PWS.pdf
PDF 202 KB Posted
- Attached to
- UMSB Electrical Study
- Solicitation number
- W912HQ26S0068
About this file
This is a Performance Work Statement (PWS) for an electrical study at USASOC Building 2580, located at Humphrey Engineers Center, 7701 Telegraph Road, Alexandria, VA 22315. The contract number is W802Y962338763.
The contractor must conduct a comprehensive electrical assessment and design services for the facility's motor pool maintenance areas and a supply warehouse being converted into a fabrication facility. Key deliverables include: (1) an evaluation of the existing electrical distribution system; (2) assessment of new equipment power requirements for the fabrication facility and motor pool; (3) a written electrical study report identifying anticipated additional loads, system limitations, and required infrastructure improvements; (4) electrical design documents showing modifications needed for Sprint Team operations, motor pool operations, and future expansion; and (5) evaluation of electrical requirements for future HVAC modifications including cooling coils and condenser units. The contractor must submit design documents for government review and approval, addressing all comments and incorporating revisions. The period of performance is 120 calendar days after receipt of Notice to Proceed, with weekly progress updates required. All work must comply with the National Electrical Code (NEC), NFPA requirements, OSHA standards, applicable UFC criteria, manufacturer recommendations, and industry standards for electrical engineering design. The contractor must provide qualified electrical engineering personnel, perform all field verification, protect government property, coordinate site access, and submit a one-year warranty for parts and service at no additional cost to the government.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CSS_Electrical Study.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USASOC BLDG 2580
PERFORMANCE WORK STATEMENT
ELECTRICAL STUDY
PR&C# W802Y962338763
General Overview:
1.0 Background
The US Army Corps of Engineers customer USASOC has a requirement for an electrical power study to upgrade the electrical requirements for their motor pool maintenance areas and convert a supply warehouse into a fabrication facility supporting specialized fabrication equipment as required located at building 2580, Humphrey Engineers Center, 7701 Telegraph Road, Alexandria, VA 22315.
2.0 Scope of Work
The Contractor will furnish all labor, supervision, engineering expertise, tools, equipment, and incidental materials necessary to complete the electrical assessment and design services described herein.
The Contractor will provide a complete evaluation of the existing electrical system and develop design recommendations that support current and future operational requirements.
2.1 Existing Electrical Power Study
The Contractor will perform an electrical power study of the existing facility electrical distribution system.
2.2 New Equipment Power Requirements Assessment
The Contractor will evaluate anticipated electrical requirements associated with new equipment planned for the fabrication facility and motor pool areas.
2.3 Electrical Study Findings Report
The Contractor will provide a written electrical study report summarizing findings and recommendations.
The report will include:
• Anticipated additional loads.
• Electrical system limitations.
• Required infrastructure improvements.
Recommended modifications necessary to support:
• Sprint Team operations.
• Motor pool operations.
• Future facility expansion.
The Contractor will identify whether existing electrical infrastructure is sufficient or whether upgrades are required.
2.4 Electrical Design
Based on the findings of the electrical study, the Contractor will develop electrical design documents identifying required modifications and new electrical distribution requirements.
The electrical design will include:
• Existing electrical infrastructure modifications.
• New electrical feeds are required for Sprint Team equipment.
• New electrical feeds required for motor pool equipment.
2.5 HVAC Electrical Considerations
The Contractor will evaluate electrical requirements associated with future HVAC modifications.
The evaluation will include consideration for:
• Addition of cooling coils.
• Addition of condenser units.
The Contractor will identify any electrical infrastructure requirements necessary to support future HVAC improvements.
2.6 Design Submittals
The Contractor will submit design documents for Government review and approval.
Submittals will include:
• Recommendations for implementation.
The Contractor will address Government comments and incorporate approved revisions.
3.0 Government Furnished Information
The Government will provide:
• CAD backgrounds for development of final drawings.
• Facility access.
• Existing available electrical documentation, if available.
• Equipment information provided by facility users.
• Equipment layout information from the Sprint Team.
4.0 Awarded Contractor Responsibilities
The Contractor will:
• Provide qualified electrical engineering personnel.
• Perform all required field verification.
• Protect Government property.
• Coordinate site access with Government representatives.
• Perform work in accordance with applicable codes and standards.
• Provide complete and accurate documentation.
The Contractor will be responsible for identifying discrepancies between existing conditions and available Government documentation.
5.0 Applicable Codes and Standards
All work will comply with applicable requirements including:
• National Electrical Code (NEC).
• NFPA requirements.
• OSHA requirements.
• Applicable UFC criteria.
• Manufacturer recommendations.
• Industry standards for electrical engineering design.
6.0 Period of Performance
The Contractor will complete all work within 120 calendar days after receipt of the Notice to Proceed.
The contractor will also provide weekly progress updates to the government Project Manager throughout the duration of this requirement.
Α.8 The contractor will perform testing and a final serviceability inspection, training to the HEC security office and end user.
Technical point of contact for questions or project visit (recommended) is Michael Johnson, 703-428-9172, room 2D10 in building 2593. Contractual POC is UMSB/HEC Contracting Office, 703-428-7153; FAX 703-428-8181.
Performance of Work:
B.1. The contractor will perform this service IAW EM 385-1-1, US Army Corps of Engineers Safety and Health Requirements Manual, National Electric Code (NEC) and, 28 CFR Part 36 and Public Law 101-336 -Americans with Disabilities Act (ADA).
B.2. The contractor will furnish the government a warranty for a minimum of one year for parts and service (at no additional cost to the government), including all labor and service calls if needed. Contractor will also submit Manufacturers extended warranties on equipment to the POC.
B.3 The contractor will not leave any areas in an unsafe manner and will remove debris from the complex daily. The government will provide the location at the facility for dumpster placement.
B.4 The contractor will verify measurements and site conditions prior to any work starting. Contractor will also provide submittals (and be approved by the POC) for all equipment and materials prior to purchase.
B.5. Any Government property damaged by contractor will be repaired to a condition acceptable to the Government at no additional cost to the Government.
B.6. All work will be performed during normal duty hours, 0630 to 1500 and will be coordinated with the P.O.C. Parts of this work may be required to be done after hours or weekends and the government will provide escorts for contractor personnel to perform work.
B.7. The contractor will be responsible for obtaining all information of manufacture requirements and will install all materials and equipment in accordance with manufacturer's specifications.
B.8. All work will be done in a professional workman like manner.
B.9. All material used for this project will be new, and any requests to use equivalent parts and materials must be made and approved by the POC prior to purchase/installation of materials.
B.10. All work performed will not be accepted until 100 % complete and operational to the satisfaction of the POC (Michael Johnson).
General Security Requirements:
C.1. All contractor and all associated sub-contractor’s employees will comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor will also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
C.2 All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
C.3 The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award. *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative.
This Form will be provided to the Contracting Officer and will become part of the official contract file.
Local Security Policy:
D.1 All contractor employees who require physical access to government-controlled facilities or logical access to government information and or information systems are subject to a fitness determination and appropriate vetting. To assist in the vetting process, the contractor must submit a notice of visit form for each employee who will perform work on the contract, including at the minimum, the name, social security number and date of birth of each employee performing work on the contract that need physical and or logical access.
D.2 Documents containing personally identifiable information may only be submitted via encrypted email, by first class mail or it may be hand carried to the security office. Notice of visits must be submitted through the government contracting officer representative (COR) or technical representative who will deliver them to the security office. All notice of visits must be received three business days in advance of the contractor reporting for work.
D.3 The contractor will work through the COR or technical representative for the contract who will serve as the liaison between the security office and the contractor. Contractor employees who are not sponsored by a government employee will not be granted access to any facilities under HECSA control nor will HECSA security approve logical access to information systems if a notice of visit containing either the DOD ID number or the social security number is not provided to the security office.
D.4 Contractor personnel who do not require a common access card may be granted physical access based on favorable results of an NCIC III records check. Contractors who need a common access card must have the minimum of a favorably adjudicated NACI. If no investigation is on file, the CAC will not be issued until a favorable FBI fingerprints check is received by the security office and the NACI has been initiated in PSIP. HECSA Security will initiate all NACI investigations. Contractors who require access to classified information must be performing work on a classified contract and the contract company is responsible for initiating all required investigations for the appropriate security clearance.
D.5 If an employee has been the subject of a previous favorably adjudicated investigation, it may be reciprocally accepted if there has not been a two-year break in service and there is no presence of new and potentially unfavorable information that casts doubt about the subject’s suitability. When a background check is reciprocally accepted but is more than 5 years old, the security office may initiate an NCIC III check to ensure no new unfavorable information exists.
D.6 Contractor employees whose access to classified information has been suspended or revoked will not be authorized logical access to government information systems IAW AR 25-2 paragraph 4-14 b (2) until that investigation is favorably adjudicated. These personnel will also not be allowed unescorted access to government facilities until the investigation has been favorably adjudicated by the Command Security Manager. OPM Final Credentialing Standards allow agencies to deny a CAC or PIV card to any individual who has had their access to classified information denied or revoked. Further due process is not required in these situations. The contractor must provide employees who can be cleared to perform work and must immediately provide replacement employees for those who cannot be cleared.
Accident Prevention and Requirements:
E.1 In performing this contract, the contractor will provide for protecting the lives and health of employees and other persons; preventing damage to property, materials, supplies and equipment; and avoiding work interruptions. For these purposes, the Contractor will:
(1) Comply with all pertinent provisions of the most recent version of U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the solicitation and available at:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_3 85-1-1_2008Sep_Consolidated_2011Aug.pdf ;
(2) Provide appropriate safety personal protection equipment (steel toe safety boots, eye protection, hearing protection, reflective vests, etc.) as required by the Position Hazard Analysis.
(2) Comply with the standards issued by the Secretary of Labor in 29 CFR Part 1910 and or 29 CFR Part 1926.
(3) Safeguard the public and Government personnel, property, materials, supplies, and
(4) equipment exposed to Contractor operations and activities.
(5) Avoid interruptions of Government operations and delays in project completion dates, and.
(6) Control costs in the performance of this contract.
E.2 Additionally, for these purposes on contracts for construction or dismantling, demolition, or removal of improvements, the Contractor will also --
(1) Provide appropriate safety barricades, signs, and signal lights, and.
(2) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken.
E.3 Whenever the Contracting Officer becomes aware of any noncompliance with these requirements or any condition which poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer will notify the http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1_2008Sep_Consolidated_2011Aug.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1_2008Sep_Consolidated_2011Aug.pdf
Contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor’s representative at the work site, will be deemed sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor will immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor will not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any Stop-Work Order issued under this clause.
E.4 The Contractor will require any/all subcontractors to comply with these safety requirements.
E.5 After receipt of a notice of award, the Contractor will:
(1) Submit in writing (within 10 working days) a proposal for effectuating this provision for accident prevention. The plan will include an analysis of the significant hazards to life, limb, and property inherent in the contract work performance and a plan for controlling these hazards.
(2) The plan, which will be reviewed by the Humphreys Engineer Center Support Activity, Safety and Occupational Health Office will include but not be limited to the following:
(a) Identification and signature of on-site contractor safety officer.
(b) Identification and telephone numbers of medical emergency facilities.
(c) Medical emergency response procedures (what to do in a medical emergency).
(d) Plans for initial safety indoctrination and continuing safety training for employees.
(e) Hazard analysis and abatement.
(f) Personal protective equipment.
(g) Procedures to be used for accident reporting and investigating.
(h) Criteria for reprimand due to willful negligence towards safety standards.
(3) Meet in conference with representatives of the Contracting Officer to discuss and develop mutual understanding relative to administration of the overall safety program.