Q and A 8 2020 APR08.docx
DOCX document 12 KB Posted
- Solicitation number
- W912HQ20R0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QandA 2020APR10.docx | DOCX document | |
| Q and A 2020APR06.docx | DOCX document | |
| Attachment 2 - RFBCP - Example BPA Call.docx | DOCX document | |
| Q and A 2020APR02.docx | DOCX document | |
| Pre-Proposal Teleconference.docx | DOCX document | |
| RFP for IEPR BPAs.pdf | ||
| Solicitation 20R0005 3-10-2020 (Final).pdf | ||
| Attachment 4 - Example BPA Call Price Sheet.xlsx | XLSX spreadsheet | |
| Attachment 2 - RFBCP - Example BPA Call.docx | DOCX document | |
| Attachment 1 - USACE-NAVFAC Past Performance Questionnaire.pdf | ||
| Attachment 3- Example IEPR PWS 20200220.pdf | ||
| Attachment 5 - PWS for IEPR BPAs 20200312.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q16: During previous contracts there has been a requirement that all peer reviewers must be subcontractors to the prime. Has that requirement been removed from this BPA’s expectations?
A16: While not stated as a requirement specifically in the Applicable Directives, USACE prefers that the individual members of the review panel do not come from the contractor's own organization. However, as this is not a specific requirement per the Applicable Directives, it is possible there could be situations when it is necessary or preferable to use an employee from the contractor's organization as a member of the review panel. In these situations possible issues of independence, conflict of interest or review panel balance will be determined at the individual Call level. Therefore, please expect such requests to use panel members from a Contractor's own organization to be carefully reviewed, on a case-by-case (individual Call) basis.