Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This purpose of this amendment is to modify the Pricing schedule and Section 3.2 in the Statement of Work.
Please see summary of changes and attachment for changes.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Jun-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HP-15-R-0007
X 9B. DATED (SEE ITEM 11)
04-Jun-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Jun-2015
CODE
US ARMY CORPS OF ENGINEERS, CHARLESTON
69-A HAGOOD AVENUE
CHARLESTON SC 29403
W912HP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HP-15-R-0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been modified:
PRICING SCHEDULE
PRICING SCHEDULE
The maximum amount of this contract shall not exceed $25,000,000.00. The Base and all Option Periods are an estimated $5,000,000.00 each. The actual obligation per year may be greater than or less than these amounts, but the total contract amount shall not exceed $25,000,000.00.
The contractor shall perform any and all functions called out in the contract per the scope specified in individual delivery orders issued against this contract. The unit prices shall be as specified in the unit price database provided by the R.S. Means® Company, current as of the date of the basic contract period, multiplied by the City Cost Index (CCI) for the closest city in which the work is to take place, and then multiplied times the coefficient entered below:
Basic contract period: Date of award through 365 days. Definitive beginning and ending date for the basic contract period will be established on the award document.
NOTE: The coefficient submitted for the basic year will be used for each option year exercised. The only adjustment will be made through changes in the RS MEANS© and/or the applicable CCI.
(CLINS) DESCRIPTION COEFFICIENT
0001AA Standard working hours, local Charleston SC area
0001AB Non-standard working hours, local Charleston SC area
0001AC Modifications under $3,000, local Charleston, SC area ____________
0001AD Standard working hours St. Stephen Powerhouse, SC
0001AE Non-standard working hours St. Stephen Powerhouse, SC
0001AF Modifications under $3,000, St. Stephen Powerhouse, SC _________________
0001AG Non Pre-Price Item (NPI) _________________
The following CLIN will be used during the basic year and for each option year exercised for the portion of all CLINS attributed to project estimating.
OPTION PERIODS
1st Option Period: End of Base Period through 365 days
The contractor shall perform any and all functions called out in the contract per scope specified in individual delivery orders issued against this contract. The unit prices shall be as specified in the unit price database provided by the R.S. MEANS® Company, current as of the date of the 1st option period, multiplied by the City Cost Index (CCI) for the closest city in which the work is to take place, and then multiplied times the applicable coefficient entered for the basic year.
2nd Option Period: End of Option Period One through 365 days
The contractor shall perform any and all functions called out in the contract per scope specified in individual delivery orders issued against this contract. The unit prices shall be as specified in the unit price database provided by the R.S. MEANS® Company, current as of the date of the 2nd option period, multiplied by the City Cost Index (CCI) for the closest city in which the work is to take place, and then multiplied
3rd Option Period: End of Option Period Two through 365 days
The contractor shall perform any and all functions called out in the contract per scope specified in individual delivery orders issued against this contract. The unit prices shall be as specified in the unit price database provided by the R.S. MEANS® Company, current as of the date of the 3rd option period, multiplied by the City Cost Index (CCI) for the closest city in which the work is to take place, and then multiplied
4th Option Period: End of Option Period Three through 365 days
The contractor shall perform any and all functions called out in the contract per scope specified in individual delivery orders issued against this contract. The unit prices shall be as specified in the unit price database provided by the R.S. MEANS® Company, current as of the date of the 4th option period, multiplied by the City Cost Index (CCI) for the closest city in which the work is to take place, and then multiplied
NOTES TO BIDDERS
Note 1: In order to be considered for award, the offeror must submit a coefficient for each line item above. The Government uses these multipliers to determine the price of work for each task on individual delivery orders. The prices established in the RS MEANS® (current year) database bare costs (which means no markup for overhead and profit (O&P)) column, will be multiplied by the City Cost Index Weighted Average Total for the closest city, and the coefficient to arrive at the actual price for a unit of work. The coefficients shall be represented as"net", a "decrease from" or an "increase to" the prices listed in the RS MEANS®. An offer of "net" would be represented as "1.0." An example of a decrease from the prices in RS MEANS® would be "0.98." An example of an increase above the prices listed in the RS MEANS® would be "1.10."
Note 2: If the Government directs a work schedule during nonstandard hours, then the coefficients entered for the nonstandard hours, as appropriate, shall be applied against those items of work, which will be performed during the nonstandard hours. The price for the remaining items of work is calculated using the coefficients entered for standard hour work, as appropriate. The term "nonstandard working hours" is not to be interpreted as "overtime."
Note 3: Offerors’ Price Proposal will be evaluated as a weighted sum of Bid Schedule Coefficients multiplied by the Project Distribution percent.
PROJECT DISTRIBUTION
It is estimated that the maximum dollar amount of this contract will be distributed as follows:
Unit Price Book Costs:
85% Work accomplished during standard working hours at JBC, SC 2% Work accomplished during non-standard working hours at JBC, SC
6% Work accomplished during standard working hours at St. Stephen Power House, SC 2% Work accomplished during non-standard hours at St. Stephen Power House, SC
Non Pre-Priced Item Costs:
5% Non Pre-Priced Work
DELIVERY ORDER RANGE AND ANTICIPATED AVERAGE DELIVERY ORDER SIZE:
Construction projects under this contract will generally range from $3,000 to $750,000.
Following is other pertinent historical information on the previous JOC contract at JBC, SC as accumulated: Total dollars spent on all delivery orders issued: $11.6 Million
Total number of orders issued: 57
Smallest delivery order issued: $3,000
Largest delivery order issued: $1.07 Million
Majority of delivery orders were in the range of $20,000 to $450,000
Average delivery order size was: $200,000 $160,000
The above information is historical data only and does not necessarily represent future volume under this contract.
(End of Summary of Changes)
STATEMENT OF WORK
TECHNICAL SPECIFICATIONS
FOR
JOB ORDER CONTRACT
JOC
AT
CHARLESTON AND ST. STEPHEN,
SOUTH CAROLINA
03 JUNE 2015
JOB ORDER CONTRACT (JOC)
CHARLESTON& ST. STEPHEN,
SOUTH CAROLINA STATEMENT
OF WORK
1.0 PROJECT DESCRIPTION
1.1 The contractor shall provide all management, labor, material, equipment, (unless furnished by the Government), transportation, and supervision to accomplish simultaneous projects for a broad range of maintenance, repair and minor construction work in the local Charleston, SC and St Stephens area.
Work will be accomplished for military and federal government customers to include but not limited to Army, Navy, Air Force, NNPTC, NPTU, NMC, BRIG, SPAWAR, ASLAC, SDDC, Veterans Affairs, Medical Clinic Charleston, Department of State, and Army Corps of Engineers. Facilities include, but are not limited to, research and development, medical, academic, secure areas, waterfront, administrative, institutional, industrial, etc., as well as their corresponding support facilities; infrastructure such as pavements, roads, parking, drainage systems, utility systems, and force protection. Prompt response and execution of all task orders is required. The Contracting Officer (KO) will issue a request for proposal (RFP) describing basic requirements for each individual task order (TO) on an as needed basis. Following review of the Contractor’s TO proposal, the KO will negotiate with the Contractor, and award an individual TO. The Contractor will be required to maintain a local office to facilitate receipt of each RFP and provide other services as described in Section
3.0 – PERFORMANCE CAPABILITIES.
1.2 The Government will provide design information or performance based requirements for each RFP. The Contractor shall complete the incidental design as construction shop drawings and manufacturers data (design does not require stamped drawings by licensed professional engineers) and complete as- built drawings. The Contractor shall provide sufficient technical support and project management to assure quality and completeness of TO proposals, accommodate a number of concurrent “active” projects, provide flexibility of subcontractor pool to handle rapid increases in work volume, process submittals in a timely manner, and perform according to schedule. The contractor shall be required to manage and execute the normal workload of up to thirty-five plus (35+) concurrent projects, and up to seventy plus (70+) projects annually. The contractor may on occasion be required to provide for large unexpected fluctuations in the workload. It is estimated that less than five percent (5%) of all work will be required during other than normal working hours.
1.3 The government will not use this contract solely to satisfy equipment requirements. Task orders issued hereunder, however, may include incidental requirements for equipment that are reasonable components of construction projects.
1.4 Simplified TO Execution:
1.4.1 Pre-Construction Administrative Submittals: There shall be two categories of Pre-Construction administrative submittals for Government review:
(1) Base Contract Submittals and (2) TO Submittals. Base Contract Submittals shall be provided within fifteen (15) calendar days of award of the Base Contract and will serve to reduce subsequent TO paperwork, maximize TO execution efficiency, and speed commencement of field work. The Base Contract Submittals will address general administrative contract requirements, plans, procedures and shall thoroughly address the type of work and situations typically encountered for this type of work. TO Submittals will be submitted as Addendums to the Base Contract Submittals and will address TO specific administrative requirements, plans, and procedures. TO Submittals shall be submitted to the Government no more than 15 calendar days after Notice to Proceed (NTP) is given on the specific task order. TO Submittals will appoint personnel, address specific hazards, controls, and features of work. Example administrative submittals for each category are below:
Base Contract Submittals:
- Contractor Quality Control (QC) Plan
- Accident Prevention Plan (APP)
- Environmental Protection Plan (EPP)
- Master Project Schedule
TO Submittals:
- QC Plan Addendum
- APP Addendum (with AHAs)
- EPP Addendum
- Bar Chart Schedule
- Construction Site Plan
- Asbestos Abatement/Control Plan
- Lead Abatement/Control Plan
- Outage Requests
- Permits
- O&M Manuals
- Warranty Data
- As-Built Drawings
1.4.2 Consistent Format for Task order Statement of Work: The Government will use a template Statement of Work in preparing RFPs to outline minimum requirements. A draft of this template is provided as Appendix B.
2.0 WORK BY THE GOVERNMENT: The Government is not obligated to issue any particular type of work under this contract and reserves the right to accomplish work using Government workforces or by other contracts, as the Government deems necessary or desirable, and to do so will not breach or otherwise violate this contract.
3.0 PERFORMANCE CAPABILITIES
3.1 Commencement of Work:
3.1.1 The contractor shall be capable of negotiating and executing task orders within fifteen (15) calendar days from the time of base contract award.
3.1.2 The contractor shall have fifteen (15) calendar days from the time of base contract award to be fully operational to administer and meet all the requirements of the contract.
3.1.3 Upon notification from the Contracting Officer (KO) of a requirement, the Contractor shall prepare and submit a task order proposal to the KO within ten (10) working days from the date of the task order request. If the KOdetermines the requirement to be a quick response requirement, the Contractor shall submit the TO proposal to the KO within five (5) working days. For more complex projects, additional time may be granted by the KO.
3.1.4 PRE-BID SITE VISITS: The Contractor shall make every effort to have all applicable and necessary parties at the official Pre-Bid site walk as deemed necessary by the Contractor in order to minimize or eliminate the need for follow-up site visits. Applicable parties include prime contractor estimators, project managers, superintendents, and subcontractors.
3.2 Contractor Personnel
3.2.1 Project Team and Shared Roles: The Contract Manager (CM) shall not serve as the primary QCM (Quality Control Manager), PS (Project Superintendent), or SSHO (Site Safety and Health Officer), however the CM may be appointed as an alternate to provide oversight during the short term absence (no more than one week) of the primary QCM, PS, SSHO if the CM meets the qualifications of those positions. Unless dedicated personnel are required in the TO, the QCM, PS, and SSHO may be a single person if they meet the qualifications of each position. If dedicated personnel are required for a particular TO it will be considered a Non Pre-Priced Item (NPI) for that TO and therefore should not be included in the coefficients. If there is evidence the appointed personnel cannot fulfill all contract requirements while serving in multiple roles, they shall be replaced, supplemented, or roles separated as directed by the KO at no additional cost to the Government.
The QCM, PS, and SSHO shall have full mobility and reasonable access to effectively provide oversight and sustain a daily physical presence over ALL active TO project sites, unless (1) a TO specifically requires a dedicated QCM, PS, and/or SSHO to be their sole, full-time responsibility. If a specific task order requires a full time dedicated QCM, PS, and/or SSHO, it will be covered as a non priced line item under that task order. ; (2) active TO project sites are separated by more than 45 minutes' travel time; (3) the TO project sites are more than 45 minutes travel time from the QCM’s office location. Any project site more than 45 minutes from the QCM, PS, and SSHO location shall have dedicated, appointed, and qualified personnel for oversight and sustainment of a physical presence.
Subcontractors may not perform the CM, QCM, PS, or SSHO duties. Appoint alternates to serve in the event of a CM, QCM, PS, or SSHO absence from the physical site. The requirements, authority, and qualifications for the alternates are the same as primary appointee.
3.2.2 Contractor’s Contract Manager (CM): The contract manager will be responsible for the overall performance of this contract. The contract manager shall have a minimum of 5 years experience managing Government construction contracts and a minimum of 10 years managing construction and renovation work similar to the work to be performed under this contract. This individual(s) shall have direct oversight of all project construction and planning activities.
The CM will receive each RFP. The Contractor shall provide quality, cost-effective proposals for multiple TOs simultaneously within the time constraints stated in Section 16.0 – ORDERING PROCEDURES.
3.2.3 Contractor’s Quality Control Manager (QCM): The QCM executes the CQC Plan and implements the three phase control system as described in UFGS section 01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS). The QCM shall visit each active project site daily and verify that the materials and workmanship are in accordance with the approved construction drawings, shop drawings, material submittals and technical specifications. The QCM shall prepare and coordinate material submittal sheets and shop drawing submittals, prepare QC daily reports, schedule and coordinate testing procedures and attend all bi-weekly status meetings, site visits, and pre-final/final Inspections. The QCM shall have complete authority to take any action necessary to ensure compliance with the contract requirements. The QCM shall have a minimum of five (5) years of relevant construction quality control experience, a minimum of ten (10) years experience on construction similar to this contract, and shall have completed the course entitled “Construction Quality Management for Contractors” offered by the U.S. Army Corps of Engineers, NAVFAC, and partner agencies. The name of the QCM and alternates, who shall act for the contractor when the QCM is absent, shall be designated in writing to and approved by the KO for each task order as part of the QC Plan Addendum.
3.2.4 Contractor’s Project Superintendent (PS): Provides on-site supervision in accordance with FAR 52.236-6. The PS shall visit each active project site daily, provide data to the QCM for the Daily CQC Report, schedule and coordinate subcontractors and material suppliers, and attend all bi-weekly status meetings, site visits and pre-final/final inspections.
3.2.5 Contractor’s Environmental Manager (EM): The environmental manager shall ensure environmental compliance on all projects. This individual shall visit project sites at least weekly and may perform these duties in conjunction with other duties.
3.2.6 Contractor’s Site Safety and Health Officer (SSHO): The Contractor shall appoint a competent prime contractor employee for each TO to function as the Site Safety and Health Officer (SSHO) in accordance with EM 385-1-1, Section 01.A.17. The SSHO shall report to the senior project official or to a senior corporate official. The SSHO shall be responsible for appointing a Designated Representative at each active TO project site to support and supplement the SSHO efforts in managing, implementing and enforcing the Contractor's Safety and Health Program. The Designated Representative shall be at the work site at all times when the SSHO is overseeing other project sites.
The Designated Representative shall be qualified as required by the SSHO, will perform safety program tasks as designated by the SSHO, and will report safety findings to the SSHO/Alternate SSHO. The SSHO shall document results of safety findings and provide information for inclusion in the CQC reports to the Government Representative.
3.2.7 The Contractor shall also provide and maintain the following capabilities, through in-house or sub-contractors, to support the JOC contract.
3.2.7.1 Incidental Design/Drafting: Provide accurate shop drawings compatible with most recent version of AUTOCAD or MicroStation V8XM edition version 08.09.04.51 for each individual TO within the time constraints specified in Section 16.0 – ORDERING PROCEDURES where applicable.
3.2.7.2 Cost Estimating/Negotiating: Provide estimating/negotiating support capable of producing accurate quantity take-offs and cost proposals, using e4clicks, within the time constraints specified.
3.3 Contractor Employee Requirements: The contractor shall ensure that employees and subcontractor employees have current, valid driver’s licenses and certifications necessary to perform their functions. Any cost or time associated with obtaining licenses or certifications shall be at the contractor’s expense.
3.4 Conflict of Interest: The contractor shall not employ any person who is or was an employee of the US Government, if the KO determines that the employment of that person would create a conflict of interest.
3.5 Subcontractors: All subcontractor firms shall be licensed in the State of South Carolina in their specialty where required. They shall have a minimum of two (2) years experience in related projects of similar size and scope.
3.6 Availability: Throughout the life of this contract, whenever there are active TOs, the CM shall be available to meet with the KO promptly after notification by telephone during normal business hours. The CM shall provide overall contract management, including full authority to develop TO proposals, negotiate and sign TOs, and shall attend all bi-weekly Progress Meetings, site visits and pre-final/final inspections.
3.7 Not Used.
3.8 Not Used.
3.9 Key Personnel, Outside Associates, or Consultants: In connection with this contract, any in-house personnel, outside associates, or consultants will be limited to individuals or firms that were specifically identified in the Contractor’s accepted proposal. The Contractor shall obtain the Contracting Officer's written consent before making any substitution for these designated in-house personnel, subcontractors, associates, or consultants. If the Contractor proposes a substitution, it shall submit the same type of information that was submitted in the accepted proposal to the Contracting Officer for evaluation and approval. The level of qualifications and experience submitted in the accepted proposal or that required by the Solicitation, whichever is greater, is the minimum standard for any substitution.
4.0 Technical Design Support:
4.1 Projects accomplished under the scope of this contract will not require the services of a registered architect or engineer. Each TO will specify in the Statement of Work if it is performance based scope of work with no design requirement or a basic incidental design requirement (not requiring professionally sealed/stamped designs/documents) completed by the contractor and subcontractors.
4.2. General Requirements:
4.2.1 The Contractor’s staff (in-house or sub-contractor) shall include individuals with multidiscipline design experience in order to perform incidental design necessary to accomplish the required tasks outlined in each TO. Areas of required technical design competence shall include, but are not limited to architectural, structural, civil, mechanical, electrical, communications, fire protection and environmental.
4.2.2 Incidental design documents submitted by the contractor, subcontractor, and any lower tier subcontractor, pursuant to a construction contract, shall detail the proposed fabrication and assembly of structural elements and/or the installation (i.e., form fit, and attachment details) of materials or equipment. The design documents provided shall have sufficient detail to enable the government to understand the proposed method of work. For the purpose of this requirement, design documents include plans, shop drawings, diagrams, layouts, schematics, descriptive literature, specifications, illustrations, schedules, performance and test data, and similar materials furnished by the contractor to explain in detail specific portions of the work required by the contract.
The government reserves the right to duplicate, use, and disclose in any manner and for any purpose any design documents delivered under this contract.
4.2.3 Incidental design submittals shall clearly identify any proposed alternatives from the original pre-award design concept envisioned to meet the project requirements.
4.2.4 During incidental design stage, the Contractor shall identify, prepare documentation for, coordinate with Base Environmental Office, obtain, and pay fees associated with environmental permits, applications, and/or notices.
5.0 NOT USED
6.0 DESIGN AND CONSTRUCTION REQUIREMENTS
6.1 Codes: All incidental design documentation and subsequent construction accomplished pursuant to this contract shall comply with the latest edition of the following codes, unless the KO directs the Contractor otherwise. Any exception must be approved in writing by the KO prior to construction start-up.
1. International Building Code
2. International Mechanical Code
3. International Plumbing Code
4. National Electrical Code
5. National Fire Code
6. Uniform Federal Accessibility Standards
7. Base Architectural Compatibility Guide (provided upon request).
8. Air Mobility Command Design Guides can be accessed and downloaded http://www.wbdg.org/ online from http://www.wbdg.org.
9. Unified Federal Criteria (UFC). Criteria can be accessed and downloaded online from http://www.wbdg.org.
10. Unified Facilities Guide Specifications (UFGS). These specifications can be accessed and downloaded on line at http://www.wbdg.org.
6.2 Order of Precedence: In the event an item within the contractor’s proposal fails to comply with the mandatory requirements as stated in the contract specifications and/or SOW, the contractor shall furnish components or services which conform to the mandatory requirements as stated in the contract specifications and/or SOW.
The contract specification and/or SOW requirements shall prevail in any other circumstances in establishing the requirement.
6.3 Joint Base Charleston Environmental Specifications (provided as Appendix D): The following environmental specifications shall be the specifications used to address environmental protection and controls on all projects.
6.3.1 UFGS Specification # 01 50 10 Environmental.
6.3.2 UFGS Specification # 01 54 00 Green Procurement.
6.3.3 JBC Specification # 01 57 20 Waste Management.
6.3.4 JBC Specification # 01 57 50 Temporary Environmental Controls.
6.3.5 The contractor shall perform all activities of this contract in accordance with all applicable Federal, State and local laws and regulations.
6.3.6 JBC is committed to recycling as much construction and demolition debris as is practical. The contractor is required to make every effort to recycle materials including concrete, support metal, etc. Submit monthly and final Recycling and Disposal Report sorted by material type and tonnage (for 628 CES/CEAN records). Use recycled materials in the projects per EO#13101.
6.3.7 The contractor shall comply with all applicable requirements stated in the Toxic Substances Control Act of 1976. All materials used in the performance of this contract shall be applied in strict accordance with manufacturer's printed label instructions and all applicable standards. The use of Class I ozone depleting substances, asbestos containing materials, and lead paints are strictly prohibited.
6.4 Manufacturer’s Instructions: Manufacturer's instructions pertaining to the use or installation of products, materials, or equipment used or installed in the execution of work under this contract form a part of these specifications as though specifically set forth herein. These instructions apply whether furnished as a normal, usual, or customary practice of the manufacturer or if furnished in response to a requirement stipulated herein. In the event of conflict between the specification of drawings and manufacturers' instructions, the contractor shall bring such conflict to the attention of the KO for resolution before proceeding with the work involved.
6.5 Minor Materials and Work: Minor material and work not specifically mentioned herein, but necessary for the proper completion of the specified work, shall be furnished without additional cost to the Government.
6.6 Existing Work: Where existing work is changed or removed, where new work adjoins, connects to, or abuts existing work, the existing work shall be altered, as necessary, and connected in a substantial and workmanlike manner. All new work shall match, as nearly as practicable, the existing adjoining and/or adjacent similar work. Operations affecting existing work damaged by such operations shall be rectified, or replaced, without additional expense to the Government.
7.0 QUALITY CONTROL (QC)
7.1 It is the Contractor’s responsibility to provide, inspect, and document the level of quality that has been established by the minimum standards of this Statement of Work (SOW) and to ensure compliance with the Contract Clause entitled "Inspection of Construction" and other contract requirements. The contractor is responsible for quality control and shall establish and maintain an effective quality control system consisting of plans, procedures, personnel, control, instructions, tests, records, forms and organization necessary to manage all task orders to produce end products which comply with the contract requirements.
The system shall cover all construction operations, both on site and off site, including work by subcontractors, fabricators, suppliers and purchasing agents.
7.2 The QCM shall direct the execution of the Contractor’s QC Plan.
7.3 Separate payment will not be made for providing and maintaining an effective
Quality Control program. All costs associated therewith shall be included in the contractor's coefficient.
7.4 QC Plan: The Base Contract QC Plan shall reflect the individual elements of the
Management Approach Narrative submitted with the technical proposal and shall be submitted to the Contracting Officer within fifteen (15) days after award of the base contract. Any changes to the accepted QC plan shall be submitted to the Government in writing for approval by the KO. The QC plan shall cover all incidental design and construction operations, both onsite and offsite, including work by subcontractors, fabricators, suppliers, and consultants. It shall include, but not limited to the following:
1. A description of the quality control organization, including a chart showing lines of authority and acknowledgment that the CQC staff will implement the three phase control system for all aspects of the work specified.
2. The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a QC function.
3. A copy of the letter to the QCM signed by an authorized official of the firm describing their responsibilities and delegating sufficient authorities to adequately perform the functions of the QC manager, including authority to stop work not in compliance with the contract.
4. Copies of letters issued by the QC manager to other various quality control representatives outlining duties, authorities, and responsibilities.
5. Procedures for scheduling, reviewing, certifying, and managing submittals, including those of subcontractors, fabricators, suppliers, and consultants.
6. Control, verification, and acceptance testing procedures for each specific test to include the test name, specification paragraph requiring test, feature of work to be tested, test frequency, and person responsible for each test.
Procure the services of a Corps of Engineers Material Testing Center validated testing laboratory to perform laboratory tests, collect associated samples, and perform field tests;
7. Description and details of the Contractor’s inspection system to monitor the execution of any task completed under this contract. Description of specific areas to be inspected on a scheduled or unscheduled basis, how often inspections will be accomplished, and titles of the individuals who will perform the inspections. Procedures for tracking preparatory, initial, and follow-up control phases and control, verification, and acceptance tests including documentation. The three phase inspections shall be tracked and updated in QCS during the performance of a task order.
8. Description and details of procedures for tracking incidental design and construction deficiencies and their causes from identification through acceptable corrective action. Establish verification procedures that identified deficiencies have been corrected. Repetitive deficiencies shall be tracked in QCS.
9. Reporting procedures, including proposed reporting formats.
10. A list of the definable features of work. A definable feature of work is a task which is separate and distinct from other tasks, has separate control requirements, and may be identified by different trades or disciplines, or it may be work by the same trade in a different environment. Although each section of the specifications may generally be considered as a definable feature of work, there are frequently more than one definable feature or work under a particular section. This list will be agreed upon during the Pre-Work Meeting.
7.4.1 QC Plan Addendums: For each TO, submit an addendum to the Base Contract QC Plan Submittal to address TO specific administrative requirements, plans, and procedures. The QC Plan Addendum shall be a concise document which appoints personnel, addresses specific controls, task order particular tests, and identifies definable features of work.
7.5 QC Coordination Meeting: After the Pre-Performance Conference, before issuance of any task order under this contract, and prior to acceptance by the Government of the QC Plan, the contractor shall meet with the KO to discuss the contractor's quality control system. The QC Plan shall be submitted for review a minimum of 5 calendar days prior to the Coordination Meeting. During the meeting, a mutual understanding of the system details shall be developed, including the forms for recording the QC operations, control activities, testing, administration of the system for both on site and off site work, and the interrelationship of contractor's management and control with the Government's
Quality Assurance. Minutes of the meeting shall be prepared by the contractor and provided to the COR for review. The minutes shall become a part of the contract file. There may be occasions when subsequent conferences will be called by either party to reconfirm mutual understandings and/or address deficiencies in the QC system or procedures which may require corrective action by the contractor.
7.6 Acceptance of QC Plan: Acceptance of the Contractor's Base Contract QC plan is required prior to the award of any TO. Construction will be permitted to begin on a TO only after acceptance of the QC Plan Addendum. Acceptance is conditional and will be predicated on satisfactory performance during the incidental design and construction. The Government reserves the right to require the Contractor to make changes in his CQC Plan and operations including removal of personnel, as necessary, to obtain the quality specified.
7.7 Design Quality Control: The CQM shall thoroughly review all incidental design submittals for accuracy, completeness, and compliance with contract requirements, and shall indicate its approval thereon as evidence of such coordination and review. The contractor shall include constructability, architectural and system compatibility, operability, maintainability considerations and engineering disciplines as applicable for each task order in each review.
7.8 Supplemental Inspectors: If required by the TO, the contractor shall provide
ICC certified inspectors to assist the QCM in the areas of Mechanical, Electrical, Structural, and Materials (Concrete, Pavement, Soils), Fire Protection and Environmental. Certifications shall be current and inspectors shall have a minimum of 4 years related experience in the work involved in this contract.
Applicable certifications are: ICC Commercial Mechanical Inspector; ICC Commercial Electrical Inspector, ICC Reinforced Concrete Special Inspector and Structural Steel and Bolting Special Inspector (as applicable to the type of construction involved), SCDOT or other nationally recognized agency certifications. These individuals shall be directly responsible to the QC manager;
be physically present at the construction site during work within their areas of responsibility; and have the necessary education and/or experience to be qualified to inspect their trade. These individuals may perform other duties but must be allowed sufficient time to perform their assigned quality control duties as described in the QC Plan.
7.9 Not Used.
7.10 Control: Contractor Quality Control is the means by which the Contractor ensures that the construction, to include that of subcontractors and suppliers, complies with the requirements of the contract. At least three phases of control must be conducted by the CQC System Manager for each definable feature of the construction work as follows:
7.10.1 Preparatory Phase: Notify the KO at least 48 hours in advance of each preparatory phase meeting. Conduct the preparatory phase meeting with the superintendent and the foreman responsible for the definable feature of work.
The QCM shall document the results of the preparatory phase actions and attach to the daily CQC report. Perform the following prior to beginning work on each definable feature of work: (a) A review of each paragraph of applicable specifications, reference codes, and standards. Make available during the preparatory inspection a copy of those sections of referenced codes and standards applicable to that portion of the work to be accomplished in the field.
Maintain and make available in the field for use by Government personnel until final acceptance of the work; (b) Review of the contract drawings; (c) Check to assure that all materials and/or equipment have been tested, submitted, and approved; (d) Review of provisions that have been made to provide required control inspection and testing; (e) Examination of the work area to assure that all required preliminary work has been completed and is in compliance with the contract; (f) Examination of required materials, equipment, and sample work to assure that they are on hand, conform to approved shop drawings or submitted data, and are properly stored; (g) Review of the appropriate activity hazard analysis to assure safety requirements are met. (h) Discussion of procedures for controlling quality of the work including repetitive deficiencies. Document construction tolerances and workmanship standards for that feature of work; (i) Check to ensure that the portion of the plan for the work to be performed has been accepted by the Contracting Officer; (j) Discussion of the initial control phase;
7.10.2 Initial Phase: Notify the KO at least 48 hours in advance of each initial phase meeting. Conduct the initial phase meeting with the superintendent and the foreman responsible for the definable feature of work. The QCM shall document the results of the initialphase actions and attach to the daily CQC report. Accomplish the following: (a) Check work to ensure that it is in full compliance with contract requirements. Review minutes of the preparatory meeting; (b) Verify adequacy of controls to ensure full contract compliance.
Verify required control inspection and testing; (c) Establish level of workmanship and verify that it meets minimum acceptable workmanship standards. Compare with required sample panels as appropriate; (d) Resolve all differences; (e) Check safety to include compliance with and upgrading of the safety plan and activity hazard analysis. Review the activity analysis with each worker;
7.10.3 Follow-up Phase: Perform daily checks to assure control activities, including control testing, are providing continued compliance with contract requirements, until completion of the particular feature of work. Record the checks in the CQC documentation. Conduct final follow-up checks and correct all deficiencies prior to the start of additional features of work which may be affected by the deficient work. Prior to requesting a Government verification of work completed, the CQC must perform an inspection and provide a written punchlist to the Government for reference during the follow-up or final inspections. Do not build upon nor conceal non-conforming work. A minimum of 48 hours notice shall be provided to the Government Quality Assurance Representative to inspect the work prior to covering up work.
7.10.4 Additional Preparatory and Initial Phases: Conduct additional preparatory and initial phases on the same definable features of work if: the quality of on-going work is unacceptable; if there are changes in the applicable CQC staff, onsite production supervision or work crew; if work on a definable feature is resumed after a substantial period of inactivity; or if other problems develop.
7.11 Tests:
7.11.1 Testing Procedure: Perform specified or required tests to verify that control measures are adequate to provide a product which conforms to contract requirements. Upon advance request, furnish to the Government duplicate samples of test specimens, at no additional cost to the Government, for possible testing by the Government. Testing includes operation and/or acceptance tests when specified. Procure the services of a Corps of Engineers Material Testing Center validated testing laboratory to perform laboratory tests, collect associated samples and perform field tests. Perform the following activities and record and provide the following data: (a) Verify that testing procedures comply with contract requirements; (b) Verify that facilities and testing equipment are available and comply with testing standards.
(c) Check test instrument calibration data against certified standards. (d) Verify that recording forms and test identification control number system, including all of the test documentation requirements, have been prepared; (e) Record results of all tests taken, both passing and failing on the CQC report for the date taken.
Specification paragraph reference, location where tests were taken, and the sequential control number identifying the test. If approved by the Contracting Officer, actual test reports may be submitted later with a reference to the test number and date taken. Provide an information copy of tests performed by an offsite or commercial test facility directly to the Contracting Officer. Failure to submit timely test reports as stated may result in nonpayment for related work performed and disapproval of the test facility for future work on this contract.
7.11.2 Testing Laboratories: The Government reserves the right to check laboratory equipment in the proposed laboratory for compliance with the standards set forth in the contract specifications and to check the laboratory technician's testing procedures and techniques. Laboratories utilized for testing soils, concrete, asphalt, and steel must meet criteria detailed in ASTM D3740 and ASTM E329. If the selected laboratory fails the capability check, the Contractor will be assessed a charge of $3,000 to reimburse the Government for each succeeding recheck of the laboratory or the checking of a subsequently selected laboratory. Such costs will be deducted from the contract amount due the Contractor.
7.12 Quality Control System (QCS): The Government will use the Resident
Management System (RMS) to assist in its monitoring and administration of this contract. The Contractor must use the Government-furnished Construction Contractor Module of RMS, referred to as QCS, to record, maintain, and submit various information throughout the contract period. The use of QCS will be required on all task orders. When required, the contractor shall comply with UFGS 01 45 00.10 10 provided as Appendix C.
7.13 Documentation: The contractor shall maintain, on site, current records providing factual evidence that the required quality control inspections, tests and other activities have been conducted by the contractor and the necessary corrective actions taken. These records shall include the work of subcontractors and suppliers. Documentation shall be in a format acceptable to the KO and made available to the Government throughout the performance period of this contract.
7.13.1 Daily Reports: Contractor shall develop and maintain daily reports for each TO, indicating:
1. Contractor and subcontractors working on the project, a description of trades, their area of responsibility and their number of personnel working.
2. Operating plant/equipment with hours worked, idle, or down for repair.
3. Work performed each day, giving location, description, and by whom.
4. Test and/or three phases of control activities performed with results and references to specifications/drawings requirements. List deficiencies noted along with corrective action.
5. Quantity of materials received at the site with statement as to acceptability, storage, and reference to specifications/drawings requirements.
6. Submittals reviewed, with contract reference, by whom, and action taken.
7. Off-site surveillance activities, including actions taken.
8. Job safety evaluations stating what was checked, results, and instructions or corrective actions.
9. Instructions given/received and conflicts in plans and/or specifications.
10. Weather conditions encountered
11. Any delays encountered, and.
12. Contractor's verification statement that equipment and materials incorporated in the work and workmanship comply with the contract.
13. Potential changes or issues
14. The weather for that particular day and any associated impacts to progress
15. User or Government caused delays
Furnish the original of these records in report form to the Government daily within 24 hours after the date covered by the report. Submit reports for non-work periods so that all calendar days are accounted for throughout the life of the contract. Reports shall be signed and dated by the QCM. Reports shall include copies of test reports and copies of reports prepared by subordinate QC personnel.
7.14 Notification of Noncompliance: The Contracting Officer will notify the
Contractor of any detected noncompliance with the foregoing requirements.
The Contractor is required to take immediate corrective action after receipt of such notice. Such notice, when delivered to the Contractor at the work site, will be deemed sufficient for the purpose of notification. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders will be made the subject of claim for extension of time or for excess costs or damages incurred by the Contractor.
8.0 CONTRACTOR USE OF PREMISES: The government will provide staging and storage areas on a Task order basis and only upon written request. Staging and storage areas may be limited to the project boundaries.
9.0 PROTECTION OF CONTRACTOR’S EQUIPMENT & GOVERNMENT PROPERTY
9.1 All Contractor supplied equipment is the sole responsibility of the Contractor.
The Government shall not be liable for any loss or damage to the Contractor's property, including stock, or for expenses incidental to such loss or damage.
The Contractor shall secure his materials and protect all equipment from damage.
The Contractor is responsible for insuring his/her own contents. In the event of a fire or damage to either Contractor or Government property, the contractor shall immediately notify the KO.
9.2 Any equipment/material the Contractor removes and which requires reinstallation as part of the job requirements shall be the responsibility of the Contractor. All damaged material shall be replaced with equipment/material of equal quality and function by the Contractor at his own expense.
This is the start of the file's text. The full file is on GovTribe.