Amendment_Drawings.pdf
PDF 6 MB Posted
- Solicitation number
- W912HP-16-R-0008
About this file
Amended Drawings
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C L
O U
T E
R
E E
K
P
IN
E F
IE
D
IV
E
W.E.
4.5
N O
R T
H
A R
L E
S T
O N
A C
H
C O
O P
IV
E R
HIGHWAY CELL
410 AC
E 2325000E 2317000 E 2318000 E 2319000 E 2320000 E 2321000 E 2322000 E 2323000 E 2324000 E 2326000 E 2327000
E 2327000E 2326000E 2325000E 2324000E 2321000 E 2322000 E 2323000E 2318000E 2317000 E 2319000 E 2320000
P.I . 15
+6
0+00
0+00
0+00
NUMBER
REFERENCE
SHEET
C H
A R
L E S T
O N S
O U
A
R O
L
IN
A
C O
R P S
F
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
IS
T R
IC
T
D a te
R e v
D ra w n b y
C k d b y
D e s ig n fi le n o
R e v ie w e d b y
S u b m it te d b y
D ra w in g o d e
D w g s c a le
P lo t d a te
F ile n a m e
M A
R K
D E S
C R
IP
T
IO
N A P P
R V
D A T E
D E S
C R
IP
T
IO
N M
A R
K A P P
R V
D A T E of Engineers US Army Corps
Charleston District
D e s ig n e d b y
1"
C-02
S A
G
R
W
H P R
B E
R K
E L E
Y
C
O U
N T
Y S
O U
R O
L
IN
A
CROSS DIKE B
P.I.
6+44
1600+00
1620+00
P.I. 1621+37
1630+00
1640+00
P.I. 1615+95
F
IL
B
IN
A C
H
300 300 6000
SCALE IN FEET
N
I-526 BRIDGE
OVERHEAD POWERLINE
I-526 BRIDGE
I-526 BRIDGE
J R J
S C
O
G L A S S
CROSS DIKE A
CROSS DIKE B
50+
55+
60+
65+00
70+00
75+00
80+00
85+00
90+00
295+00
300+00
305+00
310+00
315+00
320+00
325+00
0 2
SOUTH CELL
R
J U
N
I-5
P E
R
IM
E T
E R D
IK
E
C R
O S
S D
IK
E
P E
R
IM
E T
E R D
IK
E
C R
O S
S D
IK
E
40" STEEL WATER MAIN
SHEET 2 OF 22
STA. 57+57
CENTERLINE
4 X 4 SPILLWAY
STA. 84+75
CENTERLINE
4 X 4 SPILLWAY
STA. 295+67
CENTERLINE
4 X 4 SPILLWAY
STA. 303+26
CENTERLINE
4 X 4 SPILLWAY
STA. 322+92
CENTERLINE
4 X 4 SPILLWAY
STA. 274+74
CENTERLINE
4 X 4 SPILLWAYSTA. 286+27
CENTERLINE
4 X 4 SPILLWAY
STA. 111+58
CENTERLINE
4 X 4 SPILLWAY
A
IG
H W
A Y
C
E L L
R
E P
A
IR
M
ID
D
L L
D
IK
N S T R
U C
T
IO
N
F Y
C
L O
U T
E
K
P O
S A L
A
R E
A
E X
IS
T
G
U
R V E
Y
M
ID
D
L L
M J C
M J C
MIDDLE CELL
CENTERLINE STA. 48+13
DREDGE PIPE RAMP
CENTERLINE STA. 95+61
DREDGE PIPE RAMP
2319766.68, 380355.79XY=
2320207.31, 385018.42XY=
2324282.23, 384317.03XY=
P E
R
IM
E T E
R D
IK
E C
R O
S S D
IK
E
+9
5 = 0+
PERI
METE
R
DI
KE =
C
ROSS
D
IKE
2323228.34, 380764.63XY=
16 16
16 16
18 18
0 2
AMENDMENT
W H
P R
E V a .d g n a
S A
G
COORDINATE SYSTEM, NAD83 (NSRS2007).
ON THE SOUTH CAROLINA STATE PLANE
ALL HORIZONTAL COORDINATES ARE BASED2.
SITE CONDITIONS ONLY.
DRAWING IS TO BE USED FOR GENERAL
FEET BASED ON APRIL 2016 LIDAR. THIS
ALL ELEVATIONS ARE NAVD88 INTERNATIONAL1.
NOTES:
J U
N
C O
N T
O U
R S
N O
T
D A T a
LEGEND
DIKE CENTERLINE
E 2325000E 2319000 E 2320000 E 2321000 E 2322000 E 2323000 E 2324000 E 2326000 E 2327000 E 2328000
E 2325000E 2319000 E 2320000 E 2321000 E 2322000 E 2323000 E 2324000 E 2326000 E 2327000 E 2328000
CROSS DIKE B
CR
OS
S
D
IKE
C
I-526 BRIDGE
I-526 BRIDGE
I-526 BRIDGE
OVERHEAD POWERLINE
NORTH CELL
HIGHWAY CELL
C O
O P
E R
MIDDLE CELL
1660+00
P.I. 1664+72
300 300 6000
SCALE IN FEET
N
20 20
22 22 a
C O
N T
O U
R S
N O
T
D A T
J U
N
S A
G
NUMBER
REFERENCE
SHEET
C H
A R
L E S T
O N S
O U
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
D a te
R e v
D ra w n b y
C k d b y
D e s ig n fi le n o
R e v ie w e d b y
S u b m it te d b y
D ra w d e
D w g s c a le
P lo t d a te
F ile n a m e
M A
R K
D E S
C R
IP
T
IO
N A P P
R V
D A T E
D E S
C R
IP
T
IO
N M
A R
K A P P
R V
D A T E of Engineers US Army Corps
Charleston District
D e s ig n e d b y
C-03
M J C
M J
R
S A
G
R
W
H P R
J R J
S C
O
G L A S S
AMENDMENT
SHEET 3 OF 22
A
H W
A Y
C
E L L
R
E P
A
IR
M
ID
D
L L
D
N S T R
U C
T
IO
N
F Y
C
L O
U T
E
P O
S A L
A
R E
A
E X
IS
T
R V E
Y
H
IG
H W
A Y
C
E L L
B E
R K
E L E
Y
C
O U
N T
Y S
O U
R O
L
IN
A
W H
P R
E V a .d g n
J U
N a a
THAT TIME.
IN APRIL 2015. IT HAS BEEN DEWATERING SINCE
THE HIGHWAY CELL WAS LAST USED FOR DREDGING3.
SYSTEM, NAD83 (NSRS2007).
THE SOUTH CAROLINA STATE PLANE COORDINATE
ALL HORIZONTAL COORDINATES ARE BASED ON2.
TO BE USED FOR GENERAL SITE CONDITIONS ONLY.
BASED ON APRIL 2016 LIDAR. THIS DRAWING IS
ALL ELEVATIONS ARE NAVD88 INTERNATIONAL FEET1.
NOTES:
0+
105+00
115+00
0+00
125+00
130+00
135+00
145+00
+0
5+
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+00
265+00
270+00
275+00
1+
P
IP
E R
A M P
3+
0+
+7
+0
P
IP
M P
INV. OUT = 3.0’
INV. IN = 7.0’
TOP RISER = 22.4’
220’ - 30" HDPE
SPILLWAY STA. 127+58
INV. OUT = 2.0’
INV. IN = 5.0’
TOP RISER = 20.4’
220’ - 30" HDPE
SPILLWAY STA. 249+04
INV. OUT = 1.6’
INV. IN = 5.0’
TOP RISER = 20.1’
220’ - 30" HDPE
SPILLWAY STA. 274+74
INV. OUT = 2.0’
INV. IN = 5.0’
TOP RISER = 20.3’
220’ - 30" HDPE
SPILLWAY STA. 286+27
INV. OUT = 1.5’
INV. IN = 7.0’
TOP RISER = 22.3’
220’ - 30" HDPE
SPILLWAY STA. 111+58
LEGEND
DIKE CENTERLINE
O U
T
E E
K
P
IN
E F
IE
IV
E
W.E.
4.5
N O
R
A R
L E
S T
A C
H
C O
O P
E R
HIGHWAY CELL
410 AC
E 2317000 E 2318000 E 2319000 E 2320000 E 2321000 E 2322000 E 2323000 E 2324000 E 2326000 E 2327000
E 2327000E 2326000E 2324000E 2321000 E 2322000 E 2323000E 2318000E 2317000 E 2319000 E 2320000
P.I . 15
+6
0+00
0+00
0+00
NUMBER
REFERENCE
SHEET
C H
A R
L E S T
O N S
O U
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
D a te
R e v
D ra w n b y
C k d b y
D e s ig n fi le n o
R e v ie w e d b y
S u b m it te d b y
D ra w d e
D w g s c a le
P lo t d a te
F ile n a m e
M A
R K
D E S
C R
IP
T
IO
N A P P
R V
D A T E
D E S
C R
IP
T
IO
N M
A R
K A P P
R V
D A T E of Engineers US Army Corps
Charleston District
D e s ig n e d b y
C-04
S A
G
R
W
H P R
B E
R K
E L E
Y
C
O U
N T
Y S
O U
R O
L
IN
A
P.I.
6+44
1600+00
1620+00
P.I. 1621+37
1630+00
1640+00
P.I. 1615+95
F
IL
A C
H
300 300 6000
SCALE IN FEET
M
ID
D
W
Q U
IR
E M
E N
T S
I-526 BRIDGE
OVERHEAD POWERLINE
I-526 BRIDGE
J R J
S C
O
G L A S S
CROSS DIKE A
CROSS DIKE B
SOUTH CELL
R
J U
N
I-5
P E
R
IM
E T
E R D
IK
E
C R
O S
S D
IK
E
P E
R
IM
E T E
R D
IK
E
C R
O S S D
IK
E
SHEET 4 OF 22
CENTERLINE STA. 95+61
DREDGE PIPE RAMP
CENTERLINE STA. 48+13
DREDGE PIPE RAMP
0 5
0 1
0 2
0 2
+0
55+00
+0
65+00
70+00
75+00
80+00
85+00
90+00
+9
295+00
300+00
305+00
310+00
315+00
320+00
325+00
ON C-13
SEE CROSS SECTIONS
ON C-13
SEE CROSS SECTIONS
A
H W
A Y
C
E L L
R
E P
A
IR
M
ID
D
L L
D
N S T R
U C
T
IO
N
F Y
C
L O
U T
E
P O
S A L
A
R E
A M J C
M J C
BORROW LIMIT EL. 15.0
MIDDLE CELL
40" STEEL WATER MAIN
STA. 322+92
CENTERLINE
4 X 4 SPILLWAY
NEW
STA. 57+57
CENTERLINE
4 X 4 SPILLWAY
NEW
STA. 303+26
CENTERLINE
4 X 4 SPILLWAY
NEW
STA. 295+67
CENTERLINE
4 X 4 SPILLWAY
NEW
STA. 84+75
CENTERLINE
4 X 4 SPILLWAY
NEW
E 2325000
E 2325000
N
327+00 TO 330+00
PERIMETER DIKE
290+30 TO 327+00
PERIMETER DIKE
0+00 TO 41+54
CROSS DIKE
50+00 TO 97+71
PERIMETER DIKE
47+95 TO 50+00
PERIMETER DIKE
STATIONING
MIDDLE CELL WORK REQUIREMENTS
SEE CROSS SECTIONS ON C-09 & C-10
MIDDLE CELL WORK REQUIREMENTS
SEE WORK REQUIREMENTS IN TABLE
S
O
C T I O
M I D
D
Q U I R
E M
E N
T S
S
Q U I R
E M
E N
T S
I
B L
E
S
O
C T I O
M I D
D
Q U I R
E M
E N
T S
S
Q U I R
E M
E N
T S
B L
E
.0
T
E V
A T I O
N
.0
T
E V
A T I O
N
26.0’ TOP OF DIKE ELEVATION
TO EL. 26.0’
FROM EXISTING
205’ TRANSITION
TO EXISTING
FROM EL. 26.0’
300’ TRANSITION
OPTION 0017
OPTION 0017
OPTION 0018
OPTION 0019
OPTION 0019
GEOTEXTILE EL. 19.0’
300’ TRANSITION 26.0’ TO EXISTING
26.0’
26.0’
26.0’
205’ TRANSITION EXISTING TO 26.0’
REQUIRED TOP OF DIKE ELEVATION
15 15
18 18
SEE SPILLWAY REQUIREMENTS ON SHEETS C-14 AND C-15.9.
RAISING DIKE WHERE NO CROSS SECTIONS ARE SHOWN.
FOLLOW THE EXISTING CENTERLINE CURVATURE WHEN8.
AWARDED.
GEOTEXTILE SHALL BE PLACED IF OPTIONS ARE7.
NAD83 (NSRD2007)
SOUTH CAROLINA STATE PLANE COORDINATE SYSTEM,
ALL HORIZONTAL COORDINATES ARE BASED ON THE 6.
BASED ON APRIL 2016 LIDAR.
ALL ELEVATIONS ARE NAVD88 INTERNATIONAL FEET 5.
THE MARSH.
MARSH. NO FILL SHALL BE PLACED OR FLOW INTO
ORDER TO CONTROL SEDIMENT FROM ENTERING THE
EXTERIOR SLOPE OF THE DIKE CONSTRUCTION AREA IN
SILT FENCES SHALL BE USED ALONG THE OUTSIDE 4.
AND NOT BLOCKED INSIDE THE DISPOSAL AREA.
IS FORCED OUT OF THE DITCH TOWARD OUTLETS
BERM CONSTRUCTION IN SUCH MANNER THAT WATER
EXISTING PERIMETER DITCH SHALL BE FILLED FOR
CONSTRUCTION, IF NEEDED. WHERE RELOCATED, THE
BE RELOCATED TO THE INSIDE TO ALLOW FOR BERM
THE DURATION OF DIKE CONSTRUCTION OR SHALL
AREA SHALL REMAIN OPEN TO DRAIN THROUGHOUT
EXISTING PERIMETER DITCHES INSIDE THE DISPOSAL 3.
MATERIAL SHALL BE USED FROM THE PIPE RAMPS.
FROM BORROW AREAS TO THE DIKE SECTION. NO
PIPE RAMPS. THIS WILL REQUIRE HAULING OF FILL
ARE AT AN ELEVATION 15.0’ OR HIGHER, EXCLUDING
OF ALL AREAS INSIDE OF THE BERM THAT
THE BORROW AREA IN THE MIDDLE CELL CONSISTS 2.
AS SHOWN ON CROSS SECTION SHEETS.
THE PERIMETER OF THE SITE SHALL BE REPAIRED
OF THE WORK. THE DIKES AND BERMS AROUND
THIS SHEET INDICATES THE GENERAL REQUIREMENTS 1.
NOTES:
a
C O
N T
O U
R S
N O
T
D A T
J U
N
S A
G a a
AMENDMENT
H
P R
E V a .d g n
LEGEND
DIKE CENTERLINE
E 2319000 E 2320000 E 2321000 E 2322000 E 2323000 E 2324000 E 2326000 E 2327000 E 2328000
E 2319000 E 2320000 E 2321000 E 2322000 E 2323000 E 2324000 E 2326000 E 2327000 E 2328000
N
CROSS DIKE B
CR
OS
S
D
IKE
C
300 300 6000
SCALE IN FEET
I-526 BRIDGE
I-526 BRIDGE
I-526 BRIDGE
OVERHEAD POWERLINE
NORTH CELL
HIGHWAY CELL
C O
O P
E R
MIDDLE CELL
1660+00
P.I. 1664+72
NOTES:
275+00
270+00
265+00
0+0
0+0
CELL DIKE REPAIR.
BORROW MATERIAL FOR HIGHWAY
POTENTIAL LOCATION OF
7+0
E 2325000
E 2325000
450 AC
HIGHWAY CELL WORK REQUIREMENTS
S
O
C T I O
H I G
H W
Y
Q U I R
E M
E N
T S
S
Q U I E
M E
N T
S
B L
E
.0
T
E V
A T I O
N
287+50 TO 290+41
285+00 TO 287+50
247+00 TO 285+00
245+00 TO 247+00
241+00 TO 245+00
STATIONING
291’ TRANSITION 23.0’ TO 26.0’
250’ TRANSITION 20.0’ TO 23.0’
20.0’
200’ TRANSITION 22.0’ TO 20.0’
400’ TRANSITION EXISTING TO 22.0’
REQUIRED TOP OF DIKE ELEVATION
TO EL. 20.0’
FROM EL. 22.0’
200’ TRANSITION
TO EL. 22.0’
FROM EXISTING
400’ TRANSITION
EXISTING
FROM EL. 23.0’
291’ TRANSITION
TO EL. 23.0’
FROM EL. 22.0’
250’ TRANSITION
END EL.16.0’ LAYER AT STA. 288+50
END EL. 18.0’ LAYER AT STA. 287+50
CONTINUE EL. 16.0’ LAYER
CONTINUE EL. 18.0’ LAYER
CONTINUE EL. 16.0’ LAYER
START EL. 18.0’ LAYER AT STA. 245+00
CONTINUE EL. 16.0’ LAYER
START EL.16.0’ LAYER AT STA. 244+00
GEOTEXTILE
NUMBER
REFERENCE
SHEET
C H
A R
L E S T
O N S
O U
R O
L
IN
A
C O
R
E
N G
IN
E E
R S
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
D a te
R e v
D ra w n b y
C k d b y
D e s ig n fi le n o
R e v ie w e d b y
S u b m it te d b y
D ra w d e
D w g s c a le
P lo t d a te
F ile n a m e
M A
R K
D E S
C R
IP
T
IO
N A P P
R V
D A T E
D E S
C R
IP
T
IO
N M
A R
K A P P
R V
D A T E of Engineers US Army Corps
Charleston District
D e s ig n e d b y
C-05
M J C
M J
R
S A
G
R
W
H P R
J R J
S C
O
G L A S S
AMENDMENT
SHEET 5 OF 22
A
H W
A Y
C
E L L
R
E P
A
IR
M
ID
D
L L
D
N S T R
U C
T
IO
N
F Y
C
L O
U T
E
P O
S A L
A
R E
A
H
IG
H W
A Y
C
E
Q U
IR
E M
E N
T S
B E
R K
E L E
Y
C
O U
N T
Y S
O U
R O
L
IN
A
W H
P R
E V a .d g n
J U
N a
C O
N T
O U
R S
N O
T
D A T
J U
N
S A
G a a
BE REUSED.
MARSH. EXISTING SILT FENCE BETWEEN STA. 259+00 AND 272+00 MAY
FROM ENTERING THE MARSH. NO FILL SHALL BE PLACED IN THE
SLOPE OF THE DIKE REPAIR AREA IN ORDER TO CONTROL SEDIMENT
7. SILT FENCES SHALL BE USED ALONG THE OUTSIDE EXTERIOR
DISPOSAL AREA.
THE DITCH TOWARD OUTLETS AND NOT BLOCKED INSIDE THE
CONSTRUCTION IN SUCH MANNER THAT WATER IS FORCED OUT OF
EXISTING PERIMETER DITCH SHALL BE FILLED FOR BERM
FOR BERM CONSTRUCTION, IF NEEDED. WHERE RELOCATED, THE
CONSTRUCTION OR SHALL BE RELOCATED TO THE INSIDE TO ALLOW
REMAIN OPEN TO DRAIN THROUGHOUT THE DURATION OF DIKE
6. EXISTING PERIMETER DITCHES INSIDE THE DISPOSAL AREA SHALL
THE MIDDLE CELL.
APPROVED BY THE COR. ADDITIONAL FILL MAY BE TAKEN FROM INSIDE
UNDER WAY AND MATERIAL IS DEEMED ACCEPTABLE QUALITY AND IS
BORROW AREA IN NORTH CELL MAY BE USED IF DREDGING IS NOT
5. FILL FROM EXISTING DIKE AND BERM MAY BE USED AS NEW FILL.
SHALL BE REPAIRED AS SHOWN ON TYPICAL SECTION SHEET.
WORK. THE DIKES AND BERMS AROUND THE PERIMETER OF THE SITE
4. THIS SHEET INDICATES THE GENERAL REQUIREMENTS OF THE
& ASSOCIATES FIELD SURVEY IN JANUARY 2012.
3. HIGHWAY CELL SPILLWAY INFORMATION PROVIDED BY COX SURVEYORS
PLANE COORDINATE SYSTEM, NAD 83 (NSRS2007).
2. ALL COORDINATES ARE BASED ON THE SOUTH CAROLINA STATE
2016 LIDAR.
1. ALL ELEVATIONS ARE NAVD88 INTERNATIONAL FEET BASED ON APRIL
0+
105+00
115+00
0+00
125+00
130+00
135+00
145+00
+0
5+
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
+0
3+
0+
+0
+0
P
M P
INV. OUT = 3.0’
INV. IN = 7.0’
TOP RISER = 22.4’
220’ - 30" HDPE
SPILLWAY STA. 127+58
INV. OUT = 1.5’
INV. IN = 7.0’
TOP RISER = 22.3’
220’ - 30" HDPE
SPILLWAY STA. 111+58
P
IP
E R
A M P
LEGEND
DIKE CENTERLINE
INV. OUT = 2.0’
INV. IN = 5.0’
TOP RISER = 20.3’
220’ - 30" HDPE
SPILLWAY STA. 286+27
RESET WALKWAY
INV. OUT = 1.6’
INV. IN = 5.0’
TOP RISER = 20.1’
220’ - 30" HDPE
SPILLWAY STA. 274+74
RESET WALKWAY
INV. OUT = 2.0’
INV. IN = 5.0’
TOP RISER = 20.4’
220’ - 30" HDPE
SPILLWAY STA. 249+04
RESET WALKWAY
SCALE: 1"=20’
STA. 50+00
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 55+00
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 60+00
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 47+95 (= STA. 0+00 CROSS DIKE A)
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SHEET
REFERENCE
NUMBER
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
C O
R
E
N G
IN
E E
R S
C H
A R
L E S T
O N S
O U
R O
L
IN
A
D a te
R e v
D ra w n b y
C k d b y
D e s ig n fi le n o
R e v ie w e d b y
S u b m it te d b y
D ra w d e
D w g s c a le
P lo t d a te
F ile n a m e
M A
R K
D E S
C R
IP
T
IO
N A P P
R V
D A T E
D E S
C R
IP
T
IO
N M
A R
K A P P
R V
D A T E of Engineers US Army Corps
Charleston District
D e s ig n e d b y
C-06
SHEET 6 OF 22
R
W
H P R
S A
G
B E
R K
E L E
Y
C
O U
N T
Y S
O U
R O
L
IN
A
LEGEND
BORROW LIMIT
GEOTEXTILE (OPTION)
R
J U
N
A
H W
A Y
C
E L L
R
E P
A
IR
M
ID
D
L L
D
N S T R
U C
T
IO
N
F Y
C
L O
U T
E
P O
S A L
A
R E
A M J C
M J C
J R J
S C
O
G L A S S
P E
R
IM
E T
E
S T
A
T
O
C R
O S S
S E
C T
IO
D
L L
EXISTING PROFILE
MINIMUM REQUIRED PROFILE - FILL
OPTION IS AWARDED
REQUIRED TIE IN IF GEOTEXTILE
AMENDMENT
W H
P R
E V a .d g n a
J U
N
S A
G a
15’ AND 20’ UNLESS APPROVED BY THE COR.
THE DIKE AND THE PERIMETER DITCH BETWEEN ELEVATION
BORROW MATERIAL SHALL NOT BE TAKEN FROM BETWEEN10.
AND COMPACT ACCORDING TO SPECIFICATIONS.
EXISTING GROUND, CUTTING IS NOT REQUIRED. SPREAD
IN ANY PLACE WHERE THE REQUIRED PROFILE IS BELOW9.
WITHIN THE NEW PORTION OF THE DIKE AND BERM.
STA 47+95 TO 97+71 AND SHALL BE EVENLY SPACED
GEOTEXTILE OPTION, IF AWARDED, SHALL BE PLACED FROM 8.
THROUGHOUT CONSTRUCTION.
TO PROVIDE DRAINAGE FOR INTERIOR LATERAL DITCHES
NECESSARY TO ALLOW FOR BERM CONSTRUCTION AND
RELOCATE PERIMETER DITCH TO THE INSIDE AS 7.
DIKE WHERE NO CROSS SECTIONS ARE SHOWN.
FOLLOW THE EXISTING CENTERLINE CURVATURE WHEN RAISING6.
TO BERM GRADE PRIOR TO ADDITIONAL DIKE CONSTRUCTION.
FULL WIDTH OF DIKE AND BERM MUST BE CONSTRUCTED5.
STATIONS SHOWN.
BE EVENLY TRANSITIONED BETWEEN THE CROSS-SECTION
DIFFERENCES IN CENTERLINE OFFSET DISTANCES ARE TO4.
TO THE EXISTING DIKE CENTERLINE, IE. OFFSET "0".
THE HORIZONTAL REFERENCE IS A RELATIVE VALUE TIED 3.
NAD83 (NSRS2007).
SOUTH CAROLINA STATE PLANE COORDINATE SYSTEM,
ALL HORIZONTAL COORDINATES ARE BASED ON THE 2.
BASED ON APRIL 2016 LIDAR.
ALL ELEVATIONS ARE NAVD88 INTERNATIONAL FEET1.
NOTES:
a
SURVEY APRIL 2016 a
E X
IS
T
O F
IL
E C
R O
S S
S E
C T
IO
N S
L E
G E
N D
N O
T
D A T
-10
0 25 50 75 100 125 150 175 200-25-50-75-100
-10
-10
0 25 50 75 100 125 150 175 200-25-50-75-100
-10
0 25 50 75 100 125 150 175 200-25-50-75-100
N
A V
D
I
N
V E
R T I
C
S T
A N
-10
0 25 50 75 100 125 150 175 200-25-50-75-100
-10
40 40
N A
V D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
OUTSIDE DISPOSAL AREA
16’
NEW C
L
50’ BERM
INSIDE MIDDLE CELL
FILL
OFFSET
5’
EL. 26.0 (MIN)
TIE TO EXISTING SLOPE
MHW 5.6’
MHW 5.6’
MHW 5.6’
MHW 5.6’
OUTSIDE DISPOSAL AREA
NEW C
L
INSIDE MIDDLE CELL
FILL
OFFSET
EL. 26.0 (MIN)
TIE TO EXISTING SLOPE
OUTSIDE DISPOSAL AREA
INSIDE MIDDLE CELL
FILLTIE TO EXISTING SLOPE
OUTSIDE DISPOSAL AREA
INSIDE MIDDLE CELL
FILL
OFFSET
TIE TO EXISTING SLOPE
EL. 21.0 (MIN)
EL. 20.0 (MIN)
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
19.0’ EL.
94’ WIDTH
OPTION 0019
GEOTEXTILE
16’
EL. 21.0 (MIN)
50’ BERM
EL. 20.0 (MIN)
17’
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
13’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
13’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
19.0’ EL.
94’ WIDTH
OPTION 0019
GEOTEXTILE
19.0’ EL.
94’ WIDTH
OPTION 0019
GEOTEXTILE
19.0’ EL.
94’ WIDTH
OPTION 0019
GEOTEXTILE
STA. 70+00
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 75+00
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 80+00
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 65+00
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SHEET
REFERENCE
NUMBER
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
C O
R
E
N G
IN
E E
R S
C H
A R
L E S T
O N S
O U
R O
L
IN
A
D a te
R e v
D ra w n b y
C k d b y
D e s ig n fi le n o
R e v ie w e d b y
S u b m it te d b y
D ra w d e
D w g s c a le
P lo t d a te
F ile n a m e
M A
R K
D E S
C R
IP
T
IO
N A P P
R V
D A T E
D E S
C R
IP
T
IO
N M
A R
K A P P
R V
D A T E of Engineers US Army Corps
Charleston District
D e s ig n e d b y
C-07
R
W
H P R
S A
G
B E
R K
E L E
Y
C
O U
N T
Y S
O U
R O
L
IN
R
J U
N E
A
H W
A Y
C
E L L
R
E P
A
IR
M
ID
D
L L
D
N S T R
U C
T
IO
N
F Y
C
L O
U T
E
P O
S A L
A
R E
A M J C
M J C
J R J
S C
O
G L A S S
P E
R
IM
E T
E
S T
A
T
O
C R
O S S
S E
C T
IO
D
L L
SHEET 7 OF 22
AMENDMENT
a
W H
P R
E V a .d g n
15’ AND 20’ UNLESS APPROVED BY THE COR.
THE DIKE AND THE PERIMETER DITCH BETWEEN ELEVATION
BORROW MATERIAL SHALL NOT BE TAKEN FROM BETWEEN10.
AND COMPACT ACCORDING TO SPECIFICATIONS.
EXISTING GROUND, CUTTING IS NOT REQUIRED. SPREAD
IN ANY PLACE WHERE THE REQUIRED PROFILE IS BELOW9.
WITHIN THE NEW PORTION OF THE DIKE AND BERM.
STA 47+95 TO 97+71 AND SHALL BE EVENLY SPACED
GEOTEXTILE OPTION, IF AWARDED, SHALL BE PLACED FROM 8.
THROUGHOUT CONSTRUCTION.
TO PROVIDE DRAINAGE FOR INTERIOR LATERAL DITCHES
NECESSARY TO ALLOW FOR BERM CONSTRUCTION AND
RELOCATE PERIMETER DITCH TO THE INSIDE AS 7.
DIKE WHERE NO CROSS SECTIONS ARE SHOWN.
FOLLOW THE EXISTING CENTERLINE CURVATURE WHEN RAISING6.
TO BERM GRADE PRIOR TO ADDITIONAL DIKE CONSTRUCTION.
FULL WIDTH OF DIKE AND BERM MUST BE CONSTRUCTED5.
STATIONS SHOWN.
BE EVENLY TRANSITIONED BETWEEN THE CROSS-SECTION
DIFFERENCES IN CENTERLINE OFFSET DISTANCES ARE TO4.
TO THE EXISTING DIKE CENTERLINE, IE. OFFSET "0".
THE HORIZONTAL REFERENCE IS A RELATIVE VALUE TIED 3.
NAD83 (NSRS2007).
SOUTH CAROLINA STATE PLANE COORDINATE SYSTEM,
ALL HORIZONTAL COORDINATES ARE BASED ON THE 2.
BASED ON APRIL 2016 LIDAR.
ALL ELEVATIONS ARE NAVD88 INTERNATIONAL FEET1.
NOTES:
a
LEGEND
BORROW LIMIT
GEOTEXTILE (OPTION)
EXISTING PROFILE
MINIMUM REQUIRED PROFILE - FILL
OPTION IS AWARDED
REQUIRED TIE IN IF GEOTEXTILE
SURVEY APRIL 2016 a a
E X
IS
T
O F
IL
E C
R O
S S
S E
C T
IO
N S
L E
G E
N D
N O
T
D A T
J U
N
S A
G
-10
0 25 50 75 100 125 150 175 200-25-50-75-100
-10
-10
0 25 50 75 100 125 150 175 200-25-50-75-100
-10
0 25 50 75 100 125 150 175 200-25-50-75-100
0 25 50 75 100 125 150 175 200-25-50-75-100
N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
MHW 5.6’
MHW 5.6’
MHW 5.6’
OUTSIDE DISPOSAL AREA
INSIDE MIDDLE CELL
FILL
EL. 26.0 (MIN)
TIE TO EXISTING SLOPE
OUTSIDE DISPOSAL AREA
INSIDE MIDDLE CELL
FILL
TIE TO EXISTING SLOPE
OUTSIDE DISPOSAL AREA
INSIDE MIDDLE CELL
FILLTIE TO EXISTING SLOPE
OUTSIDE DISPOSAL AREA
INSIDE MIDDLE CELL
FILLTIE TO EXISTING SLOPE
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
13’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
25’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
16’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
19’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
19.0’ EL.
94’ WIDTH
OPTION 0019
GEOTEXTILE
19.0’ EL.
94’ WIDTH
OPTION 0019
GEOTEXTILE
19.0’ EL.
94’ WIDTH
OPTION 0019
GEOTEXTILE
19.0’ EL.
94’ WIDTH
STA. 85+00
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 90+00
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 95+00
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
SCALE: 1"=20’
STA. 97+71 (= STA. 0+00 CROSS DIKE B)
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SHEET
REFERENCE
NUMBER
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
C O
R
E
N G
IN
E E
R S
C H
A R
L E S T
O N S
O U
R O
L
IN
A
D a te
R e v
D ra w n b y
C k d b y
D e s ig n fi le n o
R e v ie w e d b y
S u b m it te d b y
D ra w d e
D w g s c a le
P lo t d a te
F ile n a m e
M A
R K
D E S
C R
IP
T
IO
N A P P
R V
D A T E
D E S
C R
IP
T
IO
N M
A R
K A P P
R V
D A T E of Engineers US Army Corps
Charleston District
D e s ig n e d b y
C-08
SHEET 8 OF 22
R
W
H P R
S A
G
B E
R K
E L E
Y
C
O U
N T
Y S
O U
R O
L
IN
R
J U
N E
A
H W
A Y
C
E L L
R
E P
A
IR
M
ID
D
L L
D
N S T R
U C
T
IO
N
F Y
C
L O
U T
E
P O
S A L
A
R E
A M J C
M J C
J R J
S C
O
G L A S S
P E
R
IM
E T
E
S T
A
T
O
C R
O S S
S E
C T
IO
D
L L
AMENDMENT
a
W H
P R
E V a .d g n
15’ AND 20’ UNLESS APPROVED BY THE COR.
THE DIKE AND THE PERIMETER DITCH BETWEEN ELEVATION
BORROW MATERIAL SHALL NOT BE TAKEN FROM BETWEEN10.
AND COMPACT ACCORDING TO SPECIFICATIONS.
EXISTING GROUND, CUTTING IS NOT REQUIRED. SPREAD
IN ANY PLACE WHERE THE REQUIRED PROFILE IS BELOW9.
WITHIN THE NEW PORTION OF THE DIKE AND BERM.
STA 47+95 TO 97+71 AND SHALL BE EVENLY SPACED
GEOTEXTILE OPTION, IF AWARDED, SHALL BE PLACED FROM 8.
THROUGHOUT CONSTRUCTION.
TO PROVIDE DRAINAGE FOR INTERIOR LATERAL DITCHES
NECESSARY TO ALLOW FOR BERM CONSTRUCTION AND
RELOCATE PERIMETER DITCH TO THE INSIDE AS 7.
DIKE WHERE NO CROSS SECTIONS ARE SHOWN.
FOLLOW THE EXISTING CENTERLINE CURVATURE WHEN RAISING6.
TO BERM GRADE PRIOR TO ADDITIONAL DIKE CONSTRUCTION.
FULL WIDTH OF DIKE AND BERM MUST BE CONSTRUCTED5.
STATIONS SHOWN.
BE EVENLY TRANSITIONED BETWEEN THE CROSS-SECTION
DIFFERENCES IN CENTERLINE OFFSET DISTANCES ARE TO4.
TO THE EXISTING DIKE CENTERLINE, IE. OFFSET "0".
THE HORIZONTAL REFERENCE IS A RELATIVE VALUE TIED 3.
NAD83 (NSRS2007).
SOUTH CAROLINA STATE PLANE COORDINATE SYSTEM,
ALL HORIZONTAL COORDINATES ARE BASED ON THE 2.
BASED ON APRIL 2016 LIDAR.
ALL ELEVATIONS ARE NAVD88 INTERNATIONAL FEET1.
NOTES:
a
LEGEND
BORROW LIMIT
GEOTEXTILE (OPTION)
EXISTING PROFILE
MINIMUM REQUIRED PROFILE - FILL
OPTION IS AWARDED
REQUIRED TIE IN IF GEOTEXTILE
SURVEY APRIL 2016 a a
E X
IS
T
O F
IL
E C
R O
S S
S E
C T
IO
N S
L E
G E
N D
N O
T
D A T
J U
N
S A
G
0 25 50 75 100 125 150 175 200-25-50-75-100
0 25 50 75 100 125 150 175 200-25-50-75-100
0 25 50 75 100 125 150 175 200-25-50-75-100
0 25 50 75 100 125 150 175 200-25-50-75-100
N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
0 0
OUTSIDE DISPOSAL AREA
INSIDE MIDDLE CELL
FILLTIE TO EXISTING SLOPE
OUTSIDE DISPOSAL AREA
INSIDE MIDDLE CELL
FILLTIE TO EXISTING SLOPE
OUTSIDE DISPOSAL AREA
INSIDE MIDDLE CELL
FILLTIE TO EXISTING SLOPE
INSIDE MIDDLE CELL
FILLTIE TO EXISTING SLOPE
INSIDE HIGHWAY CELL
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
22’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
19’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
13’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
5’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
19.0’ EL.
94’ WIDTH
OPTION 0019
GEOTEXTILE
19.0’ EL.
94’ WIDTH
OPTION 0019
GEOTEXTILE
19.0’ EL.
94’ WIDTH
OPTION 0019
GEOTEXTILE
19.0’ EL.
94’ WIDTH
STA. 5+00
CROSS DIKE B
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 10+00
CROSS DIKE B
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 15+00
CROSS DIKE B
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 20+00
CROSS DIKE B
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 0+00 (= STA. 97+71 PERIMETER DIKE)
CROSS DIKE B
MIDDLE CELL
HORIZONTAL DISTANCE
SHEET
REFERENCE
NUMBER
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
C O
R
E
N G
IN
E E
R S
C H
A R
L E S T
O N S
O U
R O
L
IN
A
D a te
R e v
D ra w n b y
C k d b y
D e s ig n fi le n o
R e v ie w e d b y
S u b m it te d b y
D ra w d e
D w g s c a le
P lo t d a te
F ile n a m e
M A
R K
D E S
C R
IP
T
IO
N A P P
R V
D A T E
D E S
C R
IP
T
IO
N M
A R
K A P P
R V
D A T E of Engineers US Army Corps
Charleston District
D e s ig n e d b y
C-09
SHEET 9 OF 22
R
W
H P R
S A
G
B E
R K
E L E
Y
C
O U
N T
Y S
O U
R O
L
IN
R
J U
N E
A
H W
A Y
C
E L L
R
E P
A
IR
M
ID
D
L L
D
N S T R
U C
T
IO
N
F Y
C
L O
U T
E
P O
S A L
A
R E
A M J C
M J C
J R J
S C
O
G L A S S
C R
O
T
A
T
O
C R
O S S
S E
C T
IO
D
L L
AMENDMENT
W H
P R
E V a .d g n a 15’ AND 20’ UNLESS APPROVED BY THE COR.
THE DIKE AND THE PERIMETER DITCH BETWEEN ELEVATION
BORROW MATERIAL SHALL NOT BE TAKEN FROM BETWEEN10.
AND COMPACT ACCORDING TO SPECIFICATIONS.
EXISTING GROUND, CUTTING IS NOT REQUIRED. SPREAD
IN ANY PLACE WHERE THE REQUIRED PROFILE IS BELOW9.
WITHIN THE NEW PORTION OF THE DIKE AND BERM.
STA 0+00 TO 41+53 AND SHALL BE EVENLY SPACED
GEOTEXTILE OPTION, IF AWARDED, SHALL BE PLACED FROM 8.
THROUGHOUT CONSTRUCTION.
TO PROVIDE DRAINAGE FOR INTERIOR LATERAL DITCHES
NECESSARY TO ALLOW FOR BERM CONSTRUCTION AND
RELOCATE PERIMETER DITCH TO THE INSIDE AS 7.
DIKE WHERE NO CROSS SECTIONS ARE SHOWN.
FOLLOW THE EXISTING CENTERLINE CURVATURE WHEN RAISING6.
TO BERM GRADE PRIOR TO ADDITIONAL DIKE CONSTRUCTION.
FULL WIDTH OF DIKE AND BERM MUST BE CONSTRUCTED5.
STATIONS SHOWN.
BE EVENLY TRANSITIONED BETWEEN THE CROSS-SECTION
DIFFERENCES IN CENTERLINE OFFSET DISTANCES ARE TO4.
TO THE EXISTING DIKE CENTERLINE, IE. OFFSET "0".
THE HORIZONTAL REFERENCE IS A RELATIVE VALUE TIED 3.
NAD83 (NSRS2007).
SOUTH CAROLINA STATE PLANE COORDINATE SYSTEM,
ALL HORIZONTAL COORDINATES ARE BASED ON THE 2.
BASED ON APRIL 2016 LIDAR.
ALL ELEVATIONS ARE NAVD88 INTERNATIONAL FEET1.
NOTES:
a
LEGEND
BORROW LIMIT
GEOTEXTILE (OPTION)
EXISTING PROFILE
MINIMUM REQUIRED PROFILE - FILL
OPTION IS AWARDED
REQUIRED TIE IN IF GEOTEXTILE
SURVEY APRIL 2016 a a
E X
IS
T
O F
IL
E C
R O
S S
S E
C T
IO
N S
L E
G E
N D
N O
T
D A T
J U
N
S A
G
0 25 50 75 100 125 150 175 200-25-50-75-100
0 25 50 75 100 125 150 175 200-25-50-75-100
0 25 50 75 100 125 150 175 200-25-50-75-100
0 25 50 75 100 125 150 175 200-25-50-75-100
0 25 50 75 100 125 150 175 200-25-50-75-100
40 40
40 40
40 40
N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
TIE TO EXISTING SLOPE
1 FILL
INSIDE MIDDLE CELLINSIDE HIGHWAY CELL
TIE TO EXISTING SLOPE 2
1 FILL
INSIDE MIDDLE CELLINSIDE HIGHWAY CELL
TIE TO EXISTING SLOPE
1 FILL
INSIDE MIDDLE CELLINSIDE HIGHWAY CELL
TIE TO EXISTING SLOPE 2
1 FILL
INSIDE MIDDLE CELLINSIDE HIGHWAY CELL
TIE TO EXISTING SLOPE
1 FILL
INSIDE MIDDLE CELLINSIDE HIGHWAY CELL
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
19.0’ EL.
88’ WIDTH
OPTION 0018
GEOTEXTILE
19.0’ EL.
88’ WIDTH
OPTION 0018
GEOTEXTILE
19.0’ EL.
88’ WIDTH
OPTION 0018
GEOTEXTILE
19.0’ EL.
88’ WIDTH
OPTION 0018
GEOTEXTILE
19.0’ EL.
88’ WIDTH
OPTION 0018
GEOTEXTILE
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
4’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
4’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
2’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
16’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
5’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
26’ BERM
26’ BERM
TIE TO EXISTING SLOPE
TIE TO EXISTING SLOPE
TIE TO EXISTING SLOPE
26’ BERM
26’ BERM
26’ BERM
TIE TO EXISTING SLOPE
STA. 25+00
CROSS DIKE B
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 30+00
CROSS DIKE B
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 35+00
CROSS DIKE B
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 40+00
CROSS DIKE B
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
SCALE: 1"=20’
STA. 41+54 (= STA. 290+30 PERIMETER DIKE)
CROSS DIKE B
MIDDLE CELL
HORIZONTAL DISTANCE
SHEET
REFERENCE
NUMBER
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
C O
R
E
N G
IN
E E
R S
C H
A R
L E S T
O N S
O U
R O
L
IN
A
D a te
R e v
D ra w n b y
C k d b y
D e s ig n fi le n o
R e v ie w e d b y
S u b m it te d b y
D ra w d e
D w g s c a le
P lo t d a te
F ile n a m e
M A
R K
D E S
C R
IP
T
IO
N A P P
R V
D A T E
D E S
C R
IP
T
IO
N M
A R
K A P P
R V
D A T E of Engineers US Army Corps
Charleston District
D e s ig n e d b y
C-10
SHEET 10 OF 22
R
W
H P R
S A
G
B E
R K
E L E
Y
C
O U
N T
Y S
O U
R O
L
IN
R
J U
N E
A
H W
A Y
C
E L L
R
E P
A
IR
M
ID
D
L L
D
N S T R
U C
T
IO
N
F Y
C
L O
U T
E
P O
S A L
A
R E
A M J C
M J C
J R J
S C
O
G L A S S
C R
O
T
A
T
O
1+
C R
O S S
S E
C T
IO
D
L L
AMENDMENT
W H
P
R
E V a .d g n
15’ AND 20’ UNLESS APPROVED BY THE COR.
THE DIKE AND THE PERIMETER DITCH BETWEEN ELEVATION
BORROW MATERIAL SHALL NOT BE TAKEN FROM BETWEEN10.
AND COMPACT ACCORDING TO SPECIFICATIONS.
EXISTING GROUND, CUTTING IS NOT REQUIRED. SPREAD
IN ANY PLACE WHERE THE REQUIRED PROFILE IS BELOW9.
WITHIN THE NEW PORTION OF THE DIKE AND BERM.
STA 0+00 TO 41+53 AND SHALL BE EVENLY SPACED
GEOTEXTILE OPTION, IF AWARDED, SHALL BE PLACED FROM 8.
THROUGHOUT CONSTRUCTION.
TO PROVIDE DRAINAGE FOR INTERIOR LATERAL DITCHES
NECESSARY TO ALLOW FOR BERM CONSTRUCTION AND
RELOCATE PERIMETER DITCH TO THE INSIDE AS 7.
DIKE WHERE NO CROSS SECTIONS ARE SHOWN.
FOLLOW THE EXISTING CENTERLINE CURVATURE WHEN RAISING6.
TO BERM GRADE PRIOR TO ADDITIONAL DIKE CONSTRUCTION.
FULL WIDTH OF DIKE AND BERM MUST BE CONSTRUCTED5.
STATIONS SHOWN.
BE EVENLY TRANSITIONED BETWEEN THE CROSS-SECTION
DIFFERENCES IN CENTERLINE OFFSET DISTANCES ARE TO4.
TO THE EXISTING DIKE CENTERLINE, IE. OFFSET "0".
THE HORIZONTAL REFERENCE IS A RELATIVE VALUE TIED 3.
NAD83 (NSRS2007).
SOUTH CAROLINA STATE PLANE COORDINATE SYSTEM,
ALL HORIZONTAL COORDINATES ARE BASED ON THE 2.
BASED ON APRIL 2016 LIDAR.
ALL ELEVATIONS ARE NAVD88 INTERNATIONAL FEET1.
NOTES:
a a
LEGEND
BORROW LIMIT
GEOTEXTILE (OPTION)
EXISTING PROFILE
MINIMUM REQUIRED PROFILE - FILL
OPTION IS AWARDED
REQUIRED TIE IN IF GEOTEXTILE
SURVEY APRIL 2016 a a
E X
IS
T
O F
IL
E C
R O
S S
S E
C T
IO
N S
L E
G E
N D
N O
T
D A T
J U
N
S A
G
0 25 50 75 100 125 150 175 200-25-50-75-100
0 25 50 75 100 125 150 175 200-25-50-75-100
0 25 50 75 100 125 150 175 200-25-50-75-100
0 25 50 75 100 125 150 175 200-25-50-75-100
0 25 50 75 100 125 150 175 200-25-50-75-100
40 40
40 40
40 40
40 40
40 40
N A
V D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
1 FILL
INSIDE MIDDLE CELLINSIDE HIGHWAY CELL
FILL
INSIDE MIDDLE CELLINSIDE HIGHWAY CELL
TIE TO EXISTING SLOPE
1 FILL
INSIDE MIDDLE CELLINSIDE HIGHWAY CELL
TIE TO EXISTING SLOPE
1 FILL
INSIDE MIDDLE CELLINSIDE HIGHWAY CELL
TIE TO EXISTING SLOPE
1 FILL
INSIDE MIDDLE CELLINSIDE HIGHWAY CELL
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
TIE TO EXISTING SLOPE
19.0’ EL.
88’ WIDTH
OPTION 0018
GEOTEXTILE
19.0’ EL.
88’ WIDTH
OPTION 0018
GEOTEXTILE
19.0’ EL.
88’ WIDTH
OPTION 0018
GEOTEXTILE
19.0’ EL.
88’ WIDTH
OPTION 0018
GEOTEXTILE
19.0’ EL.
88’ WIDTH
OPTION 0018
GEOTEXTILE
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
7’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
5’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
4’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
3’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
1’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
26’ BERM
26’ BERM
26’ BERM
26’ BERM
26’ BERM
TIE TO EXISTING SLOPE
TIE TO EXISTING SLOPE
TIE TO EXISTING SLOPE
STA. 295+00
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 300+00
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 305+00
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 310+00
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
STA. 290+30 (=STA. 41+54 CROSS DIKE B)
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SHEET
REFERENCE
NUMBER
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
C O
R
E
N G
IN
E E
R S
C H
A R
L E S T
O N S
O U
R O
L
IN
A
D a te
R e v
D ra w n b y
C k d b y
D e s ig n fi le n o
R e v ie w e d b y
S u b m it te d b y
D ra w d e
D w g s c a le
P lo t d a te
F ile n a m e
M A
R K
D E S
C R
IP
T
IO
N A P P
R V
D A T E
D E S
C R
IP
T
IO
N M
A R
K A P P
R V
D A T E of Engineers US Army Corps
Charleston District
D e s ig n e d b y
C-11
SHEET 11 OF 22
R
W
H P R
S A
G
B E
R K
E L E
Y
C
O U
N T
Y S
O U
R O
L
IN
R
J U
N E
A
H W
A Y
C
E L L
R
E P
A
IR
M
ID
D
L L
D
N S T R
U C
T
IO
N
F Y
C
L O
U T
E
P O
S A L
A
R E
A M J C
M J C
J R J
S C
O
G L A S S
P E
R
IM
E T
E
S T
A
T
O
C R
O S S
S E
C T
IO
D
AMENDMENT
W H
P
R
E V a .d g n
15’ AND 20’ UNLESS APPROVED BY THE COR.
THE DIKE AND THE PERIMETER DITCH BETWEEN ELEVATION
BORROW MATERIAL SHALL NOT BE TAKEN FROM BETWEEN10.
AND COMPACT ACCORDING TO SPECIFICATIONS.
EXISTING GROUND, CUTTING IS NOT REQUIRED. SPREAD
IN ANY PLACE WHERE THE REQUIRED PROFILE IS BELOW9.
WITHIN THE NEW PORTION OF THE DIKE AND BERM.
STA 290+30 TO 330+00 AND SHALL BE EVENLY SPACED
GEOTEXTILE OPTION, IF AWARDED, SHALL BE PLACED FROM 8.
THROUGHOUT CONSTRUCTION.
TO PROVIDE DRAINAGE FOR INTERIOR LATERAL DITCHES
NECESSARY TO ALLOW FOR BERM CONSTRUCTION AND
RELOCATE PERIMETER DITCH TO THE INSIDE AS 7.
DIKE WHERE NO CROSS SECTIONS ARE SHOWN.
FOLLOW THE EXISTING CENTERLINE CURVATURE WHEN RAISING6.
TO BERM GRADE PRIOR TO ADDITIONAL DIKE CONSTRUCTION.
FULL WIDTH OF DIKE AND BERM MUST BE CONSTRUCTED5.
STATIONS SHOWN.
BE EVENLY TRANSITIONED BETWEEN THE CROSS-SECTION
DIFFERENCES IN CENTERLINE OFFSET DISTANCES ARE TO4.
TO THE EXISTING DIKE CENTERLINE, IE. OFFSET "0".
THE HORIZONTAL REFERENCE IS A RELATIVE VALUE TIED 3.
NAD83 (NSRS2007).
SOUTH CAROLINA STATE PLANE COORDINATE SYSTEM,
ALL HORIZONTAL COORDINATES ARE BASED ON THE 2.
BASED ON APRIL 2016 LIDAR.
ALL ELEVATIONS ARE NAVD88 INTERNATIONAL FEET1.
NOTES:
a a
LEGEND
BORROW LIMIT
GEOTEXTILE (OPTION)
EXISTING PROFILE
MINIMUM REQUIRED PROFILE - FILL
OPTION IS AWARDED
REQUIRED TIE IN IF GEOTEXTILE
SURVEY APRIL 2016 a a
E X
IS
T
O F
IL
E C
R O
S S
S E
C T
IO
N S
L E
G E
N D
N O
T
D A T
J U
N
S A
G
-10
0 25 50 75 100 125 150 175 200-25-50-75-100
-10
0 25 50 75 100 125 150 175 200-25-50-75-100
-10
0 25 50 75 100 125 150 175 200-25-50-75-100
-10
-10
0 25 50 75 100 125 150 175 200-25-50-75-100
-10
0 25 50 75 100 125 150 175 200-25-50-75-100
40 40
40 40
40 40
40 40
40 40
N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
MHW 5.6’
MHW 5.6’
MHW 5.6’
TIE TO EXISTING SLOPE
1 FILL
INSIDE MIDDLE CELL
TIE TO EXISTING SLOPE
OUTSIDE DISPOSAL AREA
FILL
INSIDE MIDDLE CELL
TIE TO EXISTING SLOPE 3
OUTSIDE DISPOSAL AREA
FILL
INSIDE MIDDLE CELL
TIE TO EXISTING SLOPE
OUTSIDE DISPOSAL AREA
FILL
INSIDE MIDDLE CELL
TIE TO EXISTING SLOPE
OUTSIDE DISPOSAL AREA
FILL
INSIDE MIDDLE CELL
INSIDE HIGHWAY CELL
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
19.0’ EL.
94’ WIDTH
OPTION 0017
GEOTEXTILE
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
1’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
5’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
15’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
15’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
EL. 26.0 (MIN)
16’ 50’ BERM
NEW C
L
OFFSET
10’
EL. 21.0 (MIN)
EL. 20.0 (MIN)
TIE TO EXISTING SLOPE
19.0’ EL.
94’ WIDTH
OPTION 0017
GEOTEXTILE
19.0’ EL.
94’ WIDTH
OPTION 0017
GEOTEXTILE
19.0’ EL.
94’ WIDTH
OPTION 0017
GEOTEXTILE
19.0’ EL.
94’ WIDTH
OPTION 0017
STA. 315+00
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 320+00
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 325+00
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 330+00 (= STA. 34+97 CROSS DIKE A)
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SHEET
REFERENCE
NUMBER
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
C O
R
E
N G
IN
E E
R S
C H
A R
L E S T
O N S
O U
R O
L
IN
A
D a te
R e v
D ra w n b y
C k d b y
D e s ig n fi le n o
R e v ie w e d b y
S u b m it te d b y
D ra w d e
D w g s c a le
P lo t d a te
F ile n a m e
M A
R K
D E S
C R
IP
T
IO
N A P P
R V
D A T E
D E S
C R
IP
T
IO
N M
A R
K A P P
R V
D A T E of Engineers US Army Corps
Charleston District
D e s ig n e d b y
C-12
SHEET 12 OF 22
R
W
H P R
S A
G
B E
R K
E L E
Y
C
O U
N T
Y S
O U
R O
L
IN
R
J U
N E
A
H W
A Y
C
E L L
R
E P
A
IR
M
ID
D
L L
D
N S T R
U C
T
IO
N
F Y
C
L O
U T
E
P O
S A L
A
R E
A M J C
M J C
J R J
S C
O
G L A S S
P E
R
IM
E T
E
S T
A
T
O
C R
O S S
S E
C T
IO
D
L L
AMENDMENT
a
W H
P
R
E V a .d g n
15’ AND 20’ UNLESS APPROVED BY THE COR.
THE DIKE AND THE PERIMETER DITCH BETWEEN ELEVATION
BORROW MATERIAL SHALL NOT BE TAKEN FROM BETWEEN10.
AND COMPACT ACCORDING TO SPECIFICATIONS.
EXISTING GROUND, CUTTING IS NOT REQUIRED. SPREAD
IN ANY PLACE WHERE THE REQUIRED PROFILE IS BELOW9.
WITHIN THE NEW PORTION OF THE DIKE AND BERM.
STA 290+30 TO 330+00 AND SHALL BE EVENLY SPACED
GEOTEXTILE OPTION, IF AWARDED, SHALL BE PLACED FROM 8.
THROUGHOUT CONSTRUCTION.
TO PROVIDE DRAINAGE FOR INTERIOR LATERAL DITCHES
NECESSARY TO ALLOW FOR BERM CONSTRUCTION AND
RELOCATE PERIMETER DITCH TO THE INSIDE AS 7.
DIKE WHERE NO CROSS SECTIONS ARE SHOWN.
FOLLOW THE EXISTING CENTERLINE CURVATURE WHEN RAISING6.
TO BERM GRADE PRIOR TO ADDITIONAL DIKE CONSTRUCTION.
FULL WIDTH OF DIKE AND BERM MUST BE CONSTRUCTED5.
STATIONS SHOWN.
BE EVENLY TRANSITIONED BETWEEN THE CROSS-SECTION
DIFFERENCES IN CENTERLINE OFFSET DISTANCES ARE TO4.
TO THE EXISTING DIKE CENTERLINE, IE. OFFSET "0".
THE HORIZONTAL REFERENCE IS A RELATIVE VALUE TIED 3.
NAD83 (NSRS2007).
SOUTH CAROLINA STATE PLANE COORDINATE SYSTEM,
ALL HORIZONTAL COORDINATES ARE BASED ON THE 2.
BASED ON APRIL 2016 LIDAR.
ALL ELEVATIONS ARE NAVD88 INTERNATIONAL FEET1.
NOTES:
a
LEGEND
BORROW LIMIT
GEOTEXTILE (OPTION)
EXISTING PROFILE
MINIMUM REQUIRED PROFILE - FILL
OPTION IS AWARDED
REQUIRED TIE IN IF GEOTEXTILE
SURVEY APRIL 2016 a a
E X
IS
T
O F
IL
E C
R O
S S
S E
C T
IO
N S
L E
G E
N D
N O
T
D A T
J U
N
S A
G
-10
0 25 50 75 100 125 150 175 200-25-50-75-100
-10
-10
0 25 50 75 100 125 150 175 200-25-50-75-100
-10
0 25 50 75 100 125 150 175 200-25-50-75-100
0 25 50 75 100 125 150 175 200-25-50-75-100
40 40
40 40
40 40
N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
MHW 5.6’
MHW 5.6’
TIE TO EXISTING SLOPE
OUTSIDE DISPOSAL AREA
FILL
INSIDE MIDDLE CELL
TIE TO EXISTING SLOPE
OUTSIDE DISPOSAL AREA
FILL
INSIDE MIDDLE CELL
TIE TO EXISTING SLOPE
OUTSIDE DISPOSAL AREA
FILL
INSIDE MIDDLE CELL
1 FILL
OFFSET
INSIDE MIDDLE CELLINSIDE SOUTH CELL
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
EL. 20.0 (MIN)
50’ BERM
EL. 21.0 (MIN)
NEW C
L
OFFSET
6’
16’
EL. 26.0 (MIN)
EL. 20.0 (MIN)
50’ BERM
EL. 21.0 (MIN)
NEW C
L
OFFSET
6’
16’
EL. 26.0 (MIN)
EL. 20.0 (MIN)
50’ BERM
EL. 21.0 (MIN)
NEW C
L
OFFSET
6’
16’
EL. 26.0 (MIN)
EL. 20.0 (MIN)
50’ BERM
EL. 21.0 (MIN)
NEW C
L
OFFSET
0’
16’
EL. 26.0 (MIN)
TIE TO EXISTING SLOPE
TIE TO EXISTING SLOPE
TIE TO EXISTING SLOPE
19.0’ EL.
94’ WIDTH
OPTION 0017
GEOTEXTILE
19.0’ EL.
94’ WIDTH
OPTION 0017
GEOTEXTILE
19.0’ EL.
94’ WIDTH
OPTION 0017
GEOTEXTILE
19.0’ EL.
94’ WIDTH
OPTION 0017
STA. 48+13 PIPE RAMP CENTERLINE (+/- 15 FT. EITHER SIDE OF RAMP CL)
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 95+61 PIPE RAMP CENTERLINE (+/- 15 FT. EITHER SIDE OF RAMP CL)
PERIMETER DIKE
MIDDLE CELL
HORIZONTAL DISTANCE
SHEET
REFERENCE
NUMBER
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
C O
R
E
N G
IN
E E
R S
C H
A R
L E S T
O N S
O U
R O
L
IN
A
D a te
R e v
D ra w n b y
C k d b y
D e s ig n fi le n o
R e v ie w e d b y
S u b m it te d b y
D ra w d e
D w g s c a le
P lo t d a te
F ile n a m e
M A
R K
D E S
C R
IP
T
IO
N A P P
R V
D A T E
D E S
C R
IP
T
IO
N M
A R
K A P P
R V
D A T E of Engineers US Army Corps
Charleston District
D e s ig n e d b y
C-13
SHEET 13 OF 22
R
W
H P R
S A
G
B E
R K
E L E
Y
C
O U
N T
Y S
O U
R O
L
IN
R
J U
N E
A
H W
A Y
C
E L L
R
E P
A
IR
M
ID
D
L L
D
N S T R
U C
T
IO
N
F Y
C
L O
U T
E
P O
S A L
A
R E
A M J C
M J C
J R J
S C
O
G L A S S
P
M P S
S T
A
C R
O S S
S E
C T
IO
D
L L
AMENDMENT
a
W H
P
R
E V a .d g n a
15’ AND 20’ UNLESS APPROVED BY THE COR.
THE DIKE AND THE PERIMETER DITCH BETWEEN ELEVATION
BORROW MATERIAL SHALL NOT BE TAKEN FROM BETWEEN10.
AND COMPACT ACCORDING TO SPECIFICATIONS.
EXISTING GROUND, CUTTING IS NOT REQUIRED. SPREAD
IN ANY PLACE WHERE THE REQUIRED PROFILE IS BELOW9.
WITHIN THE NEW PORTION OF THE DIKE AND BERM.
STA 47+95 TO 97+71 AND SHALL BE EVENLY SPACED
GEOTEXTILE OPTION, IF AWARDED, SHALL BE PLACED FROM 8.
THROUGHOUT CONSTRUCTION.
TO PROVIDE DRAINAGE FOR INTERIOR LATERAL DITCHES
NECESSARY TO ALLOW FOR BERM CONSTRUCTION AND
RELOCATE PERIMETER DITCH TO THE INSIDE AS 7.
DIKE WHERE NO CROSS SECTIONS ARE SHOWN.
FOLLOW THE EXISTING CENTERLINE CURVATURE WHEN RAISING6.
TO BERM GRADE PRIOR TO ADDITIONAL DIKE CONSTRUCTION.
FULL WIDTH OF DIKE AND BERM MUST BE CONSTRUCTED5.
STATIONS SHOWN.
BE EVENLY TRANSITIONED BETWEEN THE CROSS-SECTION
DIFFERENCES IN CENTERLINE OFFSET DISTANCES ARE TO4.
TO THE EXISTING DIKE CENTERLINE, IE. OFFSET "0".
THE HORIZONTAL REFERENCE IS A RELATIVE VALUE TIED 3.
NAD83 (NSRS2007).
SOUTH CAROLINA STATE PLANE COORDINATE SYSTEM,
ALL HORIZONTAL COORDINATES ARE BASED ON THE 2.
BASED ON APRIL 2016 LIDAR.
ALL ELEVATIONS ARE NAVD88 INTERNATIONAL FEET1.
NOTES:
LEGEND
BORROW LIMIT
GEOTEXTILE (OPTION)
EXISTING PROFILE
MINIMUM REQUIRED PROFILE - FILL
OPTION IS AWARDED
REQUIRED TIE IN IF GEOTEXTILE
SURVEY APRIL 2016 a a
E X
IS
T
O F
IL
E C
R O
S S
S E
C T
IO
N S
L E
G E
N D
N O
T
D A T
J U
N
S A
G
-10
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360 380 400 420 440-20-40-60-80-100-120-140-160-180-200
0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360 380 400 420 440-20-40-60-80-100-120-140-160-180-200
N
A V
D
I
N
V E
R T I
C
S T
A N
N
A V
D
I
N
V E
R T I
C
S T
A N
OUTSIDE DISPOSAL AREA
EL. 26.0 (MIN)
FILL
400’PIPE RAMP
INSIDE MIDDLE CELL
40 40
OUTSIDE DISPOSAL AREA
EL. 26.0 (MIN)
FILL
400’PIPE RAMP
INSIDE MIDDLE CELL
TIE TO EXISTING SLOPE
30’
TYPICAL SECTION OF PIPE RAMP
L C
PIPE RAMP
-10
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
19.0’ EL.
94’ WIDTH
OPTION 0019
GEOTEXTILE
19.0’ EL.
94’ WIDTH
STA. 57+57
SPILLWAY REPLACEMENT
MIDDLE CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 84+75
SPILLWAY REPLACEMENT
MIDDLE CELL
HORIZONTAL DISTANCE
SHEET
REFERENCE
NUMBER
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
C O
R
E
N G
IN
E E
R S
C H
A R
L E S T
O N S
O U
R O
L
IN
A
D a te
R e v
D ra w n b y
C k d b y
D e s ig n fi le n o
R e v ie w e d b y
S u b m it te d b y
D ra w d e
D w g s c a le
P lo t d a te
F ile n a m e
M A
R K
D E S
C R
IP
T
IO
N A P P
R V
D A T E
D E S
C R
IP
T
IO
N M
A R
K A P P
R V
D A T E of Engineers US Army Corps
Charleston District
D e s ig n e d b y
C-14
SHEET 14 OF 22
R
W
H P R
S A
G
B E
R K
E L E
Y
C
O U
N T
Y S
O U
R O
L
IN
R
J U
N E
A
H W
A Y
C
E L L
R
E P
A
IR
M
ID
D
L L
D
N S T R
U C
T
IO
N
F Y
C
L O
U T
E
P O
S A L
A
R E
A M J C
M J C
J R J
S C
O
G L A S S
S P
IL
L W
A Y S
S T
A
C R
O S S
S E
C T
IO
D
L L
SPILLWAY SCHEDULE
SPLASHPAD
YES
RISER SIZE
(FT)
4 X 4 X 20
AT RISER
+ 0.5
- 0.0
40’ FROM RISER
+ 0.5
- 0.0
+ 0.5
- 0.0
80’ FROM RISERAT OUTLET
+ 0.5
- 0.0
YES
+ 0.5
- 0.0
+ 0.5
- 0.0
+ 0.5
- 0.0
+ 0.5
- 0.0
INVERTS ( M. L. L. W. )
YES
+ 0.5
- 0.0
+ 0.5
- 0.0
+ 0.5
- 0.0
+ 0.5
- 0.0
LOCATION
SPILLWAY
YES
YES
4 X 4 X 20
4 X 4 X 20
4 X 4 X 20
4 X 4 X 20
- 0.0- 0.0- 0.0- 0.0
+ 0.5 + 0.5 + 0.5 + 0.5
- 0.0- 0.0- 0.0- 0.0
+ 0.5 + 0.5 + 0.5
STA. 57+57
STA. 84+75
STA. 295+67
STA. 303+26
STA. 322+92
11.012.013.06.1
10.011.0
+ 0.5
12.05.1
9.010.011.06.1
8.09.010.05.0
11.012.013.07.9
AMENDMENT
W H
P
R
E V a .d g n a a
BE REUSED.
FOR BIDDING PURPOSES, ASSUME THAT 75% OF PIPE CAN16.
THE FIELD. MINIMUM OF 2’ SOIL COVER TO NOT USE SUPPORTS.
THE NUMBER OF PIPE SUPPORTS SHALL BE DETERMINED IN15.
FUSION JOINTS.
30" DIA. HDPE PIPE SECTIONS TO BE JOINED WITH BUTT14.
SEE SPECS FOR MATERIAL DETAIL.
CRUSHED GRAVEL: 6" THICK, OVERLAIN WITH RIPRAP 2’ THICK.
GEOTEXTILE SECURED BY SECURING PINS 4’ ON CENTER,
14’ x 12’ SPLASH PAD, CENTER ON AXIS OF PIPE:13.
EXISTING CONCRETE SPILLWAY PAD TO BE ABANDONED IN PLACE.12.
MAKE FINAL DETERMINATION ON REUSE OF ANY LUMBER.
IT IS SOLID WITH NO SIGNS OF ROT. THE COR SHALL
EXISTING WALKWAY LUMBER MAY BE REUSED TO THE EXTENT 11.
ON SHEET C-19.WALKWAY DETAIL LOCATED
TOLERANCE OF +/-0.5. 4"X4" POST PENETRATION 4’ MIN.
NEW OR RESET WOODEN WALKWAY SET DECK AT A 10.
COR). RISER BOTTOM SECTION SHALL BE REPLACED.
REUSED (SUBJECT TO INSPECTION AND APPROVAL OF THE
IF UNDAMAGED, EXISTING RISER TOP SECTIONS MAY BE 9.
BEFORE BEING CUT FOR INSTALLATION OF PIPE.
DIKE SHALL BE BUILT TO GRADE AND ACCEPTED8.
15’ AND 20’ UNLESS APPROVED BY THE COR.
THE DIKE AND THE PERIMETER DITCH BETWEEN ELEVATION
BORROW MATERIAL SHALL NOT BE TAKEN FROM BETWEEN7.
THROUGHOUT CONSTRUCTION.
TO PROVIDE DRAINAGE FOR INTERIOR LATERAL DITCHES
NECESSARY TO ALLOW FOR BERM CONSTRUCTION AND
RELOCATE PERIMETER DITCH TO THE INSIDE AS 6.
TO BERM GRADE PRIOR TO ADDITIONAL DIKE CONSTRUCTION.
FULL WIDTH OF DIKE AND BERM MUST BE CONSTRUCTED5
STATIONS SHOWN.
BE EVENLY TRANSITIONED BETWEEN THE CROSS-SECTION
DIFFERENCES IN CENTERLINE OFFSET DISTANCES ARE TO4.
TO THE EXISTING DIKE CENTERLINE, IE. OFFSET "0".
THE HORIZONTAL REFERENCE IS A RELATIVE VALUE TIED 3.
NAD83 (NSRS2007).
SOUTH CAROLINA STATE PLANE COORDINATE SYSTEM,
ALL HORIZONTAL COORDINATES ARE BASED ON THE 2.
BASED ON APRIL 2016 LIDAR.
ALL ELEVATIONS ARE NAVD88 INTERNATIONAL FEET1.
NOTES:
LEGEND
BORROW LIMIT
GEOTEXTILE (OPTION)
EXISTING PROFILE
MINIMUM REQUIRED PROFILE - FILL
OPTION IS AWARDED
REQUIRED TIE IN IF GEOTEXTILE
SURVEY APRIL 2016 a a
E X
IS
T
O F
IL
E C
R O
S S
S E
C T
IO
N S
L E
G E
N D
N O
T
D A T
J U
N
S A
G
-10
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
-10
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
N
A V
D
I
N
V E
R T I
C
S T
A N
-10
-10
N
A V
D
I
N
V E
R T I
C
S T
A N
C E
MHW 5.6’
OFFSET
8" TO 12" CLEAR GAP BETWEEN
WALKWAY AND SPILLWAY
NEW SPILLWAY BASE SECTION AND RISER.
FABRICATION DETAIL ON SHEET C-19 & C-20
FILL
NEW C
L
EL. 26.0 (MIN)
TIE TO EXISTING GRADE
72’ 24’
INVERT OF EXISTING DRAINAGE
DITCH VARIES, EXCAVATE OR BACKFILL WITH
DRY MATERIAL TO OBTAIN REQUIRED INVERT.
INSIDE MIDDLE CELL
SPLASH PAD, SEE NOTE 12
CONCRETE SPILLWAY FOUNDATION PAD
SEE DETAIL ON SHEET C-19
SEE DETAIL ON SHEET C-19
PIPE SUPPORT FRAME
OUTSIDE DISPOSAL AREA
12’
3’11’
MHW 5.6’
OFFSET
8" TO 12" CLEAR GAP BETWEEN
WALKWAY AND SPILLWAY
NEW SPILLWAY BASE SECTION AND RISER.
FABRICATION DETAIL ON SHEET C-19 & C-20
FILL
NEW C
L
EL. 26.0 (MIN)
1TIE TO EXISTING GRADE
72’ 24’
INVERT OF EXISTING DRAINAGE
DITCH VARIES, EXCAVATE OR BACKFILL WITH
DRY MATERIAL TO OBTAIN REQUIRED INVERT.
INSIDE MIDDLE CELL
SPLASH PAD, SEE NOTE 12
CONCRETE SPILLWAY FOUNDATION PAD
SEE DETAIL ON SHEET C-19
SEE DETAIL ON SHEET C-19
PIPE SUPPORT FRAME
OUTSIDE DISPOSAL AREA
21’
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
19.0’ EL.
94’ WIDTH
OPTION 0019
GEOTEXTILE
19.0’ EL.
94’ WIDTH
OPTION 0019
GEOTEXTILE
TIE TO EXISTING GRADE
3’11’
SCALE: 1"=20’
STA. 295+67
SPILLWAY REPLACEMENT
MIDDLE CELL
HORIZONTAL DISTANCE
STA. 303+26
SPILLWAY REPLACEMENT
MIDDLE CELL
HORIZONTAL DISTANCE
STA. 322+92
SPILLWAY REPLACEMENT
MIDDLE CELL
HORIZONTAL DISTANCE
SHEET
REFERENCE
NUMBER
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
C O
R
E
N G
IN
E E
R S
C H
A R
L E S T
O N S
O U
R O
L
IN
A
D a te
R e v
D ra w n b y
C k d b y
D e s ig n fi le n o
R e v ie w e d b y
S u b m it te d b y
D ra w d e
D w g s c a le
P lo t d a te
F ile n a m e
M A
R K
D E S
C R
IP
T
IO
N A P P
R V
D A T E
D E S
C R
IP
T
IO
N M
A R
K A P P
R V
D A T E of Engineers US Army Corps
Charleston District
D e s ig n e d b y
C-15
SHEET 15 OF 22
R
W
H P R
S A
G
B E
R K
E L E
Y
C
O U
N T
Y S
O U
R O
L
IN
R
J U
N E
A
H W
A Y
C
E L L
R
E P
A
IR
M
ID
D
L L
D
N S T R
U C
T
IO
N
F Y
C
L O
U T
E
P O
S A L
A
R E
A M J C
M J C
J R J
S C
O
G L A S S
S P
IL
L W
A Y S
S T
A
C R
O S S
S E
C T
IO
D
L L
AMENDMENT
W H
P
R
E V a .d g n a a
BE REUSED.
FOR BIDDING PURPOSES, ASSUME THAT 75% OF PIPE CAN16.
THE FIELD. MINIMUM OF 2’ SOIL COVER TO NOT USE SUPPORTS.
THE NUMBER OF PIPE SUPPORTS SHALL BE DETERMINED IN15.
FUSION JOINTS.
30" DIA. HDPE PIPE SECTIONS TO BE JOINED WITH BUTT14.
SEE SPECS FOR MATERIAL DETAIL.
CRUSHED GRAVEL: 6" THICK, OVERLAIN WITH RIPRAP 2’ THICK.
GEOTEXTILE SECURED BY SECURING PINS 4’ ON CENTER,
14’ x 12’ SPLASH PAD, CENTER ON AXIS OF PIPE:13.
EXISTING CONCRETE SPILLWAY PAD TO BE ABANDONED IN PLACE.12.
MAKE FINAL DETERMINATION ON REUSE OF ANY LUMBER.
IT IS SOLID WITH NO SIGNS OF ROT. THE COR SHALL
EXISTING WALKWAY LUMBER MAY BE REUSED TO THE EXTENT 11.
ON SHEET C-19.WALKWAY DETAIL LOCATED
TOLERANCE OF +/-0.5. 4"X4" POST PENETRATION 4’ MIN.
NEW OR RESET WOODEN WALKWAY SET DECK AT A 10.
COR). RISER BOTTOM SECTION SHALL BE REPLACED.
REUSED (SUBJECT TO INSPECTION AND APPROVAL OF THE
IF UNDAMAGED, EXISTING RISER TOP SECTIONS MAY BE 9.
BEFORE BEING CUT FOR INSTALLATION OF PIPE.
DIKE SHALL BE BUILT TO GRADE AND ACCEPTED8.
15’ AND 20’ UNLESS APPROVED BY THE COR.
THE DIKE AND THE PERIMETER DITCH BETWEEN ELEVATION
BORROW MATERIAL SHALL NOT BE TAKEN FROM BETWEEN7.
THROUGHOUT CONSTRUCTION.
TO PROVIDE DRAINAGE FOR INTERIOR LATERAL DITCHES
NECESSARY TO ALLOW FOR BERM CONSTRUCTION AND
RELOCATE PERIMETER DITCH TO THE INSIDE AS 6.
TO BERM GRADE PRIOR TO ADDITIONAL DIKE CONSTRUCTION.
FULL WIDTH OF DIKE AND BERM MUST BE CONSTRUCTED5
STATIONS SHOWN.
BE EVENLY TRANSITIONED BETWEEN THE CROSS-SECTION
DIFFERENCES IN CENTERLINE OFFSET DISTANCES ARE TO4.
TO THE EXISTING DIKE CENTERLINE, IE. OFFSET "0".
THE HORIZONTAL REFERENCE IS A RELATIVE VALUE TIED 3.
NAD83 (NSRS2007).
SOUTH CAROLINA STATE PLANE COORDINATE SYSTEM,
ALL HORIZONTAL COORDINATES ARE BASED ON THE 2.
BASED ON APRIL 2016 LIDAR.
ALL ELEVATIONS ARE NAVD88 INTERNATIONAL FEET1.
NOTES:
LEGEND
BORROW LIMIT
GEOTEXTILE (OPTION)
EXISTING PROFILE
MINIMUM REQUIRED PROFILE - FILL
OPTION IS AWARDED
REQUIRED TIE IN IF GEOTEXTILE
SURVEY APRIL 2016 a a
E X
IS
T
O F
IL
E C
R O
S S
S E
C T
IO
N S
L E
G E
N D
N O
T
D A T
J U
N
S A
G
-10
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
-10
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
-10
0 20 40 60 80 100 120 140 160 180 200-20-40-60-80-100-120-140-160-180-200
-10
-10
-10
N
A V
D
I
N
V E
R T I
C
S T
A N
C E
N
A V
D
I
N
V E
R T I
C
S T
A N
C E
N
A V
D
I
N
V E
R T I
C
S T
A N
C E
MHW 5.6’
OFFSET
8" TO 12" CLEAR GAP BETWEEN
WALKWAY AND SPILLWAY
NEW SPILLWAY BASE SECTION AND RISER.
FABRICATION DETAIL ON SHEET C-19 & C-20
FILL
NEW C
L
EL. 26.0 (MIN)
1TIE TO EXISTING GRADE
72’ 24’
INVERT OF EXISTING DRAINAGE
DITCH VARIES, EXCAVATE OR BACKFILL WITH
DRY MATERIAL TO OBTAIN REQUIRED INVERT.
INSIDE MIDDLE CELL
SPLASH PAD, SEE NOTE 12
CONCRETE SPILLWAY FOUNDATION PAD
SEE DETAIL ON SHEET C-19
SEE DETAIL ON SHEET C-19
PIPE SUPPORT FRAME
OUTSIDE DISPOSAL AREA
12’
MHW 5.6’
OFFSET
8" TO 12" CLEAR GAP BETWEEN
WALKWAY AND SPILLWAY
NEW SPILLWAY BASE SECTION AND RISER.
FABRICATION DETAIL ON SHEET C-19 & C-20
FILL
NEW C
L
EL. 26.0 (MIN)
1TIE TO EXISTING GRADE
72’ 24’
INVERT OF EXISTING DRAINAGE
DITCH VARIES, EXCAVATE OR BACKFILL WITH
DRY MATERIAL TO OBTAIN REQUIRED INVERT.
INSIDE MIDDLE CELL
SPLASH PAD, SEE NOTE 12
CONCRETE SPILLWAY FOUNDATION PAD
SEE DETAIL ON SHEET C-19
SEE DETAIL ON SHEET C-19
PIPE SUPPORT FRAME
OUTSIDE DISPOSAL AREA
14’
MHW 5.6’
OFFSET
8" TO 12" CLEAR GAP BETWEEN
WALKWAY AND SPILLWAY
NEW SPILLWAY BASE SECTION AND RISER.
FABRICATION DETAIL ON SHEET C-19 & C-20
FILL
NEW C
L
EL. 26.0 (MIN)
TIE TO EXISTING GRADE
72’ 24’
INVERT OF EXISTING DRAINAGE
DITCH VARIES, EXCAVATE OR BACKFILL WITH
DRY MATERIAL TO OBTAIN REQUIRED INVERT.
INSIDE MIDDLE CELL
CONCRETE SPILLWAY FOUNDATION PAD
SEE DETAIL ON SHEET C-19
OUTSIDE DISPOSAL AREA
4’
SEE DETAIL ON SHEET C-19
PIPE SUPPORT FRAME
SPLASH PAD, SEE NOTE 12
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
BORROW LIMIT= ELEV. 15.0
19.0’ EL.
94’ WIDTH
OPTION 0017
GEOTEXTILE
19.0’ EL.
94’ WIDTH
OPTION 0017
GEOTEXTILE
19.0’ EL.
94’ WIDTH
OPTION 0017
GEOTEXTILE
TIE TO EXISTING GRADE
11’ 3’
11’ 3’
11’ 3’
STA. 250+00
PERIMETER DIKE
HIGHWAY CELL
HORIZONTAL DISTANCE
STA. 255+00
PERIMETER DIKE
HIGHWAY CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 241+00
PERIMETER DIKE
HIGHWAY CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 245+00
PERIMETER DIKE
HIGHWAY CELL
HORIZONTAL DISTANCE
SCALE: 1"=20’
STA. 247+00
PERIMETER DIKE
HIGHWAY CELL
HORIZONTAL DISTANCE
SHEET
REFERENCE
NUMBER
U .S
A R
M Y
E
N G
IN
E
T R
IC
T
C O
R
E
N G
IN
E E
R S
C H
A R
L E S T
O N S
O U
R O
L
IN
A
D a te
R e v
D ra w n b y
C k d b y
D e s ig n fi le n o
R e v ie w e d b y
S u b m it te d b y
D ra w d e
D w g s c a le
P lo t d a te
F ile n a m e
M A
R K
D E S
C R
IP
T
IO
N A P P
R V
D A T E
D E S
C R
IP
T
IO
N M
A R
K A P P
R V
D A T E of Engineers US Army Corps
Charleston District
D e s ig n e d b y
C-16
SHEET 16 OF 22
R
W
H P R
S A
G
B E
R K
E L E
Y
C
O U
N T
Y S
O U
R O
L
IN
R
J U
N E
A
H W
A Y
C
E L L
R
E P
A
IR
M
ID
D
L L
D
N S T R
U C
T
IO
N
F Y
C
L O
U T
E
P O
S A L
A
R E
A M J C
M J C
J R J
S C
O
G L A S S
P E
R
IM
E T
E
S T
A 1+
T
O
H
IG
H W
A Y
C
E L L
C
R O
S S
S E
C T
IO
a
W H
P
R
E V a .d g n
CONSTRUCTION UNDER THIS CONTRACT.
DURING CONSTRUCTION. IT IS NOT EXPECTED TO IMPACT
FABRIC EXISTS IN THIS AREA AND ME BE ENCOUNTERED8.
STATIONS SHOWN.
BE EVENLY TRANSITIONED BETWEEN THE CROSS-SECTION
DIFFERENCES IN CENTERLINE OFFSET DISTANCES ARE TO7.
DIKE WHERE NO CROSS SECTIONS ARE SHOWN.
FOLLOW THE EXISTING CENTERLINE CURVATURE WHEN RAISING6.
TO BERM GRADE PRIOR TO ADDITIONAL DIKE CONSTRUCTION.
FULL WIDTH OF DIKE AND BERM MUST BE CONSTRUCTED5.
REMOVE WALKWAYS AND RESET ACCORDING TO SPECIFICATIONS.4.
LAYER OF GEOTEXTILE.
EXCAVATE TO 16.0’ AND LEVEL BEFORE PLACING FIRST3.
NAD83 (NSRS2007).
SOUTH CAROLINA STATE PLANE COORDINATE SYSTEM,
ALL HORIZONTAL COORDINATES ARE BASED ON THE 2.
BASED ON APRIL 2016 LIDAR SURVEY.
ALL ELEVATIONS ARE NAVD88 INTERNATIONAL FEET1.
NOTES:
REQUIRED PROFILE - FILL
EXISTING PROFILE
LEGEND
GEOTEXTILE
aSURVEY APRIL 2016 a
L E
G E
N D
N O
T
D A T
X
IS
T
O F
IL
E C
R O
S S
S E
C T
IO
N S
J U
N
S A
G
0 25 50 75 100 125 150 175 200-25-50-75-100
0 25 50 75 100 125 150 175 200-25-50-75-100
40 40
40 40
N
A V
D
I
N
V E
R T I
C
S T
A N
A V
D
I
N
V E
R T I
C
S T
A N
OUTSIDE DISPOSAL AREA INSIDE HIGHWAY CELL
MHW 5.6’
MHW 5.6’
TIE TO EXISTING SLOPE
EL. 20.0 (MIN)
45’
NEW C
L
FILL
52’ BERM
OFFSET
EL. 20.0 (MIN)
EL. 19.0 (MIN)
31’
EL. 16.0
94’ WIDTH
GEOTEXTILE
EL. 18.0
86’…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .