Questions and Answers-locker room renovation.pdf

PDF 41 KB Posted

Attached to
UMSB Locker Room Renovation
Solicitation number
W912HQ26S0069
Issued by

About this file

This is a Questions and Answers (Q&A) document clarifying the scope of work for a Men's Locker Room renovation project.

The scope includes renovation of the Men's Locker Room only (not the Women's), encompassing all new fixtures: 6 showers, 2 urinals, 2 toilets, and 3 sinks, along with new vanities and toilet partitions. Benches are to be wall-mounted stainless steel with blocking, one per shower space. The vanity, toilet, and partition areas are included with new fixtures throughout. The transition between existing and new tile occurs parallel to the endpoint of the shower room and vanity area. No drawings or floor plans are available for the locker area. Tile specifications are to be provided by the contractor as samples for approval. All plumbing and fixtures are new installations. No ceiling modifications are required. All HVAC-related requirements, including system modifications and compressor upgrades for the existing chiller, have been removed from the project scope.

Work is authorized Monday through Friday from 0600 to 1500 hours; any work outside these hours requires advance approval. Shelving relocation is confirmed at 40 units (20 shelves at 2 per location). For pricing purposes, contractors must create a pricing breakdown that includes materials, labor, and overhead while adhering to the CLIN structure specified in the Contract Statement.

View the file

Other files

File Type Posted
CSS_Locker Room Renovation.pdf PDF
PWS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. a. Please confirm whether the area of the Men’s Locker Room containing the vanities, toilets, and partitions is to be included in the renovation.

If this area is included, please confirm whether the scope is to include new vanities, toilets, and toilet partitions.

If this area is not included in the renovation, please clarify where the transition between the existing tile and new tile is to occur.

Answer: Yes, the area with the vanity, toilets and partitions are included. Yes, all new items in this area. The transition is parallel at the end point of the shower room area and the vanity area. Only the Men’s room is included: 6 showers, 2 urinals, 2 toilets, and 3 sinks.

2. Please confirm that only the Men’s Locker Room is part of this scope and not also the Women’s.

Answer: only the Men’s room is included.

3. Locker /Shower area: Please provide a sketch or drawings of the locker area.

Answer: No drawing is available.

4. Will the bench be wall-mounted or floor-mounted? If wall-mounted, blocking will be required.

Answer: wall mounted and blocking

5. Provide the specification for the bench, including material.-Qty

Answer: stainless steel and one for each shower space. The toilets, urinals, and sinks are included. 6 showers, 2 sinks, 2 urinals, 2 toilets.

6. Confirm that no modifications are required for plumbing, plumbing fixtures, or floor drains.

Answer: all new fixtures

7. Confirm no ceiling modifications are required.

Answer: No ceilings

8. Provide the specification for the tile.

Answer: contractor to provide samples.

9. Please confirm if HVAC system needs to be modified. If so, please provide details on the existing unit.

Answer: remove HVAC requirements

10. Shelving Relocation: Provide some pictures of the shelving. Please confirm the quantity is 20 (2x20=40)

Answer: Confirm

11. HVAC upgrade- TRANE compressor for existing YORK chiller- Provide details of the existing units.

Answer: remove HVAC upgrade

12. CSS states CLIN structure indicates only one line. Do we create our own CLIN's for labor, Material, overhead...etc.?

Answer: Create a pricing breakdown including materials, labor, O/H, etc. However, please use the CLIN structure in the CSS.

13. Please confirm work hours.

Answer: Monday-Friday 0600-1500. Any other hours must be approved in advance.

14. Is a floor plan available for the restrooms? Has a determination been made regarding whether it is the men's room only or if it also includes the women's restroom?

Answer: No floor plan and only the Men’s locker room

15. During the site walk we discussed changing the compressor on the existing chiller. Is any information available on the existing chiller?

Answer: remove from bid

16. The PWS indicates poor air conditioning in the locker room. Can you provide any additional information regarding the existing HVAC system's shortcomings?

Answer: Remove

File details come from the government source that posted it. Updated .