DRAFT
GENERAL NOTES: PUBLIC HEALTH AND SAFETY NOTES (CONT):
GENERAL TRAFFIC NOTES:
5. THE SITE SHOULD DISPLAY CLEAR SIGNS WHICH ARE VISIBLE TO PEDESTRIANS,
INDICATING THAT CONSTRUCTION IS IN PROGRESS ALONG THE PERIMETER OF THE SITE
AND AT ANY ENTRANCE TO THE SITE. AT ENTRANCES TO SITES, A SIGN SHOULD ALSO BE
DISPLAYED INDICATING THAT THE AREA AFTER THE ENTRANCE IS A HARD HAT AREA,
REQUIRING THE USE OF A SAFETY CONSTRUCTION HARD HAT AT ALL TIMES.
6. WHEN CRANES ARE LIFTING HEAVY MATERIALS TO DEPOSIT ON THE SITE, THE CRANES
SHOULD NOT MOVE THE MATERIAL OVER ANY SPACE THAT IS NOT CORDONED OFF. IF A
CRANE NEEDS TO MOVE A LOAD OUT OF THE SITE REGULARLY, THE AREAS DIRECTLY
BELOW WHERE THE CRANE WILL BE MOVING ITS LOAD SHOULD BE BLOCKED TO THE
PUBLIC IN CASE ANYTHING FALLS FROM THE CRANE.
7. UNEVEN AND DANGEROUS SURFACES AND TERRAIN CAN RESULT FROM CONSTRUCTION
WORK. WHEN WORK IS CARRIED OUT ON THE GROUND, THE SAFETY OF THE PUBLIC IS
THREATENED BY THE UNEVEN AND COLLAPSIBLE TERRAIN. TO AVOID PEDESTRIANS
BEING UNABLE TO ACCESS THE AREAS NEEDED AND CAUSING INCONVENIENCE, AND TO
PROVIDE SAFE PASSAGE THROUGH THE DANGEROUS SITUATIONS ON THE GROUND, A
PLATFORM SURFACE SHOULD BE ERECTED OVER THE GROUND FOR THE PUBLIC TO
WALK ON.
8. CONSTRUCTION SAFETY IS CRUCIAL IN COMPLETING A SUCCESSFUL PROJECT AND
SHOULD ALWAYS TAKE THE SAFETY OF THE PUBLIC INTO ACCOUNT AS MUCH AS THE
SAFETY OF CONSTRUCTION WORKERS BY USING STRICT RULES AND ENFORCING
COMPLIANCE FROM THE CONTRACTOR AND THE PUBLIC TO AVOID INJURIES AND
FATALITIES TO THE MAXIMUM EXTENT POSSIBLE.
1. TRAVEL PATHS FOR GENERAL TRAFFIC AND SITE VEHICLE MOVEMENTS MUST BE CLEARLY
MARKED.
2. REGULATORY AND WARNING SIGNS WITHIN THE CONSTRUCTION ZONE THAT ARE IN
CONFLICT WITH THE FLOW OF TRAFFIC AROUND THE CONSTRUCTION SITE SHALL BE
REMOVED OR COVERED. ALL SIGNS SHALL BE RESTORED UPON COMPLETION OF THE
WORK.
3. ALL CONSTRUCTION WARNING SIGNS SHALL BE PROMPTLY REMOVED OR COVERED
WHENEVER THE MESSAGE IS NOT APPLICABLE OR NOT IN USE. THE BACKS OF ALL SIGNS
USED FOR TRAFFIC CONTROL SHALL BE APPROPRIATELY COVERED TO PRECLUDE THE
DISPLAY OF INAPPLICABLE SIGN MESSAGES (I.E., WHEN SIGNS HAVE MESSAGES ON BOTH
FACES).
4. AT THE END OF EACH WORKING DAY OR AS SOON AS THE WORK IS COMPLETED, THE
CONTRACTOR SHALL REMOVE ALL TRAFFIC CONTROL DEVICES NO LONGER NEEDED TO
PERMIT FREE AND SAFE PASSAGE OF PUBLIC TRAFFIC. REMOVAL SHALL BE IN THE
REVERSE ORDER OF INSTALLATION.
5. WHERE PEDESTRIAN WALKWAYS EXIST, THEY SHALL BE MAINTAINED IN SAFE PASSABLE
CONDITION OR OTHER FACILITIES FOR PEDESTRIANS SHALL BE PROVIDED. PASSAGE
BETWEEN WALKWAYS AT INTERSECTIONS SHALL LIKEWISE BE PROVIDED WITH SAFETY
BARRICADES OR FENCING.
6. NO MATERIAL AND/OR EQUIPMENT SHALL BE STOCKPILED OR OTHERWISE STORED WITHIN
STREET TRAVELED WAY.
7. THE CONTRACTOR SHALL PROVIDE, INSTALL, AND MAINTAIN ALL NECESSARY
CONSTRUCTION TRAFFIC SIGNS, LIGHTS, FLARES, BARRICADES, MARKERS, CONES, AND
OTHER PROTECTIVE FACILITIES AND SHALL TAKE ALL NECESSARY PRECAUTIONS FOR
THE PROTECTION AND SAFETY OF PUBLIC TRAFFIC. THE CONTRACTOR SHALL PROVIDE
FLAG MEN AS NECESSARY TO DIRECT TRAFFIC IF A LANE IS CLOSED TO PERFORM THE
WORK. ALL SUCH PROTECTIVE FACILITIES AND PRECAUTIONS TO BE TAKEN SHALL
CONFORM WITH THE "RULES AND REGULATIONS GOVERNING THE USE OF TRAFFIC
CONTROL DEVICES AT WORK SITES ON OR ADJACENT TO PUBLIC STREETS AND
HIGHWAYS" ADOPTED BY THE HIGHWAY SAFETY COORDINATOR, AND THE U.S. HIGHWAY
ADMINISTRATION "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND
HIGHWAYS, PART 6 - TEMPORARY TRAFFIC CONTROL" 2009 EDITION, UNLESS OTHERWISE
SPECIFIED ON THE PLANS AND SPECIFICATIONS. THE CONTRACTOR SHALL PROVIDE TO
THE BASE SECURITY POLICE A TRAFFIC CONTROL PLAN APPROVED BY THE CONTRACTING
OFFICER.
8. ONE LANE OF THE PARKING AREA SHALL BE OPEN TO TRAFFIC AT ALL TIMES.
1. ALL UNDERGROUND PIPES, CABLES OR DUCTLINES KNOWN TO EXIST BASED ON AVAILABLE
RECORDS ARE INDICATED ON THE PLANS AND ARE APPROXIMATE ONLY. THE CONTRACTOR
SHALL VERIFY THE LOCATION, SIZE AND DEPTH OF THE FACILITIES WHERE SHOWN AND
EXERCISE PROPER CARE IN EXCAVATING THE AREA. ANY DAMAGE TO THESE FACILITIES
SHALL BE REPAIRED AND PAID FOR BY THE CONTRACTOR. CONTRACTOR SHALL
COORDINATE WITH THE CONTRACTING OFFICER FOR AN EXCAVATION PERMIT.
2. EXISTING SURFACE CONDITIONS, INCLUDING BUT NOT LIMITED TO PAVEMENT, SIDEWALKS, CURBS, AND EXISTING UTILITIES WHICH MAY OR MAY NOT BE SHOWN ON DRAWINGS, THAT
ARE DISTURBED BY CONTRACTOR'S OPERATIONS, SHALL BE RESTORED TO A CONDITION
SATISFACTORY TO THE CONTRACTING OFFICER AND SHALL MATCH ALL EXISTING
ADJACENT SURFACES AT THE CONTRACTOR'S EXPENSE.
3. THE CONTRACTOR SHALL VERIFY AND CHECK ALL DIMENSIONS, ELEVATIONS AND DETAILS
SHOWN ON THE PLANS PRIOR TO START OF ANY CONSTRUCTION WORK. ANY
UNCERTAINTIES OR DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE
CONTRACTING OFFICER IMMEDIATELY FOR CLARIFICATION.
4. IF A CONFLICT ARISES BETWEEN THE REQUIREMENTS OF THE GENERAL PROVISIONS AND
THE SPECIFICATIONS, THE REQUIREMENTS OF THE SPECIFICATIONS SHALL GOVERN.
5. IN THE EVENT THAT ANY CHANGES IN ALIGNMENT OR GRADE ARE REQUIRED DUE TO
UNFORESEEN CONFLICT WITH OTHER UNDERGROUND UTILITIES, THE CONTRACTOR SHALL
INFORM THE CONTRACTING OFFICER OF SUCH CONFLICT. NO CHANGES IN ALIGNMENT OR
GRADE SHALL BE MADE WITHOUT THE APPROVAL OF THE CONTRACTING OFFICER IF NOT
SHOWN ON PLANS.
6. THE GOVERNMENT REQUIRES 30 DAYS ADVANCE NOTICE FOR ANY DISRUPTION OF UTILITY
SERVICES, INCLUDING WATER AND SEWER SERVICES.
7. THE CONTRACTOR SHALL NOTIFY THE GOVERNMENT UPON UNCOVERING ANY POTENTIAL
HISTORICAL ARTIFACTS OR ITEMS OF ARCHAEOLOGICAL SIGNIFICANCE.
8. THE PROJECT SITE SHALL BE FENCED AND SECURED AT ALL TIMES DURING CONSTRUCTION
FENCES AND GATES SHALL BE STRUCTURALLY INTACT AND LOCKED DURING PERIODS OF
NO CONSTRUCTION WORK. THE WORK AREA FOR A SPECIFIC WORK PERIOD SHALL BE
FLAGGED BEFORE THE COMMENCEMENT OF WORK FOR THAT PERIOD.
9. THE CONTRACTOR SHALL SUBMIT A DUST AND EROSION CONTROL PLAN TO THE
CONTRACTING OFFICER FOR APPROVAL PRIOR TO ANY COMMENCEMENT OF GRADING OR
TRENCHING. THE DUST AND EROSION CONTROL PLAN SHALL ADDRESS PREVENTION OF
SILTATION TO ADJACENT AND EXISTING WATERWAYS. THE CONTRACTOR IS RESPONSIBLE
FOR SECURING ANY PERMITS REQUIRED FOR REMOVING DELETERIOUS MATERIALS FROM
THE PROJECT SITE.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DAILY CLEARING AND REMOVAL OF
ALL SILT AND DEBRIS GENERATED BY HIS GRADING AND CONSTRUCTION WORK THAT
DEPOSIT AND ACCUMULATE ON ROADWAYS OR OTHER AREAS. THE CONTRACTOR SHALL
REIMBURSE THE GOVERNMENT FOR ALL COSTS ASSOCIATED WITH REMEDIAL ACTION
REQUIRED AND MADE NECESSARY BY THE CONTRACTOR'S NONPERFORMANCE OF HIS
WORK.
11. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF OFF-SITE ALL SHRUBS, TREE ROOTS,
AND ORGANIC MATERIALS ENCOUNTERED DURING CONSTRUCTION AS REQUIRED.
12. THE CONTRACTOR SHALL DISPOSE OF ALL CONSTRUCTION DEBRIS AND OTHER WASTE
MATERIAL AT AN APPROVED OFF-SITE DISPOSAL AREA IN ACCORDANCE WITH APPLICABLE
REGULATORY AGENCY REQUIREMENTS AND SHALL PROVIDE DOCUMENTATION OF
DISPOSAL SITES BEING UTILIZED. ALL PERMITS REQUIRED FOR OFF-SITE DISPOSAL SHALL
BE OBTAINED BY THE CONTRACTOR.
13. THE CONTRACTOR SHALL MAINTAIN A MINIMUM OF ONE (1) SET OF APPROVED PLANS AT
THE PROJECT SITE DURING THE WORK.
14. SOD SHALL BE PROVIDED IN ALL UNPAVED AREAS DISTURBED BY THE CONTRACTOR
DURING CONSTRUCTION. SEEDING/SOD SHALL BE APPROVED BY THE CONTRACTING
OFFICER.
15. TOPOGRAPHIC SURVEY COMPLETED BY ENVIRONMENTAL SCIENCE CORPORATION ON 10-18
JULY 2011 AND 19-20 SEPTEMBER 2011. THE COORDINATE SYSTEM FOR THIS SURVEY IS THE
JAPAN GEODETIC DATUM (JGD) 2000 COORDINATE SYSTEM, ZONE 9. BENCHMARK: 11-7, ('+'
CUT W/BLUE PAINT), N: -55450.540, E: -39706.162, ELEV=61.787. SUBSEQUENT PARTIES ARE
REQUIRED TO MAKE PRUDENT CHECKS PRIOR TO USE OF THIS TOPOGRAPHIC SURVEY MAP.
THE CONTRACTOR SHALL RETAIN A LICENSED LAND SURVEYOR TO STAKE OUT BUILDINGS
AND SITE IMPROVEMENTS PRIOR TO CONSTRUCTION AND TO VERIFY BENCHMARKS.
16. THE CONTRACTOR SHALL PROVIDE SAFE ACCESS TO AND FROM DRIVEWAYS AND PUBLIC
AREAS AT ALL TIMES, UNLESS OTHERWISE NOTED.
17. WHEN EXCAVATIONS ARE ADJACENT TO OR UNDER EXISTING STRUCTURES OR FACILITIES,
THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY SHEETING AND BRACING THE
EXCAVATION AND STABILIZING THE EXISTING GROUND TO RENDER IT SAFE AND SECURE
FROM POSSIBLE SLIDES, CAVE-INS AND SETTLEMENT AND FOR PROPERLY SUPPORTING
EXISTING STRUCTURES AND FACILITIES WITH BEAMS, STRUTS OR UNDERPINNING TO FULLY
PROTECT IT FROM DAMAGE, UNLESS OTHERWISE NOTED.
18. DURING NON-WORKING HOURS, ALL CONSTRUCTION EQUIPMENT AND MATERIALS SHALL BE
STORED IN A DESIGNATED STORAGE AREA.
19. ALL GRASSED OR PLANTED AREAS DAMAGED DURING THE CONSTRUCTION WHETHER BY
STOCKPILING OF EXCAVATION MATERIAL OR OTHER OPERATIONS SHALL BE RESTORED TO
A CONDITION SATISFACTORY TO THE CONTRACTING OFFICER. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR WATERING AND MAINTAINING THESE AREAS UNTIL GROWTH IS
ESTABLISHED TO THE SATISFACTION OF THE CONTRACTING OFFICER.
20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE CONTRACTING OFFICER
INFORMATION ON THE HAUL ROUTES TO BE USED DURING THE PROJECT FOR THEIR
APPROVAL. HAUL ROUTES SHALL BE DIRECTLY FROM THE ROADWAYS EXTERIOR TO THE
BASE TO THE WORK AREA AT THE VARIOUS GATES UNLESS OTHERWISE APPROVED BY THE
CONTRACTING OFFICER. THE CONTRACTOR, EQUIPMENT, AND PERSONNEL SHALL BE
RESTRICTED TO THE APPROVED HAUL ROUTE TO THE CONSTRUCTION AREA AND THE
CONTRACTOR'S OFFICE AND LAYDOWN AREA ONLY.
21. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE TRANSPORTATION AND DISPOSAL OF
ALL OF ALL EXCAVATED MATERIALS TO AN APPROVED OFF-BASE DISPOSAL SITE. THERE IS
NO ON-BASE FACILITY OR AREA AVAILABLE TO THE CONTRACTOR FOR ANY DISPOSAL OF
EXCAVATED MATERIALS.
CIVIL UTILITIES NOTES:
1. THE CONTRACTOR SHALL MARK ON THE GROUND ALL OF THE NEW UTILITY LINES AND
PROVIDE ALL LAND SURVEY CONSTRUCTION STAKEOUT SERVICES
2. THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF THE EXISTING UTILITIES
BEFORE START OF CONSTRUCTION. ALL DISTURBED AREAS OUTSIDE THE LIMIT OF
PROJECT AREA SHALL BE RESTORED TO ITS ORIGINAL CONDITION.
3. THE CONTRACTOR SHALL ALSO CHECK WITH THE DIRECTORATE OF PUBLIC WORKS TO
DISCERN THE EXACT UTILITY LOCATIONS PRIOR TO ANY TRENCHING OR EXCAVATION.
4. ALL EXISTING UTILITIES AND FACILITIES TO REMAIN IN USE, WHETHER OR NOT SHOWN ON
THESE PLANS, SHALL BE PROTECTED AT ALL TIMES BY THE CONTRACTOR DURING
CONSTRUCTION UNLESS SPECIFIED ON THE PLANS TO BE ABANDONED OR DEMOLISHED.
THE CONTRACTOR SHALL PERFORM EXTRA CARE NOT TO DAMAGE EXISTING UTILITY
LINES AND STRUCTURES DURING CONSTRUCTION. UTILITIES DAMAGED DURING
CONSTRUCTION WORK SHALL BE REPLACED BY THE CONTRACTOR AT NO ADDITIONAL
COST TO THE GOVERNMENT.
5. IF THERE ARE SOME CHANGES IN THE DESIGN DRAWINGS DUE TO THE CONFLICT
BETWEEN THE INVERT OF OTHER EXISTING UTILITY LINES AND THE PROPOSED STORM
DRAINAGE LINE, THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR APPROVAL BY
THE CONTRACTING OFFICER.
GENERAL NOTES (CONT.):
22. CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PREVENT EROSION AND THE
TRANSPORT OF SEDIMENTS ONTO PAVED SURFACES AND INTO DRAINAGE FACILITIES, AND
COMPLY WITH THE REQUIREMENTS OF FEDERAL AND LOCAL REGULATIONS.
23. TEMPORARY EROSION CONTROL MEASURES, INCLUDING DRAINAGE SWALES, GRASSING
AND SILT FENCES SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT AT NO EXTRA COST
TO THE GOVERNMENT. TEMPORARY EROSION CONTROLS SHALL NOT BE REMOVED BEFORE
PERMANENT EROSION CONTROL MEASURES ARE IN PLACE AND ESTABLISHED.
24. NONCOMPLIANCE OF ANY OF THE REQUIREMENTS PRESENTED ON THESE PLANS OR IN THE
SPECIFICATIONS SHALL MEAN IMMEDIATE SUSPENSION OF ALL WORK AND REMEDIAL WORK
SHALL COMMENCE IMMEDIATELY. ALL COST INCURRED SHALL BE BILLED TO THE
CONTRACTOR. FURTHERMORE, VIOLATORS SHALL BE SUBJECTED TO ADMINISTRATIVE CIVIL
AND/OR CRIMINAL PENALTIES.
1. ALL EROSION CONTROL AND SEDIMENTATION CONTROL MEASURES SHALL ALSO
CONFORM TO THE LATEST JEGS (2012).
2. CONSTRUCTION SHALL BE SEQUENCED TO MINIMIZE THE EXPOSURE TIME OF CLEARED
SURFACE AREA. THE FIRST CONSTRUCTION SHALL BE STABILIZED BEFORE THE NEXT
SECTION SHALL BEGIN. STABILIZATION SHALL BE ACCOMPLISHED BY TEMPORARILY OR
PERMANENTLY PROTECTING THE DISTURBED SOIL SURFACE FROM RAINFALL IMPACT AND
RUNOFF.
3. STOCKPILE AND DUMPSTER AREAS SHALL NOT BE CLOSE TO THE DIRECTION OF STORM
WATER RUNOFF FLOW INTO RECEIVING STATE WATER. STOCKPILE AREAS SHALL BE KEPT
TO A MINIMUM AS MUCH AS POSSIBLE. SEDIMENT TRAPPING DEVICES SUCH AS FENCE
TRAPS, BASINS OR BARRIERS SHALL BE USED AROUND THE BASE OF THE STOCKPILE.
TRASH DUMPSTER SHALL BE LEAK PROOF AND SHALL NOT BE OVERFILLED TO THE LEVEL
WHERE THEIR COVERS CANNOT BE FULLY SHUT.
4. DUST CONTROL SHALL BE APPLIED TO REDUCE DUST EMISSIONS. THE CONTRACTOR
SHALL KEEP THE PROJECT AREA AND SURROUNDING AREA FREE FROM DUST NUISANCE.
THE WORK SHALL BE IN CONFORMANCE WITH THE GOVERNMENT'S AIR POLLUTION
CONTROL STANDARDS.
5. INSTALL ALL EROSION CONTROL STRUCTURES INCLUDING EROSION CONTROL BLANKETS
TO PREVENT EROSION ON GRADED AREAS. SILT FENCES SHALL BE CONSTRUCTED TO
STABILIZE SEDIMENTS AND CONSTRUCT NO. 3 COARSE CRUSHED ROCK AT THE DRIVEWAY
ENTRANCE WHERE INDICATED ON THIS EROSION CONTROL PLAN.
6. ALL CONTROL MEASURES SHALL BE CHECKED AND REPAIRED AS NECESSARY; FOR
EXAMPLE, WEEKLY IN DRY PERIODS AND WITHIN TWENTY FOUR HOURS AFTER ANY
RAINFALL OF 13mm OR GREATER WITHIN A 24 HOUR PERIOD. DURING PROLONGED
RAINFALL, DAILY CHECKING IS NECESSARY. THE CONTRACTOR SHALL MAINTAIN RECORDS
OF THE DURATION AND ESTIMATED VOLUME OF STORM WATER DISCHARGE(S) AND
CHECKS & REPAIRS.
7. IF HEAVY RAINS ARE PROJECTED DURING A WORKDAY, ALL CONTROL MEASURES THAT
ARE A PART OF THIS PROJECT WILL BE INSPECTED IMMEDIATELY AND REINFORCED IF
NECESSARY.
8. ALL EROSION CONTROL STRUCTURES THAT ARE A PART OF THIS PROJECT WILL REMAIN IN
PLACE UNTIL VEGETATION IS ESTABLISHED. BEFORE FINAL ACCEPTANCE, ALL
TEMPORARY SILT FENCES SHALL BE REMOVED AND THE UNDERLYING AREAS
REVEGETATED. NO. 3 COARSE CRUSHED ROCK SHALL BE REMOVED AND REPLACED WITH
ASPHALT CONCRETE PAVEMENT.
9. A SPECIFIC INDIVIDUAL APPOINTED BY THE CONTRACTOR SHALL BE DESIGNATED TO BE
RESPONSIBLE FOR EROSION AND SEDIMENT CONTROLS ON THIS PROJECT.
10. THE CONTRACTOR SHALL TRAIN HIS/HER EMPLOYEES AND SUBCONTRACTORS ON THE
BEST MANAGEMENT PRACTICES FOR EROSION CONTROL.
11. FILTER FABRIC ON ALL EROSION CONTROL STRUCTURES SHALL BE CLEARED OF SILT
IMMEDIATELY FOLLOWING THE END OF ANY RAINFALL THAT CAUSES SILT BUILDUP ON THE
FABRIC.
12. THE CONTRACTOR SHALL PROVIDE ADDITIONAL EROSION CONTROL STRUCTURES AS
NEEDED WHERE CONTRACTOR TRAVELS OR WORKS BEYOND THE GRADING LIMITS
INDICATED ON THE PLANS.
13. GRUBBED MATERIAL, DEMOLITION WASTES, AND CONSTRUCTION WASTES SHALL BE
STORED TEMPORARILY IN DUMP TRUCKS OR IN DESIGNATED STOCKPILE AREAS UNTIL
THEY ARE TRANSFERRED TO AN AUTHORIZED DISPOSAL AREA. THE CONTRACTOR SHALL
SUBMIT HIS PROPOSED TEMPORARY STOCKPILING AREAS AND CONSTRUCTION STAGING
STORAGE AREAS TO THE MANAGER FOR APPROVAL PRIOR TO CONSTRUCTION, AND
COORDINATE THEIR LOCATION WITH THE OFFICER-IN-CHARGE DURING CONSTRUCTION.
14. PRE-CONSTRUCTION VEGETATIVE GROUND COVER SHALL NOT BE DESTROYED, REMOVED
OR DISTURBED MORE THAN TWENTY CALENDAR DAYS PRIOR TO LAND DISTURBANCE.
15. TEMPORARY SOIL STABILIZATION WITH APPROPRIATE VEGETATION SHALL BE APPLIED ON
AREAS THAT WILL REMAIN UNFINISHED FOR MORE THAN THIRTY CALENDAR DAYS.
16. ALL EXPOSED SOILS SHALL BE SODDED USING KOURAISHIBA (KOREAN TURF)
IMMEDIATELY AFTER GRADING WORK HAS BEEN COMPLETED. AT THE STEEPER SLOPED
AREAS AROUND THE NORTHEAST CORNER OF THE BUILDING, EROSION CONTROL
BLANKETS SHALL BE INSTALLED AFTER HYDROMULCHING. IRRIGATION AND MAINTENANCE
OF THE PERENNIAL VEGETATION SHALL BE PROVIDED FOR 60 CALENDAR DAYS OR UNTIL
THE VEGETATION TAKES ROOT, WHICHEVER IS LONGER.
EROSION AND SEDIMENTATION CONTROL NOTES AND BMPS:
PUBLIC HEALTH AND SAFETY NOTES:
1. THE CONTRACTOR SHALL OBSERVE AND COMPLY WITH APPLICABLE FEDERAL, JAPANESE
AND PREFECTURAL LAWS REQUIRED FOR THE PROTECTION OF PUBLIC HEALTH, SAFETY,
AND THE ENVIRONMENT.
2. THE CONTRACTOR AT HIS OWN EXPENSE, SHALL KEEP THE PROJECT AND SURROUNDING
AREA FREE FROM DUST AND NOISE NUISANCE. THE WORK SHALL BE IN CONFORMANCE
WITH THE AIR AND NOISE POLLUTION CONTROL STANDARDS, REGULATIONS OF THE
JAPANESE ENVIRONMENTAL GOVERNING STANDARDS AND EM-385-1-1.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING THE NECESSARY PERMITS
AND APPROVALS GOVERNED BY FEDERAL, JAPANESE AND PREFECTURAL LAWS AND
STANDARDS IN THE HANDLING, REMOVAL, AND DISPOSAL OF ANY HAZARDOUS
MATERIALS PRIOR TO THE START OF CONSTRUCTION.
4. THE CONTRACTOR SHALL CONFORM TO "CONFINED SPACE" PROCEDURES, IN
ACCORDANCE WITH EM 385-1-1, ON ANY PITS, EXISTING OR NEWLY CONSTRUCTED
MANHOLES, WHICH COULD PRESENT A HAZARD (HYDROGEN SULFIDE EXPOSURE,
LIMITED ACCESS, ETC.) TO OPERATOR OR CONTRACTOR PERSONNEL.
C
D
W G
D E
S C
R I P
T I O
N D
A T
E
D E
S I G
N E
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
C T
N
O
F I L E
A M
E
S I Z
E
A
D R
A W
I N
G
C
O D
E
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
A P
O
A
P
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
M A
R K
US Army Corps of Engineers
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
I S
S U
E
D
A T
E
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
F Y
P
N
C A
M
Z
M
A
J A
P A
N
M E
D I C
A L
C
L I N
I
D D
I T
I O
N A
L T
E R
A T
I O
N
B L D
G
BLDG 704
FINAL
A P
R I L
C-001
G E
N E
R A
L
C
I V
I L
N
O T
E
B R
B R
J C
D H
A
EXIST. CHERRY TREE TO BE CUT AND REMOVED
CHERRY TREE - 2 EACHCHERRY TREE - 1 EACH
REMOVE EXIST. BENCHES AND SALVAGE
BENCHES EACH: 3
EXIST. CHERRY TREE TO BE CUT AND SALVAGED
REMOVE EXIST. DRAIN INLET AND PORTION OF
400 MM STORM DRAIN PIPING
DRAIN INLET AND PIPING AREA: XX L. M.
REMOVE EXISTING CONCRETE WALKWAY
& SALVAGE EXIST. THREE (3) BENCHES
REMOVE EXISTING PORTION
OF 400 MM DRAINAGE PIPE
& DRAIN INLET
1. EXISTING SUPPORTING STRUCTURES AND ALL ASSOCIATED
UTILITY LINES SHALL BE DEMOLISHED/REMOVED DURING
DEMOLITION OPERATIONS. THE CONTRACTOR SHALL
COORDINATE WITH THE CONTRACTING OFFICER ON
SCHEDULING.
2. THE CONTRACTOR SHALL DEMOLISH ALL SITE ITEMS AS
NECESSARY, INCLUDING BUT NOT LIMITED TO THOSE
SHOWN ON THIS PLAN, FOR THE COMPLETION OF THE
PREVENTIVE MEDICINE ADDITION.
3. CHERRY TREE - THE CONTRACTOR SHALL SALVAGE AND
PROCESS REMOVED CHERRY TREES AS FOLLOWS:
SALVAGE ALL TREE TRUNKS AND BRANCHES 300
MILLIMETERS DIAMETER OR LARGER. SAW INTO LARGEST
PRACTICAL SECTIONS NO LONGER THAN 2.5 METERS LONG.
RETAIN BARK ON SECTIONS. BUNDLE AND DELIVER ON
STANDARD WOOD PALLETS TO THE OPEN STORAGE
FACILITY (S-1047) ON CAMP ZAMA BASE AS DIRECTED BY
THE COR.
4. THE CONTRACTOR SHALL TURN OVER ALL SALVAGED
BENCHES (3) TO THE DPW STORAGE AREA (BUILDING 686)
ON CAMP ZAMA BASE AS DIRECTED BY THE COR.
5. THE CONTRACTOR SHALL COORDINATE WITH MEDDAC-J
FOR CLOSURE OF MEDICAL AND DENTAL CLINIC
ENTRANCES.
GENERAL NOTES:
C-101
EXISTING BLDG 704 SITE DEMOLITION PLAN
SCALE: 1:200
REMOVE EXISTING
RAMP
EXISTING BUILDING
LEGEND:
EXISTING STRUCTURE TO BE
REMOVED
EXISTING UTILITIES TO BE
REMOVED
CUT AND REMOVE EXIST.
CHERRY TREE - 2
(SEE NOTE 3)
PROJECT LIMITS
EXISTING BLDG 704
EXIST.
BLDG
EXISTING T-704-3
(BICYCLE SHED)
TO REMAIN
REMOVE EXISTING
PORTION OF
CONCRETE WALKWAY
SCALE: 1:200
GRAPHIC SCALE
C
D
W G
T R
U
R
T H
EXISTING CONC. WALKWAY 65 S.M.±
REMOVE ABANDONED
FIRE SERVICE LINE
C-101
S I T
E
D
E M
O L I T
I O
N
P
L A
N
B R
B R
J C
D H
D E
S C
R I P
T I O
N D
A T
E
D E
S I G
N E
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
F I
M
E
S I Z
E
A
D R
A W
I N
G
C
O D
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
A P
O
A
P
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
M A
R K
US Army Corps of Engineers
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
I S
S U
E
D
A T
E
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
F Y
P
N
C A
M
A
J A
P A
N
M E
D I C
A L
C
L I N
D
I T
I O
N A
L T
E R
A T
I O
N
B L D
G
BLDG 704
FINAL
A P
R I L
A
CUT AND SALVAGE EXIST. CHERRY TREE - 1
(SEE NOTE 3)
DRAFT
AutoCAD SHX Text
EL=62.47
AutoCAD SHX Text
LP
AutoCAD SHX Text
EMH
AutoCAD SHX Text
EMH
AutoCAD SHX Text E
AutoCAD SHX Text
EP
AutoCAD SHX Text
WV
AutoCAD SHX Text
FH
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
EMH
AutoCAD SHX Text
EMH
AutoCAD SHX Text
EMH
AutoCAD SHX Text
EMH
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text
LP
AutoCAD SHX Text T-704-3
AutoCAD SHX Text
AutoCAD SHX Text
EP
AutoCAD SHX Text
HIGH VOL TAGE
AutoCAD SHX Text Tinplate
AutoCAD SHX Text
LIGHT PANEL
AutoCAD SHX Text Tinplate
AutoCAD SHX Text
WV
AutoCAD SHX Text
EL=62.090
AutoCAD SHX Text
TBM.2
AutoCAD SHX Text
DMH
AutoCAD SHX Text
DMH
AutoCAD SHX Text
DMH
AutoCAD SHX Text
DMH
AutoCAD SHX Text
DMH
AutoCAD SHX Text
DMH
AutoCAD SHX Text
DMH
AutoCAD SHX Text
DMH
AutoCAD SHX Text
DMH
AutoCAD SHX Text
DMH
AutoCAD SHX Text
DMH
AutoCAD SHX Text
DMH
AutoCAD SHX Text
DMH
AutoCAD SHX Text
SMH
AutoCAD SHX Text H=13.0
AutoCAD SHX Text W=8.0
AutoCAD SHX Text D=0.45
AutoCAD SHX Text H=13.0
AutoCAD SHX Text W=8.0
AutoCAD SHX Text D=0.45
AutoCAD SHX Text H=1.7
AutoCAD SHX Text W=1.2
AutoCAD SHX Text D=0.1
AutoCAD SHX Text H=1.7
AutoCAD SHX Text W=1.4
AutoCAD SHX Text D=0.1
AutoCAD SHX Text H=1.7
AutoCAD SHX Text W=1.2
AutoCAD SHX Text D=0.1
AutoCAD SHX Text H=2.1
AutoCAD SHX Text W=1.5
AutoCAD SHX Text D=0.3
AutoCAD SHX Text H=2.1
AutoCAD SHX Text W=1.4
AutoCAD SHX Text D=0.3
AutoCAD SHX Text H=2.0
AutoCAD SHX Text W=1.4
AutoCAD SHX Text D=0.2
AutoCAD SHX Text H=1.8
AutoCAD SHX Text W=0.4
AutoCAD SHX Text D=0.1
AutoCAD SHX Text H=1.8
AutoCAD SHX Text W=0.4
AutoCAD SHX Text D=0.1
AutoCAD SHX Text H=10.0
AutoCAD SHX Text W=15.0
AutoCAD SHX Text D=1.4
AutoCAD SHX Text H=10.0
AutoCAD SHX Text W=15.0
AutoCAD SHX Text D=0.8
AutoCAD SHX Text H=10.0
AutoCAD SHX Text W=15.0
AutoCAD SHX Text D=0.7
AutoCAD SHX Text H=15.0
AutoCAD SHX Text W=8.0
AutoCAD SHX Text D=0.6
AutoCAD SHX Text H=4.0
AutoCAD SHX Text W=5.0
AutoCAD SHX Text D=0.5
AutoCAD SHX Text H=6.0
AutoCAD SHX Text W=4.0
AutoCAD SHX Text D=0.3
AutoCAD SHX Text H=1.3
AutoCAD SHX Text W=2.0
AutoCAD SHX Text D=0.2
AutoCAD SHX Text H=6.0
AutoCAD SHX Text W=15.0
AutoCAD SHX Text D=0.8
AutoCAD SHX Text D=38
AutoCAD SHX Text
OUT61.02
AutoCAD SHX Text
IN61.26
AutoCAD SHX Text
IN61.04
AutoCAD SHX Text
D=300 CP
AutoCAD SHX Text
OUT61.11
AutoCAD SHX Text
D=300 CP
AutoCAD SHX Text
IN61.11
AutoCAD SHX Text
D=300 CP
AutoCAD SHX Text
TOP62.32
AutoCAD SHX Text
TOP62.41
AutoCAD SHX Text
TOP62.07
AutoCAD SHX Text
OUT61.30
AutoCAD SHX Text
IN61.35
AutoCAD SHX Text
IN61.32
AutoCAD SHX Text
OUT61.33
AutoCAD SHX Text
D=200 CP
AutoCAD SHX Text
D=300 CP
AutoCAD SHX Text
TOP62.21
AutoCAD SHX Text
OUT61.45
AutoCAD SHX Text
IN61.51
AutoCAD SHX Text
IN61.46
AutoCAD SHX Text
OUT61.51
AutoCAD SHX Text
D=200 CP
AutoCAD SHX Text
TOP62.33
AutoCAD SHX Text
OUT61.58
AutoCAD SHX Text
IN61.61
AutoCAD SHX Text
IN61.58
AutoCAD SHX Text
OUT61.63
AutoCAD SHX Text
D=200 CP
AutoCAD SHX Text
D=300 CP
AutoCAD SHX Text
D=300 CP
AutoCAD SHX Text
TOP62.42
AutoCAD SHX Text
OUT61.66
AutoCAD SHX Text
OUT61.75
AutoCAD SHX Text
D=200 CP
AutoCAD SHX Text
TOP61.05
AutoCAD SHX Text
OUT57.08
AutoCAD SHX Text
IN58.02
AutoCAD SHX Text
IN59.67
AutoCAD SHX Text
D=300 VP
AutoCAD SHX Text
D=700 CP
AutoCAD SHX Text
TOP61.44
AutoCAD SHX Text
OUT58.14
AutoCAD SHX Text
IN58.88
AutoCAD SHX Text
TOP61.83
AutoCAD SHX Text
OUT59.20
AutoCAD SHX Text
IN59.21
AutoCAD SHX Text
D=700 CP
AutoCAD SHX Text
D=700 CP
AutoCAD SHX Text
D=400 CP
AutoCAD SHX Text
D=250 VP
AutoCAD SHX Text
IN60.11
AutoCAD SHX Text
OUT60.08
AutoCAD SHX Text
TOP62.13
AutoCAD SHX Text
D=400 CP
AutoCAD SHX Text
IN60.03
AutoCAD SHX Text
OUT60.00
AutoCAD SHX Text
TOP62.17
AutoCAD SHX Text
IN60.31
AutoCAD SHX Text
IN60.15
AutoCAD SHX Text
IN60.37
AutoCAD SHX Text
D=200 VP
AutoCAD SHX Text
OUT61.44
AutoCAD SHX Text
D=200 VP
AutoCAD SHX Text
OUT60.92
AutoCAD SHX Text
D=100 VP
AutoCAD SHX Text
IN61.46
AutoCAD SHX Text
D=100 VP
AutoCAD SHX Text
IN61.48
AutoCAD SHX Text
D=100 VP
AutoCAD SHX Text
IN61.13
AutoCAD SHX Text
D=200 VP
AutoCAD SHX Text
OUT60.89
AutoCAD SHX Text
D=100 VP
AutoCAD SHX Text
IN61.10
AutoCAD SHX Text
D=100 VP
AutoCAD SHX Text
IN61.05
AutoCAD SHX Text
D=100 VP
AutoCAD SHX Text
D=200 VP
AutoCAD SHX Text
OUT61.42
AutoCAD SHX Text
D=100 VP
AutoCAD SHX Text
IN61.42
AutoCAD SHX Text
D=100 VP
AutoCAD SHX Text
IN61.31
AutoCAD SHX Text
OUT60.90
AutoCAD SHX Text
D=400 CP
AutoCAD SHX Text
OUT59.88
AutoCAD SHX Text
IN59.90
AutoCAD SHX Text
D=400 CP
AutoCAD SHX Text
OUT59.77
AutoCAD SHX Text
IN59.79
AutoCAD SHX Text
TOP61.71
AutoCAD SHX Text
OUT59.72
AutoCAD SHX Text
IN59.76
AutoCAD SHX Text
IN60.31
AutoCAD SHX Text
D=200 CP
AutoCAD SHX Text
D=500 CP
AutoCAD SHX Text
D=400 CP
AutoCAD SHX Text
IN60.17
AutoCAD SHX Text
D=300 CP
AutoCAD SHX Text
D=300 CP
AutoCAD SHX Text
OUT60.72
AutoCAD SHX Text
IN60.59
AutoCAD SHX Text
TOP61.95
AutoCAD SHX Text
OUT60.31
AutoCAD SHX Text
IN60.53
AutoCAD SHX Text
D=100 VP
AutoCAD SHX Text
IN61.52
AutoCAD SHX Text
D=300 CP
AutoCAD SHX Text
D=300 CP
AutoCAD SHX Text
OUT60.83
AutoCAD SHX Text
IN60.84
AutoCAD SHX Text
OUT60.93
AutoCAD SHX Text
D=200 CP
AutoCAD SHX Text
D=200 CP
AutoCAD SHX Text
IN59.10
AutoCAD SHX Text
OUT58.96
AutoCAD SHX Text
TOP61.46
AutoCAD SHX Text
SMH
AutoCAD SHX Text
IN60.05
AutoCAD SHX Text
IN59.12
AutoCAD SHX Text
D=200 CP
AutoCAD SHX Text
D=200 CP
AutoCAD SHX Text
TOP61.33
AutoCAD SHX Text
IN59.99
AutoCAD SHX Text
D=200 CP
AutoCAD SHX Text
D=50 VP
AutoCAD SHX Text H=1.6
AutoCAD SHX Text W=2.0
AutoCAD SHX Text D=0.6
AutoCAD SHX Text Konoteg ashiwa
AutoCAD SHX Text Konoteg ashiwa
AutoCAD SHX Text Konoteg ashiwa
AutoCAD SHX Text Konoteg ashiwa
AutoCAD SHX Text Konoteg ashiwa
AutoCAD SHX Text Konoteg ashiwa
AutoCAD SHX Text Tree of chair
AutoCAD SHX Text Tree of chair
AutoCAD SHX Text Cherry blossoms
AutoCAD SHX Text Cherry blossoms
AutoCAD SHX Text Cherry blossoms
AutoCAD SHX Text Satsuki azalea
AutoCAD SHX Text Satsuki azalea
AutoCAD SHX Text Pine
AutoCAD SHX Text Uncertainty
AutoCAD SHX Text Uncertainty
AutoCAD SHX Text Cherry blossoms
AutoCAD SHX Text Cedar
AutoCAD SHX Text As
AutoCAD SHX Text As
AutoCAD SHX Text As
AutoCAD SHX Text Vent
AutoCAD SHX Text
IN61.71
AutoCAD SHX Text 62.11
AutoCAD SHX Text 62.10
AutoCAD SHX Text
TOP 60.51
AutoCAD SHX Text
TOP 60.35
AutoCAD SHX Text
TOP 60.39
AutoCAD SHX Text
TOP 61.08
AutoCAD SHX Text
TOP 61.20
AutoCAD SHX Text
TOP 61.57
AutoCAD SHX Text 61.77
AutoCAD SHX Text 62.12
AutoCAD SHX Text 62.11
AutoCAD SHX Text 61.28
AutoCAD SHX Text 61.32
AutoCAD SHX Text 62.12
AutoCAD SHX Text 62.08
AutoCAD SHX Text 61.60
AutoCAD SHX Text 62.08
AutoCAD SHX Text 61.55
AutoCAD SHX Text 61.67
AutoCAD SHX Text 61.69
AutoCAD SHX Text 62.10
AutoCAD SHX Text 61.67
C-111
SITE & LANDSCAPING PLAN
SCALE: 1:100
EXISTING BLDG 704
CLINICAL ADDITION
BLDG 704
.9
QUANTITY COMMON NAME
MAME SAKURA
P L A N T & M A T E R I A L L I S T
BOTANICAL NAME REMARKS
PRUNUS PENDULA
EA.2
KOURAISHIBA (KOREAN TURF)
ZOYSIA TENUIFOLIA
SM127
1.8M (3 FT.) HEIGHT, 35-50 MM CIRCUMFERENCE,
900MM (3 FT.) WIDE
CHERRY TREE
( MAME SAKURA)
LAWN
LAWN
SCALE: 1:100
GRAPHIC SCALE
LAWN
T R
R
T H
GRASS LAWN
C-504
CCSDII FROM CONTROLLED ROAD /
PARKING AREA TO FACILITY &
UNOBSTRUCTED SPACE
(REFER TO SHEET G-101 FOR LIMITS)
NOTES:
1. SEE ARCHITECTURAL SHEET FOR TIE-IN GRID OF THE
CLINICAL ADDITION BUILDING TO BUILDING 704 GRID.
2. CONCRETE WALKWAY SHALL BE DONE AS NOTED IN
PHASING PLANS (G-SHEETS), WHEN MAIN ENTRY TO BLDG
704 IS CLOSED AND ALTERNATE ENTRANCE IS PROVIDED TO
BLDG 704.
3. THE CONTRACTOR SHALL TRIM ROOTS AND BRANCHES OF
REMAINING EXIST. CHERRY TREE.
4. THE CONTRACTOR SHALL PROVIDE PROTECTION FOR ALL
EXIST. PLANTS AND TREES IN THE PROJECT AREA. HE SHALL
REPLACE IN KIND ANY DAMAGED TREES AT HIS EXPENSE.
5. THE CONTRACTOR SHALL COORDINATE WITH CONTRACTING
OFFICER'S REPRESENTATIVE FOR LOCATION OF
REPLACEMENT CHERRY (MAME SAKURA) TREES AS NEEDED.
PLANTING PROCEDURES SHALL ALSO CONFORM TO CAMP
ZAMA INSTALLATION DESIGN GUIDE.
6. THE CONTRACTOR SHALL PLACE CHERRY TREE CLEAR OF
ALL EXIST. UTILITY LINES AND INSTALL ROOT BARRIER
AROUND ESTIMATED MATURE TREE DRIPLINE.
7. THE CHERRY TREE TO REMAIN SHALL BE TRIMMED TO BE
CLEAR OF PREVENTIVE MEDICINE ADDITION ROOF AREA.
8. CONTRACTOR SHALL PROVIDE TEMPORARY IRRIGATION
(WATERING) DURING THE ESTABLISHMENT PERIOD
(WARRANTY PERIOD) OR ALL LANDSCAPING. REFER TO SPEC
SECTION 32 05 33.
9. EXISTING SITE SOIL SHALL BE SCREENED AND USED AS TOP
SOIL AT 150 MM DEPTH.
10. REFER TO "LANDSCAPE SPECIFICATIONS" PRIOR TO THE
START OF WORK. CONTRACTOR SHALL BE HELD
RESPONSIBLE FOR ALL MATERIALS, SCHEDULING,
PRODUCTS, WARRANTIES AND METHODS FOR EXECUTION
OF WORK WHICH MAY NOT BE INDICATED WITHIN THE
DRAWINGS.
BUILDING
LEGEND:
CONC. SIDEWALK /
WALKWAY
GRASS LAWN
(KOURAI-SHIBA
(KOREAN TURF))
C-111
DETAIL LOCATION FOR NEW CHERRY TREE
SCALE: 1:100
C-504
CHERRY TREE
( MAME SAKURA)
CONCRETE
WALKWAY
C-501
PERGOLA
(SEE ARCH DWGS)
EXIST. CHERRY TREE
TO REMAIN
SEE NOTE: 3
M A
T C
H E
X
IS
T
W
A L K
W
A Y
W
ID
T
H
M
EXIST. CONCRETE
SIDEWALK TO REMAIN
GRASS LAWN
CONCRETE
WALKWAY
C-501
START CONCRETE
WALKWAY AT NEAREST
CONTRACTION OR
EXPANSION JOINT
ROOT BARRIER
C-111
S I T
N D
S C
A P
I N
G
P
L A
N
B R
B R
J C
D P
I
C
D
W G
EXISTING BLDG 704
I S
H
I N
O
M
A K
I
A
V E
N
U
E
D E
S C
R I P
T I O
N D
A T
E
D E
S I G
N E
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
F I
M
E
S I Z
E
A
D R
A W
I N
G
C
O D
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
A P
O
A
P
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
M A
R K
US Army Corps of Engineers
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
I S
S U
E
D
A T
E
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
F Y
P
N
C A
M
A
J A
P A
N
M E
D I C
A L
C
L I N
D
I T
I O
N A
L T
E R
A T
I O
N
B L D
G
BLDG 704
FINAL
O C
T O
B E
R
A
ROOT BARRIER
AROUND TREE
SEE DETAIL
C-504
CONCRETE
WALKWAY
C-501
PROVIDE EXPANSION JOINTS
TO PERIMETER OF MANHOLE
C-501
DRAFT
AutoCAD SHX Text
EMH
AutoCAD SHX Text
EMH
AutoCAD SHX Text
EMH
AutoCAD SHX Text
EMH
AutoCAD SHX Text
LP
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text
LP
AutoCAD SHX Text T-704-3
AutoCAD SHX Text
AutoCAD SHX Text Tinplate
AutoCAD SHX Text Tinplate
AutoCAD SHX Text 62.11
AutoCAD SHX Text 62.10
AutoCAD SHX Text 62.12
AutoCAD SHX Text 62.11
AutoCAD SHX Text 61.28
AutoCAD SHX Text 61.32
AutoCAD SHX Text 62.12
AutoCAD SHX Text 62.08
AutoCAD SHX Text 61.60
AutoCAD SHX Text 62.08
AutoCAD SHX Text 61.55
AutoCAD SHX Text 61.67
AutoCAD SHX Text 61.69
AutoCAD SHX Text 62.10
AutoCAD SHX Text 61.67
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text 11-8
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
EMH
AutoCAD SHX Text
EMH
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text
HIGH VOL TAGE
AutoCAD SHX Text
SMH
AutoCAD SHX Text
CVT D=41
AutoCAD SHX Text
TOP60.58
AutoCAD SHX Text
OUT59.63
AutoCAD SHX Text
IN59.68
AutoCAD SHX Text
D=100 VP
AutoCAD SHX Text
IN59.78
AutoCAD SHX Text
D=200 CP
AutoCAD SHX Text
TOP 60.13
AutoCAD SHX Text
TOP 60.38
61.29
PROJECT
LIMITS
C-121
SITE GRADING & DRAINAGE PLAN
SCALE: 1:100
EXISTING BLDG 704
C
DRAINAGE
LINE D-2
SEE PROFILE
C-202
D2-1
TOP=61.81
DRAINAGE
LINE D-1
SEE PROFILE
C-201
D1-1
TOP 61.94
61.92
61.89
61.92
FF 62.12
CLINICAL ADDITION
61.92
D4-1
CONNECT D3-1
TO EXIST. D4-1
62.10
61.98
62.08
62.10
.0
N=-55464.1490
E=-39665.1125
N=-55464.0897
E=-39649.5263
PROJECT LIMITS
GRADING LIMITS
NEW BLDG
NEW CONCRETE
DRAINAGE FLOW ARROW
NEW SLOPE
NEW SPOT ELEVATION
MATCH EXISTING GRADE
EXISTING SPOT ELEVATION
NEW DRAIN INLET
NEW STORM DRAIN MANHOLE
EXISTING ELECTRICAL LINE
EXISTING ABANDONED FIRE
SUPPRESSION LINE
EXISTING STORM DRAIN
NEW STORM DRAIN
EXISTING MANHOLE
EXISTING TREE
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
NORTHING/ EASTING
COORDINATES
LEGEND:
1.5%
61.284
SD
E
OR
FS
D2-2
TOP 61.78
N=-55460.4460
E=-39663.7267
GRADING
LIMITS
61.82
62.00
61.82
EXIST. CHERRY TREE
TO REMAIN
62.00
.7
61.69
NOTES:
1. CONTRACTOR SHALL PROVIDE POSITIVE DRAINAGE
AWAY FROM ALL BUILDINGS AND STRUCTURES.
2. SEE EROSION AND SEDIMENTATION CONTROL
NOTES, SHEET C-001.
3. SEE DETAIL 3, SHEET C-501 FOR DOWNSPOUT
CONNECTION.
62.11
62.09
SCALE: 1:100
GRAPHIC SCALE
T R
R
T H
C
D
W G
N=12345.6798
E=12345.6798
D3-1
TOP=62.16
N=-55458.7706
E=-39647.7423
62.11
62.12
C-121
S I T
E
G
R A
D I N
G
R A
I N
A G
E
P
L A
N
B R
B R
J C
D H
62.10 62.11
M.E.
M.E.
62.06
62.07
62.12
M.E.
M.E.
M.E.
62.17
M.E.
M.E.
C
61.97
61.96
61.98
62.01
62.04
62.06
D E
S C
R I P
T I O
N D
A T
E
D E
S I G
N E
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
F I
M
E
S I Z
E
A
D R
A W
I N
G
C
O D
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
A P
O
A
P
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
M A
R K
US Army Corps of Engineers
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
I S
S U
E
D
A T
E
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
F Y
P
N
C A
M
A
J A
P A
N
M E
D I C
A L
C
L I N
D
I T
I O
N A
L T
E R
A T
I O
N
B L D
G
BLDG 704
FINAL
O C
T O
B E
R
A
SD
C-503
C-502
C-503
C-503
1.0%
CONCRETE SPLASH BLOCK
C-501DRAFT
AutoCAD SHX Text
EMH
AutoCAD SHX Text
EMH
AutoCAD SHX Text
EMH
AutoCAD SHX Text
EMH
AutoCAD SHX Text
LP
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text Co
AutoCAD SHX Text T-704-3
AutoCAD SHX Text Tinplate
AutoCAD SHX Text
DMH
AutoCAD SHX Text
DMH
AutoCAD SHX Text H=1.7
AutoCAD SHX Text W=1.2
AutoCAD SHX Text D=0.1
AutoCAD SHX Text H=2.1
AutoCAD SHX Text W=1.5
AutoCAD SHX Text D=0.3
AutoCAD SHX Text H=2.1
AutoCAD SHX Text W=1.4
AutoCAD SHX Text D=0.3
AutoCAD SHX Text H=2.0
AutoCAD SHX Text W=1.4
AutoCAD SHX Text D=0.2
AutoCAD SHX Text H=1.8
AutoCAD SHX Text W=0.4
AutoCAD SHX Text D=0.1
AutoCAD SHX Text H=1.8
AutoCAD SHX Text W=0.4
AutoCAD SHX Text D=0.1
AutoCAD SHX Text H=10.0
AutoCAD SHX Text W=15.0
AutoCAD SHX Text D=0.7
AutoCAD SHX Text
D=400 CP
AutoCAD SHX Text
IN60.11
AutoCAD SHX Text
OUT60.08
AutoCAD SHX Text
TOP62.13
AutoCAD SHX Text
D=400 CP
AutoCAD SHX Text
IN60.03
AutoCAD SHX Text
OUT60.00
AutoCAD SHX Text
TOP62.17
AutoCAD SHX Text
IN60.31
AutoCAD SHX Text
IN60.15
AutoCAD SHX Text
IN60.37
AutoCAD SHX Text
D=200 VP
AutoCAD SHX Text
OUT60.92
AutoCAD SHX Text
D=100 VP
AutoCAD SHX Text
IN61.13
AutoCAD SHX Text
D=200 VP
AutoCAD SHX Text
OUT60.89
AutoCAD SHX Text
D=100 VP
AutoCAD SHX Text
IN61.10
AutoCAD SHX Text
D=100 VP
AutoCAD SHX Text
IN61.05
AutoCAD SHX Text
D=100 VP
AutoCAD SHX Text
D=200 VP
AutoCAD SHX Text
OUT61.42
AutoCAD SHX Text
D=100 VP
AutoCAD SHX Text
IN61.42
AutoCAD SHX Text
D=100 VP
AutoCAD SHX Text
IN61.31
AutoCAD SHX Text
OUT60.90
AutoCAD SHX Text
D=400 CP
AutoCAD SHX Text
OUT59.88
AutoCAD SHX Text
IN59.90
AutoCAD SHX Text
D=400 CP
AutoCAD SHX Text
D=300 CP
AutoCAD SHX Text
OUT60.83
AutoCAD SHX Text
IN60.84
AutoCAD SHX Text
D=200 CP
AutoCAD SHX Text Konoteg ashiwa
AutoCAD SHX Text Konoteg ashiwa
AutoCAD SHX Text Konoteg ashiwa
AutoCAD SHX Text Konoteg ashiwa
AutoCAD SHX Text Tree of chair
AutoCAD SHX Text Tree of chair
AutoCAD SHX Text Cherry blossoms
AutoCAD SHX Text 61.92
AutoCAD SHX Text 61.89
AutoCAD SHX Text 61.88
AutoCAD SHX Text 61.91
AutoCAD SHX Text 61.90
AutoCAD SHX Text 61.96
AutoCAD SHX Text 62.00
AutoCAD SHX Text 61.94
AutoCAD SHX Text 62.09
AutoCAD SHX Text 61.93
AutoCAD SHX Text 61.86
AutoCAD SHX Text 61.85
AutoCAD SHX Text 61.94
AutoCAD SHX Text 61.93
AutoCAD SHX Text 61.88
AutoCAD SHX Text 61.84
AutoCAD SHX Text 61.80
AutoCAD SHX Text 61.66
AutoCAD SHX Text 61.83
AutoCAD SHX Text 61.98
AutoCAD SHX Text 62.10
AutoCAD SHX Text 61.90
AutoCAD SHX Text 62.00
AutoCAD SHX Text 61.49
AutoCAD SHX Text 61.61
AutoCAD SHX Text 62.19
AutoCAD SHX Text 62.16
AutoCAD SHX Text 62.28
AutoCAD SHX Text 62.20
AutoCAD SHX Text 61.75
AutoCAD SHX Text 62.21
AutoCAD SHX Text 61.62
AutoCAD SHX Text 62.11
AutoCAD SHX Text 61.54
AutoCAD SHX Text 62.05
AutoCAD SHX Text 62.01
AutoCAD SHX Text 62.11
AutoCAD SHX Text 62.08
AutoCAD SHX Text 61.44
AutoCAD SHX Text 62.11
AutoCAD SHX Text 61.94
AutoCAD SHX Text 61.99
AutoCAD SHX Text 62.07
AutoCAD SHX Text 61.55
AutoCAD SHX Text 62.10
AutoCAD SHX Text 62.09
AutoCAD SHX Text 61.96
AutoCAD SHX Text 62.11
AutoCAD SHX Text 62.08
AutoCAD SHX Text 62.08
AutoCAD SHX Text 62.10
AutoCAD SHX Text 62.06
AutoCAD SHX Text 61.98
AutoCAD SHX Text 61.86
AutoCAD SHX Text 61.75
AutoCAD SHX Text 61.86
AutoCAD SHX Text 61.99
AutoCAD SHX Text 62.12
AutoCAD SHX Text 62.14
AutoCAD SHX Text 61.36
AutoCAD SHX Text 61.59
AutoCAD SHX Text 61.11
AutoCAD SHX Text 61.45
AutoCAD SHX Text 61.31
AutoCAD SHX Text 61.31
AutoCAD SHX Text 61.35
AutoCAD SHX Text 61.40
AutoCAD SHX Text 61.46
AutoCAD SHX Text 61.56
AutoCAD SHX Text 61.77
AutoCAD SHX Text 61.91
AutoCAD SHX Text 61.83
AutoCAD SHX Text 61.42
AutoCAD SHX Text 61.31
AutoCAD SHX Text 62.17
AutoCAD SHX Text 62.15
AutoCAD SHX Text 62.12
AutoCAD SHX Text 62.11
AutoCAD SHX Text 62.15
AutoCAD SHX Text 62.14
AutoCAD SHX Text 62.15
AutoCAD SHX Text 62.04
AutoCAD SHX Text 62.05
AutoCAD SHX Text 61.97
AutoCAD SHX Text 62.05
AutoCAD SHX Text 62.00
AutoCAD SHX Text 62.04
AutoCAD SHX Text 61.94
AutoCAD SHX Text 62.08
AutoCAD SHX Text 62.05
AutoCAD SHX Text 62.12
AutoCAD SHX Text 62.02
AutoCAD SHX Text 62.08
AutoCAD SHX Text 61.89
AutoCAD SHX Text 62.07
AutoCAD SHX Text 62.03
AutoCAD SHX Text 61.85
AutoCAD SHX Text 62.05
AutoCAD SHX Text 62.11
AutoCAD SHX Text 61.38
AutoCAD SHX Text 62.00
AutoCAD SHX Text 61.85
AutoCAD SHX Text 61.82
AutoCAD SHX Text 61.84
AutoCAD SHX Text 61.49
AutoCAD SHX Text 61.47
AutoCAD SHX Text
AutoCAD SHX Text 62.12
AutoCAD SHX Text 62.11
AutoCAD SHX Text 61.28
AutoCAD SHX Text 61.32
AutoCAD SHX Text 62.12
AutoCAD SHX Text 62.08
AutoCAD SHX Text 61.55
AutoCAD SHX Text 61.67
AutoCAD SHX Text 61.69
AutoCAD SHX Text 62.10
AutoCAD SHX Text 61.67
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text 63.87
AutoCAD SHX Text 63.75
64.00
CUTTING
JOINT FILTER
EXPANSION JOINT DETAIL
CONTRACTION JOINT DETAIL
C-501
CONCRETE WALKWAY DETAIL
SCALE: NOT TO SCALE
NOTES:
1. PROVIDE EXPANSION JOINTS FOR EVERY SIX CONTRACTION JOINTS.
PROVIDE CONTRACTION JOINTS (TYP) L/W=1.00 TO 1.50 ON CENTERS,
WHICHEVER IS LESS.
2%(MAX)
GL
BROOM FINISH
BASE COURSE
(CRUSHER-RUN, RC-40, COMPACTED
TO AT LEAST 95% OF MAX DENSITY)
SUB GRADE
(COMPACTED TO AT LEAST
90% OF MAX DENSITY)
PLAIN CONC (MIN. 25N/mm²)
5〜10mm CHAMFER, TYP
±3000 (MATCH EXISTING)
150 mm DIA. VP PIPE
100 mm DIA. VP PIPE
100X150 VP ENLARGER
2% MIN. SLOPE
1% MIN.
AREA DRAIN
150 mm 90° PVC
ELBOW
FINISHED
GRADE
PAINTED VP
DOWNSPOUT (DS)
(SEE ARCH. DWGS.)
BUILDING WALL &
DOWNSPOUT,
SEE ARCH. DWGS.
SD PIPE
VP COUPLER
(PAINT EXPOSED PORTION W/
EXTERIOR LATEX PAINT)
VP DOWNSPOUT BOOT
(SHOE)
PROVIDE 5 MM AIRBREAK BETWEEN
DOWNSPOUT BOOT AND VP COUPLER
VARIES (SEE DWG CG101)
C-501
TYPICAL DOWNSPOUT (DS) AREA DRAIN DETAIL
SCALE: NOT TO SCALE
I N
CLEANOUT
S
L
O
P
E
V
A
R
I E
S
75 MM (MIN.)
O V
E R
L A
P m m
20 300~400 300~400 20
PLAN
SOD
(KOURAI-SHIBA)
20 300~400 300~400 20
SOD (KOURAI-SHIBA)
TOP SOIL (100mm THK)
COMPACTED SUBGRADE
SAND TOPPING
SECTION
NOTE:
SAND TOPPING SHALL BE NORMAL SAND
USUALLY USED IN READY-MIX CONCRETE.
C-501
SODDING DETAILS
SCALE: NOT TO SCALE
C-501
CONCRETE SPLASH BLOCK DETAIL
SCALE: NOT TO SCALE
C
D
W G
C-501
M I S
C E
L L A
N E
I O
T
A I L S
B R
B R
J C
D H
D E
S C
R I P
T I O
N D
A T
E
D E
S I G
N E
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
F I
M
E
S I Z
E
A
D R
A W
I N
G
C
O D
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
A P
O
A
P
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
M A
R K
US Army Corps of Engineers
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
I S
S U
E
D
A T
E
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
F Y
P
N
C A
M
A
J A
P A
N
M E
D I C
A L
C
L I N
D
I T
I O
N A
L T
E R
A T
I O
N
B L D
G
BLDG 704
FINAL
A P
R I L
N
H
D
H
N
N
H<1m
1m≦H<5m 0.5
SLOPE (N)DEPTH (H)
VERTICAL
N
SATISFACTORY SOIL
D
DRAINAGE
PIPE
SATISFACTORY SOIL
DRAINAGE
PIPE
SECTION FOR GENERAL PORTION
BASE COURSE
UNDERLAY PAPER
(JIS 3401)
CONCRETE SIDEWALK
SECTION FOR CONCRETE SIDEWALK
Ø900
Ø600
Ø1200
150 150Ø900
H
Ø1200
150 150Ø900
150150
O C
CAST IRON COVER
(T-6)
MAHOLE COVER AND
COVER RECEIVER
ROCK BOLT (M16)
WASHER AND MORTAR
ADJUST BLOCK
SLANT WALL
BODY BLOCK
BOTTOM SLAB
Ø19mm
MUZZLE CONCRETE
PLAIN CONCRETE
PLAIN CONCRETE
(18N/mm²)
FOUNDATION (RC-40)
TABLE OF DIMENSIONS
MANHOLE
NUMBER
DEEP
MANHOLE
H
BOTTOM
OF PIPE
PIPE
DIAMETER
CAST-IRON
COVER
RATING
BODY BLOCK
D3-1 2.157
60.003
VU Ø300 T-6 1
C-502
PRE CAST MANHOLE FOR STORM DRAINAGE
SCALE: NOT TO SCALE
CROSS SECTION LONGITUDINAL SECTION
TOP
ELEVATION
62.11
(62.16)
60.002
LADDER
RUNGS
MANHOLE BLOCKS
SLANT WALL
ADJUST
BLOCK
WASHER
C-502
TRENCH DETAIL
SCALE: NOT TO SCALE
DETECTABLE
WARNING TAPE
DETECTABLE
WARNING TAPE
D
Ø600
C-502
MANHOLE COVER DETAIL
SCALE: NOT TO SCALE
PLAN SECTION
LETTER "D" EMBOSSED
C
D
W G
C-502
M I S
C E
L L A
N E
I O
T
A I L S
B R
B R
J C
D H
D E
S C
R I P
T I O
N D
A T
E
D E
S I G
N E
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
F I
M
E
S I Z
E
A
D R
A W
I N
G
C
O D
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
A P
O
A
P
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
M A
R K
US Army Corps of Engineers
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
I S
S U
E
D
A T
E
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
F Y
P
N
C A
M
A
J A
P A
N
M E
D I C
A L
C
L I N
D
I T
I O
N A
L T
E R
A T
I O
N
B L D
G
BLDG 704
FINAL
A P
R I L
150800150
H
FH
EL
PLAN
SECTION
TABLE OF DIMENSIONS
INLET
NUMBER
GRATING COVER.
GRATING COVER.
D13 @200, 2 DIRECTION
REINFORCED
CONCRETE
(21 N/mm²)
LEVELING CONCRETE
FOUNDATION
(RC-40)
STEP METAL
@300
TOP
ELEVATION
PIPE BOTTOM
ELEVATION
RATING OF
GRATING
COVER
H
LADDER
RUNGS
D2-1 61.81
59.855
T-6 2.105m 6
D2-2 61.78
59.880
T-6 2.049m 5
C-503
STORM DRAIN INLET
SCALE: NOT TO SCALE
FH
EL
150 600 150
900100
H
GRATING COVER.
GRATING COVER.
PLAIN CONCRETE
(18 N/mm²)
FOUNDATION
(RC-40)
PLAN
SECTION
TABLE OF DIMENSIONS
INLET
NUMBER
TOP
ELEVATION
PIPE BOTTOM
ELEVATION
RATING OF
GRATING
COVER
H
D1-1 61.94 60.840 T-6 1.100m
C-503
STORM DRAIN INLET
SCALE: NOT TO SCALE
C
D
W G
C-503
M I S
C E
L L A
N E
I O
T
A I L S
B R
B R
J C
D H
D E
S C
R I P
T I O
N D
A T
E
D E
S I G
N E
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
F I
M
E
S I Z
E
A
D R
A W
I N
G
C
O D
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
A P
O
A
P
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
M A
R K
US Army Corps of Engineers
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
I S
S U
E
D
A T
E
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
F Y
P
N
C A
M
A
J A
P A
N
M E
D I C
A L
C
L I N
D
I T
I O
N A
L T
E R
A T
I O
N
B L D
G
BLDG 704
FINAL
A P
R I L
SECTION (ANCHORING)
m m
D
I A
F I L
T E
R
S
O C
K
PROTECTED AREA
RUNOFF
FLOW
PROTECTED
AREA
RUNOFF
FLOW
STAKE, AS REQUIRED
(TYP.)
MIN.
OVERLAP
NOTES:
1. INSTALLATION, INSPECTION, MAINTENANCE AND REMOVAL OF COMPOST FILTER SOCKS SHALL BE
DONE IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
2. PROVIDE NECESSARY TRAINING FOR PERSONNEL WHO WILL BE RESPONSIBLE FOR
IMPLEMENTATION OF BMPS.
OVERLAP (ANCHORING)
PLAN (ANCHORING)
WORK
AREA
300mm DIA. FILTER SOCK
300mm DIA. FILTER SOCK
300mm
DIA. FILTER
SOCK
WORK
AREA
RUNOFF
FLOW
LIMIT OF
GRADING
PROTECTED
AREA
STAKE, AS REQUIRED
(TYP.)
STAKE, AS REQUIRED
(TYP.)
WORK
AREA
m m
BURY BOTTOM OF
FILTER FABRIC
EXST GROUND
CAP TOP OF
REBAR (TYP)
12 Ømm
REBAR (TYP)
FASTEN SILT FENCE
TO REBAR (TYP)
1800mm O.C. MAX.
0m m
0m m
0m m
F
L
O
W
EXST GROUND
0m m
PIN. FABRIC @
600 mm O.C.
12 Ømm REBAR
150mm
BACKFILL W/ SOIL
AND COMPACT
C-504
SILT FENCE DETAIL
SCALE: NOT TO SCALE
GEOTEXTILE
FABRIC
GEOTEXTILE FABRIC
ELEVATION
PANELS ARE PRE-ASSEMBLED IN 600mm LONG SEGMENTS
WHICH CAN BE COMBINED TO CREATE VARIOUS LENGTHS OF
BARRIER TO APPLICATION.
NOTES:
1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH
MANUFACTURER'S SPECIFICATIONS.
2. ALL DIMENSIONS SHALL REFLECT MANUFACTURER'S
SPECIFICATIONS.
1. SPECIFICATIONS:
A. THE BARRIERS SHALL BE BLACK, MOLDED, MODULAR
PANELS MANUFACTURED USING 50% RECYCLED
POLYETHYLENE PLASTIC WITH ULTRAVIOLET INHIBITORS
AND .060 -.080 MIL IN THICKNESS. EACH PANEL HAS
VERTICAL 90° ROOT DEFLECTING RIBS PROTRUDING
13mm - 16mm IN HEIGHT. THE RIBS HAVE A MINIMUM
THICKNESS OF .060 MIL - .080 MIL AND ARE PLACED 150mm
- 200mm APART. AN INTEGRATED SELF-INTERLOCKING 90°
RIBBED CONNECTION JOINING SYSTEM PROVIDES FOR
INSTANT ASSEMBLY BY SLIDING ONE PANEL INTO
ANOTHER.
2. INSTALLATION
A. THE SPECIFIED NUMBER OF PANELS SHALL BE JOINED
TOGETHER AND PLACED ALONG THE UTILITY TRENCH TO
CREATE A LINEAR PLANTING APPLICATION.
B. VERTICAL 90° ROOT DEFLECTING RIBS ARE ALWAYS
FACING THE ROOT BALL. C. ALWAYS INSTALL THE
PANELS 25mm - 50mm ABOVE GRADE TO AVOID ROOT
PENETRATION ABOVE THE BARRIER.
C. PREPARE YOUR INSTALLATION AS SHOWN.
D. RECOMMENDED FOR LINEAR OR SURROUND PLANTING
APPLICATIONS. FOR DRAINAGE BACKFILL WITH NATIVE
SOIL OR (IF NECESSARY) WHILE COMPACT SOIL
CONDITIONS EXIST, USE GRAVEL OR CRUSHED ROCK.
AVOID BACKFILL LESS THAN 16mm OR GREATER THAN
37mm. FINISH TO GRADE. DO NOT DISTORT BARRIER
INSTALLATION.
90° ROOT DEFLECTING
RIB, PROTRUDING 13mm - 16mm
SELF INTERLOCKING
CONNECTION
150mm
150mm
300mm 300mm
600mm
C-504
COMPOST FILTER SOCK INSTALLATION
SCALE: 1:50
C-504
UTILITY ROOT BARRIER DETAIL
SCALE: NTS
NOTES:
1. TOPSOIL MIX, SEE SPEC
2. DO NOT DAMAGE MAIN ROOTS OR DESTROY
ROOT BALL WHEN INSTALLING TREE STAKE
3. WATER THOROUGHLY AFTER INSTALLATION
4. REMOVE TREE RINGS AND STAKES TWO
YEARS AFTER INSTALLATION
ENLARGED DETAIL
50mm MULCH (PULL AWAY FROM
BASE OF TRUNK) CREATE SAUCER
AROUND TREE
COMPACTED TOPSOIL
MIX (SEE SPEC)
SOD OR GROUNDCOVER
EXISTING SUB GRADE
TRIM BRANCHES
TO RETAIN NATURAL
FORM OF TREE
MAINTAIN TREE BASE AT
OR SLIGHTLY HIGHER
THAN EXISTING GRADE,
TO ALLOW FOR
SETTLEMENT
30mm BLACK
PLASTIC HOSE
3mm (NO.11 GA.)
GALV. WIRE, COIL
EACH END TIGHTLY
ENLARGED DETAIL
POLYETHYLENE TREE
TRUNK PROTECTOR-
TYPICAL
VARIES
ROOT
BALL
2 T- BARS 40mm X 40mm
X 1.8 M LONG
C-504
TREE PLANTING DETAIL
SCALE: NTS
GEOTEXTILE REQUIREMENTS
MECHANICAL
PROPERTIES
TEST METHOD UNITS MARV
GRAB TENSILE STRENGTH ASTM D 4632 KN 1.62 X 0.89
GRAB TENSILE ELONGATION ASTM D 4632
% 24 X 10
PUNCTURE STRENGTH ASTM D 4833 KN 0.40
MULLEN BURST STRENGTH ASTM D 3786 KPA
TRAPEZOID TEAR STRENGTH
ASTM D 4533
KN 0.51 X 0.33
UV RESISTENCE
ASTM D 4355 % 90
APPARENT OPENING SIZE ASTM D 4751 MM 0.425
FLOW RATE
ASTM D 4491 1/MIN/M 5907
PERMITTIVITY
ASTM D 4491
SEC
2.1
-1
SECTION
VELCRO CLOSURE
STORM SEWER
GRATE
STORM SEWER
GRATE
RUNOFF WATER WITH
SUSPENDED SEDIMENT
19mm TO 76mm
GRAVEL (300 MINIMUM
DEPTH)
WIRE MESH (13mm
OPENINGS) WITH
GEOTEXTILE FILTER FABRIC
ON TOP
EXISTING
DRAIN INLET
SEDIMENT
ALTERNATIVE: GRAVEL FILTERPLAN
GEOTEXTILE FABRIC STORM DRAIN
INLET PROTECTION (OR APPROVED EQUAL)
GEOTEXTILE FABRIC
INLET PROTECTION BAG
STORM SEWER GRATE
MIN
C-504
GEOTEXTILE FABRIC STORM DRAIN INLET PROTECTION
SCALE: NTS
C
D
W G
C-504
M I S
C E
L L A
N E
I O
T
A I L S
B R
B R
J C
D H
D E
S C
R I P
T I O
N D
A T
E
D E
S I G
N E
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
F I
M
E
S I Z
E
A
D R
A W
I N
G
C
O D
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
A P
O
A
P
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
M A
R K
US Army Corps of Engineers
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
I S
S U
E
D
A T
E
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
F Y
P
N
C A
M
A
J A
P A
N
M E
D I C
A L
C
L I N
D
I T
I O
N A
L T
E R
A T
I O
N
B L D
G
BLDG 704
FINAL
A P
R I L
CENTERLINE
COLUMN
D E
S C
R I P
T I O
N D
A T
E
D E
S I G
N E
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
F I L
E
N
A M
E
S I Z
E
A
D R
A W
I N
G
C
O D
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
A P
O
A
P
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
M A
R K
US Army Corps of Engineers
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
I S
S U
E
D
A T
E
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
F Y
C A
M
A
J A
P A
N
M E
D I C
I N
D
I T
I O
N A
L T
E R
A T
I O
N
B L
BLDG 704
FINAL
A P
R
GRAPHIC SCALE
0 4000
SCALE: 1:100
NORTH
A-001
DEMOLITION PLAN
SCALE: 1:100
1 DIMENSIONS INDICATED ARE APPROXIMATE.
NEW ROUGH OPENINGS MUST NOT EXTEND
PAST EXISTING STRUCTURAL OPENINGS.
MIN SIZE OF OPENING:
・ 1750 W X 2500 H, REFER TO SECTION 1/A-311.
・ PROTECT EXISTING STRUCTURAL MEMBERS.
・ FINISH NEW OPENING TO MATCH EXISTING
WALL AND FLOOR FINISHES.
2 REMOVE EXISTING DOOR AND FRAME.
FINISH TO MATCH EXISTING ADJACENT
INTERIOR FINISHES. REFER TO SECTION
2/A-313.
3 REMOVE EXISTING CONCRETE RAMP,
FOOTING AND GUARDRAILS.
A-001
E X
I S
T I N
G
C
O N
D I T
I O
O M
L I T
I O
N
P
L A
N
J R
W
J R
W
D H
D H
A
D
W G
KEY NOTES
A
B
A
CLASSROOM
CLR01
AUDIO TESTING
PEHS2
SUB WAITING
WRC01
NCOIC
OFFICE
OFA02
HEALTH
PROMOTIONS
OFA02
WELLNESS
CENTER
PTES1
PUBLIC HEALTH
NURSE
OFA02
OCC. HEALTH
TECHNICIANS
OFA03
OCC. HEALTH
NURSE
OFA02
MASK FIT
TESTING
OPPS1
STORAGE
SRE01
TOILET
TLTU1
RECEPTION/
ADMIN
RECP1
HALL 1
VEST.
ELEC.
HALL 2
HALL 3
3.7321.7
GRAPHIC SCALE
0 4000
SCALE: 1:100
A1
A-401
A-301
A-201
A-301
A-301
A-301
LEGEND
A-201
NORTH
E X
I S
T I N
G
G
R
EXISTING GRID C
A-201
A-101
OVERALL GROUND FLOOR PLAN
SCALE: 1:100
19565
NEW DOOR
EXISTING WALL
TO REMAIN
NEW WALL
A-101
O V
E R
A L
L
G
R O
U N
D
F
L O
A
N
J R
W
J R
W
D H
D H
A
D
W G
ROOM
NAME
ROOM #
ROOM
CODE
D E
S C
R I P
T I O
N D
A T
E
D E
S I G
N E
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
F I L
E
N
A M
E
S I Z
E
A
D R
A W
I N
G
C
O D
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
A P
O
A
P
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
M A
R K
US Army Corps of Engineers
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
I S
S U
E
D
A T
E
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
F Y
C A
M
A
J A
P A
N
M E
D I C
I N
D
I T
I O
N A
L T
E R
A T
I O
N
B L
BLDG 704
FINAL
A P
R
A
CONSTRUCT PERGOLA
(OPTION #1)
1 NEW OPENING CONNECTING NEW BLDG WITH EXISTING BLDG.
KEY NOTES
101010
700 700
18500 1860
20360
M A
T C
H
E
X I S
T I N
G
S
C U
P P
W
D
T H
EXISTING
SCUPPER
14950
4321.710 3.7
C
B
A
ALUMINUM
EXPANSION JOINT
COVER
NEW ROOFING SYSTEM
FULLY REINFORCED
FLASHING MEMBRANE
LINE OF
EXISTING
ROOF BEYOND
MATCH WIDTH
OF
EXISTING
OPENING
SCALE: 1:50
20000
GRAPHIC SCALE
S L O
P E
GENERAL NOTES
PROVIDE FLASHING FOR ALL NEW ROOF
PENETRATIONS AND AROUND ANY NEW ROOF
SUPPORTS FOR EQUIPMENT.
PROVIDE VAPOR RELIEF VENTS AS REQUIRED
BY ROOFING MANUFACTURER'S INSTALLATION
INSTRUCTIONS.
1.
2.
PROVIDE NEW ROOF SLOPE TO COMPLY WITH
UFC 3-110-03 (5% MIN)
PROVIDE CRICKETS TO SHED WATER FROM
AROUND SKYLIGHTS AND ROOF MOUNTED
EQUIPMENT AS NEEDED, TYP.
3.
4.
S L O
P E
NORTH
A-103
ROOF PLAN
SCALE: 1:50
D5
A-501
RD
1. SOLAR TUBE, SEE B2/A-501
2. FLUID-APPLIED ROOFING SYSTEM, SEE SPEC
SECTION 07 56 00 FLUID APPLIED ROOFING YSTEM
3. EXPANSION JOINT AND COVER, SEE D1/A-501
4. INTEGRAL CONCRETE GUTTER, SEE D3/A-501
5. CONCRETE SCUPPER AND SHEET METAL LEADER
BOX DOWNSPOUT, SEE C3/A-501
6. PRECAST CONCRETE PARAPET CAP, SEE D4/A-501
7. LINE OF ROOF TOP AIR HANDLER UNIT w/ SUPPORT
FRAME ABOVE, SEE C5/A-501
8. MAIN CLINIC ENTRY VESTIBULE BELOW
9. DUCT PENETRATION, B1/A-502.
10. FLASH CONDUIT PENETRATION, SEE MECH.
11. VTR PENETRATION, SEE MECH.
LEGEND KEYNOTES
NOTE: REFER TO DETAIL D1/A-501 FOR ADDITIONAL INFORMATION
CLAY TILE ROOFING
SYSTEM, SEE A4, B4,
C4/A-401
EXISTING ROOFING
A-103
R O
A
N
J R
W
J R
W
D H
A
D
W G
RIDGE
TYP.
B1
A-501 SIM.
B1
A-502
C5
A-501
REMOVE EXISTING CAP
PARAPET
TRAFFIC BEARING
SURFACING ON STANDARD
FLUID APPLIED ROOFING
SYSTEM, SEE D2/A-501, SIM.
DUCT SUPPORTS
A1
A-501
TYP. SUPPORTS DETAIL
12. REMOVE EXISTING
PARAPET CAP.
13. CRICKET TO DRAIN.
USE SHEET METAL
TO PITCH
14. GUTTER HIGH POINT.
15. CLAY ROOF TILE.
D E
S C
R I P
T I O
N D
A T
E
D E
S I G
N E
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
F I L
E
N
A M
E
S I Z
E
A
D R
A W
I N
G
C
O D
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
A P
O
A
P
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
M A
R K
US Army Corps of Engineers
E N
G I N
E E
R I N
G
D
I V
I S
I O
N
I S
S U
E
D
A T
E
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
F Y
C A
M
A
J A
P A
N
M E
D I C
I N
D
I T
I O
N A
L T
E R
A T
I O
N
B L
BLDG 704
FINAL
A P
R
A
2% GUTTER SLOPE
CONSTRUCT PERGOLA
(OPTION #1)
2% GUTTER SLOPE 2% GUTTER SLOPE
T
T E
R
S
L O
P E
S L O
P E
S L O
P E
A-103
NEW WALL PENETRATION
SCALE: 1:10
A-103
GENERAL NOTES
1.
2.
3.
4.
ALL ELEVATIONS RELATE TO ACTUAL COMPASS
DIRECTION
ALL SURFACES TO BE PAINTED TO MATCH
EXISTING CURRENT COLORS.
FINISH FLOOR ELEVATIONS 0.00 EQUALS
ELEVATION DATUM 62.10 +/- FOR MAIN BUILDING
AND 61.33 +/- FOR MECHANICAL / ELECTRICAL AS
FOUND ON CIVIL DRAWING C-121
EXISTING VENTS TO BE CAPPED WITH
GALVANIZED METAL COVER AND PAINTED
SAME COLOR AS BUILDING. INSULATE ON
INTERIOR (TYP.) W/R-13 INSULATION.
COVER EXPOSED INSULATION FROM
INTERIOR PLENUM SPACE WITH PLENUM
RATED MATERIAL.
A-201
NORTH ELEVATION
SCALE: 1:50
A-201
EAST ELEVATION
SCALE: 1:50
TOP OF SLAB
TOP OF CONC PARAPET
TOP OF SLAB
TOP OF CONC PARAPET
D1
A-401
D2
A-401
SCALE: 1:50
20000
GRAPHIC SCALE
A-201
WEST ELEVATION
SCALE: 1:50
TOP OF SLAB
TOP OF CONC PARAPET
A-301
A-301
KEY NOTES
1. SOLAR TUBE, SEE B2/A-501
2. ROOF TOP AIR HANDLER UNIT w/ SUPPORT FRAME
ON CURB, SEE C5/A-501 AND MECHANICAL.
3. CONCRETE RELIEF PATTERN TO MATCH EXISTING,
SEE C2/A-501
4. STAINLESS STEEL PARAPET CAP TO MATCH
EXISTING BULDING, SEE D5/A501
5. REINFORCED CAST-IN-PLACE CONCRETE WALL -
FINISH AND PAINT TO MATCH EXISTING, SEE
STRUCTURAL.
6. SRM PROJECT PN74868.
7. SCUPPER AND STEEL LEADER BOX, SEE C3/A-501
8. STEEL DOWNSPOUT, SEE CIVIL DRAWING FOR
UNDERGROUND CONNECTION.
9. EXPANSION JOINT, SEAL AND COVER, SEE D1/A-501
10. ALUMINUM WINDOW SYSTEM, SEE A2 & A3/A-501
11. TOP OF ROOF LINE
A-201
B U
I L
D I N
G
E
L E
V A
T I O
N S
J R
W
J R
W
D H
D H
A
D
W…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.