About this file
This is a Statement of Work (SOW) for expendable prime power materials required by Alpha Company, 249th Engineer Battalion to support Prepare to Deploy Order (PTDO) execution following equipment return from a deployment to the Island of Tinian. The U.S. Army Corps of Engineers (USACE) Mission Support Battalion is conducting this procurement as a Firm Fixed Price contract below the simplified acquisition threshold. The contracting effort targets vendors with NAICS code 423610 (Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers). This is a sources sought market survey for planning purposes only; no quotes are being requested or accepted at this stage, and no award will result from this announcement.
Interested vendors should submit capability packages—not binding quotes—that include organization name, location, CAGE Code, socioeconomic status, capability statements addressing the contract scope and complexity, and comments on the draft SOW. All submissions are to be provided at no cost or obligation to the Government. The Government reserves the right to reject any private sector input and is not obligated to notify respondents of survey results. The specific products and quantities are detailed in the attached SOW document, which outlines the electrical and power-related materials needed for post-deployment equipment reconstitution and operational readiness of the 249th Engineer Battalion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A_DRAFT PWS - BOM Replenishment_FY26.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
DPGDS BOM Procurement
ALPHA COMPNAY, 249TH ENGINEER BATTALION
Schofield Barracks, HI
1. GENERAL: This is a purchase description that outlines the expendable prime power materials required by Alpha Company, 249th Engineer Battalion (EN BN) to execute Prepare to Deploy Order (PTDO) upon return on equipment from a deployment to the Island of Tinian.
2. DESCRIPTION: The contractor shall procure and deliver listed materials.
3. BACKGROUND: 249th EN BN designated Alpha Company to have an Active PTDO and NRF platoon available to respond worldwide at a moment’s notice. IAW 249th EN BN SOP. Prime power soldiers require expendable materials to deploy with. The materials listed below will ensure Alpha Company has the proper materials to deploy and operate a Deployable Power Generation Distribution System (DPGDS). This order replenishes items utilized during Alpha Company’s deployment to Tinian in support of FEMA’s Operation Mega Power.
4. OBJECTIVES:
a. 249th EN BN requires the procurement and delivery of listed materials.
5. SCOPE: The contractor shall:
a. Procure all materials as outlined in Paragraph 6: Material Requirements.
Deliver or ship all materials as outlined in Paragraph 6: Material Requirements to 1165 Maurico Rd. Bldg. 1400, Schofield Barracks, HI 96857 with delivery within 60 days of award.
6. MATERIAL REQUIREMENTS:
| DESCRIPTION OF MATERIALS |
| NSN/Part Number |
| QTY |
| UNIT |
| 200A LOAD BREAK KITS |
| 5810-B-1/0 |
| 38 |
| EA |
| CONNECTOR COMPRESSION, LUG, 1/0 STR ALUM, 200A, LOAD BREAK |
| 02500240 |
| 40 |
| EA |
| 1/0 BARREL COMPRESSION LUG |
| 054007-13277 |
| 10 |
| EA |
| DEAD BREAK KIT, ELBOW, INSULATING, 15KV |
| K655BLR-K0330 |
| 12 |
| EA |
| CONNECTOR , SPLIT BOLT, 1/0 - 350 KCML |
| 3LK56 (Grainger) |
| 24 |
| EA |
| CONNECTOR, SPLIT BOLT, 6 AWG - 2 AWG |
| 3LK36 (Grainger) |
| 20 |
| EA |
| TAPE, 33+ |
| 5970-00-788-4901 |
| 64 |
| EA |
| TAPE, 130C, 1", 30' |
| 5970-01-290-1623 |
| 13 |
| EA |
| TAPE, 2228 MASTIC, 1" |
| 5970-01-494-1416 |
| 28 |
| EA |
| ZIP TIES, 30", 50 PACK |
| 5975-00-899-4606 |
| 6 |
| EA |
| ZIP TIES, 15", 50 PACK |
| 5975-01-048-2922 |
| 1 |
| EA |
| CLEANING KIT, TERMINATION, BOX OF 10 |
| 6850-01-015-2758 |
| 5 |
| EA |
| OIL ABSORBENT PADS 100 PADS PER BAG |
| 4235-01-451-8744 |
| 1 |
| EA |
| FUEL HOSE @75FT |
| 4720-01-688-0943 |
| 1 |
| EA |
| BOWL, SEDIMENT |
| 2910-01-699-7814 |
| 4 |
| EA |
| 1/0 Bare copper ground |
| NNC2137X |
| 450 |
| FT |
| 1/0 cable 15kv TXRLP Copper Conductor 250 Amp Rating w/JCN |
| NNC2665X |
| 1920 |
| FT |
| 500 MCM/KCM cable 15kv EPR Copper Conductor 700 Amp Rating with Wire Shielding |
| NNC5001UDTR-XLPE |
| 1000 |
| FT |
7. USG: The US Government will not furnish any items, property, or services. The US Government will ensure the delivery location is unlocked and open for deliveries during the normal duty hours of 9am-4pm daily, excluding weekends and Federal holidays.
8. PERIOD OF PERFORMANCE: 30 days from NTP, with a delivery schedule of no later than 60 days after award. Deliver all items to the following location:
Alpha Company, 0249th EN BN, PRIME POWER:
1165 Maurico Rd. Bldg 1400, Schofield Barracks, HI 96857
9. SECURITY REQUIREMENTS: Meet all identified antiterrorism/operations security review cover sheet in ENG Form 6055 and DD Form 254.
10. POINT OF CONTACT: CPT Duncan Day at (702) 379-4426 or duncan.r.day.mil@army.mil.