About this file

This document provides details for a planned federal contract solicitation for raising dikes and berms and installing new spillway systems at multiple AIWW placement areas in Charleston and Colleton Counties, South Carolina. The Army Corps of Engineers Engineering District Charleston will issue a firm-fixed-price solicitation between 15 to 30 days after posting a pre-solicitation notice to furnish all plant, equipment, labor, transportation, fuel, lubricant, supplies and materials and perform all operations in connection with the work. The work locations include placement areas 2564 C-P, 2536 C-P, 2508 C-P, 2461 C-P, 2160 C-P, 1820 C-P, 1764 C-P, 1743 C-P, 1717 C-P, and 532 C-P. The magnitude of work is estimated between $5 million to $10 million. Offerors should monitor the website for the formal solicitation announcement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Placement Area Site Inspections 18 March 2020

It is strongly recommended that bidders visit the sites in person before bidding on the contract. It is best to visit most sights at high tide as noted under each placement area. Snake boots are recommended.

Placement Area 1717 C-P Not accessible at mid-tide when pictures were taken.

Placement area was not used in 2018-2019 dredging contract.

PA 1717 C-P exterior

PA 1717 C-P spillway 55+43 outfall

Placement Area 1743 C-P Accessible at mid-tide.

Used June 2018 to January 2019 for contract dredged material. Drying and dewatering underway.

PA 1743 C-P spillway 1 outfall exterior

PA 1743 C-P spillway 1 outfall exterior

PA 1743 C-P spillway 1 interior (before boards removed)

PA 1743 C-P spillway 2 outfall

PA 1743 C-P interior at outfall 2

PA 1743 C-P interior at outfall 1

Placement Area 1764 C-P Not accessible at mid-tide. Was not used during 2018-2019 dredging contract due to breached spillway and excess vegetation.

Placement Area 1820 C-P

PA 1820 C-P spillway 1+55 outfall

PA 1820 C-P spillway 1+55 interior

PA 1820 C-P spillway 1+55 interior before boards were pulled

PA 1820 C-P interior at spillway 1+55 before boards were pulled

PA 1820 C-P interior at finger dike before boards were pulled

Placement Area 2160 C-P

Not used June 2018 to January 2019 for contract dredged material.

Placement Area 2160 C-P spillway 1+49 outfall

Placement Area 2160 C-P spillway 1+49 outfall

Placement Area 2160 C-P spillway 1+49 interior

Placement Area 2160 C-P spillway 1+49 interior

Placement Area 2461 C-P

Placement Area 2461 C-P spillway 15+72 outfall

Placement Area 2461 C-P spillway 15+72 interior

Placement Area 2461 C-P spillway 15+72 interior before boards were pulled

Placement Area 2461 C-P spillway 68+54 outfall

Placement Area 2461 C-P spillway 68+54 outfall

Placement Area 2461 C-P spillway 68+54 interior before boards were pulled

Placement Area 2508 C-P

Placement Area 2508 C-P spillway 1 outfall

Placement Area 2508 C-P spillway 2 outfall

Placement Area 2536 C-P

Placement Area 2536 C-P spillway outfall location.

Placement Area 2564 C-P

Entrance to creek leading to Placement Area 2564 C-P spillway.

File details come from the government source that posted it. Updated .