This document contains drawings and specifications for the construction of a 500,000-gallon composite elevated water storage tank. Key details include constructing the tank, associated piping, valves, electrical work, site clearing and grubbing, demolition, earthwork, grading, landscaping and other appurtenances at the Winding Woods Industrial Park in Dorchester County, South Carolina. The work includes delegated design of the tank foundation. The solicitation was posted on April 6, 2021 by the U.S. Army Corps of Engineers Charleston District for the Lake Marion Regional Water Agency. Drawings show plans for the tank, bottom layout, and section views with technical requirements for materials, dimensions, and construction details.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUIREMENTS
VENT AND ROOF APPURTENANCE
SEE SPECIFICATIONS FOR HATCH,
RUSTICATIONS
STEEL PIPE HANDRAIL
WITH KICKPLATE
3'x7' PERSONNEL DOOR10'W x 14'H OVERHEAD ROLL-UP DOOR
FINISHED FLOOR 79.50
TANK AND PEDESTAL SECTION
NO SCALE
COMPOSITE COLUMN EXTERIOR
NO SCALE
NOTES:
12" OVERFLOW PIPE
SUPPORT COLUMN
4'Ø (MIN) ACCESS TUBE
30" Ø FLOOR MANHOLE
ACCESS LADDER
REINFORCED CONCRETE
PAINTER'S RAILS
STEEL TANK ROOF
STEEL FLOOR
12" OVERFLOW
PAINTER'S RAIL
16" DISCHARGE
CONCRETE RING BEAM
FINISHED FLOOR EL 79.50
10'Wx14'H ROLL-UP DOOR
RAMP
HATCH/LOUVER WITH INSECT SCREEN
UPPER PLATFORM WITH HANDRAILS
(WITH CONDENSATE PAN UNDER ACCESS TUBE AND
DRAIN TO FINISHED GRADE WITH CONCRETE SPLASH
PAD)
STEEL PIPE
HANDRAIL WITH
KICKPLATE
SEE STRUCTURAL DRAWINGS FOR
FOUNDATION REQUIREMENTS
M
A X
T
Y P
SEE SPECIFICATIONS FOR HATCH, VENT
AND ROOF APPURTENANCE
REQUIREMENTS
ROOF ACCESS LADDER
WITH SAFETY RAIL
TANK ACCESS LADDER
WITH SAFETY RAIL
HWL & OVERFLOW WEIR BOX
CREST EL 256.50 (SEE NOTE 11)
16" REMOVABLE SILT STOP
6" MIN ABOVE TANK FLOOR
REINFORCED DOME
STRUCTURAL CONCRETE SLAB
ACCESS LADDER WITH
CONTINUOUS FALL PROTECTION
16" SUPPLY
SEE DRAWING C103 FOR
CONTINUATION OF PIPING
16" SUPPLY
3" DRIP LIP, TYP
EL 238.25
500,000 GAL NET CAPACITY
H
E A
D
R
A N
G E
PAINTER'S RAIL
PAINTER'S
RAIL
STEEL TANK SHELL,
SEE NOTE 10
10" SUPPLY, TYP,
SEE TANK INLET PIPE
GEOMETRY ON DWG M102
LWL EL 220.00 (SEE NOTE 11)
30" MIN ROOF OPENING WITH HINGED
WEATHER PROOF COVER
OVERFLOW WEIR
INTERMEDIATE PLATFORM
WITH HANDRAIL
1. THE TANK AND COLUMN SECTION SHOWN ON THIS
DRAWING ARE NOT TO SCALE AND ARE INTENDED TO
BE DIAGRAMMATIC ONLY.
2. ACTUAL TANK DIMENSIONS MAY VARY SLIGHTLY
DEPENDING ON THE MANUFACTURER OF THE TANK
SELECTED. TANK MANUFACTURER SHALL BE
RESPONSIBLE FOR ALL ADJUSTMENTS AND
STRUCTURAL CLEARANCES.
3. THE TANK FOUNDATION SHALL BE DESIGNED BY THE
TANK MANUFACTURER AND SHALL COMPLY WITH THE
RELEVANT SECTIONS OF ACI 318, AWWA D107-10, AND
THE SOUTH CAROLINA BUILDING CODE, INCLUDING
DESIGN LOADS AND SAFETY FACTORS. THE CONTRACT
DRAWINGS ARE DIAGRAMMATIC ONLY AND DO NOT
REFLECT THE SCOPE, TYPE, SIZE, OR DIMENSION OF
THE ACTUAL FOUNDATION THE TANK MANUFACTURER
DETERMINES IS NECESSARY.
4. CONTRACTOR SHALL PERFORM ANY ADDITIONAL
GEOTECHNICAL EXPLORATIONS DEEMED NECESSARY,
BEYOND THE PROVIDED GEOTECHNICAL REPORT, AT
CONTRACTOR EXPENSE.
5. CONTRACTOR SHALL CONSTRUCT THE TANK TO ITS
FULL HEIGHT PRIOR TO CONNECTING ANY SITE PIPING
TO THE TANK PIPING. CONTRACTOR SHALL OBSERVE
ANY AND ALL FOUNDATION SETTLEMENT
RECOMMENDATIONS IN THE GEOTECHNICAL REPORT.
6. SOME APPURTENANCES ARE SPECIFIED AND NOT
SHOWN HERE. SOME ITEMS ARE SHOWN ROTATED FOR
CLARITY.
7. PAINTER'S ACCESS HATCH AND PRESSURE MANHOLE
SHALL BE LOCATED IN LINE WITH THE ACCESS LADDER.
8. ALL VENTS, LIGHTS, AND OTHER APPURTENANCES ON
THE TOP OF THE TANK SHALL BE LOCATED WITHIN THE
HANDRAIL.
9. OWNER WILL PROVIDE LOCKS FOR ALL TANK ACCESS
HATCHES, DOORS, MANWAYS, AND FENCE GATES.
10. TANK COLOR SHALL BE COLOR AVIATION ORANGE AND
WHITE (CHECKERBOARD PATTERN) BY TNEMEC OR
APPROVED EQUAL. THE BLOCK STYLE LETTERING ON
THE TANK SHALL BE DORCHESTER COUNTY AND BLACK
IN COLOR.
11. ALL ELEVATIONS SHOWN ARE BASED ON A VERTICAL
DATUM REFERENCE TO NAVD 1988.
S a n t e e
C o o p e r
AU
R
R A
C F
I T
I
E
OF
T
S
C E
UTH
O
CA
TH
R O
IZ
I
T A
IO
AN
O N
BEFORE YOU DIG!
CONTACT THE PALMETTO
UTILITY PROTECTION SERVICE
1-888-721-7877
ISSUED FOR CONSTRUCTION
C H
A R
L O
T T
E
C
O L U
M B
I A
C
H A
R L E
S T
O N
H A
Z E
N
A
N D
S
A W
Y E
R
K M
B C
L F
M101
A
D D
E N
D U
M
N
O
H A
Z E
N
K
M B
AutoCAD SHX Text
SANTEE, S.C.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
CODE I.D. NO.
AutoCAD SHX Text
DRAWING SIZE:
AutoCAD SHX Text
CONSTRN. CONTR. NO.
AutoCAD SHX Text
SPEC. NO.
AutoCAD SHX Text
RECORD DRAWING DATE
AutoCAD SHX Text
DEPARTMENT OF THE ARMY
AutoCAD SHX Text
CHARLESTON, S.C.
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PREP BY DATE APPRVD
AutoCAD SHX Text
REV. DESCRIPTION
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DSGN
AutoCAD SHX Text
SUPV
AutoCAD SHX Text
DR
AutoCAD SHX Text
CHK
AutoCAD SHX Text
EIC
AutoCAD SHX Text
FPE
AutoCAD SHX Text
BR HD
AutoCAD SHX Text
DIR
AutoCAD SHX Text
SUBMITTED BY
AutoCAD SHX Text
OFFICE OF THE DISTRICT ENGINEER
AutoCAD SHX Text
U.S. ARMY ENGINEER DISTRICT
AutoCAD SHX Text
WINDING WOODS REACH WATER STORAGE TANK
AutoCAD SHX Text
LAKE MARION REGIONAL WATER AGENCY
AutoCAD SHX Text
CHARLESTON
AutoCAD SHX Text
OFFICER IN CHARGE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C00638
AutoCAD SHX Text
SAWYER
AutoCAD SHX Text
HAZEN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REGULATORY REVIEW
AutoCAD SHX Text
HAZEN
AutoCAD SHX Text 09/2019
AutoCAD SHX Text
WHO
AutoCAD SHX Text
HAZEN
AutoCAD SHX Text
JAN 2021
AutoCAD SHX Text
KMB
AutoCAD SHX Text
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
HAZEN
AutoCAD SHX Text 03/2021
AutoCAD SHX Text
KMB
AutoCAD SHX Text
ELEVATED WATER STORAGE TANK
AutoCAD SHX Text
SECTION AND ELEVATION
k2pmpnlr Sticky Note replace sheet M101 RFP page 697 RFI 1 Questions - 8, 13, 24 RFI 2 Questions - 1, 3, 12
#5@10" EW
BACK FILL WITH
ABC OR #57 STONE
#4@12"
FOUNDATION BY TANK
MANUFACTURER
#4@12"
6'-0"
1/2" EXP JT
6"
CORNER GUARD
AT DOOR, TYP
1/2" EXP JT
EL 79.50
BOTTOM PLAN
1/4" = 1'-0"
SECTION
M102
A
NOT TO SCALE
M
A
M
A
1/2" EXPANSION JOINT
MATERIAL AND SEALANT
AROUND SLAB
PENETRATIONS, TYP
16" 90° BEND
CONCRETE THRUST BLOCK/PIPE
SUPPORTS DESIGNED BY TANK
MANUFACTURER, TYP
16" 90° BEND
16" CHECK VALVE
16" HARNESSED
FLANGED ADAPTER
12" SST OVERFLOW
SEE STRUCTURAL DRAWINGS FOR
FOUNDATION REQUIREMENTS
INSTRUMENTATION TAP:
2 - 3/4" SST NIPPLES AND
3/4" SST BALL VALVE WITH
PRESSURE GAUGE, CL 85.50
6" DRAIN, CL 86.50
16" BUTTERFLY
VALVE, TYP
16" INLET/OUTLET,
CL 82.00
FF EL 79.50
16" SST SUPPLY
16" SST DISCHARGE
16" BASE 90° BEND
16" BASE 90° BEND
12" 90° BEND
12" OVERFLOW
FINISHED GRADE 79.00
DIP ONLY
BELOW THIS
POINT
#5@10"
EW, T&B
BACKFILL WITH
COMPACTED NO. 57
STONE
SECTION
3/8" = 1'-0"
M102
4%
4%
CENTER OF
ROLLUP DOOR
M102
B
4'-0"
4'-0"
4'-0"
TANK BOWL
TANK PEDESTAL
16" INLET/
OUTLET PIPE
10" SUPPLY TUBE
(TYP 2)
4' ACCESS TUBE
TANK INLET PIPE GEOMETRY
N.T.S.
NOTES
1. PIPING DEPICTED SHOWS TOP OF PIPE. CONTRACTOR
SHALL INSTALL APPROPRIATE PIPING TO TERMINATE
AT THE LOCATIONS SHOWN AND PROVIDE SUPPORT OF
ALL PIPING IN THE BOWL.
U
P
P
L
Y
I
S
C
H
A
R
G
E
6'-0" 6'-0"
12'-0"
6'-0"
10" SST INLET, TYP
16" SST INLET, TYP
16" SST INLET, TYP
10" SST
INLET, TYP
C
C
TANK INLET ARRANGEMENT
3/8"=1'-0"
PLAN
SECTION C-C
EL 236.25
EL 238.25
NOTES:
1. THE FLOOR PLAN ILLUSTRATED ON THIS SHEET REPRESENTS THE PROPOSED
FLOOR PLAN FOR A COMPOSITE TANK WITH A 24 FOOT DIAMETER COLUMN.
2. USE TYPE 2 BOLLARD.
3. CONTRACTOR SHALL PROVIDE "ISOLATION KIT" FOR SEPARATION OF DISSIMILAR
METALS AT ALL LOCATIONS WHERE DUCTILE IRON AND STAINLESS STEEL ARE
CONNECTED.
4. PIPE SUPPORTS SHALL BE ADDED.
5. THE TANK SHALL BE SUPPORTED ON PILES. REFER TO STRUCTURAL DRAWINGS
FOR FOUNDATION REQUIREMENTS.
6. CONCRETE SLAB AT BASE OF TANK AND ROLL-UP DOOR SHALL BE SEALED WITH
CONCRETE LIQUID DENSIFER SEALER. SEE SPECIFICATION SECTION 03 35 00.
7. THE JOINT SEALANT INDICATED AT CONTROL JOINTS AND EXPANSION JOINTS
SHALL BE A MULTI-COMPONENT, NON-SAG, LOW-MODULUS POLYURETHANE
RUBBER SEALANT MEETING ASTM C-920, TYPE M, GRADE NS, CLASS 25 FOR NT, M,
A, AND O.
8. CONTRACTOR TO DESIGN A SUMP PUMP. DISCHARGE PIPING SHALL BE DIRECTED
TO THE OVERFLOW DRAIN SPLASH PAD.
9. MOUNT PRESSURE TRANSMITTER ON PIPE STAND AS SHOWN IN ELECTRICAL
DETAILS. PROVIDE IMPULSE TUBING AS SPECIFIED IN SECTION 40 79 00 FROM
PRESSURE TAP TO TRANSMITTER.
S a n t e e
C o o p e r
AU
R
R A
C F
I T
I
E
OF
T
S
C E
UTH
O
CA
TH
R O
IZ
I
T A
IO
AN
O N
BEFORE YOU DIG!
CONTACT THE PALMETTO
UTILITY PROTECTION SERVICE
1-888-721-7877
ISSUED FOR CONSTRUCTION
C H
A R
L O
T T
E
C
O L U
M B
I A
C
H A
R L E
S T
O N
H A
Z E
N
A
N
A W
Y E
R
0245100
ACCESS LADDER
TYPE 1 BOLLARD,
SEE NOTE 2
CONCRETE RAMP
10' W x 14' H
ROLL-UP DOOR
0245100
TYPE 1 BOLLARD,
SEE NOTE 2
16" WATER MAIN
HOSE BIBB ASSEMBLY
3/4" CORP STOP,
3/4" BALL VALVE,
NIPPLE PIECES, AND BIBB,
TYP OF 2
16" ALTITUDE VALVE
16" CHECK VALVE
16" BFV, TYP
16" DISCHARGE
6" PLUG VALVE
6" DRAIN
6" THICK CONCRETE PAD
WITH #4 @ 12 EW ON
COMPACTED SOIL
3'-0" MIN,
TYP
12" OVERFLOW
INSTRUMENTATION TAP:
2 - 3/4" SST NIPPLES AND
3/4" SST BALL VALVE WITH
PRESSURE GAUGE
PIT-SYSTEM
(SEE NOTE 9)
PIT-TANK LEVEL
(SEE NOTE 9)
M
I N
AutoCAD SHX Text B
AutoCAD SHX Text
SANTEE, S.C.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
CODE I.D. NO.
AutoCAD SHX Text
DRAWING SIZE:
AutoCAD SHX Text
CONSTRN. CONTR. NO.
AutoCAD SHX Text
SPEC. NO.
AutoCAD SHX Text
RECORD DRAWING DATE
AutoCAD SHX Text
DEPARTMENT OF THE ARMY
AutoCAD SHX Text
CHARLESTON, S.C.
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PREP BY DATE APPRVD
AutoCAD SHX Text
REV. DESCRIPTION
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DSGN
AutoCAD SHX Text
SUPV
AutoCAD SHX Text
DR
AutoCAD SHX Text
CHK
AutoCAD SHX Text
EIC
AutoCAD SHX Text
FPE
AutoCAD SHX Text
BR HD
AutoCAD SHX Text
DIR
AutoCAD SHX Text
SUBMITTED BY
AutoCAD SHX Text
OFFICE OF THE DISTRICT ENGINEER
AutoCAD SHX Text
U.S. ARMY ENGINEER DISTRICT
AutoCAD SHX Text
WINDING WOODS REACH WATER STORAGE TANK
AutoCAD SHX Text
LAKE MARION REGIONAL WATER AGENCY
AutoCAD SHX Text
CHARLESTON
AutoCAD SHX Text
OFFICER IN CHARGE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C00638
AutoCAD SHX Text
SAWYER
AutoCAD SHX Text
HAZEN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REGULATORY REVIEW
AutoCAD SHX Text
HAZEN
AutoCAD SHX Text 09/2019
AutoCAD SHX Text
WHO
AutoCAD SHX Text
HAZEN
AutoCAD SHX Text
JAN 2021
AutoCAD SHX Text
KMB
AutoCAD SHX Text
AutoCAD SHX Text
ISSUED FOR CONSTRUCTION
AutoCAD SHX Text
HAZEN
AutoCAD SHX Text 03/2021
AutoCAD SHX Text
KMB
AutoCAD SHX Text
KMB
AutoCAD SHX Text
CLF
AutoCAD SHX Text
AutoCAD SHX Text M102
AutoCAD SHX Text
ELEVATED WATER STORAGE TANK
AutoCAD SHX Text
BOTTOM PLAN AND SECTION
AutoCAD SHX Text
KMB
AutoCAD SHX Text 04/2021
AutoCAD SHX Text
HAZEN
AutoCAD SHX Text
ADDENDUM NO. 1
AutoCAD SHX Text k2pmpnlr Sticky Note Replace sheet M102 RFP Page 698 including CO-PB and CO-M-S01
| Sheets and Views |
| M101 SECTION AND ELEVATION |
| M102 BOTTOM PLAN AND SECTION |
| CO-PB |
| CO-M-S01 |
File details come from the government source that posted it. Updated .