A.07.24_AMD_0003_SPECS.pdf

PDF 355 KB Posted

Attached to
Semmes Lake Dam Rebuild Federal contract opportunity
Solicitation number
W912HP18R2002
Issued by
Department of the Army Corps of Engineers Engineering District Charleston

About this file

Specs

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Semmes Lake Dam Reconst r uct i on W912HP18R2002 Ft . Jackson, SC

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1. 1 SUBMI TTALS

1. 2 WORK COVERED BY CONTRACT DOCUMENTS

1. 2. 1 Pr oj ect Descr i pt i on

1. 2. 2 Locat i on

1. 2. 3 Hi st or y

1. 2. 4 Or der of Wor k

1. 3 Gover nment Occupancy

1. 4 EXI STI NG WORK

1. 5 LOCATI ON OF UNDERGROUND UTI LI TI ES

1. 5. 1 Not i f i cat i on Pr i or t o Excavat i on

PART 2 PRODUCTS

PART 3 EXECUTI ON

3. 1 I NI TI AL RESERVOI R FI LLI NG

3. 1. 1 I mpl ement at i on

3. 1. 2 Reser voi r Fi l l i ng

3. 1. 3 Pr ef er r ed Fi l l i ng Rat e

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 11 00 Page 1 ( Revi sed by Amendment 0003)

SECTI ON 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1. 1 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

1. 2 WORK COVERED BY CONTRACT DOCUMENTS

1. 2. 1 Pr oj ect Descr i pt i on

Semmes Lake Dam Reconst r uct i on wi l l be c l assi f i ed as an i nt er medi at e, hi gh hazar d, ear t hen dam. Reconst r uct i on consi st s of r emovi ng t he r emai ni ng embankment mat er i al and r econst r uct i ng t he embankment .

Reconst r uct i on wi l l al so i ncl ude a cont r ol l ed concr et e out l et wor ks, a 4' x 4' out l et gat e and a t hr ee- st age l abyr i nt h wei r . The dam i s appr oxi mat el y 970 f eet l ong, wi t h maxi mum hei ght of 29 f eet above t he l ake bed. The t hr ee- st age wei r wi l l be desi gned t o keep a nor mal pool at el evat i on 215. 0' ( NAVD88) , wi t h secondar y and t er t i ar y cycl es at

215. 5' and 219. 2' , r espect i vel y. Ther e i s no emer gency spi l l way, t he pr i mar y spi l l way i s desi gned t o handl e a 100, 000 year f l ood wi t h no over t oppi ng of t he dam embankment . Wi t h t he pr oposed st or age capaci t y and hei ght , t he dam i s c l assi f i ed as an i nt er medi at e s i ze dam, accor di ng t o Tabl e 5- 1 of AR 420- 1.

1. 2. 2 Location

Semmes Lake Dam i s l ocat ed on For t Jackson i n Col umbi a, Sout h Car ol i na.

The dam and r eser voi r ar e owned and oper at ed by For t Jackson. Semmes Lake Dam i s l ocat ed at t he west er n s i de of t he Ft Jackson r eser vat i on wi t h an appr oxi mat e Lat i t ude of 34. 005° N, Longi t ude 80. 942 W ( NAVD88) .

1. 2. 3 History

A. The or i gi nal Semmes Dam was compl et ed i n 1940. The ear t hen embankment dam was 970 f eet l ong wi t h a st r uct ur al hei ght of 27 f eet and t op wi dt h of 48- f eet . The t op of dam el evat i on var i ed bet ween 220. 7 f eet and 222. 0 f eet NAVD88. The dam cr est consi st ed of t he t wo- l ane paved Semmes Road and concr et e s i dewal k.

B. Semmes Lake Dam was br eached dur i ng a maj or f l oodi ng event i n Oct ober 2015. A br each measur i ng 130 f eet wi de and over 20 f eet i n hei ght was cr eat ed dr ai ni ng Semmes Lake.

SECTI ON 01 11 00 Page 2

* * * AMENDMENT 0001* * *

1. 2. 4 Or der of Wor k

* * * AMENDMENT 0002* * *

Unl ess ot her wi se di r ect ed by t he Cont r act i ng Of f i cer or hi s/ her desi gnat ed r epr esent at i ve t he or der of wor k shal l be as f ol l ows:

1. Const r uct al l r equi r ed Er osi on and Sedi ment cont r ol measur es;

2. Const r uct new r ei nf or ced concr et e spi l l way i nc l udi ng f oundat i on pr epar at i on and anchor i ng, f oundat i on under dr ai n syst em, r ei nf or ced concr et e l abyr i nt h wei r , spi l l way t r ai ni ng wal l s and sl ab, and st i l l i ng basi n;

3. Const r uct i on of cof f er dams and sequenci ng wor k f or st r eam diversion

4. I nst al l i ng dewat er i ng syst em;

5. Reconst r uct new ear t hf i l l dam wi t h sand chi mney dr ai n and sand bl anket dr ai n;

6. I nst al l i ng a t oe dr ai n seepage col l ect i on syst em connect ed t o t he bl anket dr ai n i ncl udi ng f i l t er sand, dr ai n gr avel , dr ai n pi pes, c l eanout s and manhol es;

7. I nst al l i ng new i nst r ument at i on i ncl udi ng new pi ezomet er s i n dr i l l hol es, a r eser voi r st af f gage on t he spi l l way wal l , and new movement monument s;

8. I ni t i al r eser voi r f i l l i ng i nc l udi ng moni t or i ng and eval uat i ng t he per f or mance of t he dam and i t s f oundat i on as t he r eser voi r i s bei ng f i l l ed. I ni t i al r eser voi r f i l l i ng may begi n af t er compl et i on of embankment const r uct i on and pr i or t o const r uct i on of r oadway. See par agr aph I ni t i al Fi l l i ng Pl an of t hi s Sect i on.

98. Const r uct i ng new t wo l ane asphal t r oadway al ong t he ent i r e l engt h of t he new ear t h embankment wi t h guar dr ai l and pr ef abr i cat ed concr et e ar ch cul ver t t hat spans t he dei schar ge channel . Const r uct new concr et e s i dewal k and f enci ng al ong t he t op of t he new embankment .

* * * AMENDMENT 0002* * *

* * * AMENDMENT 0002* * *

I f t he Opt i onal Bi d I t ems ar e exer ci sed, t he Opt i onal Bi d I t ems must be const r uct ed af t er t he r econst r uct i on of t he new embankment dam. I f t he Opt i onal Bi d I t ems ar e exer ci sed, t he Opt i onal Bi d I t ems must be i ncor por at ed i nt o t he above Or der of Wor k by t he Cont r act or and appr oved by t he Cont r act i ng Of f i cer .

* * * AMENDMENT 0002* * *

* * * AMENDMENT 0001* * *

1. 3 Gover nment Occupancy

A. The Gover nment wi l l occupy t he pr emi ses f ul l t i me dur i ng t he per i od of const r uct i on t o conduct nor mal oper at i ons.

B. Cooper at e wi t h t he Gover nment t o mi ni mi ze conf l i c t s, and t o f aci l i t at e Gover nment ' s oper at i ons. Text

* * * AMENDMENT 0001* * *

1. 4 Or der of Wor k

Text

SECTI ON 01 11 00 Page 3

* * * AMENDMENT 0001* * *

1. 4 EXI STI NG WORK

I n addi t i on t o " FAR 52. 236- 9, Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s" :

a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.

b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.

1. 5 LOCATI ON OF UNDERGROUND UTI LI TI ES

Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on, and compl y wi t h I nst al l at i on r equi r ement s f or l ocat i ng and mar ki ng under gr ound ut i l i t i es.

Ver i f y exi st i ng ut i l i t y l ocat i ons i ndi cat ed on cont r act dr awi ngs, wi t hi n ar ea of wor k.

Ver i f y el evat i ons bef or e i nst al l i ng new wor k c l oser t han near est manhol e or ot her st r uct ur e at whi ch an adj ust ment i n gr ade can be made.

1. 5. 1 Not i f i cat i on Pr i or t o Excavat i on

Not i f y t he Cont r act i ng Of f i cer at l east 15 days pr i or t o st ar t i ng excavat i on wor k.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

* * * AMENDMENT 0001* * *

Not used.

3. 1 I NI TI AL RESERVOI R FI LLI NG

3. 1. 1 Implementation

When t he r eser voi r f i l l i ng begi ns, t he Cont r act or wi l l gi ve t he appr oval t o r est r i c t t he out l et wor ks t o meet t he mi ni mum r equi r ed 5 cf s di schar ge.

Reser voi r f i l l i ng wi l l be per f or med by t he t he Cont r act or and US Ar my Cor ps of Engi neer s Const r uct i on of f i ce st af f wi t h gui dance f r om Engi neer i ng st af f . St af f f r om geot echni cal and st r uct ur al di sc i pl i nes wi l l moni t or t he dam behavi or and pr ovi de i nput t o t he Cont r act i ng Of f i cer .

Bef or e Fi l l i ng begi ns, t he Cont r act or needs t o conf i r m t hat :

a. I ni t i al I nspect i on has been compl et ed sat i sf act or i l y and t hat any i ssues have been r esol ved.

b. Access r oads l eadi ng t o t he r eser voi r pool have been bar r i caded.

c. Reser voi r c l ear i ng has been compl et ed.

d. Cor por at e Communi cat i ons has pr ovi ded necessar y not i f i cat i ons t o

SECTI ON 01 11 00 Page 4 t he Cont r act i ng Of f i cer .

e. The Gover nment has pr ovi ded necessar y not i f i cat i ons t o t he publ i c, st akehol der s and st at e and l ocal gover nment agenci es.

The Cont r act or wi l l not i f y t he Cont r act i ng Of f i cer at l east 10 days i n advance of c l osur e.

The Cont r act or and USACE engi neer s wi l l super vi se t he i ni t i al f i l l i ng, moni t or t he i nst r ument at i on and pr ovi de t echni cal deci s i ons t o oper at e t he Dam. Techni cal deci s i ons wi l l be communi cat ed t o t he USACE Char l est on Resi dent Engi neer on a weekl y basi s or i f unexpect ed behavi or of t he Dam occur s.

3. 1. 2 Reser voi r Fi l l i ng

The met hod of f i l l i ng t he r eser voi r i s usi ng pr eci pi t at i on ( obser ved) .

Thi s pr ocess depends f ul l y on met eor ol ogi cal i nf l uence and seasonal t r ansi t i ons, i n whi ch i t coul d t ake a f ew mont hs t o f i l l t he r eser voi r .

The r eser voi r i s nor t h of t he Dam Embankment wi t h a nor mal pool capaci t y of 120 acr e- f eet , and t he maxi mum capaci t y i s 490 acr e- f eet .

3. 1. 3 Pr ef er r ed Fi l l i ng Rat e

The pr ef er r ed f i l l i ng r at e wi l l be cont r ol l ed by moni t or i ng t he r i se i n pool el evat i on t o r egul at e t he downst r eam di schar ge. Thi s wi l l pr ovi de a s l ow f i l l i ng of t he r eser voi r and an oppor t uni t y t o moni t or and eval uat e i nst r ument at i on dur i ng t he s l owl y i ncr eased r eser voi r l oadi ng. St or m event s wi l l be ant i c i pat ed and i mpoundment l evel s moder at ed ( as much as possi bl e) , wi t h t he out l et wor ks t o assur e t he i ni t i al f i l l i ng r at e occur s expedi t i ousl y and saf el y.

* * * AMENDMENT 0003* * *

The r at e of f i l l i ng of Semmes Lake shal l not exceed one- f oot per day of el evat i on on t he ear t h embankment .

* * * AMENDMENT 0003* * *

* * * AMENDMENT 0001* * *

- - End of Sect i on - -

SECTI ON 01 11 00 Page 5 ( Revi sed by Amendment 0003)

K7EPEOAF

Highlight

K7EPEOAF

Highlight

SECTI ON TABLE OF CONTENTS

DI VI SI ON 31 - EARTHWORK

SECTI ON 31 00 00

EARTHWORK

08/08

PART 1 GENERAL

1. 1 SECTI ON I NCLUDES

1. 1. 1 St r i ppi ng and St ockpi l i ng Topsoi l

1. 1. 2 Excavat i on

1. 1. 3 Dewat er i ng

1. 1. 4 Ear t hwor k

1. 2 WORK NOT I NCLUDED I N THI S SECTI ON

1. 3 REFERENCES

1. 4 DEFI NI TI ONS

1. 4. 1 Sat i sf act or y Mat er i al s

1. 4. 1. 1 Embankment

1. 4. 1. 2 Embankment Fi l l

1. 4. 2 Unsat i sf act or y Mat er i al s

1. 4. 3 Degr ee of Compact i on

1. 4. 4 Har d/ Unyi el di ng Mat er i al s

1. 4. 5 Rock

1. 4. 6 Unst abl e Mat er i al

1. 4. 7 I ni t i al Backf i l l Mat er i al f or Ut i l i t y Tr enches

1. 4. 8 Maxi mum Dr y Densi t y

1. 4. 9 St r i ppi ng

1. 5 SYSTEM DESCRI PTI ON

1. 5. 1 Haul Roads

1. 5. 2 St ockpi l i ng f r om Appr oved Bor r ow Sour ces

1. 5. 3 Cl assi f i cat i on of Excavat i on

1. 5. 4 Bl ast i ng

1. 6 SUBMI TTALS

PART 2 PRODUCTS

2. 1 Gener al

2. 2 REQUI REMENTS FOR OFFSI TE SOI LS CHEMI CAL TESTI NG

2. 3 EMBANKMENT FI LL

2. 4 FI LTER SAND

2. 5 DRAI N GRAVEL

2. 6 AGGREGATE BASE COURSE

2. 7 TOPSOI L

2. 8 COMPACTI ON EQUI PMENT

2. 9 DEWATERI NG SYSTEM

2. 9. 1 GENERAL

2. 9. 2 OBSERVATI ON WELLS

2. 10 BURI ED WARNI NG AND I DENTI FI CATI ON TAPE FOR UTI LI TY TRENCHES

2. 10. 1 War ni ng Tape f or Met al l i c Pi pi ng

2. 10. 2 Det ect abl e War ni ng Tape f or Non- Met al l i c Pi pi ng

2. 11 DETECTI ON WI RE FOR NON- METALLI C PI PI NG I N UTI LI TY TRENCHES

2. 12 MATERI AL FOR RI P- RAP

SECTI ON 31 00 00 Page 1

PART 3 EXECUTI ON

3. 1 GENERAL EXCAVATI ON

3. 1. 1 Exi st i ng Embankment s and Foundat i on Excavat i ons

3. 1. 1. 1 Gener al Excavat i on Requi r ement s

3. 1. 1. 2 Di sposal of Excavat ed Mat er i al

3. 1. 1. 3 Excavat ed Mat er i al Sui t abl e f or Fi l l

3. 1. 1. 4 Pr epar at i on of Foundat i on and Par t i al Fi l l Sur f aces

3. 1. 2 Foundat i on I nspect i on

3. 1. 2. 1 Foundat i on Condi t i on Eval uat i on

3. 1. 3 Excavat i on and Foundat i on Mappi ng

3. 1. 4 Di t ches, Gut t er s, and Channel Changes

3. 1. 5 Dr ai nage St r uct ur es

3. 1. 6 Dr ai nage

3. 1. 7 Dewat er i ng

3. 1. 8 Dewat er i ng f or Dam Foundat i on and Concr et e St r uct ur es

3. 1. 8. 1 Gener al

3. 1. 8. 2 I nst al l at i on and Oper at i on

3. 1. 8. 3 Dewat er i ng Syst em Removal

3. 1. 9 Tr ench Excavat i on Requi r ement s

3. 1. 9. 1 Bot t om Pr epar at i on

3. 1. 9. 2 Removal of Unyi el di ng Mat er i al

3. 1. 9. 3 Removal of Unst abl e Mat er i al

3. 1. 9. 4 Excavat i on f or Appur t enances

3. 1. 10 Under gr ound Ut i l i t i es

3. 1. 11 St r uct ur al Excavat i on

3. 2 OPENI NG AND DRAI NAGE OF EXCAVATI ON

3. 3 ONSI TE BORROW AREAS

3. 4 SHORI NG

3. 4. 1 Gener al Requi r ement s

3. 5 GRADI NG AREAS

3. 6 STOCKPI LE AREAS

3. 7 FI NAL GRADE OF SURFACES TO SUPPORT CONCRETE

3. 8 GROUND SURFACE PREPARATI ON

3. 8. 1 Gener al Requi r ement s

3. 8. 2 Foundat i on / Subgr ade Compact i on

3. 8. 3 Fr ozen Mat er i al

3. 9 UTI LI ZATI ON OF EXCAVATED MATERI ALS

3. 10 BURI ED TAPE AND DETECTI ON WI RE

3. 10. 1 Bur i ed War ni ng and I dent i f i cat i on Tape

3. 10. 2 Bur i ed Det ect i on Wi r e

3. 11 BACKFI LLI NG AND COMPACTI ON FOR STRUCTURES

3. 11. 1 Tr ench Backf i l l

3. 11. 1. 1 Repl acement of Unyi el di ng Mat er i al

3. 11. 1. 2 Repl acement of Unst abl e Mat er i al

3. 11. 1. 3 Beddi ng and I ni t i al Backf i l l

3. 11. 1. 3. 1 Cl ass I

3. 11. 1. 3. 2 Cl ass I I

3. 11. 1. 3. 3 Sand

3. 11. 1. 3. 4 Gr avel and Cr ushed St one

3. 11. 1. 4 Fi nal Backf i l l

3. 11. 1. 4. 1 Roadways

3. 11. 1. 4. 2 Si dewal ks, Tur f ed or Seeded Ar eas and Mi scel l aneous

Areas

3. 11. 2 Backf i l l f or Appur t enances

3. 12 SPECI AL REQUI REMENTS

3. 12. 1 El ect r i cal Di st r i but i on Syst em

3. 12. 2 Ri p- Rap Const r uct i on

SECTI ON 31 00 00 Page 2

3. 12. 2. 1 Beddi ng Pl acement

3. 12. 2. 2 St one Pl acement

3. 13 EMBANKMENTS

3. 13. 1 Conduct of Wor k

3. 13. 2 Ear t h Embankment s

3. 13. 2. 1 Dam Embankment - Gener al

3. 13. 2. 2 COFFERDAM FI LL PLACEMENT I N I NUNDATED AREAS

3. 13. 2. 3 Dam Embankment - Subgr ade Pr epar at i on

3. 13. 2. 4 Dam Embankment - Fi l t er Sand and Dr ai n Gr avel Pl acement

3. 13. 2. 5 Dam Embankment - Pl aci ng Cor eand Shel l Embankment Fi l l

3. 13. 2. 6 Dam Embankment s - Tol er ances

3. 13. 2. 7 Base Aggr egat e Compact i on

3. 14 SUBGRADE PREPARATI ON

3. 14. 1 Compact i on

3. 14. 1. 1 Subgr ade f or Pavement s

3. 14. 1. 2 Subgr ade f or Shoul der s

3. 15 SHOULDER CONSTRUCTI ON

3. 16 FI NI SHI NG

3. 16. 1 Subgr ade and Embankment s

3. 16. 2 Gr adi ng Ar ound St r uct ur es

3. 17 Pl aci ng Topsoi l

3. 18 FI ELD QUALI TY CONTROL

3. 18. 1 Fi l l and Backf i l l Mat er i al Gr adat i on

3. 18. 2 I n- Pl ace Densi t i es

3. 18. 3 Moi st ur e Cont ent s Fr equency

3. 18. 4 Opt i mum Moi st ur e and Labor at or y Maxi mum Densi t y

3. 18. 5 Tol er ance Test s f or Subgr ades

3. 18. 6 Dam Embankment - Fi el d Qual i t y Cont r ol

3. 19 DI SPOSI TI ON OF SURPLUS MATERI AL

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 31 00 00 Page 3

SECTI ON 31 00 00

EARTHWORK

08/08

PART 1 GENERAL

1. 1 SECTI ON I NCLUDES

1. 1. 1 St r i ppi ng and St ockpi l i ng Topsoi l

A. Removi ng gr ass, weeds, and t opsoi l wi t hi n t he l i mi t s of s i t e di st ur bance as shown on t he Dr awi ngs.

B. St ockpi l i ng t opsoi l i n t he st agi ng and st ockpi l e ar eas shown on t he Dr awi ngs.

C. St ockpi l i ng t opsoi l i n t he bor r ow ar eas shown on t he Dr awi ngs.

1. 1. 2 Excavation

Requi r ed s i t e excavat i ons as shown on t he Dr awi ngs.

1. 1. 3 Dewatering

A. Desi gn, i nst al l , oper at e and mai nt ai n t he dewat er i ng syst em and al l i t s component s t o ef f ect i vel y cont r ol , col l ect , and di spose of gr oundwat er or sur f ace wat er t o per mi t saf e and pr oper compl et i on of t he Wor k. Use appr opr i at e equi pment and met hods f or dewat er i ng based on exi st i ng s i t e condi t i ons.

B. Pr ovi di ng obser vat i on wel l s t o ver i f y sat i sf act or y per f or mance of t he dewat er i ng syst em.

C. Mai nt ai ni ng t he f oundat i ons and ot her por t i ons of t he Wor k f r ee f r om wat er as r equi r ed f or const r uct i ng each par t of t he Wor k.

D. Compl yi ng wi t h al l appl i cabl e f eder al , st at e and l ocal envi r onment al pr ot ect i on l aws and r equi r ement s i n oper at i on of t he dewat er i ng syst em.

E. Removi ng al l component s of t he dewat er i ng syst em af t er i t i s no l onger r equi r ed.

1. 1. 4 Earthwork

Fur ni shi ng, pl aci ng, and compact i ng f i l l mat er i al s .

1. 2 WORK NOT I NCLUDED I N THI S SECTI ON

Wor k associ at ed wi t h c l ear i ng and gr ubbi ng shal l be per f or med i n accor dance wi t h Sect i on Sect i on 31 11 00 CLEARI NG AND GRUBBI NG.

1. 3 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

SECTI ON 31 00 00 Page 4

AMERI CAN WATER WORKS ASSOCI ATI ON ( AWWA)

AWWA C600 ( 2010) I nst al l at i on of Duct i l e- I r on Wat er Mai ns and Thei r Appur t enances

ASTM I NTERNATI ONAL ( ASTM)

ASTM D1140 ( 2014) Amount of Mat er i al i n Soi l s Fi ner t han t he No. 200 ( 75- mi cr omet er ) Si eve

ASTM D1556/ D1556M ( 2015; E 2016) Densi t y and Uni t Wei ght of Soi l i n Pl ace by Sand- Cone Met hod

ASTM D2216 ( 2010) Labor at or y Det er mi nat i on of Wat er ( Moi st ur e) Cont ent of Soi l and Rock by Mass

ASTM D2487 ( 2011) Soi l s f or Engi neer i ng Pur poses ( Uni f i ed Soi l Cl assi f i cat i on Syst em)

ASTM D4318 ( 2010; E 2014) Li qui d Li mi t , Pl ast i c Li mi t , and Pl ast i c i t y I ndex of Soi l s

ASTM D6913 ( Re 2009) Par t i c l e Si ze Di st r i but i on of Soi l s Usi ng Si eve Anal ysi s

ASTM D6938 ( 2015) I n- Pl ace Densi t y and Wat er Cont ent of Soi l and Soi l - Aggr egat e by Nucl ear Met hods ( Shal l ow Dept h)

ASTM D698 ( 2012; E 2014; E 2015) Labor at or y Compact i on Char act er i st i cs of Soi l Usi ng St andar d Ef f or t ( 12, 400 f t - l bf / cu. f t .

( 600 kN- m/ cu. m. ) )

* * * AMENDMENT 0001* * *

1. 4 DEFINITIONS

1. 4. 1 Sat i sf act or y Mat er i al s

1. 4. 1. 1 Embankment

The t er m " embankment " as used i n t hese speci f i cat i ons r ef er s t o t he ear t h f i l l por t i on of t he pr oj ect t hat i ncl udes t he r econst r uct ed por t i ons of Semmes Lake Dam and t he ear t hwor k associ at ed wi t h t he const r uct i on of t he spi l l ways and appur t enant f eat ur es, as i ndi cat ed i n t he pl ans.

1. 4. 1. 2 Embankment Fi l l

a. The soi l s f or use as embankment f i l l shal l be obt ai ned f r om t he exi st i ng embankment , t he on- s i t e Nor t her n Bor r ow Ar ea i ndi cat ed on t he pr oj ect pl ans or f r om ot her appr oved bor r ow sour ces. Based on avai l abl e i nf or mat i on, t her e i s a hi gh pr obabi l i t y t hat t he soi l s cont ai ned i n t he Nor t her n Bor r ow Ar ea wi l l gener al l y meet , or coul d be pr ocessed t o meet , t he c l assi f i cat i on descr i bed bel ow. I t i s t he r esponsi bi l i t y of t he cont r act or t o ver i f y, t est , pr ocess, and/ or separ at e t he sat i sf act or y mat er i al . These mat er i al s ar e sensi t i ve t o var i at i ons i n moi st ur e cont ent and wi l l hol d excess moi st ur e, maki ng t hem

SECTI ON 31 00 00 Page 5 di f f i cul t t o handl e and compact . As a r esul t , measur es shal l be t aken dur i ng pr ocessi ng, handl i ng, st or age, pl acement and compact i on t o account f or t hi s moi st ur e cont ent of t he mat er i al bei ng used.

* * * AMENDMENT 0003* * *

b. Core: Cl assi f i cat i on of soi l s shal l be i n accor dance wi t h ASTM D2487, St andar d Test Met hods f or Par t i c l e- Si ze Di st r i but i on of Soi l s Usi ng Si eve Anal ysi s. Cor e mat er i al s shal l be CL or SC wi t h a f i nes cont ent gr eat er t han 25%. The cor e must have a pl ast i c i t y i ndex ( PI ) of 8 or gr eat er based on Satisfactory mat er i al s ar e def i ned as GW, GP, GM, GC, SP, SW, SW- SM, SW- SC, SP- SM, SP- SC, SC, CH, and CL f or t he shel l ASTM D4318 St andar d Test Met hods f or Li qui d Li mi t , Pl ast i c Li mi t , and Pl ast i c i t y I ndex of Soi l s. Cor e mat er i al shal l not cont ai n par t i c l e s i zes gr eat er t han 3 i nches i n any di r ect i on. Gr avel cont ent ( par t i c l es gr eat er t han t he No. 4 s i eve) shal l not exceed 35% by wei ght . Cor e mat er i al shal l be f r ee f r om cont ami nat i on f r om hazar dous, t oxi c, or r adi ol ogi cal subst ances, t r ash, and debr i s of any k i nd. These mat er i al s ar e sensi t i ve t o var i at i ons i n moi st ur e cont ent and wi l l hol d excess moi st ur e, maki ng t hem di f f i cul t t o handl e and compact .

Speci al measur es shal l be t aken dur i ng pr ocessi ng, handl i ng, st or age, pl acement abd compact i on. , and CL and SC f or t he i mper vi ous cor e. The shel l mat er i al shoul d be a wel l gr aded bl end of mat er i al s, wi t h a maxi mum mat er i al s i ze of t hr ee i nches. Bot h t he c l ayey sand ( SC) and l ean c l ay ( CL) f or t he i mper vi ous cor e must have a pl ast i c i t y i ndex ( PI ) of 8 and gr eat er based on ASTM D4318, St andar d Test Met hods f or Li qui d Li mi t , Pl ast i c Li mi t , and Pl ast i c i t y I ndex of Soi l s. The cl ayey sand ( SC) mat er i al ut i l i zed f or t he i mper vi ous cor e must have a f i nes cont ent gr eat er t han 25%. Poor l y- gr aded sand ( SP) shal l be ut i l i zed f or t he chi mney, bl anket , and t oe dr ai n. These mat er i al s ar e sensi t i ve t o var i at i ons i n moi st ur e cont ent and wi l l hol d excess moi st ur e, maki ng t hem di f f i cul t t o handl e and compact . Speci al measur es shal l be t aken dur i ng pr ocessi ng, handl i ng, st or age, pl acement and compaction.

c. Shel l : Cl assi f i cat i on of soi l s shal l be i n accor dance wi t h ASTM D2487, St andar d Test Met hods f or Par t i c l e- Si ze Di st r i but i on of Soi l s Usi ng Si eve Anal ysi s. Shel l mat er i al s shal l be GW, GP, GM, GC, SP, SW, SW- SM, SW- SC, SP- SM, SP- SC, SC, CH, AND CL. The shel l mat er i al shal l be a wel l gr aded bl end of mat er i al s, wi t h a maxi mum par t i c l e s i ze of 3 i nches. Gr avel cont ent ( par t i c l es gr eat er t han t he No. 4 s i eve) shal l not exceed 35% by wei ght .

Shel l mat er i al shal l be f r ee f r om cont ami nat i on f r om hazar dous, t oxi c, or r adi ol ogi cal subst ances, t r ash, and debr i s of any k i nd.

c. Embankment f i l l shal l not cont ai n par t i c l e s i zes gr eat er t han 3 i nches i n any di r ect i on. Gr avel cont ent ( par t i c l es gr eat er t han t he No. 4 s i eve) shal l not exceed 35% by wei ght . Embankment Fi l l shal l be f r ee f r om cont ami nat i on f r om hazar dous, t oxi c, or r adi ol ogi cal subst ances, t r ash and debr i s of any k i nd.

d. Unsat i sf act or y mat er i al s ar e def i ned i n par agr aph UNSATI SFACTORY MATERI ALS FOR EMBANMENT FI LL below.

* * * AMENDMENT 0003* * *

e. Not e - r equi r ement s f or mat er i al s desi gnat ed as f i l t er sand

SECTI ON 31 00 00 Page 6 ( Revi sed by Amendment 0003)

K7EPEOAF

Highlight and dr ai n gr avel ar e i ncl uded i n Sect i on 35 42 35 FI LTER MATERI AL.

* * * AMENDMENT 0001* * *

1. 4. 2 Unsat i sf act or y Mat er i al s

Mat er i al s c l assi f i ed by ASTM D2487 as OL, OH, ML, MH, and Pt ar e consi der ed unsat i sf act or y f or t he ear t hen embankment . Cobbl es, debr i s, and veget at i ve mat t er ar e consi der ed unsat i sf act or y. Unsat i sf act or y mat er i al s al so i ncl ude man- made f i l l s , t r ash, r ef use, sedi ment , and mat er i al c l assi f i ed as sat i sf act or y whi ch cont ai ns mor e t han t he l i mi t i ng per cent ages of r oot s and ot her or gani c mat t er di scussed above and as det er mi ned by ASTM D2974.

Not i f y t he Cont r act i ng Of f i cer when encount er i ng any cont ami nat ed mat er i al s. Fi nal det er mi nat i on of compl i ance and use of unsat i sf act or y mat er i al s shal l be at t he di r ect i on of t he Cont r act i ng Of f i cer .

* * * AMENDMENT 0003* * *

1. 4. 3 Degr ee of Compact i on

Semmes Lake Dam ear t hen embankment f i l l shal l be compact ed t o 95% of t he l abor at or y maxi mum dr y densi t y f or t he out er shel l , i mper vi ous cor e. The chi mney, bl anket , and t oe dr ai n shal l be compact ed t o 9295% of t he l abor at or y maxi mum dr y densi t y. The l abor at or y maxi mum dr y densi t y shal l be det er mi ned i n accor dance wi t h ASTM D698, St andar d Test Met hods f or Labor at or y Compact i on Char act er i s t i cs of Soi l Usi ng St andar d Ef f or t f or t he shel l , i mper vi ous cor e, and f oundat i on. The l abor at or y maxi mum dr y densi t y shal l be det er mi ned i n accor dance wi t h ASTM D7382 f or t he chi mney, bl anket , and t oe dr ai ns. Suf f i c i ent t est i ng shal l be per f or med f or each t ype of mat er i al t o det er mi ne t he opt i mum moi st ur e and l abor at or y maxi mum densi t y val ues. Spr eadi ng or di sci ng may be r equi r ed t o dr y t he mat er i al suf f i c i ent l y so t hat pr oper compact i on i s achi eved. Compact i on shal l be accompl i shed by sheepsf oot r ol l er s, pneumat i c- t i r ed r ol l er s, st eel - wheel ed r ol l er s, v i br at or y compact or s, or ot her appr oved equi pment sui t abl e f or t he soi l t ype. The mi ni mum wei ght of t he r ol l er shal l not be l ess t han 3, 000 pounds per l i near f oot of dr um.

* * * AMENDMENT 0003* * *

1. 4. 4 Har d/ Unyi el di ng Mat er i al s

Har d/ Unyi el di ng mat er i al s compr i se weat her ed r ock, dense consol i dat ed deposi t s, or congl omer at e mat er i al s whi ch ar e not i ncl uded i n t he def i ni t i on of " r ock" wi t h st ones gr eat er t han 3 i nch i n any di mensi on or as def i ned by t he pi pe manuf act ur er , whi chever i s smal l er . These mat er i al s usual l y r equi r e t he use of heavy excavat i on equi pment , r i pper t eet h, or j ack hammer s f or r emoval .

1. 4. 5 Rock

Sol i d homogeneous i nt er l ocki ng cr yst al l i ne mat er i al wi t h f i r ml y cement ed, l ami nat ed, or f ol i at ed masses or congl omer at e deposi t s, nei t her of whi ch can be r emoved wi t hout syst emat i c dr i l l i ng and bl ast i ng, dr i l l i ng and t he use of expansi on j acks or f eat her wedges, or t he use of backhoe- mount ed pneumat i c hol e puncher s or r ock br eaker s; al so l ar ge boul der s, bur i ed masonr y, or concr et e ot her t han pavement exceedi ng 1/ 2 cubi c yar d i n vol ume.

1. 4. 6 Unst abl e Mat er i al

Unst abl e mat er i al s ar e t hose t hat ar e t oo wet t o pr oper l y suppor t t he

SECTI ON 31 00 00 Page 7 ( Revi sed by Amendment 0003)

K7EPEOAF

Highlight ut i l i t y pi pe, condui t , or appur t enant st r uct ur e.

1. 4. 7 I ni t i al Backf i l l Mat er i al f or Ut i l i t y Tr enches

I ni t i al backf i l l consi st s of sel ect gr anul ar mat er i al or sat i sf act or y mat er i al s f r ee f r om r ocks _3__ i nches or l ar ger i n any di mensi on or f r ee f r om r ocks of such s i ze as r ecommended by t he pi pe manuf act ur er , whi chever i s smal l er . When t he pi pe i s coat ed or wr apped f or cor r osi on pr ot ect i on, f r ee t he i ni t i al backf i l l mat er i al of st ones l ar ger t han _2_ i nches i n any di mensi on or as r ecommended by t he pi pe manuf act ur er , whi chever i s smal l er .

1. 4. 8 Maxi mum Dr y Densi t y

The maxi mum dr y densi t y i s expr essed as t he maxi mum dr y densi t y obt ai ned when t he soi l i s compact ed i n accor dance wi t h ASTM D698, abbr evi at ed as l abor at or y maxi mum dr y densi t y.

1. 4. 9 Stripping

St r i ppi ng consi st s of t he r emoval and sat i sf act or y di sposal of cr ops, weeds, gr ass, and ot her veget at i ve mat er i al s t o t he gr ound sur f ace and t opsoi l t o a dept h of at l east 4 i nches.

1. 5 SYSTEM DESCRI PTI ON

Subsur f ace soi l bor i ng l ogs f r om SPT bor i ngs ar e i n Appendi x A and l ab dat a ar e l ocat ed i n Appendi x B. These dat a r epr esent subsur f ace i nf or mat i on avai l abl e; however , var i at i ons may exi st i n t he subsur f ace bet ween bor i ng locations.

1. 5. 1 Haul Roads

Haul r oads shal l be l ocat ed wher e shown on t he pl ans. They shal l be desi gned t o mai nt ai n t he i nt ended t r af f i c , t o be f r ee dr ai ni ng and shal l be mai nt ai ned i n good condi t i on t hr oughout t he cont r act per i od. Wher e appl i cabl e, haul r oads wi t hi n t he ar ea of cont act bet ween t he embankment and i t s f oundat i on and abut ment s shal l be r emoved and t he ar ea shal l be t r eat ed as speci f i ed i n par agr aph DAM EMBANKMENT - SUBGRADE PREPARATI ON.

1. 5. 2 St ockpi l i ng f r om Appr oved Bor r ow Sour ces

When t he excavat i on f r om appr oved bor r ow sour ces pr ogr esses at a f ast er r at e t han pl acement i n t he f i l l i s bei ng accompl i shed, such excavat ed mat er i al shal l be st ockpi l ed at appr oved l ocat i ons adj acent t o t he wor k unt i l i t s use i s aut hor i zed. Tempor ar y st ockpi l e ar eas have been i dent i f i ed on t he dr awi ngs. No payment wi l l be made f or such st ockpi l i ng nor f or t he r el oadi ng and haul i ng of t hi s mat er i al t o i t s f i nal posi t i on i n t he embankment .

1. 5. 3 Cl assi f i cat i on of Excavat i on

No consi der at i on wi l l be gi ven t o t he nat ur e of t he mat er i al s, and al l excavat i on wi l l be desi gnat ed as uncl assi f i ed excavat i on.

1. 5. 4 Blasting

Bl ast i ng wi l l not be per mi t t ed.

SECTI ON 31 00 00 Page 8

1. 6 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Pr of essi onal Geot echni cal Engi neer ; G

The Cont r act or shal l hi r e a Pr of essi onal Geot echni cal Engi neer , l i censed i n Sout h Car ol i na, t o pr ovi de i nspect i on of excavat i ons and soi l / gr oundwat er condi t i ons t hr oughout const r uct i on. The Cont r act or shal l demonst r at e v i a a r esume and r ef er ences, as needed, t hat t he Geot echni cal Engi neer meet s t he qual i f i cat i ons r equi r ed her ei n. The Geot echni cal Engi neer shal l have a mi ni mum of 5 year s of exper i ence i n i nspect i on of dewat er i ng syst ems and obser vat i ons of ear t hwor k const r uct i on and at l east 5 pr oj ect s.

The Geot echni cal Engi neer i s r esponsi bl e f or per f or mi ng pr e- const r uct i on and per i odi c s i t e v i s i t s t hr oughout const r uct i on t o assess s i t e condi t i ons. The Geot echni cal Engi neer i s r esponsi bl e f or pr epar i ng and updat i ng t he excavat i on, sheet i ng, and dewat er i ng pl ans as const r uct i on pr ogr esses t o r ef l ect any changi ng condi t i ons and submi t an updat ed pl an i f necessar y.

Submi t a mont hl y wr i t t en r epor t , i nf or mi ng t he Cont r act or and Cont r act i ng Of f i cer of t he st at us of t he pl an and an account i ng of t he Cont r act or ' s adher ence t o t he pl an addr essi ng any pr esent or pot ent i al pr obl ems. The Cont r act i ng Of f i cer and t he USACE Lead Geot echni cal Engi neer or Lead Geot echni cal Engi neer ' s Repr esent at i ve r eser ve t he r i ght t o r equest and shal l be gr ant ed meet i ngs wi t h t he Geot echni cal Engi neer at any t i me t hr oughout t he cont r act dur at i on.

The Cont r act or shal l submi t t he qual i f i cat i ons and r esume f or t he Pr of essi onal Geot echni cal Engi neer , f or t he appr oval by t he Cont r act i ng Of f i cer , at t he t i me of t he NTP.

Shoring ; G

Submi t a det ai l ed shor i ng, sheet i ng and br aci ng pl an 30 days pr i or t o t he begi nni ng of i nst al l at i on of such f eat ur es or any excavat i on so suppor t ed, whi chever occur s f i r st . The pl an f or shor i ng, sheet i ng and br aci ng shal l be pr epar ed and cer t i f i ed by a Sout h Car ol i na l i censed pr of essi onal engi neer . I nc l ude i n t he pl an dr awi ngs and desi gn comput at i ons of t he pr oposed shor i ng, sheet i ng, and br aci ng, and document at i on, showi ng det ai l s of t he coor di nat i on and appr oval of shor i ng, sheet i ng, and br aci ng by t he appl i cabl e par t i es. Appr oval of t he det ai l ed pl an shal l be obt ai ned f r om t he Cont r act i ng Of f i cer pr i or t o st ar t i ng t he wor k.

I f necessar y, modi f y t he pl an as r equi r ed t o meet f i el d condi t i ons, and t he modi f i cat i ons shal l be appr oved pr i or t o use.

Dewat er i ng Wor k Pl an; G

Submi t a Dewat er i ng Pl an pr epar ed by a qual i f i ed dewat er i ng

SECTI ON 31 00 00 Page 9 speci al i s t , wi t h at l east 10 year s of exper i ence i n desi gn, i nst al l at i on, and oper at i on of dewat er i ng syst ems f or s i mi l ar pr oj ect s. The Dewat er i ng Pl an shal l be pr epar ed by a Pr of essi onal Engi neer r egi st er ed i n t he St at e of Sout h Car ol i na and shal l i ncl ude, at a mi ni mum, t he i t ems l i s t ed bel ow. The wor k pl an shal l det ai l how sur f ace and gr oundwat er wi l l be cont r ol l ed dur i ng const r uct i on and shal l be submi t t ed 30 cal endar days af t er NTP.

1. Qual i f i cat i ons of t he desi gn pr of essi onal ( s) r esponsi bl e f or desi gn and oper at i on of t he dewat er i ng syst em and saf et y i nspect i on pr ocedur es. The dewat er i ng pl ans and cal cul at i ons f or t he dewat er i ng syst em shal l be s i gned and seal ed by a r egi st er ed pr of essi onal engi neer l i censed i n t he St at e of Sout h Car ol i na.

2. Det ai l s r egar di ng t he ant i c i pat ed t ypes and l ocat i ons of var i ous dewat er i ng f aci l i t i es, pr oposed number and l ocat i ons of obser vat i on wel l s and desi gn cal cul at i ons ( i . e. ar ea of i nf l uence of dewat er i ng, dept h of dewat er i ng, pumpage r at es and st abi l i t y of syst em) r equi r ed t o subst ant i at e t he Dewat er i ng Pl an.

3. Super i nt endence pl an and schedul e, i ndi cat i ng who wi l l be r esponsi bl e f or moni t or i ng t he dewat er i ng syst em and t he pr oposed schedul e descr i bi ng when per sonnel wi l l be on s i t e t o obser ve and mai nt ai n t he syst em.

4. Pr oposed l ocat i ons, dept hs, and const r uct i on det ai l s of obser vat i on wel l s. Dat a f r om t hese wel l s shal l be used as appr opr i at e, al ong wi t h ot her avai l abl e i nf or mat i on, t o modi f y dewat er i ng r equi r ement s.

5. Coor di nat i on wi t h ot her wor k i ncl udi ng sequence of const r uct i on, schedul e, dewat er i ng and di ver si on met hods and oper at i ons, er osi on and sedi ment cont r ol measur es, equi pment , l ocat i on and el evat i on of pumps, pi pes, sumps, cont ai nment ber ms and any ot her f eat ur es pl anned f or use i n t he dewat er i ng pl an.

6. Cl ear r ecommendat i ons f or dewat er i ng.

7. Cont r act or shal l not pur chase, r ent , i nst al l or mobi l i ze t o t he s i t e any el ement s of t he dewat er i ng syst em bef or e appr oval of t he dewat er i ng submi t t al . Doi ng ot her wi se, t he Cont r act or does so at i t s own r i sk and wi l l not be due any addi t i onal compensat i on f r om t he Gover nment i f such el ement s ar e not subsequent l y appr oved or used f or t he wor k.

8. I nst al l at i on met hods; descr i pt i on and l ayout of t he onsi t e wat er det ent i on syst em; l ocat i on of t he pr oposed di schar ge poi nt ( s) , di schar ge r at es, and t he associ at ed wat er qual i t y moni t or i ng l ocat i ons;

and r e- wat er i ng pr ocedur es. The l ocat i on and t ype of t ur bi di t y cont r ol devi ces and met hods necessar y t o ensur e St at e Wat er Qual i t y wi l l be met .

9. An oper at i onal pl an, whi ch demonst r at es t hat t he di schar ge t o t he r ecei v i ng wat er body meet s al l appl i cabl e St at e Wat er Qual i t y st andar ds pr i or t o di schar ge, and al so cont ai ns t he pr oposed sampl i ng l ocat i ons and dai l y t ur bi di t y measur ement s.

10. Appr oval of t he dewat er i ng syst em pr oposed by t he Cont r act or wi l l onl y be wi t h r espect t o t he basi c pr i nci pl es of t he met hods t he Cont r act or i nt ends t o empl oy. Appr oval does not r el i eve t he Cont r act or of f ul l r esponsi bi l i t y f or adequacy ( e. g. ef f ect i ve oper at i on and mai nt enance) of t he dewat er i ng syst em.

Ear t hwor k Pl an; G, DO

The Ear t hwor k Pl an may be combi ned wi t h t he Excavat i on Pl an. The ear t hwor k pl an shal l be submi t t ed at l east 30 days i n advance of t he st ar t of ear t hwor k. The ear t hwor k const r uct i on pl an shal l be appr oved by t he Cont r act i ng Of f i cer pr i or t o any ear t hwor k

SECTI ON 31 00 00 Page 10 act i v i t i es. I nc l ude al l t he f ol l owi ng i n t he ear t hwor k const r uct i on pl an:

1. Pr oposed schedul e.

2. Pr oposed bor r ow sour ce( s) f or of f s i t e mat er i al s and pr oposed met hod( s) of sampl i ng on- si t e and of f s i t e sour ce( s) f or accept ance.

3. Pr oposed soi l excavat i on, t r anspor t , pr ocessi ng, sor t i ng/ scr eeni ng, pl acement , compact i on, and moi st ur e cont r ol equi pment , i ncl udi ng equi pment cat al og wi t h wei ght , di mensi ons, and oper at i ng dat a.

4. Pr oposed equi pment and met hods f or r emovi ng embankment mat er i al f r om r equi r ed excavat i ons.

5. Pr oposed equi pment and met hods f or r emovi ng f oundat i on mat er i al f r om r equi r ed excavat i ons.

6. Pr oposed pl an and sequenci ng f or excavat i on i nc l udi ng t he ext ent and quant i t y of excavat i on, and an excavat i on schedul e.

7. Pr oposed excavat i on, st ockpi l i ng, and st agi ng pl an descr i bi ng handl i ng and t r anspor t of on- si t e and of f - s i t e mat er i al s i ncl udi ng pr oposed haul r out es.

8. Pr oposed pl an t o obt ai n, convey, and st or e const r uct i on wat er , i ncl udi ng pr oposed wat er sour ce.

9. Pr oposed met hods f or pr ocessi ng i ncl udi ng means and met hods of moi st ur e condi t i oni ng i n advance of excavat i on and af t er pl acement .

Use of pot abl e wat er shal l be coor di nat ed wi t h t he I nst al l at i on' s ut i l i t y pr ovi der Pal met t o St at e Ut i l i t y Ser vi ce ( PSUS) .

10. Pr oposed met hod of pr ot ect i ng Wor k, t o i ncl ude t empor ar y dewat er i ng, dr ai nage, moi st ur e condi t i oni ng, and f r ost pr ot ect i on measures.

11. Pr oposed pl acement pl an f or f i l t er sand and ot her dr ai n mat er i al s t hat l i mi t s wast e of t hese mat er i al s. I ncl ude pr oposed equi pment , and met hods pr oposed f or t empor ar y st ockpi l i ng, haul i ng, spr eadi ng, pl aci ng, and compact i ng t he gr anul ar dr ai n mat er i al s.

SD- 03 Pr oduct Dat a

Ut i l i zat i on of Excavat ed Mat er i al s; G, Pr oper t i es of mat er i al s t o be used as f i l l ( al l Fi l l t ypes l i s t ed under PRODUCTS)

SD- 04 Sampl es

Sampl es Of On- Si t e Excavat ed Mat er i al s And Of f - Si t e Mat er i al s For Cont r act i ng Of f i cer ' s QA Test i ng and Appr oval .

For i mpor t ed mat er i al , submi t sampl es and l abor at or y t est r esul t s pr i or t o shi pment of t he mat er i al t o t he s i t e.

SD- 06 Test Repor t s

Testing

Wi t hi n 24 hour s of concl usi on of physi cal t est s, submi t el ect r oni c copy ( as PDF) of t est r esul t s, i ncl udi ng cal i br at i on cur ves and r esul t s of cal i br at i on t est s. I ncl ude t he quant i t y of f i l l pl aced, as wel l as t he r ecor ds of cor r ect i ve act i ons t aken.

Bor r ow and On- Si t e Test i ng

At l east 30 days pr i or t o del i ver y of of f - s i t e mat er i al or use of

SECTI ON 31 00 00 Page 11 onsi t e mat er i al , submi t gr adat i on and moi st ur e densi t y compact i on cur ve t est r epor t s f or al l i mpor t ed ear t hwor k mat er i al s, mat er i al f r om desi gnat ed bor r ow ar eas, and on- si t e excavat ed mat er i al s sui t abl e f or use as f i l l . Any t i me t he Cont r act or changes t he sour ce and/ or st ockpi l e f r om whi ch mat er i al s ar e obt ai ned, or shoul d pr oposed mat er i al not meet r equi r ement s, addi t i onal gr adat i on and moi st ur e densi t y compact i on cur ve t est r epor t s f or t hese new sour ces shal l be r equi r ed. I ncl ude cost s f or al l t est i ng i n t he bi d pr i ce f or t he appr opr i at e mat er i al . No addi t i onal compensat i on wi l l be al l owed f or t est i ng.

Wi t hi n 24 hour s of concl usi on of physi cal t est s, submi t f i ve ( 5) copi es of t est r esul t s, i ncl udi ng cal i br at i on cur ves and r esul t s of cal i br at i on t est s el ect r oni c copy ( as PDF) of t est r esul t s, i ncl udi ng cal i br at i on cur ves and r esul t s of cal i br at i on t est s.

Measur ement of Fi l l Mat er i al ; G, DO

Submi t a copy of t he r ecor ds of each compl i ance sur vey wi t hi n 48 hour s f ol l owi ng t he sur vey.

Fi el d Densi t y and Moi st ur e Cont ent Test i ng; G, DO

Submi t mont hl y t he f i el d and l abor at or y t est s r esul t s f or al l mat er i al s pl aced. Each t r ansmi t t al shal l i ncl ude a summar y of al l densi t y cor r el at i ons f or t he j ob neat l y pr epar ed on a summar y sheet i ncl udi ng at a mi ni mum:

a. Met er ser i al number and oper at or ' s i ni t i al s

b. St andar d count f or each t est

c. Descr i pt i on of mat er i al t ype, i ncl udi ng USCS cl assi f i cat i on and color

d. Pr obe dept h

e. Moi st ur e cont ent by each t est met hod and t he devi at i on f . Wet densi t y by each t est met hod and t he devi at i on

g. Det ai l ed t est l ocat i on

h. Dat e of l ast cal i br at i on of met er , i ncl udi ng cer t i f i cat i on i . Cor r espondi ng Labor at or y Densi t y Test s ( Max. Dr y Densi t y and Opt i mum Moi st ur e) j . Whet her t est passed or f ai l ed

SD- 07 Cer t i f i cat es

Testing

Cer t i f i ed t r uckl oad wei ght bi l l s : Pr ovi de t he or i gi nal cer t i f i ed t r uckl oad wei ght bi l l s at t he t i me of del i ver y f or al l mat er i al s del i ver ed t o t he s i t e.

Nucl ear Densi t y ; G, RO

Use nucl ear densi t y t est i ng equi pment i n accor dance wi t h ASTM D6938. I n addi t i on, t he f ol l owi ng condi t i on shal l appl y:

a. Pr i or t o usi ng t he nucl ear densi t y t est i ng equi pment on t he s i t e, submi t t o t he Cont r act i ng Of f i cer a cer t i f i cat i on t hat t he oper at or has compl et ed a t r ai ni ng cour se appr oved by t he nucl ear densi t y t est i ng equi pment manuf act ur er , t he most r ecent dat a sheet f r om t he manuf act ur er ' s cal i br at i on, and a copy of t he most r ecent

SECTI ON 31 00 00 Page 12 st at i st i cal check of t he st andar d count pr eci s i on.

b. The nucl ear densi t y t est i ng equi pment shal l be capabl e of ext endi ng a pr obe a mi ni mum of 12 i nches down i nt o a hol e.

C. The nucl ear t est i ng equi pment must be cal i br at ed wi t hi n t he past 6 mont hs of use on t he s i t e.

Sur vey of Rest or ed Embankment ; G, DO

Af t er pl acement of f i l l t o r equi r ed gr ades and pr i or t o pl acement of sod and ot her sur f ace t r eat ment , per f or m a t opogr aphi c sur vey of t he r est or ed embankment . Submi t t he t opogr aphi c sur vey ( dr awi ngs) f or appr oval by t he Gover nment pr i or t o r emoval of t he cof f er dam syst em.

Foundat i on I nspect i on Checkl i st ; G, RO

Submi t a Foundat i on I nspect i on Checkl i st not i f y i ng t he Gover nment t hat t he f oundat i on i s r eady f or i nspect i on. Appr oval of t hi s checkl i st by t he Cont r act i ng Of f i cer wi l l ser ve as not i f i cat i on f r om t he Cont r act or t hat t he f oundat i on i s r eady f or mappi ng and i nspect i on. Not i f y t he Cont r act i ng Of f i cer at l east seven ( 7) days bef or e f oundat i on c l eanup wi l l be compl et ed and r eady f or i nspect i on by t he Gover nment . The checkl i st shal l i ncl ude, but i s not l i mi t ed t o t he f ol l owi ng:

a. Excavat i on bot t om and si de s l opes ar e t o t he l i nes and gr ades i ndi cat ed on t he dr awi ngs.

b. Dewat er i ng syst em i s f ul l y i nst al l ed and oper at i onal and al l dewat er i ng r equi r ement s out l i ned i n t hese speci f i cat i ons ar e met .

Sur f aces of excavat i on bot t om and si de s l opes shal l be dr y and f r ee f r om st andi ng wat er , seepage, s l oughi ng, boi l s, upl i f t or heave. Gr oundwat er moni t or i ng v i a open pi pe pi ezomet er s shal l be ongoing.

c. Tempor ar y r amps cover i ng excavat ed s i de s l opes ar e r emoved such t hat t he excavat ed s i de s l opes can be document ed and mapped.

d. Equi pment f or f oundat i on excavat i on and mappi ng ar e on s i t e and pr ovi s i ons f or equi pment oper at i ng per sonnel have been coordinated.

PART 2 PRODUCTS

2. 1 General

The or i gi n of any f i l l mat er i al i n no way det er mi nes wher e i t may be used i n t he embankment . Mat er i al s f or embankment f i l l s shal l be secur ed f r om r equi r ed excavat i ons and f r om t he bor r ow ar eas i ndi cat ed. The i nt ent i on i s t o use t he most sui t abl e mat er i al s obt ai nabl e f r om t hese sour ces. Mat er i al t o be wast ed wi l l be speci f i cal l y desi gnat ed at t he t i me t he mat er i al i s excavat ed. Mat er i al s cont ai ni ng br ush, r oot s, sod or ot her per i shabl e mat er i al s wi l l not be consi der ed sui t abl e. The sui t abi l i t y of t he mat er i al s shal l be subj ect t o appr oval and t hei r di sposi t i on i n t he embankment wi l l be as di r ect ed. Excavat e i n t he bor r ow ar eas i n t he l ocat i on det er mi ned by t he Cont r act i ng Of f i cer , whenever such cont r ol i s necessar y t o obt ai n t he t ype of mat er i al r equi r ed f or t he embankment .

Mi x i ng of mat er i al s dur i ng t he excavat i ng pr ocess at t he bor r ow ar ea may be required.

SECTI ON 31 00 00 Page 13

2. 2 REQUI REMENTS FOR OFFSI TE SOI LS CHEMI CAL TESTI NG

Test of f s i t e soi l s br ought i n f or use as backf i l l f or Tot al Pet r ol eum Hydr ocar bons ( TPH) , Benzene, Tol uene, Et hyl Benzene, and Xyl ene ( BTEX) and f ul l Toxi c i t y Char act er i st i c Leachi ng Pr ocedur e ( TCLP) i ncl udi ng i gni t abi l i t y , cor r osi v i t y and r eact i v i t y. Backf i l l shal l cont ai n a maxi mum count not exceedi ng t he l egal t hr eshol d val ue ( e. g. 100) , i n par t s per mi l l i on ( ppm) of t ot al pet r ol eum hydr ocar bons ( TPH) and a maxi mum ppm not exceedi ng t he t hr eshol d val ue ( e. g. 10) of t he sum of Benzene, Tol uene, Et hyl Benzene, and Xyl ene ( BTEX) and shal l pass t he TCPL t est . Det er mi ne TPH concent r at i ons by usi ng EPA 600/ 4- 79/ 020 Met hod 418. 1. Det er mi ne BTEX concent r at i ons by usi ng EPA SW- 846. 3- 3 Met hod 5030/ 8020. Per f or m TCLP i n accor dance wi t h EPA SW- 846. 3- 3 Met hod 1311. Pr ovi de Bor r ow Si t e Test i ng f or TPH, BTEX and TCLP f r om a composi t e sampl e of mat er i al f r om t he bor r ow si t e, wi t h at l east one t est f r om each bor r ow si t e. Do not br i ng mat er i al onsi t e unt i l t est s have been appr oved by t he Cont r act i ng Of f i cer .

2. 3 EMBANKMENT FI LL

A. Mat er i al s f r om t he desi gnat ed bor r ow sour ce t hat meet or ar e pr ocessed t o meet t he r equi r ement s of par agr aph DEFI NI TI ONS, subpar agr aph " Embankment Fi l l . "

B. The quant i t i es of mat er i al s sui t abl e f or use i n const r uct i on of embankment s obt ai ned f r om t he r equi r ed excavat i ons and t he onsi t e bor r ow ar eas wi l l be dependent upon t he Cont r act or ' s oper at i ons. The Cont r act or shal l i ndependent l y det er mi ne avai l abi l i t y and sui t abi l i t y of of f s i t e bor r ow ar eas. Wi t hi n 120 days pr i or t o t he ant i c i pat ed use of any of f - s i t e bor r ow mat er i al , t he Cont r act or shal l submi t f or r evi ew and comment a r epor t of t he i nvest i gat i ons of t he of f - s i t e sour ce or combi nat i on of sour ces f r om whi ch mat er i al s ar e pr oposed t o be f ur ni shed. The or i gi n of any f i l l mat er i al i n no way det er mi nes wher e i t may be used i n t he embankment ; t he c l assi f i cat i on of t he mat er i al , r at her t han i t s or i gi n, shal l det er mi ne i t s pl acement i n t he embankment . The Cont r act or shal l be r esponsi bl e f or sel ect i ng sui t abl e mat er i al s f r om t hose avai l abl e, and pr ocessi ng t hem as necassar y t o pr ovi de mat er i al s f or embankment whi ch wi l l meet t he speci f i ed r equi r ement s. The sui t abi l i t y of al l mat er i al s and t hei r di sposi t i on i n t he embankment shal l be subj ect t o t he appr oval of t he Cont r act i ng Of f i cer . Mat er i al s cont ai ni ng br ush, r oot s, sod or ot her or gani c mat er i al wi l l not be consi der ed sui t abl e. Mi x i ng of mat er i al s dur i ng t he excavat i ng pr ocess may be r equi r ed. No mi xi ng of mat er i al s shal l be per f or med on embankment f i l l .

C. Fi l l mat er i al s shal l be t est ed by t he Cont r act or and appr oved by t he COR bef or e use.

D. A l i s t of r…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.