W912HV-22-B-0004_Drawings.pdf
PDF 30 MB Posted
- Attached to
- Replace Munitions Structures, Kadena Air Base, Okinawa, Japan Federal contract opportunity
- Solicitation number
- W912HV22B0004
About this file
This document outlines a federal contract opportunity to replace munitions storage structures at Kadena Air Base in Okinawa, Japan. The solicitation calls for demolishing 13 earth-covered igloos and 1 above-ground magazine, then replacing them with 14 new earth-covered igloos and 1 above-ground magazine. The new igloos must accommodate current and future munitions assets and feature large sliding doors. The new above-ground magazine must have drive-in access for a 22,000-pound forklift and doors at least 34 feet wide by 20 feet high. All new facilities must have two-level intrusion detection systems, steel bars at openings greater than 96 square inches, and high-security hasps per Air Force instructions. The project scope includes asbestos abatement, lead paint abatement, and testing. The contracting agency is the Department of the Army Corps of Engineers Engineering District Japan.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract OF1419-W912HV22B0004.pdf | ||
| W912HV22B0004_AM-0002.pdf | ||
| 01 11 00.00 10-C GOVERNMENT FURNISHED PROPERTY.pdf | ||
| W912HV22B0004_AM-0001 Specifications.pdf | ||
| W912HV22B0004_AM-0001.pdf | ||
| W912HV-22-B-0004_AM-0001 Drawings.pdf | ||
| Site Visit Sign-In Sheet.pdf | ||
| W912HV22B0004_ As-Built Drawings.pdf | ||
| W912HV22B0004.pdf | ||
| W912HV-22-B-0004 Specifications.pdf | ||
| MUNS Representative Dwgs for Demo.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KADENA AIR BASE
IE SHIMA
ISHIKAWA S.
E A S T C H I N A S E A
P A C I F I C O C E A NNAHA C.
NAGO C.
SHEET ID
D R
A W
N B
Y
E
K O
N D
O
D E
S
IG
N E
D B
Y
E
K O
N D
O
S U
B M
IT
T
E D
B Y
L
R O
B B
E R
T S
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S J A
P A
N D
IS
T
R
IC
T O
K
IN
A W
A J A
P A
N
C H
E C
K E
D B
Y
P
Z
IN
N I
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
PLOT SCALE:PLOT DATE: RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
FILE PATH:
N
M
IC
H
IG
A
N A
V E
S U
IT
E
C
H
IC
A G
O
IL
T
-6
-7 w w w .e x p F e d e ra l.
c o m
F Y
L X
F B
R E
P L
A C
E M
U N
IT
IO
N S
S T
R U
C T
U R
E S
K A
D E
N A
A M
M O
S T
O R
A G
E A
N N
E X
S
IT
E
K A
D E
N A
A
IR
B A
S E
O
K
IN
A W
A
J A
P A
N
1 : 209/24/2020 2:34:15 PM
C:\Users\kondoe\Documents\ARCH-AGM_KAB2018_KondoE.rvt
S E
P T
A R
C H
-A G
M K
A B
.R
V T
G-001
G E
N E
R A
L
C O
V E
R S
H E
E T
US Army Corps of Engineers ®
JAPAN DISTRICT
RENDERING VICINITY MAP
ARCHITECTURAL
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
(NAME AND LICENSE)
FIRE PROTECTION
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
(NAME AND LICENSE)
COMMUNICATIONS
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
(NAME AND LICENSE)
DESIGNER OF RECORD
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
(NAME AND LICENSE)
MECHANICAL
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
(NAME AND LICENSE)
CIVIL
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
(NAME AND LICENSE)
STRUCTURAL
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
(NAME AND LICENSE)
ELECTRICAL
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
(NAME AND LICENSE)
AREA MAP
KADENA AIR BASE, OKINAWA, JAPAN
LXFB123876 REPLACE MUNITIONS STRUCTURES,
KADENA AMMO STORAGE ANNEX SITE #1
RTA
MUNITIONS ENTRY GATE
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
S E
P T
I S
S U
E
D
A T
E
O C
T
F Y
L
X F
B
R
E P
L A
C E
M
U N
I T
I O
N S
R
U C
T U
R E
S
K A
D E
M
O
S
T O
R A
G
N
I T
E
K A
D E
R
B
S
E
O
K I N
A W
A
J A
P A
W912HV-22-B-0004
GENERAL NOTES GENERAL SYMBOLS
A-100
DESIGN DISCIPLINE: A -
ARCHITECTURE
SHEET NUMBER WITHIN SERIES
ANNOTATION CALLOUTS
1 Ref
A101
SIM
A101
SIM
DIRECTION OF VIEW
LETTER INDICATES BUILDING SECTION
NUMBER INDICATES ELEV OR DETAIL
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
NUMBER INDICATES DETAIL NO.
PLATE NUMBER WHERE DETAIL IS
DRAWN
DIRECTION OF VIEW
PLATE NUMBER WHERE ELEVATION IS
DRAWN
ELEVATION DRAWING NUMBER
INTERIOR ELEVATION DRAWING NUMBER
PLATE NUMBER WHERE ELEVATION IS
DRAWN
DIRECTION OF VIEW
1 Ref
1Ref
4A-101
SHEET NUMBERING SYSTEM
1 Ref
A101
SIM
NORTH
DIRECTION INDICATOR
GRAPHIC SCALE
GRAPHIC SCALE
1. ALL INSTALLATION AND NEW WORK FOR THIS PROJECT SHALL BE IN
ACCORDANCE WITH THE CONTRACT DRAWINGS AND
SPECIFICATIONS.
2. VISIT THE PROJECT SITE INDICATED IN THE CONTRACT DRAWINGS
AND VERIFY EXISTING SITE CONDITIONS. ALL DIMENSIONS AND
QUANTITIES RELATED TO THE PROJECT SHALL BE VERIFIED PRIOR
TO COMMENCEMENT OF WORK.
3. DAMAGE CAUSED BY REMOVAL OPERATIONS OR CONSTRUCTION
ACTIVITY IN ALL AREAS OF THE PROJECT SITE SHALL BE
REPAIRED/RESTORED TO THE APPROXIMATE ORIGINAL CONDITIONS
OR BETTER AND SATISFACTORY TO THE CONTRACTING OFFICER AT
NO COST TO THE GOVERNMENT.
4. ANY DEVIATIONS FROM THE CONTRACT DRAWINGS WHICH ARE
REQUIRED BY FIELD CONDITIONS DIFFERING FROM THOSE
INDICATED ON THE DRAWINGS SHALL BE CALLED TO THE
ATTENTION OF THE CONTRACTING OFFICER FOR APPROVAL PRIOR
TO COMMENCING WITH THE WORK.
5. ALL MATERIALS REQUIRED TO BE REMOVED IN THIS PROJECT SHALL
LEAVE THE AREA CLEAN AND COMPLETE TO THE SATISFACTION OF
THE CONTRACTING OFFICER.
6. UPON COMPLETION OF ALL WORK IN THIS PROJECT, LEAVE THE
AREA CLEAN AND COMPLETE TO THE SATISFACTION OF THE
CONTRACTING OFFICER. ALL WORK AREAS SHALL BE MAINTAINED
IN A NEAT AND ORDERLY MANNER AND SHALL BE CLEANED ON A
DAILY BASIS. CONSTRUCTION DEBRIS AND MATERIALS SHALL NOT
BE ALLOWED TO BE TRACKED OR CARRIED OUTSIDE THE
CONSTRUCTION BOUNDARIES AND SHALL BE CLEANED
IMMEDIATELY WHEN INCIDENTAL ISSUES OCCUR.
7. ALL INDICATED SIZE AND DIMENSIONS ARE IN MILLIMETERS UNLESS
NOTED OTHERWISE.
8. COORDINATE ACCESS TO VISITOR PASS OFFICE DURING
CONSTRUCTION WITH CONTRACTING OFFICER REPRESENTATIVE.
9. REMOVE AND REINSTALL ANY SIGN, FIXTURES, RECEPTACLES, ETC.
AS NEEDED TO ACCOMMODATE NEW CONSTRUCTIONS.
10. SECURE AND WEATHER PROTECT ANY ROUGH OPENINGS DURING
NON-WORKING HOURS.
INDEX
N
PLAN NORTH
SHEET ID
D R
A W
N B
Y
E
K O
N D
O
D E
S
IG
N E
D B
Y
E
K O
N D
O
S U
B M
IT
T
E D
B Y
L
R O
B B
E R
T S
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S J A
P A
N D
IS
T
R
IC
T O
K
IN
A W
A J A
P A
N
C H
E C
K E
D B
Y
P
Z
IN
N I
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
PLOT SCALE:PLOT DATE: RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
FILE PATH:
N
M
IC
H
IG
A
N A
V E
S U
IT
E
C
H
IC
A G
O
IL
T
-6
-7 w w w .e x p F e d e ra l.
c o m
F Y
L X
F B
R E
P L
A C
E M
U N
IT
IO
N S
S T
R U
C T
U R
E S
K A
D E
N A
A M
M O
S T
O R
A G
E A
N N
E X
S
IT
E
D E
N A
A
IR
B A
S E
O
K
IN
A W
A
J A
P A
N
1 : 649/24/2020 2:34:16 PM
C:\Users\kondoe\Documents\ARCH-AGM_KAB2018_KondoE.rvt
S E
P T
A R
C H
-A G
M K
A B
.R
V T
G-002
G E
N E
R A
L
G E
N E
R A
L N
O T
E S
A
B B
R E
V
IA
T
IO
N S
A
N D
I N
D E
X
M A
D
S
C R
IP
T
IO
N
D A
T E
S E
I S
S U
E
D
A T
E
O C
T
F Y
F
B
R
E P
L A
N
I T
I O
R
U C
T U
R E
S
K A
D E
M
O
S
T O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
39807
70521
23522
21450
21449
80113
70089
70733
70330
21463
25432
82708
79953
25443
80403
46014
46120
70700
70756
82331
22765
10336
10201
47009
46025
46122
78151
80224
82415
83300
80846
83566
80902
8 3
46027
73553
53186
83534
71497
73555
23628
78172
78151
80100
83508
83379
80731
83618
70758
70128
83439
71496
83382
80745
10202
82651
54150
38132
70734
70302
30077
39808
39810
80766
55058
80830
82374
85519
20141
71449
53108
55059
55057
70839
73306
70157
Text
55085
55086
73523
38134
55087
0 3
70027
73112
55066
80876
83515
83383
80139
70088
70149
83436
50124
50126
21462
55036
83535
55044
82917
55020
55054
55032
55024
55040
55028
89905
55048
25439
54151
73416
25442
25441
80831
80429
89471
80446
21456
24082
73566
10319
20149
71463
71450
71498
73589
53101
25440
20334
20335
55053
73335
10375
80614
82943
83559
82714
82702
82915
82104
82905
82722
46015
53185
73056
73490
73531
50130
80227
73396
24081
82310
82309
81701
20139
87017
80435
70176
70087
70138
39809
70028
70324
80155
70323
71456
71495
N-7
P-11
P-3
P-15
B a r r i e r
P-7
L-8
L o c a l i z i t i c a l e a
N-12 f t
X
L-12
L-4
SA-2C-W
P
A
S
N-9
SA-1A
S
A
D f t
T r i m d
P-10
R
U
N
W
Y d m s f t f t
Service Apron 1
X
Taxiway F f t
P-1 f t
W
T
C
N-10
F
F
O
G
B
H
L
Par
V
C
P
Runway 05R/23L
HP-10
W
T
C
P
A
S
W
T
C
Taxiway L
W T
C
S
A
A
B a r r i
V
C
P
M-2
Taxiway P
Tax iw ay K
F
G
OS-1
N-1
W
T C f t
N-3
P-2 f t
W i n d o c k
P
A
S
B
R
L-3
P
A
S
P-13
W i c k
P
A
S
Serv ice
Apron 4
P
A
S
L-6
V
C
P
P A
S
P-5
Taxiway L
8 Figh ter
A pro n
N-5
P i t i c e a f t
B
R
L f t
H
Y
P
A
S
R
P
A
S
W
T
C
P i t i c e a
Figh ter
A pro n
Runway 05L/23R
S
A
B
L-1
N-14
P
A
S
B a r r i
W
T
C
Taxiway A
P
A
S
N-13
B
R
N-6
L
P-9
B
L
H t
N-2
SA-2B-E
SA-1C
f t
X f t
H
A
Z
P i t i c e a
L-5
L
P
A
S f t
Vortac
B a r r i f t
SA-2B-W
W i c k
W
T
C
Runway 05L/23R
Figh ter
A pro n T ax ila ne f t
R
Service Apron 3
Tax iw ay K
L-2
P-6 f t
Tax iw ay W
E
L f t
Tran sie nt am p
Taxiway K
H
Y
Tax iw ay G
H
A
Z
L
Taxiway H
OS-2
F
G
S
T
A
N
D
B
Y f t
Taxiway N
Ta xi w ay
N x
M-1
Taxiway E
H
A
Z
Runway 05R/23L
L-7
Tax iw ay G f t
Runway 05R/23L f t
Serv ice
Apron 5
P
N-11
B
L
Tax iw ay G
OS-3
E
L f t
C m p
Taxiway L
P-8
S
A
A
C r i t i c e a
Taxiway M
A
P
R
O
N
W
T
C
M-3
P
SA-1B
W
T
C
R p o p e
X
OPS Spots
Figh ter
A pro n T ax ila ne
(U pp er Flig ht Ram p) f t
F
G
Taxiway D
P A
S
B i r d b a t h
N-15
Taxiw ay D
W e i g h
F
G
S
A
C
E
Taxiway B
W
T
C
W
T
C
Taxiway C f t
Serv ice A pro n 2
Taxiw ay E
P
A
S
R i n s c i l i t y
Runway 05L/23R
P i t i c e a
T r d
V
C
P
P
A
S
R p o p e
G l i o p e
B a r r i
Taxiway C
L-13
Taxiway D
S
A
C
P-4
Taxiway K
Taxiway F
EOR
B a r r i
L
Tax iw ay J
P
A
T
T
E
R
S
E
A
D
A
E
D
O
O
L
I
T
T
E
F
I
S
H
E
C
O
L
L
I
S
S
E
B
I
L
E
L
E
M
JIM
M
Y `S
W A
Y
W
I
L
L
I
A
E
BUSICK DR
C
L
C
H
R
I
S
T
E
W
A
L
M
S
L
Y
A
R
N
O
R
R
A
C
E
M
C
C
O
N
N
O
P
K
I
N
D
R
H A
M P
S H
I R
E
S
T
K
I
N
C
H
E
L
R
O
H
I
G
H
L
A
R
K
B
E
E
S
D A
V
E
M
C
K
E
N
N
E
B
O
SCHREIBER AVE
S
P
A
R
W
A
D
Y
R
O
B
E
R
E
D
R
O
L
L
I
I
G
H
T
S
C
R
A
G
L
I
T
T
A
S
P
F
A
I
R
C
H
I
E
C
H
E N
N
A U
O
P
V
I N
C
E
E
W
A
R
F
I E
W
E
S
T
M
O
C
O
L
L
I
S
M
C
C
O
N
N
O
P
D O
U G
L A
S
B
L V
D
V
I
N
C
E
E
D
E
W
A
L
K
OMAHA AVE
P
E
A
W
A
L
M
S
L
Y
M
O
O
E
W
A
R
F
I E
W
A
L
K
S
E
E
C
A
R
S
W
E
E
I
V
I
N
C
E
E
I
K
U
T
V
D
S
C
H
R
E
I B
E
P
R
E
D
O
P
S
I
M
L
B
U
L
L
R
I
C
K
E
N
B
A
K
R
O
Y
A
R
N
O
E
M
C
K
E
N
N
E
P
E
A
M
C
A
L
L
I
S
T
D E
IC
H
L M
A N
N D
R
H
I G
H
L
A
R
K
P E
A S
E R
D
R
O
Y
C
H
R
I S
T
E
H
A
R
R
K
I
N
D
R
O M
A H
A
A
V E
G
A
B
R
E
S
M
O
O
E
L
E
V
I
T
E
D
O
U
G
L
V
D
B
A
N
Y
E
Z E
A M
E R
S T
K
E
A
R
O
P
H A
LY
B
U R
T O
N S
T
STETHEM S
T
S
H
O
P
R
E
D
O
P
STALHECKER ST
C
R
S
C
H
L
E
G
P
O
F
I
S
I
M
L
C
H
E
L I
S
T
M
A
H
U
B
R
O
R
L O
R
W
E N
G E
R D
R
W
I L
K
I
M
C
C
O
M
O
P
P H
O E
N
IX
A V
E
W
H
I
S
N
R
M
O
O
E
C
A
R
S
W
E
E
E
A
G
L
E
S
T
O
R
B
R
A
N
C
H
A
C
O
L
F
M
E
L
V
I L
E
L A
R O
C Q
U E
D R
E
M
M
E
B
E
E
R
B
O
W
A
R
N
O
E
V
I
N
C
E
E
P E
A S
E
R
D
B
E
E
S
W
A
R
F
I E
S
C
H
R
E
I
B
E
K
U
T
V
D
M
C
K
E
N
N
E
W
I L L I A
E
M O
LLA
N
D S
T
V
I
N
C
E
E
M
O
O
E
M
E
L
V
I L
E
V
I
N
C
E
E
W
A
L
K
V
I
N
C
E
E
P A
T T
E R
S O
N
A
V E
S E
A V
E R
C
IR
W
E
S
T
B
R
O
F
A
I
R
C
H
I
E
C
H
E
N
N
A
U
O
P
S
C
H
L
E
G
M
O
L
L
A
M
O
L
L
A
P
E
A
P
E
A
B
O
M
C
K
E
N
N
E
M
O
O
E
M
C
K
E
N
N
E
M
O
L
L
A
K
U
T
V
D
A
D
A
E
A I R
F I E
C
E S
S
J
A
C
K
S
F
L
E
M
I
E
S
I
J
B
O
W
I
L
B
A
N
S
E
B
I L
E
J
A
C
K
S
D
A
V
E
BONG DR
A
D
A
E
B
A
N
Y
E
F
O
S
T
R
F
I
G
H
T
R
O
N
G
A
I N
E
S
V
A
C
K
W
O
R
S
R
N
A
N
S
T
S
A
C
R
A
M
E
N
A
R
N
O
E
V
I N
C
E
E
C
A
M
B
R
I
D
P
O
W
E
E
K
E
A
R
O
P
D
I
L
L
W
W E
S T
B R
O O
K A
V E
L
O
R
L
I
E
A
L
B
A
E
F
IS
H
E R
A V
E
P
E
A
M
C
C
O
N
N
O
P
S
T
E
T
H
W
A
D
Y
P A
T T
E R
S O
N
A
V E
Y
O
U
M
C
G
U
I
N
A
V
A
J
Outdoor Rec. Center
HAWC WICO
Marek Park
Kenney Park
Falcon Gym
4-Diamonds
Youth Center
Scuba Rental/Repair/Boat House
O'Conner Youth Gym
Marek Park
Risner Gym
Rodriguez Park
Millenium Teen Center
73111
73114
73107
73109
73151
73128
71207
71209
73552
73551
73508
73513
73512
73509
73106
73553
Taxiway W
D
O
U
G
L
V
D
P
A
L
M
B
E
A
W
ALKER
R D
D
O
U
G
L
V
D
W
A
L
K
D
O
U
G
L
V
D
D
O
U
G
L
V
D
F
A
I
R
C
H
I
E
C
O
L
L
I
S
R O
U T
E
R O
U T
E
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c o m
F Y
F
B
R
E P
L A
C E
M U
N I T
I O
R
U C
T U
R E
S
K
A D
E N
A
A M
O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
J U
US Army Corps of Engineers ®
GC101
C I V
I L
A C
C E
U
L
R
O U
T E
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
L X
F B
G
C D
W G
2001000
M 1:10000
[m]
900 1000800700600500300 400
N
GENERAL NOTES:
1. THE CONTRACTOR SHALL PROVIDE UNRESTRICTED ACCESS TO THE SITE BY
AUTHORIZED PERSONNEL FOR INSPECTION PURPOSES DURING THE ENTIRE
CONSTRUCTION PERIOD.
2. CONTRACTOR ACCESS TO THE WORK SITE SHALL BE AS SHOWN ON THIS SHEET
UNLESS OTHERWISE APPROVED BY THE CONTRACTING OFFICER. THE CONTRACTOR
SHALL AT ALL TIMES ENSURE AGAINST UNAUTHORIZED ENTRY OR ACCESS TO THE
SECURED AREAS OF THE CONSTRUCTION.
3. ALL CONTRACTOR AND SUBCONTRACTOR PERSONNEL, VEHICLES, EQUIPMENT AND
OTHER MATERIALS SHALL REMAIN WITHIN THE LIMITS OF CONSTRUCTION AND
WITHIN THE SITE ACCESS AND HAUL ROUTES DESIGNATED ON THE PLANS.
4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE OFF BASE HAUL
ROUTES WITH THE APPROPRIATE AUTHORITIES. HAULING ON BASE SHALL NOT
INTERFERE WITH BASE OPERATIONS.
5. ALL WORK, MOVEMENT AND PARKING OF EQUIPMENT SHALL, IN ADDITION TO THE
REQUIREMENTS OF THESE SPECIFICATIONS AND ORDERS OF THE CONTRACTING
OFFICER, BE IN ACCORDANCE WITH KADENA AIR BASE REQUIREMENTS.
SAFETY NOTES:
1. EACH PERSON ENTERING ALL BASES AND INSTALLATIONS IS REQUIRED TO CARRY A
BASE PASS AND IDENTIFICATION, OR TO BE ESCORTED AT ALL TIMES BY A PERSON
CARRYING AN AUTHORITY-ISSUED ESCORT BADGE.
2. EACH VEHICLE ENTERING ALL BASES AND INSTALLATIONS IS REQUIRED TO HAVE
VEHICLE PASSES REQUIRED BY SECURITY FORCES.
3. VEHICLES AND PERSONS ENTERING KADENA AIR BASE ARE SUBJECT TO SEARCH
AND INSPECTION PRIOR TO ENTERING. CONTRACTORS ARE EXPECTED TO
FAMILIARIZE THEMSELVES WITH AND COMPLY WITH THESE PROCEDURES.
4. ALL VEHICLE DELIVERIES SHALL BE COORDINATED, IN ADVANCE, WITH THE
CONTRACTING OFFICER, SO THAT THE GATE GUARDS MAY BE NOTIFIED. VEHICLE
OPERATORS MUST HAVE IN THEIR POSSESSION A COMMERCIAL MANIFEST
IDENTIFYING THE CONTENTS OF THE VEHICLE AND/OR TRAILER WHEN ARRIVING AT
THE GATE.
5. REQUESTS FOR EXCEPTIONS TO THE POLICIES AND PROCEDURES OF THIS
DOCUMENT SHALL BE COORDINATED IN ADVANCE THROUGH THE CONTRACTING
OFFICER.
6. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
CONTRACTOR ACCESS, HAUL ROUTE AND STAGING NOTES:
1. CONTRACTOR LAYDOWN/STAGING AREA IS SHOWN ON SHEET C-101.
2. GATE 1 SHALL BE THE ACCESS POINT FOR ALL KADENA AIR BASE CONSTRUCTION
TRAFFIC. ENTRY VIA OTHER KADENA AIR BASE GATES IS PROHIBITED, UNLESS
OTHERWISE APPROVED BY THE CONTRACTING OFFICER. THE CONTRACTOR MAY
EXIT THE BASE VIA ANY OPEN GATE.
3. CONTRACTOR'S EMPLOYEES WILL ONLY PARK IN AREAS DESIGNATED BY THE
CONTRACTING OFFICER.
4. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE EMPLOYEE
TRANSPORTATION BETWEEN THE WORK AND STAGING AREAS IF NECESSARY.
5. ALL CONSTRUCTION TRAFFIC SHALL TRAVEL ON THE ROUTES INDICATED ON THIS
DRAWING, OR AS APPROVED BY THE CONTRACTING OFFICER.
6. BASE EMERGENCY VEHICLES MUST HAVE UNRESTRICTED USE OF THE EXISTING
ON-SITE HAUL ROUTES AT ALL TIMES; THE CONTRACTOR USE OF THE ON-SITE HAUL
ROUTE SHALL BE SUCH THAT THE EMERGENCY RESPONSE VEHICLES CAN OPERATE
ON THESE ROADS WITHOUT DELAYS TO THE EMERGENCY RESPONSE TIME.
7. CONTRACTOR SHALL STAY WITHIN THE CONSTRUCTION WORK AREAS.
8. UNLESS NOTED OTHERWISE, ALL CONTRACTOR EQUIPMENT MUST BE TAKEN BACK
TO THE STAGING AREA UPON THE COMPLETION OF WORK EACH DAY.
9. CONTRACTOR IS RESPONSIBLE FOR SECURING THEIR EQUIPMENT, MATERIALS AND
VEHICLES.
10. ON-SITE HAUL ROUTES SHALL BE MAINTAINED BY THE CONTRACTOR AND SHALL BE
RESTORED TO THE ORIGINAL OR BETTER CONDITION, UPON PROJECT COMPLETION.
A CONDITION REPORT OF THE BEFORE AND AFTER CONDITION OF ON-SITE HAUL
ROUTES SHALL BE PREPARED JOINTLY BY THE CONTRACTOR AND THE
CONTRACTING OFFICER. FENCING, DRAINAGE, GRADING AND TEMPORARY HAUL
ROUTES OR ACCESS POINTS ON THE SITE SHALL BE THE CONTRACTOR'S TOTAL
RESPONSIBILITY AND SHALL BE APPROVED BY THE CONTRACTING OFFICER PRIOR
TO THE WORK. DAMAGE TO THE PAVEMENT DUE TO CONSTRUCTION TRAFFIC SHALL
BE RESTORED TO ORIGINAL OR BETTER CONDITION AT NO EXTRA COST TO THE
GOVERNMENT.
11. STAGING AREA - THE CONTRACTOR SHALL MAKE PROVISIONS FOR ANY REQUIRED
UTILITIES AT HIS OWN EXPENSE.
12. ALL BARRICADE LIGHTING SHALL BE VERIFIED BY THE CONTRACTOR FOR PROPER
OPERATION AT THE END OF EACH DAY BEFORE CONTRACTOR CEASES OPERATION.
13. ALL COSTS ASSOCIATED WITH PREPARING THE STORAGE AND STAGING AREA SITE
SHALL BE BORNE BY THE CONTRACTOR. THIS INCLUDES, BUT IS NOT LIMITED TO
CLEARING AND GRADING OF THE SITE, CONSTRUCTION OF ALL TEMPORARY
UTILITIES, ACCESS ROADS, ALL SECURITY FENCING, RESTORATION OF THE SITE AT
PROJECT COMPLETION.
14. THE CONTRACTOR SHALL RESTORE ALL GRASSED AREAS USED FOR HAUL ROADS
TO THEIR ORIGINAL CONDITION, INCLUDING THE ESTABLISHMENT OF GRASS.
GATE ACCESS
FROM GATE 1
CONSTRUCTION
HAUL ROUTE
MUNITIONS GATE
ACCESS TO PROJECT AREA
SCALE 1:10000
A1
ACCESS AND HAUL ROUTE
LEGEND:
ACCESS AND HAUL ROUTE
S E
S
E P
T
I S
S U
E
D
A T
E
O C
T
F Y
L X
F B
R
E P
L A
N
I T
I O
R
U C
T U
R E
S
K A
D E
M
O
S
T O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
BB101
I V
I L
B O
R I N
G
L
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
L X
F B
B
B D
W G
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c o m
F Y
F
B
R
E P
L A
C E
M U
N I T
I O
R
U C
T U
R E
S
K
A D
E N
A
A M
O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
J U
US Army Corps of Engineers ®
SCALE: NTS
A1
BORING LOG 48405-1
SCALE: NTS
A6
BORING LOG 48405-2
S E
S E
I S
S U
E
D
A T
E
O C
T
F Y
L X
F B
R
E P
L A
N
I T
I O
R
U C
T U
R E
S
K A
D E
M
O
S
T O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
BB102
I V
I L
B O
R I N
G
L
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
L X
F B
B
B D
W G
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c o m
F Y
F
B
R
E P
L A
C E
M U
N I T
I O
R
U C
T U
R E
S
K
A D
E N
A
A M
O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
J U
US Army Corps of Engineers ®
SCALE: NTS
A6
BORING LOG 48932
S E
S
E P
T
I S
S U
E
D
A T
E
O C
T
F Y
L X
F B
R
E P
L A
N
I T
I O
R
U C
T U
R E
S
K A
D E
M
O
S
T O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
BB103
I V
I L
B O
R I N
G
L
I
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
L X
F B
B
B D
W G
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c o m
F Y
F
B
R
E P
L A
C E
M U
N I T
I O
R
U C
T U
R E
S
K
A D
E N
A
A M
O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
J U
US Army Corps of Engineers ®
SCALE: NTS
A1
BORING LOG 48933
SCALE: NTS
A6
BORING LOG 48934
S E
S
E P
T
I S
S U
E
D
A T
E
O C
T
F Y
L X
F B
R
E P
L A
N
I T
I O
R
U C
T U
R E
S
K A
D E
M
O
S
T O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
BB104
I V
I L
B O
R I N
G
L
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
L X
F B
B
B D
W G
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c o m
F Y
F
B
R
E P
L A
C E
M U
N I T
I O
R
U C
T U
R E
S
K
A D
E N
A
A M
O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
J U
US Army Corps of Engineers ®
SCALE: NTS
A1
BORING LOG 48960
SCALE: NTS
A6
BORING LOG 48962
S E
S
E P
T
I S
S U
E
D
A T
E
O C
T
F Y
L X
F B
R
E P
L A
N
I T
I O
R
U C
T U
R E
S
K A
D E
M
O
S
T O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
BB105
I V
I L
B O
R I N
G
L
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
L X
F B
B
B D
W G
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c o m
F Y
F
B
R
E P
L A
C E
M U
N I T
I O
R
U C
T U
R E
S
K
A D
E N
A
A M
O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
J U
US Army Corps of Engineers ®
SCALE: NTS
A1
BORING LOG 48963
SCALE: NTS
A6
BORING LOG 48965
S E
S
E P
T
I S
S U
E
D
A T
E
O C
T
F Y
L X
F B
R
E P
L A
N
I T
I O
R
U C
T U
R E
S
K A
D E
M
O
S
T O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
BB106
I V
I L
B O
R I N
G
L
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
L X
F B
B
B D
W G
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c o m
F Y
F
B
R
E P
L A
C E
M U
N I T
I O
R
U C
T U
R E
S
K
A D
E N
A
A M
O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
J U
US Army Corps of Engineers ®
SCALE: NTS
A1
BORING LOG 48966
SCALE: NTS
A6
BORING LOG 48967
S E
S
E P
T
I S
S U
E
D
A T
E
O C
T
F Y
L X
F B
R
E P
L A
N
I T
I O
R
U C
T U
R E
S
K A
D E
M
O
S
T O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
BB107
I V
I L
B O
R I N
G
L
I
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
L X
F B
B
B D
W G
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c o m
F Y
F
B
R
E P
L A
C E
M U
N I T
I O
R
U C
T U
R E
S
K
A D
E N
A
A M
O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
J U
US Army Corps of Engineers ®
SCALE: NTS
A1
BORING LOG 48969
SCALE: NTS
A6
BORING LOG 48971
S E
S
E P
T
I S
S U
E
D
A T
E
O C
T
F Y
L X
F B
R
E P
L A
N
I T
I O
R
U C
T U
R E
S
K A
D E
M
O
S
T O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
BB108
I V
I L
B O
R I N
G
L
I I
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
L X
F B
B
B D
W G
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c o m
F Y
F
B
R
E P
L A
C E
M U
N I T
I O
R
U C
T U
R E
S
K
A D
E N
A
A M
O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
J U
US Army Corps of Engineers ®
SCALE: NTS
A1
BORING LOG 48973
SCALE: NTS
A6
BORING LOG 48974
S E
S
E P
T
I S
S U
E
D
A T
E
O C
T
F Y
L X
F B
R
E P
L A
N
I T
I O
R
U C
T U
R E
S
K A
D E
M
O
S
T O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
SHEET ID
R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c o m
F Y
F
B
R
E P
L A
C E
M U
N I T
I O
R
U C
T U
R E
S
K
A D
E N
A
A M
O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
S E
US Army Corps of Engineers ®
C-001
C I V
I L
C I V
T
E S
L
R
O B
E R
T S
L
R
O B
E R
T S
K
F
A T
H
L
R
O B
E R
T S
L X
F B
C
D
W G
1. ALL CONSTRUCTION SHALL BE DONE IN ACCORDANCE WITH APPLICABLE FEDERAL AND LOCAL LAWS, CODES, ORDINANCE AND THE STANDARDS OF KADENA AIR BASE, JAPAN.
2. THE CONTRACTOR SHALL COORDINATE AND OBTAIN CLEARANCES AND PERMITS FROM BASE CIVIL
ENGINEERING PRIOR TO EXCAVATION ACTIVITIES.
3. THE DISRUPTION OF UTILITY SERVICES SHALL BE MINIMIZED. BASE CIVIL ENGINEERING SHALL APPROVE IN
ADVANCE ANY SERVICE INTERRUPTIONS AND THE REMOVAL OF EXISTING UTILITY LINES. TEMPORARY
SERVICE FOR WATER AND SEWER SHALL BE PROVIDED AS PART OF THE WORK.
4. ALL DISTANCES, DIMENSIONS, AND ELEVATIONS ARE IN THE METRIC SYSTEM UNLESS OTHERWISE INDICATED.
5. PROVIDE SHORING FOR TRENCH EXCAVATION WORK THAT EXCEEDS 1.50 M IN DEPTH.
6. CONTRACTOR SHALL PROVIDE FENCING AND/OR BARRICADES FROM THE WORK AREA TO THE NEAREST
STREET OR OTHER PREDETERMINED DEMARCATION LINE AND BE RESPONSIBLE FOR MAINTAINING THE
GROUNDS WITHIN IN ACCORDANCE WITH THE PROJECT CONSTRUCTION DOCUMENTS THROUGHOUT THE
PERIOD OF WORK.
7. ALL EXISTING UTILITY LINES THAT ARE BEING REPLACED SHALL BE REMOVED AND DISPOSED OF OFF SITE
UNLESS OTHERWISE INDICATED.
8. THE CONTRACTOR SHALL CONDUCT HIS CONSTRUCTION OPERATIONS WITH MINIMAL INTERFERENCE TO
ROADS, DRIVEWAYS, PARKING AREAS, AND VEHICULAR FACILITIES. THE CONTRACTOR SHALL USE ITS BEST
EFFORTS TO PROVIDE CONTINUOUS TRAFFIC FLOW IN ALL DIRECTIONS AT ALL TIMES.
9. THE LOCATIONS OF COVERED SLABS, AC PAVEMENTS, PIPES, UNDERGROUND STRUCTURES, OR OTHER
UTILITIES SHOWN ON THESE PLANS ARE BASED ON VISIBLE FEATURES ON THE GROUND OR AVAILABLE
DRAWINGS PROVIDED BY OTHERS, AND ARE APPROXIMATE. THE CONTRACTOR SHALL VERIFY THE TYPE OF
MATERIALS, EXACT LOCATION, SIZE AND DEPTH OF ALL UTILITIES PRIOR TO THE START OF WORK.
10. THE CONTRACTOR SHALL VERIFY THE WATER MAIN LOCATIONS SHOWN ON THE DRAWINGS AND SHALL
PERFORM THE NECESSARY FIELD VERIFICATION TO AVOID DISRUPTION.
11. THE CONTRACTOR SHALL VERIFY THE LOCATIONS, SIZES AND MATERIALS OF PROPOSED CONNECTIONS TO
EXISTING UTILITIES. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION DURING EXCAVATION ACTIVITIES
IN THESE LOCATIONS.
12. EXISTING UTILITIES TO BE RECONNECTED SHALL BE EXPOSED TO DETERMINE ACTUAL TYPE OF MATERIAL
AND SIZE. PROCURE THE APPROPRIATE TRANSITION COUPLINGS BEFORE STARTING TEMPORARY OUTAGES
FOR RECONNECTION.
13. THE CONTRACTOR SHALL REVIEW THE PLANS AND NOTIFY CONTRACTING OFFICER IMMEDIATELY OF ANY
DISCREPANCIES FOUND BEFORE PROCEEDING WITH THE WORK.
14. DUE TO VARIATIONS AND CONSTRAINTS, EACH UTILITY TIE IN LAYOUT WILL BE DETERMINED BY ITS ACTUAL
FIELD CONDITIONS. CHANGES TO THE DESIGN CONFIGURATION REQUIRE APPROVAL OF CONTRACTING
OFFICER AND SHALL BE DOCUMENTED ON THE AS-BUILT DRAWINGS.
15. ALL EXISTING UTILITIES, VALVE BOXES AND MANHOLES WHETHER SHOWN OR NOT SHOWN ON THE PLANS
THAT ARE AFFECTED BY TRENCHING WORK SHALL BE PROTECTED AT ALL TIMES DURING CONSTRUCTION, IF
DISTURBED THEY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION AND ANY DAMAGE SHALL BE
REPAIRED AT NO COST TO THE GOVERNMENT.
16. THE CONTRACTOR SHALL PROVIDE TEMPORARY ACCESS PROTECTION FOR EQUIPMENT, TRUCKS OR OTHER
CONSTRUCTION VEHICLES TO PREVENT ANY DAMAGE TO EXISTING AND/OR NEWLY INSTALLED PAVEMENT.
17. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN EXCAVATING AREAS THAT ARE KNOWN TO HAVE
UNDERGROUND UTILITIES. HAND EXCAVATION IS REQUIRED WITHIN 0.90 M OF ANY EXISTING UTILITIES. IN
CASE WHERE THE DEPTH OR ELEVATION ARE NOT INDICATED ON THE PLANS, THE CONTRACTOR SHALL
PROCEED WITH CAUTION AND SHALL BE RESPONSIBLE FOR ANY DAMAGES INCURRED DURING EXCAVATION
ACTIVITIES.
18. IT IS EXPECTED THAT WORK WILL BE PERFORMED IN AREAS OF PREVIOUSLY DISTURBED SOIL.
NONETHELESS, CULTURAL ASSETS MAY BE PRESENT WITHIN THE WORK AREA, AND CAUTION MUST BE
EXERCISED DURING GROUND DISTURBANCE. CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER ONE
(1) WEEK PRIOR TO EXCAVATIONS FOR WORK TO BE PERFORMED IN PREVIOUSLY UNDISTURBED SOIL OR
WITHIN ENVIRONMENTALLY SENSITIVE AREAS. THE CONTRACTING OFFICER WILL NOTIFY THE BASE CIVIL
ENGINEER (BCE) AND ENVIRONMENTAL OFFICE. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER UPON DISCOVERY OF CULTURAL ASSETS.
19. ALL FENCES SHOWN IN CONTRACT DRAWING WILL NEED TO BE RESTORED IF CONSTRUCTION REQUIRES
TEMPORARY REMOVAL DUE TO TRENCHING.
20. EXISTING ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALKS, CONCRETE
SCREEN WALLS, FENCES, TREES, NATURAL DRAINAGE SWALES, AND OTHER STRUCTURES THAT ARE
DISTURBED OR DAMAGED BY THE CONTRACTOR DURING CONSTRUCTION SHALL BE RESTORED TO ITS
ORIGINAL OR BETTER CONDITION AT NO ADDITIONAL COST TO THE GOVERNMENT.
21. UNPAVED AREAS DISTURBED DURING CONSTRUCTION SHALL BE FULLY RESTORED USING SEED AND
FERTILIZER IMPREGNATED, NON-WOVEN COTTON FABRIC, PER SEEDING SPECIFICATION 32 92 19, FOR
SLOPES FLATTER THAN 4:1. SLOPES STEEPER THAN 4:1 SHALL BE SODDED, PER SODDING SPECIFICATION
SECTION 32 92 23.
22. THE CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES AND AVOID PONDING
CONDITIONS ANYWHERE ON SITE. STORM WATER IS TO BE DIRECTED TO STORM WATER CONVEYANCE
STRUCTURES.
23. TRAFFIC CONTROL SIGNS SHALL BE BILINGUAL (ENGLISH AND JAPANESE).
24. THE PROJECT SITE HAS THE POTENTIAL FOR UNEXPLODED ORDINANCE. CONTRACTOR TO COMPLY WITH THE
BASE CIVIL ENGINEERING SQUADRON'S UXO POLICY FOR ALL CONSTRUCTION ACTIVITIES.
GENERAL NOTES CIVIL NOTES
GENERAL
1. THE CONTRACTOR SHALL PROVIDE TEMPORARY CONNECTION TO EXISTING LINES AS REQUIRED FOR
TESTING AND/OR TO MINIMIZE WATER AND SEWER SERVICE INTERRUPTION BEFORE THE REMOVAL OF ANY
PORTION OF EXISTING LINES. ALL EXISTING WATERLINES ARE ASSUMED TO BE NON-ASBESTOS CEMENT PIPE
(ACP), UNLESS OTHERWISE NOTED IN THE DRAWINGS.
2. CONSTRUCTION OF NEW WATER LINES SHOULD NOT BE REQUIRED FOR THE CONSTRUCTION SCOPE OF THIS
PROJECT; HOWEVER, IF EXISTING WATER LINES ARE DAMAGED DURING CONSTRUCTION, NEW WATER LINES
MUST BE CONSTRUCTED PER BASE CIVIL ENGINEER SQUADRON STANDARDS INCLUDING TESTING
REQUIREMENTS.
3. CONTRACTOR SHALL PROTECT EXISTING PAVEMENTS UNLESS REMOVAL IS INDICATED ON PLANS. IF
DAMAGED DURING CONSTRUCTION THE PAVEMENT SHALL BE REPLACED IN KIND BY THE CONTRACTOR AT
NO ADDITIONAL COST TO THE CONTRACT.
4. CONTRACTOR SHALL PROTECT THE EXISTING CONCRETE DITCHES DURING CONSTRUCTION UNLESS
OTHERWISE INDICATED ON PLANS. ANY CONCRETE DITCHES DAMAGED DURING CONSTRUCTION
OPERATIONS, SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR, TO EXISTING CONDITIONS AT NO
ADDITIONAL COST TO THE CONTRACT.
5. LOCATION OF UTILITY LINES IS BASED ON GIS MAPPING. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD
VERIFICATION OF EXISTING UTILITIES BEFORE GROUND DISTURBANCE.
6. FOR THE INSTALLATION OF THE UNDERGROUND ELECTRICAL CONDUIT, THE CONTRACTOR MAY UTILIZE A
DIRECTIONAL BORING METHOD IN LIEU OF A TRENCH AS INDICATED ON PLANS, OR A COMBINATION OF
THOSE METHODS.
7. EXISTING COMMUNICATIONS LINES ARE SHOWN FOR REFERENCE PER GIS MAPPING. EXISTING LINES WITHIN
THE LIMITS OF CONSTRUCTION CAN BE REMOVED OR ABANDONED IN PLACE. THE CONTRACTOR IS NOT
REQUIRED TO PROTECT, MAINTAIN SERVICE, OR RECONNECT COMMUNICATION INFRASTRUCTURE WITHIN
THE LIMITS OF CONSTRUCTION.
LOCATION OF WATER LINES
1. THE LOCATION OF THE WATER LINES SHOWN ON THE DRAWINGS IS BASED ON GIS INFORMATION, NOT
UTILITY LOCATES AND SURVEYED PAINT MARKS. FIELD VERIFICATION OF THE LOCATION OF EXISTING WATER
LINES IS REQUIRED PRIOR TO DIGGING.
SURVEY NOTES
1. SITE CONTROL WAS ESTABLISHED USING THE TRIMBLE R8M3 GNSS GPS RECEIVER WITH TRIMBLE “SURVEY
CONTROLLER” SOFTWARE.
2. CONTROL SURVEY FOR THE PROJECT WAS CONDUCTED BY DAICHI SOKUYOU SEKKEI, CO. LTD. CERTIFIED BY
THE GOVERNMENT OF JAPAN, OKINAWA PREFECTURE GENERAL BUREAU CONSTRUCTION DEVELOPMENT
DIVISION AS A LICENSED LAND SURVEYING FIRM UNDER REGISTRATION NO. 3-29025.
3. THE HORIZONTAL AND VERTICAL POSITIONS USED FOR THIS PROJECT ARE BASED UPON GPS OBSERVATIONS
IN THE JAPAN GEODETIC DATUM (JDG) 2011 ZONE 15 GRID COORDINATE SYSTEM.
4. XY COORDINATES USED IN DRAWINGS REFER TO HORIZONTAL DATUM JGD 2011 ZONE 15, IN METERS.
5. AERIAL PHOTOGRAPHY FLOWN IN APRIL 2017.
EXCAVATION NOTES
EXCAVATION REQUIREMENTS
1. CONTRACTOR MAY CHOOSE TO CUT EXISTING SOD IN THE DISTURBED AREAS AND REINSTALL; HOWEVER, RESTORATION OF ALL DISTURBED AREAS SHALL BE ACHIEVED.
2. EXCAVATE TO CONTOURS, ELEVATIONS, AND DIMENSIONS INDICATED. REUSE EXCAVATED MATERIALS
THAT MEET THE SPECIFIED REQUIREMENTS.
3. EXCAVATIONS SHALL EXTEND SUFFICIENT DISTANCE FROM WALLS AND FOOTINGS TO ALLOW FOR PLACING
AND REMOVING FORMS.
4. EXCAVATION BELOW INDICATED DEPTHS SHALL NOT BE PERMITTED EXCEPT TO REMOVE UNSATISFACTORY
MATERIAL.
5. UNSATISFACTORY MATERIAL REMOVED BELOW DEPTHS INDICATED SHALL BE REPLACED WITH
SATISFACTORY MATERIAL AT NO ADDITIONAL COST TO THE GOVERNMENT.
6. EXCAVATION SHALL BE PERFORMED SO THAT THE AREA WILL BE CONTINUALLY AND EFFECTIVELY
DEWATERED TO ELIMINATE ANY GROUND WATER IN THE EXCAVATION AS WELL AS GRADED TO DRAIN TO
ELIMINATE ANY PONDING SURFACE WATER. WATER FROM ANY SOURCE SHALL NOT BE PERMITTED TO
ACCUMULATE IN THE EXCAVATION. THE EXCAVATION SHALL BE DRAINED BY PUMPING OR OTHER
SATISFACTORY METHODS TO PREVENT SOFTENING OF THE FOUNDATION BOTTOM, UNDERCUTTING OF
FOOTINGS, OR OTHER ACTIONS DETRIMENTAL TO PROPER CONSTRUCTION.
7. SHORING INCLUDING SHEET PILING SHALL BE FURNISHED AND INSTALLED AS NECESSARY TO PROTECT
WORKMEN, BANKS, ADJACENT PAVING, STRUCTURES, AND UTILITIES.
EXAMPLE FILL REQUIREMENTS
1. TYPE OF MATERIALS PERMITTED IN FILL INCLUDE GW, GM, GC, GP, SW, SP, SM, AND SC OF THE UNIFIED
SOIL CLASSIFICATION SYSTEM. THE PLASTICITY INDEX SHOULD BE LESS THAN 12 AND THE LIQUID LIMIT
LESS THAN 35.
2. WHEN SUBGRADE SURFACES ARE LESS THAN THE SPECIFIED DENSITY, THE SURFACE SHALL BE BROKEN
UP TO A MINIMUM DEPTH OF 150 MM, PULVERIZED AND COMPACTED TO THE SPECIFIED DENSITY. SLOPED
SURFACES STEEPER THAN 1 VERTICAL TO 4 HORIZONTAL SHALL BE PLOWED, STEPPED, BENCHED, OR
BROKEN UP SO THAT THE FILL MATERIAL WILL BOND WITH THE EXISTING MATERIAL.
3. THE EXCAVATED SURFACE SHALL BE SCARIFIED TO A DEPTH OF 150 MM BEFORE FILL PLACEMENT IS
BEGUN.
4. SATISFACTORY MATERIAL SHALL BE PLACED IN HORIZONTAL LAYERS NOT EXCEEDING 200 MM IN LOOSE
DEPTH AND THEN COMPACTED IN GRASSED AREAS AND NOT EXCEEDING 150 MM IN LOOSE DEPTH IN
PAVED AREAS.
5. MATERIALS SHALL NOT BE PLACED ON SURFACES THAT ARE MUDDY.
6. COMPACTION SHALL BE ACCOMPLISHED BY SHEEPSFOOT ROLLERS, PNEUMATIC-TIRED ROLLERS, STEEL-WHEELED ROLLERS, OR OTHER APPROVED EQUIPMENT WELL SUITED TO THE SOIL BEING
PREPARED.
7. MATERIALS SHALL BE MOISTENED OR AERATED AS NECESSARY TO PROVIDE PROPER WATER CONTENT
THAT WILL READILY FACILITATE OBTAINING THE SPECIFIED COMPACTION WITH EQUIPMENT USED.
8. FILL MATERIALS SHALL BE COMPACTED TO DENSITIES AFTER ASTM STANDARD D 1557 OR JIS A 1210 TO 95%
UNDER STRUCTURES & 90% UNDER SIDEWALKS/GRASSED AREAS FOR COHESIONLESS FILLS. COMPACT
TOP 600 MM BELOW FINISHED PAVEMENT OR TOP 300 MM OF SUBGRADE, WHICHEVER IS GREATER TO 100%.
9. SEE STRUCTURAL NOTES FOR SOIL IMPROVEMENTS.
TRAFFIC CONTROL NOTES
EXCAVATION REQUIREMENTS
1. THE CONTRACTOR SHALL COORDINATE ANY TRAFFIC CONTROL MEASURES WITH THE CONTRACTING
OFFICER (CO) 72 HOURS IN ADVANCE OF ANY IMPLEMENTATION.
2. CONTRACTOR SHALL FURNISH, INSTALL AND MAINTAIN BILINGUAL TRAFFIC CONTROL DEVICES REQUIRED
FOR ROAD CLOSURE.
3. CONTRACTOR SHALL PROVIDE ROAD CLOSURE TRAFFIC CONTROL MEASURES SUCH THAT LONG DEAD
ENDS ARE NOT CREATED. TURNING MOVEMENTS OF LARGE VEHICLES MUST BE CONSIDERED.
CONTRACTOR MUST STAGE WORK SUCH THAT ACCESS TO A MUNITIONS STRUCTURE IS NOT BLOCKED. THE
PROPOSED PROJECT SITES ARE ON LOOPED ROADWAYS AND ACCESS SHALL BE MAINTAINED IF A
ROADWAY IS CLOSED BY ANOTHER ROUTE.
4. PRIOR TO COMMENCING TRENCHING CONSTRUCTION OPERATIONS FOR PROPOSED UTILITIES, ROAD
CLOSED SIGNS MAY BE REQUIRED AS DIRECTED BY THE CO.
5. CONSTRUCTION SIGNS MOUNTED ON TEMPORARY SUPPORTS SHALL ME MOUNTED AT A MINIMUM HEIGHT
OF 1.6M.
6. THE CONTRACTOR SHALL RELOCATE OR REMOVE SIGNAGE, AS DETERMINED BY THE CO.
7. THE CONTRACTOR SHALL PLACE AN OPAQUE COVERING OVER ANY SIGNAGE WHICH IS NOT APPLICABLE
FOR ANY PERIOD OF TIME.
8. BARRICADES SHALL BE PLACED AT BOTH ENDS OF CLOSED PORTIONS OF ROAD. THE CONTRACTOR SHALL
PROVIDE ENOUGH BARRICADES TO CROSS THE ENTIRE ROADWAY. BARRICADES MUST BE LIGHTED IF
ROADWAY IS TO REMAIN CLOSED DURING THE HOURS OF DARKNESS.
9. ALL BARRICADES AND VERTICAL PANELS SHALL HAVE MONO-DIRECTIONAL OR BI-DIRECTIONAL STEADY
BURNING LIGHTS.
HAZARDOUS MATERIAL DEMOLITION NOTES
1. ASBESTOS AND LEAD BASED PAINT HAVE BEEN FOUND ON SOME OF THE EXISTING STRUCTURES TO BE
DEMOLISHED. REFER TO REPORT DATED AUGUST 2017, PREPARED BY ENVIROQUEST, INSPECTION REPORT
FOR ASBESTOS & LEAD BASED PAINT FOR LOCATIONS AND DETAILED INFORMATION OF FINDINGS.
2. REFER TO SPECIFICATION SECTIONS 02 82 13.00 10 AND 02 82 13.00 30 FOR ASBESTOS REQUIREMENTS.
3. REFER TO SPECIFICATION SECTIONS 02 83 13.00 20 AND 02 83 19.00 30 FOR LEAD BASED PAINT
REQUIREMENTS AS WELL AS LEAD CONTAINING PAINT REQUIREMENTS FOR WORKER PROTECTION.
S E
I S
S U
E
D
A T
E
O C
T
F Y
L X
F B
R
E P
L A
N
I T
I O
R
U C
T U
R E
S
K A
D E
M
O
S
T O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
C
P
C
P
C P
C
P
C
P
48405
48974
48973
48971
48969
48962
48963
48960
48965
48966
48967
48934
48933
48932
C
H
I
U
V
B
O
M
B
E
R
H
M
A V
E R
IC
K
L O
O P
N
U
R
S
E
R
F
A
I R
W
A
Y
H
A
B
U
S
T
A
L
L
I
N
G
S
S
H
E
P
P
A
R
D
S
M
I
C H
I E
F
G
A U
V
H A
B U
S
I
D
E
W
I
N
D
E
R
E
A
G
L
E
MAVERIC
K LOOP
W A
Y N
E
R
E C
K N
Y
H
A
B
U
C A
R O
T H
E R
S
H
A
B
U
S
I
D
E
W
I
N
D
E
R
S
H
E
P
P
A
R
D
H
A
B
U
H
O
W
I
T
Z
E
R
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
N=43050
N=43080
N=43110
N=43140
N=43170
N=43200
N=43230
N=43260
N=43290
N=43320
N=43350
N=43380
N=43410
N=43440
N=43500
N=43530
N=43560
N=43590
N=43620
N=43650
N=43680
N=43710
N=43740
N=43770
N=43800
N=43830
N=43860
N=43890
N=43920
N=43950
N=43980
N=44010
N=44040
N=44070
N=44100
N=44130
C-101
C I V
I L
O V
E R
A L
L
M
A P
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
L X
F B
C
D
W G
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c o m
F Y
F
B
R
E P
L A
C E
M U
N I T
I O
R
U C
T U
R E
S
K
A D
E N
A
A M
O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
J U
US Army Corps of Engineers ®
40200
M 1:2000
[m]
180 20016014012010060 80
N
LEGEND:
STRUCTURE TO BE DEMOLISHED
AND REBUILT
EXISTING STRUCTURE NUMBER
48405
SCALE 1:2000
A1
OVERALL MAP
LAYDOWN AREA
S E
S
E P
T
I S
S U
E
D
A T
E
O C
T
F Y
L X
F B
R
E P
L A
N
I T
I O
R
U C
T U
R E
S
K A
D E
M
O
S
T O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
CP 1-2B
CP 1-2A
C
H
I
U
V
B
O
M
B
E
R
48904
E
N: 44059.27
E: 27850.31
N: 44106.82
E: 27858.52
N: 44061.88
E: 27835.18
N: 44109.43
E: 27843.39
C-102
C I V
I L
S I T
E
O
V E
R V
I E
W
I
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
L X
F B
C
D
W G
20100
M 1:1000
[m]
90 1008070605030 40
LEGEND:
EXISTING DITCHLINE
EXISTING ELECTRIC
EXISTING WATER
EXISTING CULVERT PIPE
ROAD CENTERLINE
EXISTING CONTOUR
EXISTING STRUCTURE NUMBER
PROPOSED STRUCTURE
PROPOSED ASPHALT PAVEMENT
PROPOSED CONCRETE PAVEMENT
PROPOSED UNDERDRAIN
EXISTING STORM SEWER INLET
EXISTING FIRE HYDRANT
CONTROL POINT
LIMITS OF CONSTRUCTION
BORE LOCATION
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c o m
F Y
F
B
R
E P
L A
C E
M U
N I T
I O
R
U C
T U
R E
S
K
A D
E N
A
A M
O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
J U
US Army Corps of Engineers ®
N
Ex
Wx
48904
CP
118.00
NOTES
1. LOCATION OF UTILITY LINES ARE AS PER GIS MAPPING. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD
VERIFICATION OF EXISTING UTILITIES BEFORE GROUND DISTURBANCE.
2. CONTRACTOR SHALL PROTECT EXISTING PAVEMENTS UNLESS REMOVAL IS INDICATED ON PLANS. IF
DAMAGED DURING CONSTRUCTION THE PAVEMENT SHALL BE REPLACED IN KIND BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE CONTRACT.
3. CONTRACTOR SHALL PROTECT THE EXISTING CONCRETE DITCHES DURING CONSTRUCTION UNLESS
OTHERWISE INDICATED ON PLANS. ANY CONCRETE DITCHES DAMAGED DURING CONSTRUCTION
OPERATIONS, SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR, TO EXISTING CONDITIONS AT NO
ADDITIONAL COST TO THE CONTRACT.
BULDING NUMBER DEMOLITION PLAN SHEET SITE PLAN SHEET GRADING PLAN SHEET
48405 CD101 CS101 CG101
D
SCALE 1:1000
A1
SITE OVERVIEW I
JGD 2011 ZONE 15 WGS84 UTM Z52
CONTROL POINT NORTHING EASTING NORTHING EASTING ELEVATION DESCRIPTION
CP 1-2A 44054.024 27864.789 2920271.173 378242.927 115.960
SURVEY NAIL (BLUE COVER)
CP 1-2B 44113.431 27885.789 2920330.324 378264.614 119.729
SURVEY NAIL (BLUE COVER)
CP 1-1A
NORTH
SOUTH
S E
S
E P
T
I S
S U
E
D
A T
E
O C
T
F Y
L X
F B
R
E P
L A
N
I T
I O
R
U C
T U
R E
S
K A
D E
M
O
S
T O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
CP 3-1A
CP 3-1B
CP 3-2B
CP 3-2A
N: 43473.36
E: 29042.32
N: 43465.34
E: 29042.56
N: 43556.59
E: 28927.18
N: 43548.68
E: 28925.88
N: 43661.73
E: 28960.49
N: 43653.87
E: 28958.88
N: 43552.77
E: 28950.50
N: 43544.85
E: 28949.20
N: 43666.47
E: 28937.33
N: 43464.63
E: 29018.92
N: 43472.64
E: 29018.68
N: 43658.61
E: 28935.72
H
A
B
U
K
E
N
T
U
C
K
Y
H
O
W
I
T
Z
E
R
48934
C-103
C I V
I L
S I T
E
O
V E
R V
I E
W
I I
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
L X
F B
C
D
W G
20100
M 1:1000
[m]
90 1008070605030 40
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c o m
F Y
F
B
R
E P
L A
C E
M U
N I T
I O
R
U C
T U
R E
S
K
A D
E N
A
A M
O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
J U
US Army Corps of Engineers ®
N
NOTES
1. SEE SHEET C-102 FOR LEGEND
2. SEE SHEET C-102 FOR NOTES
3. SEE SHEET C-102 FOR INVESTIGATIVE BORING DETAILS
BULDING NUMBER DEMOLITION PLAN SHEET SITE PLAN SHEET GRADING PLAN SHEET
48932 (BID OPTION 2)
CD102 CS102 CG102
48933 (BID OPTION 1)
CD103 CS103 CG103
48934 (BID OPTION 3)
CD104 CS104 CG104
SCALE 1:1000
A1
SITE OVERVIEW II
JGD 2011 ZONE 15 WGS84 UTM Z52
CONTROL POINT NORTHING EASTING NORTHING EASTING ELEVATION DESCRIPTION
CP 3-1A 43657.649 28922.189 2919862.570 379295.506 95.996
SURVEY NAIL (BLUE COVER)
CP 3-1B 43572.543 28921.323 2919777.491 379293.650 93.533
SURVEY NAIL (BLUE COVER)
CP 3-2A 43449.665 29048.525 2919653.157 379419.397 92.266
SURVEY NAIL (BLUE COVER)
CP 3-2B 43485.844 29055.307 2919689.250 379426.599 93.151
SURVEY NAIL (BLUE COVER)
S E
S
E P
T
I S
S U
E
D
A T
E
O C
T
F Y
L X
F B
R
E P
L A
N
I T
I O
R
U C
T U
R E
S
K A
D E
M
O
S
T O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
CP 2-1B
CP 2-1A
CP 2-2B
CP 2-2A
CP 2-4B
CP 2-4A
CP 2-6B
CP 2-6A
CP 2-7B
CP 2-7A
CP 2-8A
CP 2-8B
CP 2-9B
CP 2-9A
N: 43380.10
E: 28297.64
N: 43146.15
E: 28582.70
N: 43243.36
E: 28570.14
N: 43504.72
E: 28539.50
N: 43054.94
E: 28421.00
N: 43156.17
E: 28250.67
N: 43447.34
E: 28282.67
N: 43452.40
E: 28276.44
N: 43372.34
E: 28295.61
N: 43161.54
E: 28244.71
N: 43054.09
E: 28413.03
N: 43151.29
E: 28576.55
N: 43235.37
E: 28570.84
N: 43309.21
E: 28471.00
N: 43314.43
E: 28477.09
N: 43370.49
E: 28421.07
N: 43369.47
E: 28413.12
N: 43334.25
E: 28575.74
N: 43329.32
E: 28582.06
N: 43511.01
E: 28534.52
N: 43470.76
E: 28291.33
N: 43465.71
E: 28297.56
N: 43386.09
E: 28274.75
N: 43378.33
E: 28272.73
N: 43393.94
E: 28418.04
N: 43392.92
E: 28410.09
N: 43296.46
E: 28492.46
N: 43291.25
E: 28486.37
N: 43173.73
E: 28266.50
N: 43179.10
E: 28260.54
N: 43077.60
E: 28410.51
N: 43078.46
E: 28418.49
N: 43133.15
E: 28561.39
N: 43128.00
E: 28567.54
N: 43241.31
E: 28546.58
N: 43233.32
E: 28547.28
N: 43352.89
E: 28590.28
N: 43347.96
E: 28596.60
N: 43519.37
E: 28558.04
N: 43525.67
E: 28553.07
N: 43451.72
E: 28302.95
N: 43450.57
E: 28305.06
N: 43447.80
E: 28303.56
N: 43448.86
E: 28301.58
PROTECT CULTURAL ASSET SITE
C
P
N
U
R
S
E
R
F
A
I R
W
A
Y
H A
B U
C-104
C I V
I L
S I T
E
O
V E
R V
I E
W
I I I
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
L X
F B
C
D
W G
20100
M 1:1000
[m]
90 1008070605030 40
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c o m
F Y
F
B
R
E P
L A
C E
M U
N I T
I O
R
U C
T U
R E
S
K
A D
E N
A
A M
O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
J U
US Army Corps of Engineers ®
N
BULDING NUMBER DEMOLITION PLAN SHEET SITE PLAN SHEET GRADING PLAN SHEET
48960 CD105 CS105 CG105
48962 CD106 CS106 CG106
48963 CD107 CS107 CG107
48965 CD108 CS108 CG108
48966 CD109 CS109 CG109
48967 CD110 CS110 CG110
48969 CD111 CS111 CG111
48971 CD112 CS112 CG112
48973 CD113 CS113 CG113
48974 CD114 CS114 CG114
SCALE 1:1000
A1
SITE OVERVIEW III
JGD 2011 ZONE 15 WGS84 UTM Z52
CONTROL POINT NORTHING EASTING NORTHING EASTING ELEVATION DESCRIPTION
CP 2-1A 43483.346 28544.866 2919692.692 378916.230 86.099
SURVEY NAIL (BLUE COVER)
CP 2-1B 43517.706 28571.135 2919726.740 378942.893 90.215
SURVEY NAIL (BLUE COVER)
CP 2-2A 43330.355 28482.878 2919540.452 378852.474 78.228
SURVEY NAIL (BLUE COVER)
CP 2-2B 43366.578 28453.957 2919577.005 378823.980 81.153
SURVEY NAIL (BLUE COVER)
CP 2-4A 43212.455 28596.391 2919421.255 378964.592 78.940
SURVEY NAIL (BLUE COVER)
CP 2-4B 43301.317 28606.356 2919509.983 378975.589 78.293
SURVEY NAIL (BLUE COVER)
CP 2-6A 43141.328 28631.842 2919349.729 378999.209 79.797
SURVEY NAIL (BLUE COVER)
CP 2-6B 43160.912 28574.895 2919369.972 378942.501 77.824
SURVEY NAIL (BLUE COVER)
CP 2-7A 43037.972 28400.746 2919249.083 378766.956 70.518
ENGRAVED 'X' ETCH MARK
(BLUE COVER)
CP 2-7B 43040.816 28400.740 2919251.488 378804.595 69.839
SURVEY NAIL (BLUE COVER)
CP 2-8A 43133.585 28438.360 2919346.277 378630.544 69.257
SURVEY NAIL (BLUE COVER)
CP 2-8B 43184.881 28283.114 2919397.331 378651.056 71.766
SURVEY NAIL (BLUE COVER)
CP 2-9A 43453.010 28262.201 2919665.651 378633.267 75.503
SURVEY NAIL (BLUE COVER)
CP 2-9B 43387.253 28313.144 2919599.314 378683.435 75.372
SURVEY NAIL (BLUE COVER)
NOTES
1. SEE SHEET C-102 FOR LEGEND
2. SEE SHEET C-102 FOR NOTES
3. SEE SHEET C-102 FOR INVESTIGATIVE BORING DETAILS
S E
S
E P
T
I S
S U
E
D
A T
E
O C
T
F Y
L X
F B
R
E P
L A
N
I T
I O
R
U C
T U
R E
S
K A
D E
M
O
S
T O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
E
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
M
M
M
M
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
M
M
CP 1-2B
CP 1-2A
CD101
C I V
I L
D E
M O
L I T
I O
N
P
L A
N
A G
M
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
L X
F B
A
G M
C
D D
W G
52.50
M 1:250
[m]
22.5 252017.51512.57.5 10
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c o m
F Y
F
B
R
E P
L A
C E
M U
N I T
I O
R
U C
T U
R E
S
K
A D
E N
A
A M
O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
J U
US Army Corps of Engineers ®
N
LEGEND:
EXISTING DITCH BOTTOM
EXISTING CULVERT PIPE
STRUCTURE TO BE DEMOLISHED
EXISTING CONCRETE APRON
LIMIT OF CONSTRUCTION
ASPHALT PAVEMENT REMOVAL
CONCRETE PAVEMENT REMOVAL
CLEARING AND GRUBBING
EXISTING ELECTRIC
EXISTING WATER LINE
EXISTING ROAD CENTERLINE
SILT FENCE
SAND BAG FILTER
EXISTING ELECTRICAL MANHOLE
EXISTING POWER POLE
EXISTING LIGHTNING PROTECTION POLE
CP CP
NOTES
1. LOCATION OF UTILITY LINES ARE AS PER GIS MAPPING.
CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF
EXISTING UTILITIES BEFORE GROUND DISTURBANCE
2. CONTRACTOR SHALL PROTECT EXISTING PAVEMENTS UNLESS
REMOVAL IS INDICATED ON PLANS. IF DAMAGED DURING
CONSTRUCTION THE PAVEMENT SHALL BE REPLACED IN KIND BY
THE CONTRACTOR AT NO ADDITIONAL COST TO THE CONTRACT
3. CONTRACTOR SHALL PROTECT THE EXISTING CONCRETE DITCHES
DURING CONSTRUCTION UNLESS OTHERWISE INDICATED ON
PLANS. ANY CONCRETE DITCHES DAMAGED DURING
CONSTRUCTION OPERATIONS, SHALL BE REPAIRED OR REPLACED
BY THE CONTRACTOR, TO EXISTING CONDITIONS AT NO
ADDITIONAL COST TO THE CONTRACT
4. CONTRACT SHALL NOTE THAT THIS PLAN IS SET TO A 1:250 SCALE
Ex Ex
Wx Wx
X
KEYNOTES
REMOVE STRUCTURE 48405, INCLUDING FOOTINGS. CONTRACTOR
SHALL BE RESPONSIBLE TO FIELD VERIFY THE DIMENSIONS SHOWN
ON THE PLANS
REMOVE CONCRETE DOCK, RAMP AND STAIRS
REMOVE APPROXIMATELY 161 SQM OF ASPHALT PAVEMENT
REMOVE APPROXIMATELY 7 SQM OF CONCRETE PAVEMENT
ADJACENT TO THE CONCRETE DOCK
INSTALL SILT FENCE, REF DETAIL E1/CD501
INSTALL SAND BAG FILTER, REF DETAIL B1/CD501
EXISTING CONCRETE DITCHES TO BE PROTECTED AND TO REMAIN.
CONTRACTOR TO REMOVE AND DISPOSE OF EXISTING LIGHTNING
PROTECTION POLES AND CABLES
AGM
SCALE 1:250
A1
DEMOLITION PLAN AGM 48405
SF
E
S E
S
E P
T
I S
S U
E
D
A T
E
O C
T
F Y
L X
F B
R
E P
L A
N
I T
I O
R
U C
T U
R E
S
K A
D E
M
O
S
T O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
C
P
C
P
C
P
C
P
C
P
C
P
C
P
CP 3-1A
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C O
M M
C O
M M
C O
M M
CO
M
M
C O
M M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C O
M M
C O
M M
C O
M M
C O
M M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
S F
S F
S F
S F
S F
S F
S F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
M
M
M
M
CD102
C I V
I L
D E
M O
L I T
I O
N
P
L A
N
E C
M
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
L X
F B
E
C M
C
D D
W G
M 1:100
[m]
9 1087653 4
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c o m
F Y
F
B
R
E P
L A
C E
M U
N I T
I O
R
U C
T U
R E
S
K
A D
E N
A
A M
O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
J U
US Army Corps of Engineers ®
N
NOTES
1. SEE SHEET CD101 FOR LEGEND
2. LOCATION OF UTILITY LINES ARE AS PER GIS MAPPING.
CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION
OF EXISTING UTILITIES BEFORE GROUND DISTURBANCE
X
KEYNOTES
REMOVE STRUCTURE 48932, INCLUDING WING WALL AND
FOOTING. CONTRACTOR SHALL BE RESPONSIBLE TO FIELD
VERIFY THE DIMENSIONS SHOWN ON THE PLANS
REMOVE 2M OF ASPHALT PAVEMENT ADJACENT TO WING WALLS
FOR FOOTING EXCAVATION, APPROX. 40 SQM
REMOVE 2M OF CONCRETE PAVEMENT ADJACENT TO STRUCTURE
DOORS FOR FOOTING EXCAVATION, APPROX. 10 SQM
REMOVE VENTILATION EQUIPMENT
INSTALL SILT FENCE, REF. DETAIL E1/CD501
INSTALL INLET PROTECTION, REF. DETAIL E4/CD501
INSTALL SAND BAG FILTER, REF. DETAIL B1/CD501
REMOVE VEGETATION AND DEBRIS FROM EXISTING INLET AND
DOWNSTREAM PIPE
CONTRACTOR SHALL PROTECT THE EXISTING CONCRETE
DITCHES DURING CONSTRUCTION. ANY CONCRETE DITCHES
DAMAGED DURING CONSTRUCTION OPERATIONS, SHALL BE
REPAIRED OR REPLACED BY THE CONTRACTOR, TO EXISTING
CONDITIONS AT NO ADDITIONAL COST TO THE CONTRACT
REMOVE ASPHALT PAVEMENT FOR NEW ELECTRICAL LINE,
APPROX. 6 SQM, REF. DETAIL A1/CS501; SEE CIVIL
NOTES/GENERAL ON C-001
CONTRACTOR TO REMOVE AND DISPOSE OF EXISTING LIGHTNING
PROTECTION POLES AND CABLES
A1
SCALE 1:100
DEMOLITION PLAN ECM 48932
ECM
S E
S
E P
T
I S
S U
E
D
A T
E
O C
T
F Y
L X
F B
R
E P
L A
N
I T
I O
R
U C
T U
R E
S
K A
D E
M
O
S
T O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
CP 3-1B
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
M
M
SF
S
F
M
CD103
C I V
I L
D E
M O
L I T
I O
N
P
L A
N
E C
M
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
L X
F B
E
C M
C
D D
W G
M 1:100
[m]
9 1087653 4
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c o m
F Y
F
B
R
E P
L A
C E
M U
N I T
I O
R
U C
T U
R E
S
K
A D
E N
A
A M
O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
J U
US Army Corps of Engineers ®
N
NOTES
1. SEE SHEET CD101 FOR LEGEND
2. LOCATION OF UTILITY LINES ARE AS PER GIS MAPPING.
CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION
OF EXISTING UTILITIES BEFORE GROUND DISTURBANCE
X
KEYNOTES
REMOVE STRUCTURE 48933, INCLUDING WING WALL AND FOOTING.
CONTRACTOR SHALL BE RESPONSIBLE TO FIELD VERIFY THE
DIMENSIONS SHOWN ON THE PLANS
REMOVE 2M OF ASHPHALT PAVEMENT ADJACENT TO STRUCTURE
DOORS FOR FOOTING EXCAVATION, APPROX. 38 SQM
REMOVE 2M OF CONCRETE PAVEMENT ADJACENT TO STRUCTURE
DOORS FOR FOOTING EXCAVATION, APPROX. 10 SQM
REMOVE VENTILATION EQUIPMENT
INSTALL SILT FENCE, REF. DETAIL E1/CD501
INSTALL SAND BAG FILTER, REF. DETAIL B1/CD501
REMOVE CONCRETE WHEEL STOPS
CONTRACTOR TO REMOVE AND DISPOSE OF EXISTING LIGHTNING
PROTECTION POLES AND CABLES
ECM
SCALE 1:100
A1
DEMOLITION PLAN ECM 48933
S E
S
E P
T
I S
S U
E
D
A T
E
O C
T
F Y
L X
F B
R
E P
L A
N
I T
I O
R
U C
T U
R E
S
K A
D E
M
O
S
T O
R A
N
T
E
K A
D E
S
E
O
K I N
A W
A
J A
P A
48934
CP 3-2B
CP 3-2A
SF
SF
SF
SF
SF
SF
S
F
S
F
S
F
S F
S F
S F
S F
S F
S
F
S
F
S
F
S
F
S
F
S
F
S F
S F
S F
24.80M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C O
M
M
C O
M M
C O
M M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C O
M M
C O
M M
C
O
M
M
C O
M
M
C
O
M
M
C O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C O
M M
C
O
M
M
CD104
C I V
I L
D E
M O
L I T
I O
N
P
L A
N
E C
M
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
L X
F B
E
C M
C
D D
W G
M 1:100
[m]
9 1087653 4
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c o m
F Y
F
B
R
E P
L A
C E
M
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .