMBLY TYPE-1 AS DETAILED
ON A1/S-101. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR
APPROVAL OF CONTRACTING OFFICER PRIOR TO INSTALLATION.
CUT AND REMOVE THE EXISTING ANGLE BAR SUPPORT UP TO 10mm DEEP
FROM THE CONCRETE SURFACE, CLEAN AND APPLY ANTI-RUST PROTECTIVE
COATING, SEAL WITH EPOXY MORTAR, PAINT ALL THE SURFACE TO MATCH
THE EXISTING FINISH, AND INSTALL NEW STEEL SUPPORT ASSEMBLY
TYPE-2 AS DETAILED ON A6/S-101. THE CONTRACTOR SHALL SUBMIT SHOP
DRAWINGS FOR APPROVAL OF CONTRACTING OFFICER PRIOR TO
INSTALLATION.
REMOVE EXISTING HORIZONTAL ANGLE BAR BEAM, CUT AND REMOVE THE
EXISTING GUSSET PLATE UP TO 10mm DEEP FROM THE CONCRETE
SURFACE, CLEAN AND APPLY ANTI-RUST PROTECTIVE COATING, SEAL WITH
EPOXY MORTAR, AND INSTALL NEW STEEL FRAME AS DETAILED ON D1/S-201
AND D6/S-201.
REMOVE EXISTING DIAGONAL BRACING BAR AND REPLACE AS FRAMED
ON D1/S-201 AND D6/S-201.
CUT AND REMOVE THE EXISTING STEEL PLATE TREAD SUPPORTS UP TO
10mm DEEP FROM THE CONCRETE SURFACE, CLEAN AND APPLY ANTI-RUST
PROTECTIVE COATING, SEAL WITH EPOXY MORTAR, PAINT ALL THE SURFACE
TO MATCH THE EXISTING FINISH. SEE DETAIL B1/S-201. (ALUMINUM STAIR
TREADS = 36 PCS.)
INSTALL NEW STAIR TREADS SUPPORTS AS DETAILED ON A1/S-201.
(ALUMINUM STAIR TREADS = 36 PCS.).
REPAIR CRACKS ON STAIR LANDING WITH EPOXY MORTAR TO MATCH
ADJACENT EXISTING SURFACES. SEE DETAIL E5/S-101. (ESTIMATED LENGTH
OF CRACK = ± 26m).
REPAIR SPALLED CONCRETE WITH POLYMER CEMENT PASTE TO MATCH
ADJACENT EXISTING SURFACES. SEE DETAIL D5/S-201.
(ESTIMATED AREA = ±157.00 m²).
REPLACE CORRODED BOLTS, NUTS AND WASHERS. (ESTIMATED SIZE AND
NUMBER OF BOLTS = 8 -M16mm HSB)
PAINT ALL THE SURFACE OF WATER SLIDER STRUCTURAL SUPPORT AND
STAIR TOWER.
PROVIDE ADDITIONAL LIGHTNING PROTECTION POLE, REFER TO S-102
FOR DETAILS.
PROVIDE ADDITIONAL 200mm THK PAVEMENT, REFER TO S-102 FOR DETAILS.
REPAIR CORRODED STAIR RAILINGS SUPPORTS BY REMOVING RUST,
REPLACE DETERIORATED PLATES, REPLACE BOLTS, AND APPLY PROTECTIVE
COATING.
REPAIR ALL WATER SLIDE FIBERGLASS SURFACE AND APPLY PROTECTIVE
COATING, REFER TO 11/S-001 WATER SLIDE REPAIR METHOD.
10.5 2
1 : 30
0 3m
GRAPHIC SCALE
JOINT LOCATION (TYP.)
A D
D E
D
P
O
J
I N
T
L O
C A
T I O
N j2ee9sag
| E-101 |
| E-501 |
| S-102 |
| Sheets and Views |
| S-102 |
File details come from the government source that posted it. Updated .