ELINS_1503050_Grounds_Maintenance_Florida.xlsx
XLSX spreadsheet 187 KB Posted
- Solicitation number
- W912HP-15-R-0008
About this file
ELINS 1503050 Grounds Maintenance Florida
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELINS Summary Grounds Maintenance Services Summary
| This sheet is filled out automatically as other sheets are completed | ||
| CLIN | Total | |
| 0006 | Base Period Firm Fixed-Price - High Service Level (Green) | $0.00 |
| 0007 | Base Period Firm Fixed-Price - Medium Service Level (Amber) | $0.00 |
| 0008 | Base Period Indefinite Quantity | $30,000.00 |
| 1006 | First Option Period Firm Fixed-Price - High Service Level (Green) | $0.00 |
| 1007 | First Option Period Firm Fixed-Price - Medium Service Level (Amber) | $0.00 |
| 1008 | First Option Period Indefinite Quantity | $40,000.00 |
| 2006 | Second Option Period Firm Fixed-Price - High Service Level (Green) | $0.00 |
| 2007 | Second Option Period Firm Fixed-Price - Medium Service Level (Amber) | $0.00 |
| 2008 | Second Option Period Indefinite Quantity | $40,000.00 |
| 3006 | Third Option Period Firm Fixed-Price - High Service Level (Green) | $0.00 |
| 3007 | Third Option Period Firm Fixed-Price - Medium Service Level (Amber) | $0.00 |
| 3008 | Third Option Period Indefinite Quantity | $40,000.00 |
| 4006 | Fourth Option Period Firm Fixed-Price - High Service Level (Green) | $0.00 |
| 4007 | Fourth Option Period Firm Fixed-Price - Medium Service Level (Amber) | $0.00 |
| 4008 | Fourth Option Period Indefinite Quantity | $40,000.00 |
| $190,000.00 | |
| Note: Either CLIN 0006 or CLIN 0007 (but not both) will be awarded for fixed-price grounds maintenance services, at the discretion of the Contracting Officer. |
&F
J-0200000-07 &A &P of &N
ELINS Summary Sheet
GROUNDS MAINTENANCE (1503050)
| This sheet is filled out automatically as other sheets are completed | ||
| CLIN / SUBCLIN | Site | Total Price |
| 0006 | Base Period Firm Fixed-Price - High Service Level 1 (Green) | |
| 0006AA | FL004 | $0.00 |
| 0006AB | FL008 | $0.00 |
| 0006AC | FL009 | $0.00 |
| 0006AD | FL014 | $0.00 |
| 0006AE | FL017& FL134 | $0.00 |
| 0006AF | FL019 | $0.00 |
| 0006AG | FL020 | $0.00 |
| 0006AH | FL021 | $0.00 |
| 0006AJ | FL022 | $0.00 |
| 0006AK | FL023& FL115& FL125 | $0.00 |
| 0006AL | FL027 | $0.00 |
| 0006AM | FL029 | $0.00 |
| 0006AN | FL031 | $0.00 |
| 0006AO | FL037 | $0.00 |
| 0006AP | FL040 & FL135 | $0.00 |
| 0006AQ | FL041 & FL136 | $0.00 |
| 0006AR | FL103 & FL137 | $0.00 |
| 0006AS | FL126 | $0.00 |
| $0.00 | ||
| 0007 | Base Period Firm Fixed-Price - Medium Service Level 2 (Amber) | |
| 0007AA | FL004 | $0.00 |
| 0007AB | FL008 | $0.00 |
| 0007AC | FL009 | $0.00 |
| 0007AD | FL014 | $0.00 |
| 0007AE | FL017& FL134 | $0.00 |
| 0007AF | FL019 | $0.00 |
| 0007AG | FL020 | $0.00 |
| 0007AH | FL021 | $0.00 |
| 0007AJ | FL022 | $0.00 |
| 0007AK | FL023& FL115& FL125 | $0.00 |
| 0007AL | FL027 | $0.00 |
| 0007AM | FL029 | $0.00 |
| 0007AN | FL031 | $0.00 |
| 0007AO | FL037 | $0.00 |
| 0007AP | FL040 & FL135 | $0.00 |
| 0007AQ | FL041 & FL136 | $0.00 |
| 0007AR | FL103 & FL137 | $0.00 |
| 0007AS | FL126 | $0.00 |
| $0.00 | ||
| 0008 | Base Period Indefinite Quantity | |
| TOTAL IQ LINE ITEMS - A701 THROUGH A745 | $30,000.00 |
| 1006 | First Option Period Firm Fixed-Price - High Service Level 1 (Green) | |
| 1006AA | FL004 | $0.00 |
| 1006AB | FL008 | $0.00 |
| 1006AC | FL009 | $0.00 |
| 1006AD | FL014 | $0.00 |
| 1006AE | FL017& FL134 | $0.00 |
| 1006AF | FL019 | $0.00 |
| 1006AG | FL020 | $0.00 |
| 1006AH | FL021 | $0.00 |
| 1006AJ | FL022 | $0.00 |
| 1006AK | FL023& FL115& FL125 | $0.00 |
| 1006AL | FL027 | $0.00 |
| 1006AM | FL029 | $0.00 |
| 1006AN | FL031 | $0.00 |
| 1006AO | FL037 | $0.00 |
| 1006AP | FL040 & FL135 | $0.00 |
| 1006AQ | FL041 & FL136 | $0.00 |
| 1006AR | FL103 & FL137 | $0.00 |
| 1006AS | FL126 | $0.00 |
| $0.00 | ||
| 1007 | First Option Period Firm Fixed-Price - Medium Service Level 2 (Amber) | |
| 1007AA | FL004 | $0.00 |
| 1007AB | FL008 | $0.00 |
| 1007AC | FL009 | $0.00 |
| 1007AD | FL014 | $0.00 |
| 1007AE | FL017& FL134 | $0.00 |
| 1007AF | FL019 | $0.00 |
| 1007AG | FL020 | $0.00 |
| 1007AH | FL021 | $0.00 |
| 1007AJ | FL022 | $0.00 |
| 1007AK | FL023& FL115& FL125 | $0.00 |
| 1007AL | FL027 | $0.00 |
| 1007AM | FL029 | $0.00 |
| 1007AN | FL031 | $0.00 |
| 1007AO | FL037 | $0.00 |
| 1007AP | FL040 & FL135 | $0.00 |
| 1007AQ | FL041 & FL136 | $0.00 |
| 1007AR | FL103 & FL137 | $0.00 |
| 1007AS | FL126 | $0.00 |
| $0.00 | ||
| 1008 | First Option Period Indefinite Quantity | |
| TOTAL IQ LINE ITEMS - B701 THROUGH B745 | $40,000.00 |
| 2006 | Second Option Period Firm Fixed-Price - High Service Level 1 (Green) | |
| 2006AA | FL004 | $0.00 |
| 2006AB | FL008 | $0.00 |
| 2006AC | FL009 | $0.00 |
| 2006AD | FL014 | $0.00 |
| 2006AE | FL017& FL134 | $0.00 |
| 2006AF | FL019 | $0.00 |
| 2006AG | FL020 | $0.00 |
| 2006AH | FL021 | $0.00 |
| 2006AJ | FL022 | $0.00 |
| 2006AK | FL023& FL115& FL125 | $0.00 |
| 2006AL | FL027 | $0.00 |
| 2006AM | FL029 | $0.00 |
| 2006AN | FL031 | $0.00 |
| 2006AO | FL037 | $0.00 |
| 2006AP | FL040 & FL135 | $0.00 |
| 2006AQ | FL041 & FL136 | $0.00 |
| 2006AR | FL103 & FL137 | $0.00 |
| 2006AS | FL126 | $0.00 |
| $0.00 | ||
| 2007 | Second Option Period Firm Fixed-Price - Medium Service Level 2 (Amber) | |
| 2007AA | FL004 | $0.00 |
| 2007AB | FL008 | $0.00 |
| 2007AC | FL009 | $0.00 |
| 2007AD | FL014 | $0.00 |
| 2007AE | FL017& FL134 | $0.00 |
| 2007AF | FL019 | $0.00 |
| 2007AG | FL020 | $0.00 |
| 2007AH | FL021 | $0.00 |
| 2007AJ | FL022 | $0.00 |
| 2007AK | FL023& FL115& FL125 | $0.00 |
| 2007AL | FL027 | $0.00 |
| 2007AM | FL029 | $0.00 |
| 2007AN | FL031 | $0.00 |
| 2007AO | FL037 | $0.00 |
| 2007AP | FL040 & FL135 | $0.00 |
| 2007AQ | FL041 & FL136 | $0.00 |
| 2007AR | FL103 & FL137 | $0.00 |
| 2007AS | FL126 | $0.00 |
| $0.00 | ||
| 2008 | Second Option Period Indefinite Quantity | |
| TOTAL IQ LINE ITEMS - C701 THROUGH C745 | $40,000.00 |
| 3006 | Third Option Period Firm Fixed-Price - High Service Level 1 (Green) | |
| 3006AA | FL004 | $0.00 |
| 3006AB | FL008 | $0.00 |
| 3006AC | FL009 | $0.00 |
| 3006AD | FL014 | $0.00 |
| 3006AE | FL017& FL134 | $0.00 |
| 3006AF | FL019 | $0.00 |
| 3006AG | FL020 | $0.00 |
| 3006AH | FL021 | $0.00 |
| 3006AJ | FL022 | $0.00 |
| 3006AK | FL023& FL115& FL125 | $0.00 |
| 3006AL | FL027 | $0.00 |
| 3006AM | FL029 | $0.00 |
| 3006AN | FL031 | $0.00 |
| 3006AO | FL037 | $0.00 |
| 3006AP | FL040 & FL135 | $0.00 |
| 3006AQ | FL041 & FL136 | $0.00 |
| 3006AR | FL103 & FL137 | $0.00 |
| 3006AS | FL126 | $0.00 |
| $0.00 | ||
| 3007 | Third Option Period Firm Fixed-Price - Medium Service Level 2 (Amber) | |
| 3007AA | FL004 | $0.00 |
| 3007AB | FL008 | $0.00 |
| 3007AC | FL009 | $0.00 |
| 3007AD | FL014 | $0.00 |
| 3007AE | FL017& FL134 | $0.00 |
| 3007AF | FL019 | $0.00 |
| 3007AG | FL020 | $0.00 |
| 3007AH | FL021 | $0.00 |
| 3007AJ | FL022 | $0.00 |
| 3007AK | FL023& FL115& FL125 | $0.00 |
| 3007AL | FL027 | $0.00 |
| 3007AM | FL029 | $0.00 |
| 3007AN | FL031 | $0.00 |
| 3007AO | FL037 | $0.00 |
| 3007AP | FL040 & FL135 | $0.00 |
| 3007AQ | FL041 & FL136 | $0.00 |
| 3007AR | FL103 & FL137 | $0.00 |
| 3007AS | FL126 | $0.00 |
| $0.00 | ||
| 3008 | Third Option Period Indefinite Quantity | |
| TOTAL IQ LINE ITEMS - D701 THROUGH D745 | $40,000.00 |
| 4006 | Fourth Option Period Firm Fixed-Price - High Service Level 1 (Green) | |
| 4006AA | FL004 | $0.00 |
| 4006AB | FL008 | $0.00 |
| 4006AC | FL009 | $0.00 |
| 4006AD | FL014 | $0.00 |
| 4006AE | FL017& FL134 | $0.00 |
| 4006AF | FL019 | $0.00 |
| 4006AG | FL020 | $0.00 |
| 4006AH | FL021 | $0.00 |
| 4006AJ | FL022 | $0.00 |
| 4006AK | FL023& FL115& FL125 | $0.00 |
| 4006AL | FL027 | $0.00 |
| 4006AM | FL029 | $0.00 |
| 4006AN | FL031 | $0.00 |
| 4006AO | FL037 | $0.00 |
| 4006AP | FL040 & FL135 | $0.00 |
| 4006AQ | FL041 & FL136 | $0.00 |
| 4006AR | FL103 & FL137 | $0.00 |
| 4006AS | FL126 | $0.00 |
| $0.00 | ||
| 4007 | Fourth Option Period Firm Fixed-Price - Medium Service Level 2 (Amber) | |
| 4007AA | FL004 | $0.00 |
| 4007AB | FL008 | $0.00 |
| 4007AC | FL009 | $0.00 |
| 4007AD | FL014 | $0.00 |
| 4007AE | FL017& FL134 | $0.00 |
| 4007AF | FL019 | $0.00 |
| 4007AG | FL020 | $0.00 |
| 4007AH | FL021 | $0.00 |
| 4007AJ | FL022 | $0.00 |
| 4007AK | FL023& FL115& FL125 | $0.00 |
| 4007AL | FL027 | $0.00 |
| 4007AM | FL029 | $0.00 |
| 4007AN | FL031 | $0.00 |
| 4007AO | FL037 | $0.00 |
| 4007AP | FL040 & FL135 | $0.00 |
| 4007AQ | FL041 & FL136 | $0.00 |
| 4007AR | FL103 & FL137 | $0.00 |
| 4007AS | FL126 | $0.00 |
| $0.00 | ||
| 4008 | Fourth Option Period Indefinite Quantity | |
| TOTAL IQ LINE ITEMS - E701 THROUGH E745 | $40,000.00 |
&"Arial,Regular"&10&F
J-0200000-07
&P of &N
ELINS BASE PERIOD FFP
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS A001 - A139 | NOTE: Quantity of 9 Months assumes Period of Performance begins September 14, 2015. | ||||||||
| CLIN 0006 - Base Period - Firm Fixed-Price Work - High Service Level (Green) | Please adjust the required quantity per the Phase-In Schedule in Section C, 0100000 if | ||||||||
| Period of Performance changes, for sites where work will begin after the initial date. | |||||||||
| FAC ID | SITE NAME | UNIT OF | UNIT | TOTAL | FL004 | 9/21/15 | 8.77 | ||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT | FL019 | 9/20/15 | 8.80 | |
| FL020 | 9/21/15 | 8.77 | |||||||
| FL004 | GAINESVILLE USARC | FL029 | 9/21/15 | 8.77 | |||||
| Firm Fixed-Price Work | FL040 | 9/20/15 | 8.80 | ||||||
| A001 | Improved Grounds (Spec Item 3.1) | 8.77 | Month | $ - 0 | $ - 0 | ||||
| A002 | Storm Drainage Systems (Spec Item 3.3) | 8.77 | Month | $ - 0 | $ - 0 | ||||
| Total CLIN 0006AA (Items A001 Through A002) | $0.00 |
| FL008 | CLARENCE L BURPEE USARC | ||||
| Firm Fixed-Price Work | |||||
| A003 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A004 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AB (Items A003 Through A004) | $0.00 |
| FL009 | LTC ROBERT R MILAM USARC | ||||
| Firm Fixed-Price Work | |||||
| A005 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A006 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AC (Items A005 Through A006) | $0.00 |
| FL014 | JAMES WEST USARC | ||||
| Firm Fixed-Price Work | |||||
| A007 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A008 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AD (Items A007 Through A008) | $0.00 |
| FL017 | COL F.M. WILLIAMS USARC | ||||
| FL134 | AMSA #47 G | ||||
| Firm Fixed-Price Work | |||||
| A009 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A010 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AE (Items A009 Through A010) | $0.00 |
| FL019 | MILTON USARC | ||||
| Firm Fixed-Price Work | |||||
| A011 | Improved Grounds (Spec Item 3.1) | 8.8 | Month | $ - 0 | $ - 0 |
| A012 | Semi-Improved Grounds (Spec Item 3.2) | 8.8 | Month | $ - 0 | $ - 0 |
| A013 | Storm Drainage Systems (Spec Item 3.3) | 8.8 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AF (Items A011 Through A013) | $0.00 |
| FL020 | OCALA USARC | ||||
| Firm Fixed-Price Work | |||||
| A014 | Improved Grounds (Spec Item 3.1) | 8.77 | Month | $ - 0 | $ - 0 |
| A015 | Storm Drainage Systems (Spec Item 3.3) | 8.77 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AG (Items A014 Through A015) | $0.00 |
| FL021 | MICHAEL MCCOY USARC | ||||
| Firm Fixed-Price Work | |||||
| A016 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A017 | NOT USED | ||||
| A018 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AH (Items A016 Through A018) | $0.00 |
| FL022 | ORANGE COUNTY USARC | ||||
| Firm Fixed-Price Work | |||||
| A019 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A020 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AJ (Items A019 Through A020) | $0.00 |
| FL023 | TAFT USARC | ||||
| FL115 | WILSON AFRC | ||||
| FL125 | AMSA 50 | ||||
| Firm Fixed-Price Work | |||||
| A021 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A022 | Semi-Improved Grounds (Spec Item 3.2) | 9 | Month | $ - 0 | $ - 0 |
| A023 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AK (Items A021 Through A023) | $0.00 |
| FL027 | JOSEPH STILLWELL USARC | ||||
| Firm Fixed-Price Work | |||||
| A024 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A025 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AL (Items A024 Through A025) | $0.00 |
| FL029 | NEWKIRK SUTHERLAND JR USARC | ||||
| Firm Fixed-Price Work | |||||
| A026 | Improved Grounds (Spec Item 3.1) | 8.77 | Month | $ - 0 | $ - 0 |
| A027 | Storm Drainage Systems (Spec Item 3.3) | 8.77 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AM (Items A026 Through A027) | $0.00 |
| FL031 | LTC LUIS E. MARTINEZ USARC | ||||
| Firm Fixed-Price Work | |||||
| A028 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A029 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AN (Items A028 Through A029) | $0.00 |
| FL037 | 1LT MAX R. STOVER USARC | ||||
| Firm Fixed-Price Work | |||||
| A030 | Improved Grounds (Section C, 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A031 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AO (Items A030 Through A031) | $0.00 |
| FL040 | T. WHIDDON USARC | ||||
| FL135 | AMSA #52 (G) | ||||
| Firm Fixed-Price Work | |||||
| A032 | Improved Grounds (Spec Item 3.1) | 8.8 | Month | $ - 0 | $ - 0 |
| A033 | Storm Drainage Systems (Spec Item 3.3) | 8.8 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AP (Items A032 Through A033) | $0.00 |
| FL041 | C. LOVEJOY USARC | ||||
| FL136 | AMSA #53 (G) | ||||
| Firm Fixed-Price Work | |||||
| A034 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A035 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AQ (Items A034 Through A035) | $0.00 |
| FL103 | RATTLESNAKE POINT USARC | ||||
| FL137 | AMSA (M) #51 | ||||
| Firm Fixed-Price Work | |||||
| A036 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A037 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AR (Items A036 Through A037) | $0.00 |
| FL126 | CLEARWATER ASF | ||||
| Firm Fixed-Price Work | |||||
| A038 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A039 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AS (Items A038 Through A039) | $0.00 |
TOTAL FFP LINE ITEMS - A001 THROUGH A039 $0.00
CLIN 0007 - Base Period - Firm Fixed-Price Work - Medium Service Level (Amber)
| FL004 | GAINESVILLE USARC | ||||
| Firm Fixed-Price Work | |||||
| A101 | Improved Grounds (Spec Item 3.1) | 8.77 | Month | $ - 0 | $ - 0 |
| A102 | Storm Drainage Systems (Spec Item 3.3) | 8.77 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AA (Items A101 Through A102) | $0.00 |
| FL008 | CLARENCE L BURPEE USARC | ||||
| Firm Fixed-Price Work | |||||
| A103 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A104 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AB (Items A103 Through A104) | $0.00 |
| FL009 | LTC ROBERT R MILAM USARC | ||||
| Firm Fixed-Price Work | |||||
| A105 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A106 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AC (Items A105 Through A106) | $0.00 |
| FL014 | JAMES WEST USARC | ||||
| Firm Fixed-Price Work | |||||
| A107 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A108 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AD (Items A107 Through A108) | $0.00 |
| FL017 | COL F.M. WILLIAMS USARC | ||||
| FL134 | AMSA #47 G | ||||
| Firm Fixed-Price Work | |||||
| A109 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A110 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AE (Items A109 Through A110) | $0.00 |
| FL019 | MILTON USARC | ||||
| Firm Fixed-Price Work | |||||
| A111 | Improved Grounds (Spec Item 3.1) | 8.8 | Month | $ - 0 | $ - 0 |
| A112 | Semi-Improved Grounds (Spec Item 3.2) | 8.8 | Month | $ - 0 | $ - 0 |
| A113 | Storm Drainage Systems (Spec Item 3.3) | 8.8 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AF (Items A111 Through A113) | $0.00 |
| FL020 | OCALA USARC | ||||
| Firm Fixed-Price Work | |||||
| A114 | Improved Grounds (Spec Item 3.1) | 8.77 | Month | $ - 0 | $ - 0 |
| A115 | Storm Drainage Systems (Spec Item 3.3) | 8.77 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AG (Items A114 Through A115) | $0.00 |
| FL021 | MICHAEL MCCOY USARC | ||||
| Firm Fixed-Price Work | |||||
| A116 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A117 | NOT USED | Month | $ - 0 | $ - 0 | |
| A118 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AH (Items A116 Through A118) | $0.00 |
| FL022 | ORANGE COUNTY USARC | ||||
| Firm Fixed-Price Work | |||||
| A119 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A120 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AJ (Items A119 Through A120) | $0.00 |
| FL023 | TAFT USARC | ||||
| FL115 | WILSON AFRC | ||||
| FL125 | AMSA 50 | ||||
| Firm Fixed-Price Work | |||||
| A121 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A122 | Semi-Improved Grounds (Spec Item 3.2) | 9 | Month | $ - 0 | $ - 0 |
| A123 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AK (Items A121 Through A123) | $0.00 |
| FL027 | JOSEPH STILLWELL USARC | ||||
| Firm Fixed-Price Work | |||||
| A124 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A125 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AL (Items A124 Through A125) | $0.00 |
| FL029 | NEWKIRK SUTHERLAND JR USARC | ||||
| Firm Fixed-Price Work | |||||
| A126 | Improved Grounds (Spec Item 3.1) | 8.77 | Month | $ - 0 | $ - 0 |
| A127 | Storm Drainage Systems (Spec Item 3.3) | 8.77 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AM (Items A126 Through A127) | $0.00 |
| FL031 | LTC LUIS E. MARTINEZ USARC | ||||
| Firm Fixed-Price Work | |||||
| A128 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A129 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AN (Items A128 Through A129) | $0.00 |
| FL037 | 1LT MAX R. STOVER USARC | ||||
| Firm Fixed-Price Work | |||||
| A130 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A131 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AO (Items A130 Through A131) | $0.00 |
| FL040 | T. WHIDDON USARC | ||||
| FL135 | AMSA #52 (G) | ||||
| Firm Fixed-Price Work | |||||
| A132 | Improved Grounds (Spec Item 3.1) | 8.8 | Month | $ - 0 | $ - 0 |
| A133 | Storm Drainage Systems (Spec Item 3.3) | 8.8 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AP (Items A132 Through A133) | $0.00 |
| FL041 | C. LOVEJOY USARC | ||||
| FL136 | AMSA #53 (G) | ||||
| Firm Fixed-Price Work | |||||
| A134 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A135 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AQ (Items A134 Through A135) | $0.00 |
| FL103 | RATTLESNAKE POINT USARC | ||||
| FL137 | AMSA (M) #51 | ||||
| Firm Fixed-Price Work | |||||
| A136 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A137 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AR (Items A136 Through A137) | $0.00 |
| FL126 | CLEARWATER ASF | ||||
| Firm Fixed-Price Work | |||||
| A138 | Improved Grounds (Spec Item 3.1) | 9 | Month | $ - 0 | $ - 0 |
| A139 | Storm Drainage Systems (Spec Item 3.3) | 9 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AS (Items A138 Through A139) | $0.00 |
TOTAL FFP LINE ITEMS - A101 THROUGH A139 $0.00
&F
J-0200000-07
&P of &N
ELINS BASE PERIOD IQ
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS A701 - A745 |
| CLIN 0008 - Base Period - Indefinite Quantity Work |
| UNIT | UNIT OF | MIN. ORDER | |||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | PRICE | ISSUE | QTY |
| A701 | Tree and Stump Removal | |
| Large 18.1” DBH and above Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 10 calendar days. | $ - 0 | Each | 1 |
| A702 | Tree and Stump Removal | ||
| Medium 6.1" DBH up to 18" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 7 calendar days. | $ - 0 | Each | 1 |
| A703 | Tree and Stump Removal | ||
| Small up to 6" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| A704 | Shrub and Stump Removal | ||
| Large 15-gallon and above, 48.1” and above Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| A705 | Shrub and Stump Removal | ||
| Medium 5- to 15-gallon, 18.1” up to 48” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| A706 | Shrub and Stump Removal | ||
| Small Up to 5-gallon, up to 18” Shrub and Stump Removal | Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level.
| Work shall be completed within 3 calendar days. | $ - 0 | Each | 1 |
| A707 | Complete Tree Pruning | ||
| Small - below and including 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 1 calendar day. | $ - 0 | Each | 1 |
| A708 | Complete Tree Pruning | ||
| Large - above 15' Complete Tree Pruning | The Contractor shall prune trees according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 2 calendar days. | $ - 0 | Each | 1 | |||
| A709 | Soil Analysis | Perform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations. | $ - 0 | Each | 1 | |
| A710 | Grassing | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Work shall be completed within 10 calendar days. |
| Seed species will be identified in the task order. | $ - 0 | SF | 50 |
| A711 | Tree Planting | All trees shall be nursery grown and bear certification indicating species, common name, and grade. Trees shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Trees planted shall have trunk diameters (measured 6 inches up from the ground) of at least 3 inches. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| A712 | Shrub Planting (1-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 1-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| A713 | Shrub Planting (5-gallon) | All shrubs shall be nursery grown and bear certification indicating species, common name, and grade. Shrubs shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. |
| Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 | |||
| A714 | Bedding/Ornamental Plants (4" pot size) | All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | $ - 0 | Each | 10 | |
| A715 | Sodding | Sod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | $ - 0 | SF | 50 |
| A716 | Sprigging | Sprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government. |
| Work shall be completed within 20 calendar days. | $ - 0 | SF | 50 | |||
| A717 | Fertilize | Vegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days. | $ - 0 | SF | 100 | |
| A718 | Dethatch & Aerate | Services shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance. | ||||
| Work shall be completed within 14 calendar days. | $ - 0 | SF | 100 | |||
| A719 | Aerate | Grass shall be aerated to promote health and growth. |
| Work shall be completed within 10 calendar days. | $ - 0 | SF | 100 |
| A720 | Shrub Pruning (Stand-alone plants) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | $ - 0 | Each | 5 |
| A721 | Hedge Pruning (Continuous Hedging) | The Contractor shall prune shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. |
| Work shall be completed within 3 calendar days. | $ - 0 | LF | 100 | |||
| A722 | Erosion Control | Soil erosion damage shall be repaired by filling in washed out/bare areas with soil matching the surrounding area and ground elevation (after compacting). The area shall be raked, fertilized, seeded, covered with straw, matting, or other material suitable to correct the effects of erosion. Areas shall be cared for until vegetation is firmly established. Erosion Control shall be completed within 10 calendar days. | $ - 0 | SF | 50 | |
| A723 | Underbrushing | All brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Work shall be completed within 10 calendar days. | $ - 0 | SF | 100 | |
| A724 | Field Mowing | Vegetation shall be mowed to a height of 6". All debris shall be removed upon completion of mowing. Work shall be completed within 20 calendar days. | $ - 0 | SF | 5,000 | |
| A725 | Control Undesired Vegetation | Remove vegetation along fence lines (20' on both sides of fence) and in pavement cracks. Chemicals are limited to approved use as per the Integrated Pest Management Plan (IPMP). | ||||
| Work shall be completed within 10 calendar days. | $ - 0 | LF | 100 | |||
| A726 | Debris Removal | Remove and properly dispose of natural debris (tree limbs, leaves, dry brush, rodent habitats, dead animals, etc.), and stray man-made trash/debris. |
| Work shall be completed within 10 calendar days. | $ - 0 | SF | 50 | |||
| Special Event Grass Cutting at the following sites: | Services to be provided in improved grounds areas. Grass shall be mowed and trimmed to a uniform height of 2 inches. Edging to provide a uniform edged cut. Raking and removal of leaves, pine straw and pine cones, limbs, and other debris from the raked area. All clippings and debris shall be removed. Work to be completed in 3 calendar days. Provide a price to provide services at each site. | |||||
| A727 | FL004 | GAINESVILLE USARC | $ - 0 | Each | 1 | |
| A728 | FL008 | CLARENCE L BURPEE USARC | $ - 0 | Each | 1 | |
| A729 | FL009 | LTC ROBERT R MILAM USARC | $ - 0 | Each | 1 | |
| A730 | FL014 | JAMES WEST USARC | $ - 0 | Each | 1 | |
| A731 | FL017& FL134 | COL F.M. WILLIAMS USARC & AMSA #47 G | $ - 0 | Each | 1 | |
| A732 | FL019 | MILTON USARC | $ - 0 | Each | 1 | |
| A733 | FL020 | OCALA USARC | $ - 0 | Each | 1 | |
| A734 | FL021 | MICHAEL MCCOY USARC | $ - 0 | Each | 1 | |
| A735 | FL022 | ORANGE COUNTY USARC | $ - 0 | Each | 1 | |
| A736 | FL023& FL115& FL125 | TAFT USARC & WILSON AFRC & AMSA 50 | $ - 0 | Each | 1 | |
| A737 | FL027 | JOSEPH STILLWELL USARC | $ - 0 | Each | 1 | |
| A738 | FL029 | NEWKIRK SUTHERLAND JR USARC | $ - 0 | Each | 1 | |
| A739 | FL031 | LTC LUIS E. MARTINEZ USARC | $ - 0 | Each | 1 | |
| A740 | FL037 | 1LT MAX R. STOVER USARC | $ - 0 | Each | 1 | |
| A741 | FL040 & FL135 | T. WHIDDON USARC & AMSA #52 (G) | $ - 0 | Each | 1 | |
| A742 | FL041 & FL136 | C. LOVEJOY USARC & AMSA #53 (G) | $ - 0 | Each | 1 | |
| A743 | FL103 & FL137 | RATTLESNAKE POINT USARC & AMSA (M) #51 | $ - 0 | Each | 1 | |
| A744 | FL126 | CLEARWATER ASF | $ - 0 | Each | 1 | |
| A745 | Plant Native Vegetation | All native plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Indigenous plants, and low maintenance plants are tolerant of site's existing soils and climate without supplemental irrigation or fertilization once established. This line item may be used in conjunction with line items above to convert existing landscape to xeriscape. |
Plants established shall be 5-gallon size. Native plants shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. $ - 0 Each 10
TOTAL CAPACITY IQ LINE ITEMS - A701 THROUGH A745 $30,000.00
&F
&A &P of &N
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELINS OPTION 1 FFP
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - FIRM FIXED-PRICE IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINS B001 - B139 |
| CLIN 1006 - First Option Period - Firm Fixed-Price Work - High Service Level (Green) |
| FAC ID | SITE NAME | UNIT OF | UNIT | TOTAL | |
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| FL004 | GAINESVILLE USARC | ||||
| Firm Fixed-Price Work | |||||
| B001 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B002 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AA (Items B001 Through B002) | $0.00 |
| FL008 | CLARENCE L BURPEE USARC | ||||
| Firm Fixed-Price Work | |||||
| B003 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B004 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AB (Items B003 Through B004) | $0.00 |
| FL009 | LTC ROBERT R MILAM USARC | ||||
| Firm Fixed-Price Work | |||||
| B005 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B006 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AC (Items B005 Through B006) | $0.00 |
| FL014 | JAMES WEST USARC | ||||
| Firm Fixed-Price Work | |||||
| B007 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B008 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AD (Items B007 Through B008) | $0.00 |
| FL017 | COL F.M. WILLIAMS USARC | ||||
| FL134 | AMSA #47 G | ||||
| Firm Fixed-Price Work | |||||
| B009 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B010 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AE (Items B009 Through B010) | $0.00 |
| FL019 | MILTON USARC | ||||
| Firm Fixed-Price Work | |||||
| B011 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B012 | Semi-Improved Grounds (Spec Item 3.2) | 12 | Month | $ - 0 | $ - 0 |
| B013 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AF (Items B011 Through B013) | $0.00 |
| FL020 | OCALA USARC | ||||
| Firm Fixed-Price Work | |||||
| B014 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B015 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AG (Items B014 Through B015) | $0.00 |
| FL021 | MICHAEL MCCOY USARC | ||||
| Firm Fixed-Price Work | |||||
| B016 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B017 | NOT USED | ||||
| B018 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AH (Items B016 Through B018) | $0.00 |
| FL022 | ORANGE COUNTY USARC | ||||
| Firm Fixed-Price Work | |||||
| B019 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B020 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AJ (Items B019 Through B020) | $0.00 |
| FL023 | TAFT USARC | ||||
| FL115 | WILSON AFRC | ||||
| FL125 | AMSA 50 | ||||
| Firm Fixed-Price Work | |||||
| B021 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B022 | Semi-Improved Grounds (Spec Item 3.2) | 12 | Month | $ - 0 | $ - 0 |
| B023 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AK (Items B021 Through B023) | $0.00 |
| FL027 | JOSEPH STILLWELL USARC | ||||
| Firm Fixed-Price Work | |||||
| B024 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B025 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AL (Items B024 Through B025) | $0.00 |
| FL029 | NEWKIRK SUTHERLAND JR USARC | ||||
| Firm Fixed-Price Work | |||||
| B026 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B027 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AM (Items B026 Through B027) | $0.00 |
| FL031 | LTC LUIS E. MARTINEZ USARC | ||||
| Firm Fixed-Price Work | |||||
| B028 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B029 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AN (Items B028 Through B029) | $0.00 |
| FL037 | 1LT MAX R. STOVER USARC | ||||
| Firm Fixed-Price Work | |||||
| B030 | Improved Grounds (Section C, 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B031 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AO (Items B030 Through B031) | $0.00 |
| FL040 | T. WHIDDON USARC | ||||
| FL135 | AMSA #52 (G) | ||||
| Firm Fixed-Price Work | |||||
| B032 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B033 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AP (Items B032 Through B033) | $0.00 |
| FL041 | C. LOVEJOY USARC | ||||
| FL136 | AMSA #53 (G) | ||||
| Firm Fixed-Price Work | |||||
| B034 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B035 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AQ (Items B034 Through B035) | $0.00 |
| FL103 | RATTLESNAKE POINT USARC | ||||
| FL137 | AMSA (M) #51 | ||||
| Firm Fixed-Price Work | |||||
| B036 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B037 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AR (Items B036 Through B037) | $0.00 |
| FL126 | CLEARWATER ASF | ||||
| Firm Fixed-Price Work | |||||
| B038 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B039 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0006AS (Items B038 Through B039) | $0.00 |
TOTAL FFP LINE ITEMS - B001 THROUGH B039 $0.00
CLIN 1007 - First Option Period - Firm Fixed-Price Work - Medium Service Level (Amber)
| FL004 | GAINESVILLE USARC | ||||
| Firm Fixed-Price Work | |||||
| B101 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B102 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AA (Items B101 Through B102) | $0.00 |
| FL008 | CLARENCE L BURPEE USARC | ||||
| Firm Fixed-Price Work | |||||
| B103 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B104 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AB (Items B103 Through B104) | $0.00 |
| FL009 | LTC ROBERT R MILAM USARC | ||||
| Firm Fixed-Price Work | |||||
| B105 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B106 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AC (Items B105 Through B106) | $0.00 |
| FL014 | JAMES WEST USARC | ||||
| Firm Fixed-Price Work | |||||
| B107 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B108 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AD (Items B107 Through B108) | $0.00 |
| FL017 | COL F.M. WILLIAMS USARC | ||||
| FL134 | AMSA #47 G | ||||
| Firm Fixed-Price Work | |||||
| B109 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B110 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AE (Items B109 Through B110) | $0.00 |
| FL019 | MILTON USARC | ||||
| Firm Fixed-Price Work | |||||
| B111 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B112 | Semi-Improved Grounds (Spec Item 3.2) | 12 | Month | $ - 0 | $ - 0 |
| B113 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AF (Items B111 Through B113) | $0.00 |
| FL020 | OCALA USARC | ||||
| Firm Fixed-Price Work | |||||
| B114 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B115 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AG (Items B114 Through B115) | $0.00 |
| FL021 | MICHAEL MCCOY USARC | ||||
| Firm Fixed-Price Work | |||||
| B116 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B117 | NOT USED | Month | $ - 0 | $ - 0 | |
| B118 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AH (Items B116 Through B118) | $0.00 |
| FL022 | ORANGE COUNTY USARC | ||||
| Firm Fixed-Price Work | |||||
| B119 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B120 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AJ (Items B119 Through B120) | $0.00 |
| FL023 | TAFT USARC | ||||
| FL115 | WILSON AFRC | ||||
| FL125 | AMSA 50 | ||||
| Firm Fixed-Price Work | |||||
| B121 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B122 | Semi-Improved Grounds (Spec Item 3.2) | 12 | Month | $ - 0 | $ - 0 |
| B123 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AK (Items B121 Through B123) | $0.00 |
| FL027 | JOSEPH STILLWELL USARC | ||||
| Firm Fixed-Price Work | |||||
| B124 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B125 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AL (Items B124 Through B125) | $0.00 |
| FL029 | NEWKIRK SUTHERLAND JR USARC | ||||
| Firm Fixed-Price Work | |||||
| B126 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B127 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AM (Items B126 Through B127) | $0.00 |
| FL031 | LTC LUIS E. MARTINEZ USARC | ||||
| Firm Fixed-Price Work | |||||
| B128 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B129 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AN (Items B128 Through B129) | $0.00 |
| FL037 | 1LT MAX R. STOVER USARC | ||||
| Firm Fixed-Price Work | |||||
| B130 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B131 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AO (Items B130 Through B131) | $0.00 |
| FL040 | T. WHIDDON USARC | ||||
| FL135 | AMSA #52 (G) | ||||
| Firm Fixed-Price Work | |||||
| B132 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B133 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AP (Items B132 Through B133) | $0.00 |
| FL041 | C. LOVEJOY USARC | ||||
| FL136 | AMSA #53 (G) | ||||
| Firm Fixed-Price Work | |||||
| B134 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B135 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AQ (Items B134 Through B135) | $0.00 |
| FL103 | RATTLESNAKE POINT USARC | ||||
| FL137 | AMSA (M) #51 | ||||
| Firm Fixed-Price Work | |||||
| B136 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B137 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AR (Items B136 Through B137) | $0.00 |
| FL126 | CLEARWATER ASF | ||||
| Firm Fixed-Price Work | |||||
| B138 | Improved Grounds (Spec Item 3.1) | 12 | Month | $ - 0 | $ - 0 |
| B139 | Storm Drainage Systems (Spec Item 3.3) | 12 | Month | $ - 0 | $ - 0 |
| Total CLIN 0007AS (Items B138 Through B139) | $0.00 |
TOTAL FFP LINE ITEMS - B101 THROUGH B139 $0.00
&F
&P of &N
ELINS OPTION 1 IQ
| ATTACHMENT J-0200000-07 |
| EXHIBIT LINE ITEM NUMBERS |
| PROVIDE PRICES IN SHADED CELLS TO PROVIDE GROUNDS MAINTENANCE SERVICES - INDEFINITE QUANTITY IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINS B701 - B745 |
| CLIN 1008 - First Option Period - Indefinite Quantity Work |
| UNIT | UNIT OF | MIN. ORDER | |||
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | PRICE | ISSUE | QTY |
| B701 | Tree and Stump Removal | |
| Large 18.1” DBH and above Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 10 calendar days. | $ - 0 | Each | 1 |
| B702 | Tree and Stump Removal | ||
| Medium 6.1" DBH up to 18" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 7 calendar days. | $ - 0 | Each | 1 |
| B703 | Tree and Stump Removal | ||
| Small up to 6" Tree and Stump Removal | Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. |
Trees are sized by the Diameter at Breast Height (DBH). DBH is measured at 4.5 feet above ground level.
| Work shall be completed within 5 calendar days. | $ - 0 | Each | 1 |
| B704 | Shrub and Stump Removal |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .