W912HN-26-R-A006_SPECS_EAST_WEST_DOCK_VOL2_AMD4 - Copy.pdf

PDF 24 MB Posted

Attached to
Renovate Building 110
Solicitation number
W912HN26RA006
Issued by

About this file

This is a comprehensive specifications document for the renovation of Building 110 at Robins Air Force Base in Georgia, issued by the U.S. Army Corps of Engineers (USACE) Savannah District under solicitation W912HN-26-R-A006. The document contains detailed technical specifications for Divisions 09-33 and associated appendices, covering the East and West Dock renovation project.

The specifications detail requirements for finishes, specialties, fire suppression, plumbing, HVAC, electrical, communications, and utilities work. Key product and service requirements include: ceramic tile installation with porcelain materials meeting water absorption rates of 0.5 percent or less; epoxy flooring systems with walnut-shell aggregate; interior signage with ADA-compliant tactile letters and Braille; wet pipe sprinkler systems designed per NFPA 13 standards; general plumbing systems with specified pipe materials (copper, steel, PVC) and fittings; HVAC bracing and seismic restraints per UFC 3-301-01; HVAC testing, adjusting, and balancing (TAB) by independent certified agencies; and thermal insulation for mechanical systems. The TAB work requires compliance with AABC, NEBB, or TABB standards, with two seasonal testing cycles. Paint systems must comply with MPI specifications and meet indoor air quality certifications. The original proposal due date was April 23, 2026, extended to May 19, 2026 at 11 AM. A mandatory site visit was scheduled for April 15, 2026. Amendments provided additional drawings including structural plans, hazmat reports, and contract documents. The project involves coordination across multiple trades with submittal requirements for shop drawings, product data, design calculations, and test reports throughout the construction phases.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Robins Air Force Base, Georgia

Solicitation Number

W912HN-26-R-A006

Building 110 Renovations Volume 2 of 2: Specifications Divisions 09 - 33 and Appendices - East and West Dock

PN UHHZ050507

January 2026

U.S. ARMY ENGINEER DISTRICT, SAVANNAH

CORPS OF ENGINEERS

100 WEST OGLETHORPE AVENUE

SAVANNAH, GEORGIA 31401-3640

US Army Corps Of Engineers Savannah District

THIS PAGE INTENTIONALLY LEFT BLANK

Ready To Advertise Specifications

East and West Dock

U.S. ARMY CORPS OF ENGINEERS (USACE)

Contract Number – W912HP20D5000

Task Order Number – W912HN24F2011

Robins AFB Building 110 Renovation

Warner Robins, GA

Ready To Advertise Specifications

East and West Dock

Prepared for

U.S. Army Corps of Engineers (USACE)

Robins AFB Building 110 Renovation

Prepared by

Burns & McDonnell

Kansas City, MO

Burns & McDonnell 9400 Ward Parkway Kansas City, MO 64114

USACE

Robins AFB B110 Renovation

SPECIFICATION CERTIFICATION PAGE

CIVIL STRUCTURAL ARCHITECTURE

FIRE PROTECTION MECHANICAL PLUMBING

ELECTRICAL ELECTRONICS AND

COMMUNICATIONS

01/22/2026 01/22/2026

01/22/2026

22-Jan-2026

2026/01/22 2026/01/22

Building 110 Renovations - East Dock and West Dock UHHZ050507 Robins Air Force Base, Georgia

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REQUIREMENTS AND REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 91 00.15 BUILDING COMMISSIONING

01 91 19 BUILDING ENCLOSURE COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 82 00 ASBESTOS REMEDIATION

02 83 00 LEAD REMEDIATION

02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs

AND MERCURY

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 05 20 POST-INSTALLED CONCRETE AND MASONRY ANCHORS

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 27 26 FLUID-APPLIED VAPOR PERMEABLE MEMBRANE AIR BARRIERS

07 42 63 FABRICATED WALL PANEL ASSEMBLIES

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL AND DOOR LOUVERS

PROJECT TABLE OF CONTENTS

DIVISION 09 - FINISHES

09 01 90.50 PREPARATION OF HISTORIC WOOD AND METAL SURFACES FOR

PAINTING

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 67 23.13 STANDARD RESINOUS FLOORING

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE

DIVISION 21 - FIRE SUPPRESSION

21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 48.19 BRACING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00 COMMISSIONING OF MECHANICAL AND PLUMBING SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 11 20 FACILITY GAS PIPING

23 23 00 REFRIGERANT PIPING

23 30 00 HVAC AIR DISTRIBUTION

23 80 20.00 10 GAS-FIRED HEATING EQUIPMENT

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

DIVISION 26 - ELECTRICAL

26 05 73 POWER SYSTEM STUDIES

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 19.10 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED TRANSFORMERS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS

26 36 23 AUTOMATIC TRANSFER SWITCHES AND BY-PASS/ISOLATION SWITCH

26 51 00 INTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,

ADDRESSABLE

DIVISION 31 - EARTHWORK

(Revised by Amendment 004)

31 00 00 EARTHWORK

DIVISION 33 - UTILITIES

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

ATTACHMENT TO SPECIFICATIONS AS FOLLOWS:

01 33 00 SUBMITTAL REGISTER

01 33 29 ATTACHMENT A - HPSB CHECKLIST – B110 RTA

01 33 29 ATTACHMENT B – TPC CHECKLIST – B110 RTA

01 45 35 SCHEDULE OF SPECIAL INSPECTIONS

01 45 35 STATEMENT OF SPECIAL INSPECTIONS

01 74 19 FINAL SECTION 01530 – ENVIRONMENTAL REQUIREMENTS

08 71 00 DOOR HARDWARE

APPENDICES TO SPECIFICATIONS AS FOLLOWS:

01 91 00.15 10 APPENDIX A: OWNER'S PROJECT REQUIREMENTS

01 91 00.15 10 APPENDIX B: COMMISSIONING PLAN

*4

APPENDIX C: Geotechnical Engineering Report

APPENDIX D: Hazardous Materials Report

-- End of Project Table of Contents --

SECTION 09 01 90.50

PREPARATION OF HISTORIC WOOD AND METAL SURFACES FOR PAINTING

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)

ACGIH 0100 (2017; Suppl 2020) Documentation of the Threshold Limit Values and Biological Exposure Indices

ASTM INTERNATIONAL (ASTM)

ASTM D173/D173M (2003; R 2011; E 2012) Bitumen-Saturated Cotton Fabrics Used in Roofing and Waterproofing

ASTM D3274 (2009; R 2017) Standard Test Method for Evaluating Degree of Surface Disfigurement of Paint Films by Fungal or Algal Growth, or Soil and Dirt Accumulation

ASTM D3359 (2017) Standard Test Methods for Rating Adhesion by Tape Test

ASTM D4214 (2007; R 2015) Standard Test Method for Evaluating the Degree of Chalking of Exterior Paint Films

SOCIETY FOR PROTECTIVE COATINGS (SSPC)

SSPC PA Guide 5 (2023) Guide to Maintenance Coating of Steel Structures in Atmospheric Service

SSPC SP 1 (2015) Solvent Cleaning

SSPC SP 2 (2018) Hand Tool Cleaning

SSPC SP 3 (2018) Power Tool Cleaning

SSPC SP 5/NACE No. 1 (2007) White Metal Blast Cleaning

1.2 SUMMARY

The procedures proposed for the accomplishment of the work must provide for safe conduct of the work, careful removal and disposition of materials specified to be salvaged, protection of property which is to remain undisturbed, and coordination with other work in progress. Submit the names, quantity represented, and intended use for proprietary brands of materials proposed to be substituted for the specified materials when the

SECTION 09 01 90.50 Page 1 required quantity of a particular batch is 50 gallons or less. Submit manufacturer's current printed product description, safety data sheets (SDS) and technical data sheets for each product. Provide detailed mixing, thinning and application instructions, minimum and maximum application temperature, and curing and drying times for each product submitted. Include in the work plan a Safety and Health plan describing procedures for handling monitoring, and disposition of VOCs and other hazardous and toxic materials. Submit one copy of the Work Plan and a certificate stating that products proposed for use meet the VOC regulations of the local Air Pollution Control Districts having jurisdiction over the geographical area in which the project is located.

Include a detailed description of the methods and equipment to be used for each operation, and the sequence of operations. Test the materials designated by the Contracting Officer.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Work Plan ; G

Materials

Qualifications

SD-07 Certificates

Work Plan

1.4 QUALITY ASSURANCE

Perform work in compliance with the ACCIDENT PREVENTION PLAN, including the Activity Hazard Analysis as specified in the CONTRACT CLAUSES.

Include analyses of the potential impact of surface preparation operations on personnel and on others involved in and adjacent to the work zone in the Activity Hazard Analysis.

1.4.1 Worker Exposures

Do not expose workers to chemical substances exceeding limits as established by ACGIH 0100 .

1.4.2 Training

Inform workers, having access to an affected work area, of the contents of the applicable SDS and of potential health and safety hazard and protective controls associated with materials used on the project. An affected work area is one which may receive dust, mists, and odors from the surface preparation operations. Workers involved in surface preparation and clean-up must be trained in the safe handling and application, and the exposure limit, for each material which the worker

SECTION 09 01 90.50 Page 2 will use in the project. Instruct personnel having a need to use respirators and masks in the use and maintenance of such equipment.

1.4.3 Coordination

Coordinate work to minimize exposure of building occupants, other Contractor personnel, and visitors to mists and odors from surface preparation and cleaning operations.

1.4.4 Qualifications

Provide qualified workers trained and experienced in the preparation for painting of wood and metal surfaces in historic structures, submit documentation of 5 consecutive years of work of this type and a statement certified by the Contractor attesting that the experience and qualifications of the workers (journeymen) comply with the specifications.. Provide a list of similar jobs identifying when, where, and for whom the work was done and a current point-of-contact for identified references.

1.5 DELIVERY, STORAGE, AND HANDLING

Deliver paint removers, solvents, and other chemicals, used for surface preparation, in sealed containers that legibly show the designated name, formula or specification number, quantity, date of manufacture, manufacturer's formulation number, manufacturer's directions including any warnings and special precautions, and name of manufacturer. Furnish such materials in containers not larger than 5 gallons; store them in accordance with the manufacturer's written directions; and, as a minimum, store them off the ground, under cover, with sufficient ventilation to prevent the buildup of flammable vapors and at temperatures between 40 and 95 degrees F.

1.6 ENVIRONMENTAL REQUIREMENTS

Unless otherwise recommended by the product manufacturer, provide an ambient temperature between 45 and 95 degrees F when applying paint removers, solvents, or other preparation materials.

PART 2 PRODUCTS

2.1 PAINT REMOVERS

Provide chemical paint removers that are a commercial item specifically manufactured for the type of paint to be removed.

2.2 EPOXY CONSOLIDANTS

2.2.1 Liquid Consolidant

Provide liquid wood consolidant consisting of a 2-part, low-viscosity liquid epoxy that meets the criteria of Table 1.

2.2.2 Epoxy Paste

Provide epoxy paste consisting of a 2-part, thixotropic paste that meets the criteria of Table 1.

SECTION 09 01 90.50 Page 3

TABLE 1

LIQUID CONSOLIDANT EPOXY PASTE

Properties Low-Viscosity Liquid No-Slump, Thixotropic Paste

Toxicity Low Very Low

Toxicity Cured Non-Toxic Non-Toxic

Ratios 1:1 by Volume 1:1 by Volume

Pot Life @ Room Temp. 30 minutes min. 50 minutes min

Hardening @ Room Temp. 1 hr. or longer 1 hr. or longer

Hardening @ 140 deg. F 16 min. or less 18 min. or less

Viscosity Poises @ 72 deg. F 4.7 max. Thixotropic paste

Solids 95 percent min. 98 percent min.

Tensile Strength 4000 psi 2500 psi

Elongation 50 percent 4 percent

Compressive Strength

Failure 19,000 psi ---

Yield 3500 psi 5500 psi

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

Use methods for preparation of historic wood and metal surfaces for painting which are the gentlest possible to achieve the desired results.

Do not damage or marr substrate materials in the process of surface preparations. Collect and analyze samples of the existing paint finishes for the purpose of documentation or matching, if so directed by the Contracting Officer. Material and application requirements for paints are covered in Section 09 90 00 PAINTS AND COATINGS.

3.2 VENTILATION

Ventilate interior work zones, having a volume of 10,000 cubic feet or less, at a minimum of 2 air exchanges per hour. Maintain ventilation in larger work zones by means of mechanical exhaust. Exhaust solvent vapors outdoors, away from air intakes and workers. Temporarily seal return air inlets in the work zone before start of work until the prepared surfaces have dried. Operators and personnel in the vicinity of paint removal processes involving chemicals or mechanical action (sanding or blasting) must wear respirators.

SECTION 09 01 90.50 Page 4

3.3 PROTECTION OF AREAS NOT TO BE PAINTED

Remove or protect items not to be painted, which are in contact with or adjacent to painted surfaces, prior to surface preparation and painting operations. Replace items removed prior to painting when painting is completed. Following completion of painting, reinstall removed items.

Restore surfaces contaminated by preparation materials to original condition.

3.4 CLEANING OF SURFACES

Provide surfaces that are clean and free of grease, dirt, dust and other foreign matter before application of paint or surface treatments. After cleaning, exhibit a surface disfigurement rating of 7 or greater when evaluated in accordance with ASTM D3274. Clean dirt and surface contaminants by brush with solutions of water and detergent or trisodium phosphate, then rinsed clean with water and let dry. Clean surfaces on which mildew or other microbiological growth is present with a detergent solution containing household bleach. Remove oil and grease with clean cloths and cleaning solvents prior to mechanical cleaning. Provide low toxicity cleaning solvents with a flashpoint in excess of 100 degrees F.

Program cleaning so that dust and other contaminants will not fall on newly prepared or newly painted surfaces.

3.5 EXISTING PAINT

Test existing paint for adhesion to substrate in accordance with ASTM D3359, Test Method A and obtain a rating of 4 or better in order to be considered sound. Existing paint meeting this requirement may be considered a satisfactory base for repainting.

3.6 PAINT REMOVAL

Remove flaking, cracking, blistering, peeling or otherwise deteriorated paint by scraping with hand scrapers. After scraping, remove large areas of paint or paint on architectural details using sanders, heat guns or heat plates, or chemical paint removers. Remove paint to bare substrate or first sound paint layer. Do not use open flame heat devices.

Mechanical paint removal must not damage or mar the substrate material.

3.6.1 Chemical Paint Removers

Use chemical paint removers in accordance with manufacturer's recommendations. If chemical strippers are used, neutralizesubstrate to a pH of 5 to 8.5 after stripping.

3.6.2 Lead Paint

In preparation of lead-based painted surfaces for repainting, follow the procedures described in Section 02 83 00 LEAD REMEDIATION.

3.7 SURFACE PREPARATION

After cleaning and removal of deteriorated paint, feather and sand edges of remaining chipped paint. Repair damaged areas such as, but not limited to, nail holes, cracks, chips, and spalls with suitable material to match adjacent undamaged areas. Roughen slick surfaces. Clean rusty metal surfaces in accordance with SSPC SP 5/NACE No. 1 . Remove chalk so that when tested in accordance with ASTM D4214, the chalk resistance rating is

SECTION 09 01 90.50 Page 5 no less than 8. Provide new, proposed coatings that are compatible with existing coatings. If existing surfaces are glossy, reduce the gloss.

3.8 WOOD SURFACES

Clean wood surfaces of foreign matter. Prime or touch up surfaces adjacent to surfaces to receive water-thinned paints before applying water-thinned paints. Scrape and clean small, dry seasoned knots, and give a thin coat of commercial knot sealer before application of the priming coat. Scrape off pitch on large, open, unseasoned knots and all other beads or streaks of pitch, or, if it is still soft, remove with mineral spirits or turpentine, and thinly coat the resinous area with knot sealer.

3.8.1 Interior Wood Surfaces

Sand interior wood surfaces to receive stain. Give oak and other open-grain wood to receive stain a coat of wood filler recommended by the finish manufacturer not less than 8 hours before the application of stain;

remove excess filler and sand the surface smooth. Moisture content of the wood must not exceed 12 percent as measured by a moisture meter, unless otherwise authorized.

3.8.2 Wood Repair

Remove and repair badly decayed areas. Replace areas and pieces decayed beyond repair with new pieces that match originals in all respects. Patch moderately decayed areas, weathered, or gouged wood with approved patching compounds, and sand smooth. Identify and correct the source or cause of wood decay prior to application of patching materials. Completely dry wet wood to a moisture content not exceeding 12 percent, as measured by a moisture meter, to its full depth before patching, unless otherwise authorized. Wood that is to be patched must be clean of dust, grease, and loose paint.

3.8.2.1 Epoxy Wood Repair

Apply epoxy wood repair materials in accordance with manufacturer's written instructions. Follow health and safety instructions in accordance with the manufacturer's instructions. Use clean mixing equipment to avoid contamination. Provide mix and proportions as directed by the manufacturer. Provide batches large enough to complete the specific job intended. Completely cure batching materials before painting or reinstallation of patched pieces.

3.8.2.2 Epoxy Consolidant and Epoxy Paste

Use epoxy liquid wood consolidant: 1) to penetrate and impregnate deteriorated wood sections in order to reinforce wood fibers that have become softened or absorbent. 2) as a primer for areas that are to receive epoxy paste filler. Use epoxy paste to fill areas where portions of wood are missing such as holes, cracks, gaps, gouges, and other voids.

3.8.3 Exposed Ferrous Metals

Spot-prime exposed ferrous metals such as nail heads on or in contact with wood surfaces to be painted with water-thinned paints, with a suitable corrosion-inhibitive primer capable of preventing flash rusting and compatible with the coating specified for the adjacent areas.

SECTION 09 01 90.50 Page 6

3.8.4 Finishing Nails

Set finishing nails, and prime all holes and surface imperfections. After priming, fill holes and imperfections in finish surfaces with putty or plastic wood filler, colored to match the finish coat if natural finish is required, allowed to dry, and sanded smooth. Putty or wood filler must be compatible with subsequent coatings.

3.8.5 Wood Preservative

Treat areas of bare wood in exterior locations prone to excessive moisture or standing water with a commercial, fungicide, paintable water repellant/preservative. Do not use water repellant/preservatives on interior surfaces.

3.9 METAL SURFACES

Clean metal surfaces of foreign matter. Prepare metal in accordance with SSPC PA Guide 5 . Remove grease, oil, and other soluble contaminants by solvent cleaning in accordance with SSPC SP 1 . Surfaces must be free from soils and corrosion; e.g. grease, oil, solder flux, welding flux, weld spatter, sand, rust, scale, and other contaminants that might interfere with the application of the new finish. Gently clean to achieve the desired result. Do not abrasively clean metals which are soft, thin, or exhibit fine detail. Evidence of corrosion or contamination on a previously cleaned surface must be cause for recleaning prior to painting.

3.9.1 Ferrous Surfaces

Mechanically clean surfaces that contain loose rust, loose mill scale, and other foreign substances with hand tools according to SSPC SP 2 , power tools according to SSPC SP 3 or by blast cleaning according to SSPC SP 5/NACE No. 1 . Protect shop-coated ferrous surfaces from corrosion by treating and touching up corroded areas immediately upon detection.

3.9.2 Nonferrous Metallic Surfaces

Solvent-clean galvanized, aluminum and aluminum-alloy, lead, copper, and other nonferrous metal surfaces in accordance with SSPC SP 1 .

3.9.2.1 Aluminum

Treat aluminum surfaces in accordance with ASTM D173/D173M or ASTM D173/D173M. Do not use steel wool, steel brushes and uninhibited caustic etching solutions, such as sodium hydroxide, on aluminum.

3.9.2.2 Zinc

Clean zinc surfaces including zinc-coated substrates prior to painting as follows: degrease, soak in a mild and inhibited alkaline cleaner, rinse with clean overflowing water, clean anodically in an acid (e.g. 0.25 to

0.75 percent sulfuric acid), and rinse with clean overflowing water.

3.10 TIMING

Give surfaces that have been cleaned, pretreated, and otherwise prepared for painting a coat of the specified first coat as soon as practical after such pretreatment has been completed, but prior to any deterioration of

SECTION 09 01 90.50 Page 7 the prepared surface. Unless otherwise directed, applythe first coat primer within 48 hours of surface preparation.

3.11 SURFACES TO BE PREPARED FOR PAINTING

Prepare surfaces as specified and as shown in the painting schedule in Section 09 90 00 PAINTS AND COATINGS.

3.12 CLEANING

Place cloths, cotton waste and other debris, that might constitute a fire hazard, in closed metal containers for removal at the end of each day.

Remove containers from the site or destroy in an approved manner. Remove preparation materials and other deposits on adjacent surfaces and leave the entire job clean and ready for painting.

-- End of Section --

SECTION 09 01 90.50 Page 8

SECTION 09 22 00

SUPPORTS FOR PLASTER AND GYPSUM BOARD

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

AISC 341 (2016) Seismic Provisions for Structural Steel Buildings

AMERICAN IRON AND STEEL INSTITUTE (AISI)

AISI S220 (2020) North American Standard for Cold-Formed Steel Nonstructural Framing

ASTM INTERNATIONAL (ASTM)

ASTM A653/A653M (2023) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

ASTM C635/C635M (2022) Standard Specification for Manufacture, Performance, and Testing of Metal Suspension Systems for Acoustical Tile and Lay-In Panel Ceilings

ASTM C754 (2020) Standard Specification for Installation of Steel Framing Members to Receive Screw-Attached Gypsum Panel Products

ICC EVALUATION SERVICE, INC. (ICC-ES)

ICC-ES AC98 (2021) Accreditation Criteria for Inspection Agencies

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 3-301-01 (2023; with Change 1, 2023) Structural Engineering

UNDERWRITERS LABORATORIES (UL)

UL Fire Resistance (2014) Fire Resistance Directory

1.2 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for

SECTION 09 22 00 Page 1

Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Metal Support Systems ; G, AE

SD-03 Product Data

Metal Support Systems

Recycled Content for Metal Support Systems ; G, S

1.2.1 Sustainable Design Submittals

a. Product Data: For recycled content, indicating postconsumer and preconsumer recycled content and cost.

b. Environmental Product Declaration (EPD): For each product.

c. Construction and Demolition Waste Management: For each product.

d. Health Product Declaration (HPD): Provide documentation confirming product compliance with one of the following:

(1) Option 1: Material Ingredient Reporting: Use at least 20 different permanently installed products from at least five different manufacturers that use one of the qualifying programs to demonstrate the chemical inventory of the product to at least 0.1 percent (1000 ppm).

(2) Option 2: Material Ingredient Optimization: Use products that have a compliant material ingredient optimization report or action plan. Use at least five permanently installed products sourced from at least three different manufacturers.

SD-04 Evaluation Reports: Submit evaluation reports certified under an independent third-party inspection program administered by an agency accredited by IAS to ICC-ES AC98 accreditation criteria for inspection agencies.

1.3 DELIVERY, STORAGE, AND HANDLING

Deliver materials to the job site and store in ventilated dry locations permitting easy access for inspection and handling. If materials are stored outdoors, stack materials off the ground, supported on a level platform, and fully protected from the weather. Handle materials carefully to prevent damage. Remove damaged items and provide new items.

PART 2 PRODUCTS

2.1 MATERIALS

Provide steel materials for metal support systems with either a EQ (Equivalent Coating) coating or a galvanized coating AISI S220 G-60 or equivalent; aluminum coating T1-25; or a 55-percent aluminum-zinc coating AZ50. Provide support systems and attachments in accordance with AISC 341 and UFC 3-301-01 , "Structural Engineering" in seismic zones.

SECTION 09 22 00 Page 2

Provide metal support systems containing a minimum of 20 percent recycled content. Provide data identifying percentage of recycled content for metal support systems .

2.1.1 Materials for Attachment of Lath

2.1.1.1 Non-load Bearing Wall Framing

AISI S220 .

2.1.2 Materials for Attachment of Gypsum Wallboard

2.1.2.1 Non-load Bearing Wall Framing and Furring

a. Framing Members, General: Comply with AISI S220 for conditions indicated.

(1) Steel Sheet Components: Comply with AISI S220 requirements for metal unless otherwise indicated.

(2) Protective Coating: AISI S220 , provide EQ (Equivalent Coating) coating, galvanized coating G-60 or equivalent. G40 or coating with equivalent corrosion resistance of G40. Provide G-90 coating in high-humidity environments.

b. Studs and Runners: AISI S220 . Use either steel studs and runners or embossed steel studs and runners.

AISI S220 , but not thinner than 0.0179 inch thickness, with 0.0329 inch minimum thickness supporting wall hung items such as cabinetwork, equipment and fixtures.

c. Slip-Type Head Joints: Where indicated, provide one of the following:

(1) Slotted Deflection Track: Steel sheet top runner manufactured to prevent cracking of finishes applied to interior partition framing resulting from deflection of structure above; in thickness not less than indicated for studs and in width to accommodate depth of studs.

(2) Clip System: Clips designed for use in head-of-wall deflection conditions that provide a positive attachment of studs to tracks while allowing 2-1/2 inch minimum vertical movement.

(3) Single Long-Leg Track System: Top track with 2 inch deep flanges in thickness not less than indicated for studs, installed with studs friction fit into top track and with continuous bridging and spacer bar located within 12 inches of the top of studs to provide lateral bracing.

d. Firestop Tracks: Top runner manufactured to allow partition heads to expand and contract with movement of the structure while maintaining continuity of fire-resistance-rated assembly indicated; in thickness not less than indicated for studs and in width to accommodate depth of studs.

e. Backing Plate: Fire-retardant-treated wood blocking used for fixture attachment.

SECTION 09 22 00 Page 3

f. Sound Isolation Clips: Used with 18 mil, (25 gauge), drywall furring channels to provide acoustical separation.

g. Framed Openings: Galvanized-steel, one-piece header and jamb studs in lieu of built-up members.

h. Partial Wall Framing Connection: Stud connector designed to support out-of-plane loading of cantilevered partial wall systems that are unsupported at the top track.

i. Drywall Penetration Barrier Mesh: Supply and install security mesh, as a penetration barrier behind gypsum wallboard walls and/or ceilings, where indicated on Drawings.

2.1.2.2 Furring Structural Steel Columns

AISI S220 . Steel (furring) clips and support angles listed in UL Fire Resistance may be provided in lieu of steel studs for erection of gypsum wallboard around structural steel columns.

2.2 SUSPENSION SYSTEMS

2.2.1 Structural Classification

a. Main Beam/Tee is to be Fire-Rated Heavy Duty classification in accordance with ASTM C635/C635M.

b. Classification can require wires to be closer together for additional loading when used to support double layer gypsum, verticals, slopes, circles, soffits, canopies, and step conditions which call for loading or unusual designs and shapes in drywall construction.

c. Deflection of fastening suspension system supporting light fixtures, ceiling grilles, access doors, verticals and horizontal loads are to have a maximum deflection of 1/360 of the span.

2.2.2 Components

a. Main Beam/Tee: Is to be commercial quality, cold-rolled steel, double-web construction (minimum 0.0179 inch prior to protective coating, AISI S220 ), hot dipped galvanized (per ASTM A653/A653M ) and 1-1/2 inch high minimum with knurled face .

b. Drywall Grid Cross Tees: Are to be commercial quality, cold-rolled steel, double-web steel construction (minimum 0.0179 inch prior to protective coating, AISI S220 ), hot dipped galvanized (minimum G40 or G90 in accordance with ASTM A653/A653M ) and 1-1/2 inch high minimum with knurled face.

c. Wall Molding/Channel:

(1) 2 inch by 2 inch, knurled surface, pre-punched holes in top flange 4 inch on center, 33 mil (20 gauge).

(2) Locking Angle Molding, 1-1/4 inch by 1-1/4 inch with pre-engineered locking tabs punched 8 inches on center, knurled surface, screw stop hem, pre-punched holes in top flange, 4 inch on center, 18 mil. (25 gauge).

SECTION 09 22 00 Page 4

(3) Knurled Angle molding, 1-1/4 inch by 1-1/4 inch, knurled surface, screw stop hem, pre-punched holes in top flange, 4 inch on center, 18 mil. (25 gauge).

(4) Knurled Angle molding, 1-1/2 inch by 1-1/2 inch, knurled surface, screw stop hem, pre-punched holes in top flange 4 inch on center, 18 mil. (25 gauge) .

(5) Simple Curve Knurled Angle Molding, 1-1/2 inch by 1-1/2 inch, knurled face radius 37 inch, screw stop hem, pre-punched holes in top flange, 4 inch on center, 28 mil. (22 gauge).

d. Support Hanger:

(1) Strong Back Support Hanger

(2) Channel beam splice 8 inch used to suspend main beams to 1-1/2 inch black iron carrying channels.

(3) Hanger Wire 12 gauge, galvanized or as noted on drawings.

e. Accessories:

(1) Radius Clip.

(2) 90 Degree Drywall Angle/ Transition Clip.

(3) 45 Degree Drywall Angle/ Transition Clip.

(4) 30 Degree Drywall Angle/ Transition Clip.

(5) Double Drywall Clip.

(6) Wall Attachment Clip.

(7) Splice Plate.

(8) Dome Hub.

(9) Close Mount Attachment clip.

PART 3 EXECUTION

3.1 INSTALLATION

3.1.1 Systems for Attachment of Lath

3.1.1.1 Non-load Bearing Wall Framing

ASTM C754, Installation Standard.

3.1.2 Systems for Attachment of Gypsum Wallboard

3.1.2.1 Suspended and Furred Ceiling Systems

ASTM C754, except provide framing members 16 inches on center unless indicated otherwise.

SECTION 09 22 00 Page 5

3.1.2.2 Non-load Bearing Wall Framing and Furring

ASTM C754, except as indicated otherwise. Provide a sealer gasket under bottom of track on concrete slab or foundation.

3.1.2.3 Backing Plates

In accordance with manufacturer's installation instructions.

3.1.2.4 Framed Openings

In accordance with manufacturer's installation instructions and approved design.

3.1.2.5 Partial Wall Framing Connection

In accordance with manufacturer's installation instructions. Anchor to floor as designed by Engineer of Record. Provide a sealer gasket under bottom of track on concrete slab or foundation.

3.1.2.6 Drywall Penetration Barrier Mesh

Per manufacturer's instructions. Installation and layout of the panels to be approved by General Contractor prior to installation, with the intent to attached panels on vertical framing members. Panels may be installed in either direction. Attachment with approved clips and threaded fasteners.

3.2 ERECTION TOLERANCES

Provide framing members which will be covered by finish materials such as wallboard, plaster, or ceramic tile set in a mortar setting bed, within the following limits:

a. Layout of walls and partitions: 1/4 inch from intended position;

b. Plates and runners: 1/4 inch in 8 feet from a straight line;

c. Studs: 1/4 inch in 8 feet out of plumb, not cumulative; and

d. Face of framing members: 1/4 inch in 8 feet from a true plane.

Provide framing members which will be covered by ceramic tile set in dry-set mortar, latex-portland cement mortar, or organic adhesive within the following limits:

a. Layout of walls and partitions: 1/4 inch;

b. Plates and runners: 1/8 inch in 8 feet from a straight line;

c. Studs: 1/8 inch in 8 feet out of plumb, not cumulative and must not exceed minimum fastening requirements of sheathing or other finishing materials; and

d. Face of framing members: 1/8 inch in 8 feet from a true plane.

SECTION 09 22 00 Page 6

SECTION 09 30 10

CERAMIC, QUARRY, AND GLASS TILING

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI A108/A118/A136.1 (2024) American National Standard Specifications for the Installation of Ceramic Tile

ANSI A137.1 (2019) American National Standards Specifications for Ceramic Tile

ASTM INTERNATIONAL (ASTM)

ASTM C373 (2018; R 2023)Standard Test Methods for Determination of Water Absorption and Associated Properties by Vacuum Method for Pressed Ceramic Tiles and Glass Tiles and Boil Method for Extruded Ceramic Tiles and Non-tile Fired Ceramic Whiteware Products

ASTM C648 (2020) Standard Test Method for Breaking Strength of Ceramic Tile

ASTM C1026 (2023) Standard Test Method for Measuring the Resistance of Ceramic and Glass Tile to Freeze-Thaw Cycling

ASTM C1027 (2009; R 2017) Standard Test Method for Determining Visible Abrasion Resistance of Glazed Ceramic Tile

CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)

CDPH SECTION 01350 (2017; Version 1.2) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers

GREEN SEAL (GS)

GS-36 (2013) Adhesives for Commercial Use

SCIENTIFIC CERTIFICATION SYSTEMS (SCS)

SCS SCS Global Services (SCS) Indoor Advantage

SECTION 09 30 10 Page 1

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)

SCAQMD Rule 1168 (2022) Adhesive and Sealant Applications

TILE COUNCIL OF NORTH AMERICA (TCNA)

TCNA Hdbk (2017) Handbook for Ceramic, Glass, and Stone Tile Installation

UNDERWRITERS LABORATORIES (UL)

UL 2818 (2022) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings

1.2 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Detail Drawings ; G, AE

SD-03 Product Data

Porcelain Tile ; G

Recycled Content for Porcelain Tile ; G, S

Mortar, Grout, and Adhesive ; G

SD-04 Samples

Tile ; G

Grout ; G

SD-07 Certificates

Indoor Air Quality for Adhesives ; G, S

Water Absorption Rates

SD-08 Manufacturer's Instructions

Manufacturer's Approved Cleaning Instructions

SD-10 Operation and Maintenance Data

Porcelain Tile , Data Package 1; G

SECTION 09 30 10 Page 2

1.3 CERTIFICATIONS

1.3.1 Indoor Air Quality Certifications

Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party programs that products meet the requirements of this Section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited in this Section.

1.3.2 Water Absorption Rates Certification

Provide certification for each tile type indicating compliance with the following water absorption (wa) rates per ANSI A137.1 criteria as tested per ASTM C373 requirements.

a. Porcelain Tile (Impervious): Provide water absorption (wa) of 0.5 percent or less.

1.4 QUALITY ASSURANCE

Provide installers having a minimum of two years of experience with a company specializing in performing the type of work described. Each type and color of tile to be provided from a single source. Each type and color of mortar, adhesive, and grout to be provided from the same source.

1.5 DELIVERY, STORAGE, AND HANDLING

Ship tiles in sealed packages and clearly marked with the grade, type of tile, producer identification, and country of origin. Deliver materials to the project site in manufacturer's original unopened containers with seals unbroken and labels and hallmarks intact. Protect materials from weather, and store them under cover in accordance with manufacturer's printed instructions. Store and handle tiles per manufacturer's instructions for gauged porcelain tile and gauged porcelain tile panels/slabs.

1.6 ENVIRONMENTAL REQUIREMENTS

Do not perform ceramic tile work unless the substrate and ambient temperature is at least 50 degrees F and rising. Maintain temperature above 50 degrees F while the work is being performed and for at least 7 days after completion of the work. When temporary heaters are used, ventilate the area to the outside to avoid carbon dioxide damage to new tilework.

1.7 WARRANTY

Provide manufacturer's warranty to repair or replace defective tiling materials and workmanship, including tile, mortar and grout products and installation as a system, for a period of one year from date of final acceptance of the work.

1.8 EXTRA MATERIALS

Supply an extra 2 percent of each type tile used in clean and marked cartons.

SECTION 09 30 10 Page 3

PART 2 PRODUCTS

2.1 TILE

Provide tiles that comply with ANSI A137.1 and are standard grade tiles.

Provide a minimum breaking strength of 125 lbs. for wall tile and 250 lbs.

for floor tile in accordance with ASTM C648. Provide exterior building tile for cold climate projects that is approved by the manufacturer for exterior use when tested in accordance with ASTM C1026. Provide floor tiles with a minimum wet dynamic coefficient of friction (DCOF) value of

0.42 when tested in accordance with ANSI A137.1 requirements. Provide glazed floor tile with a Class IV-Commercial classification as rated by the manufacturer when tested in accordance with ASTM C1027 for visible abrasion resistance as related to foot traffic. For materials like tile, accessories, and transition strips submit samples of sufficient size to show color range, pattern, type and joints.

Submit manufacturers' descriptive product data for ceramic, quarry and glass tiling indicated. Include manufacturers' literature, finishes, profiles and thicknesses of materials.

Submit manufacturers' operations and maintenance data for ceramic, quarry and glass tiling indicated in accordance with Section 01 78 23 OPERATIONS

AND MAINTENANCE DATA.

2.1.1 Porcelain Tile

Provide glazed, rectified porcelain tile bullnose base and trim pieces.

Provide tile with a V2aesthetic classification. Blend tiles in factory and in a packages to have same color range and continuous blend for installation. Provide nominal tile size(s) of 24 by 48 inch and 5/16 inch thick.

Provide porcelain tiling materials that contain a minimum of 10 percent recycled content. Provide data identifying percentage of recycled content for porcelain tile .

2.2 WATER

Provide potable water.

2.3 MORTAR, GROUT, AND ADHESIVE

Provide non-aerosol adhesive products used on the interior of the building (defined as inside of the weatherproofing system) meeting either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of SCAQMD Rule 1168 . Provide aerosol adhesives used on the interior of the building meeting either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of GS-36. For products located on the interior of the building (inside of the weatherproofing system, provide certification or validation of indoor air quality for adhesives .

Provide bond coat, mortar, and grout supplied from the same manufacturer.

2.3.1 Dry-Set Portland Cement Mortar

TCNA Hdbk.

SECTION 09 30 10 Page 4

2.3.2 Urethane Grout

TCNA Hdbk; premixed, urethane, water-based grout with color consistency and antimicrobial protection; no color fading, streaking or shading, chemical and stain resistant; and UV stable.

2.4 SUBSTRATES

Refer to Section 09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD.

2.5 WATERPROOF MEMBRANE

2.5.1 General

Manufacturer's standard product that complies with ANSI A108/A118/A136.1 and is recommended by the manufacturer for the application indicated.

Include reinforcement and accessories recommended by manufacturer.

2.6 CRACK ISOLATION MEMBRANE

2.6.1 General

Manufacturer's standard product that complies with ANSI A108/A118/A136.1 and is recommended by the manufacturer for the application indicated.

Include reinforcement and accessories recommended by manufacturer.

2.6.2 Chlorinated-Polyethylene Crack Isolation Membrane

Nonplasticized, chlorinated polyethylene faced on both sides with nonwoven polyester fabric; 0.030 inch nominal thickness.

2.7 COLOR, TEXTURE, AND PATTERN

Provide color, pattern and texture as indicated; colors listed are not intended to limit the selection of equal colors from other manufacturers.

PART 3 EXECUTION

3.1 PREPARATORY WORK AND WORKMANSHIP

Inspect surface to receive tile in conformance to the requirements of TCNA Hdbk for surface conditions for the type setting bed specified and for workmanship. Provide variations of tiled surfaces that fall within maximum values shown below:

TYPE WALLS FLOORS

Dry-Set Mortar 1/8 inch in 8 ft. 1/8 inch in 10 ft.

Latex-Portland Cement Mortar 1/8 inch in 8 ft. 1/8 inch in 10 ft.

3.2 GENERAL INSTALLATION REQUIREMENTS

Do not start tile work until roughing in for mechanical and electrical work has been completed and tested, and built-in items requiring membrane waterproofing have been installed and tested. Close space, in which tile

SECTION 09 30 10 Page 5 is being set, to traffic and other work. Keep closed until tile is firmly set. Do not start floor tile installation in spaces requiring wall tile until after wall tile has been installed. Apply tile in colors and patterns indicated in the area shown on the drawings. Install tile with the respective surfaces in true even planes to the elevations and grades shown. Provide special shapes as required for sills, jambs, recesses, offsets, external corners, and other conditions to provide a complete and neatly finished installation. Solidly back tile bases and coves with mortar. Do not walk or work on newly tiled floors without using kneeling boards or equivalent protection of the tiled surface. Keep traffic off horizontal portland cement mortar installations for at least 72 hours.

Keep all traffic off epoxy installed floors for at least 40 hours after grouting, and heavy traffic off for at least 7 days, unless otherwise specifically authorized by manufacturer. Dimension and draw detail drawings at a minimum scale of 1/4 inch = 1 foot. Include drawings of pattern at inside corners, outside corners, termination points and location of all equipment items such as thermostats, switch plates, mirrors and toilet accessories mounted on surface. Submit manufacturer's preprinted installation instructions.

Do not install building construction materials that show visual evidence of biological growth.

3.3 INSTALLATION OF SUBSTRATES

3.3.1 Cementitious Backer Units

Install as specified in Section 09 22 00 SUPPORTS FOR PLASTER AND GYPSUM

BOARD.

3.4 INSTALLATION OF WALL TILE

Install wall tile in accordance with the TCNA Hdbk and with grout joints as recommended by the manufacturer for the type of tile.

3.4.1 Workable or Cured Mortar Bed

Install tile over workable mortar bed or a cured mortar bed at the option of the Contractor. Install a 4 mil polyethylene membrane, metal lath, and scratch coat. Conform to TCNA Hdbk method for workable mortar bed, materials, and installation of tile. Conform to TCNA Hdbk method for cured mortar bed and materials.

3.4.2 Dry-Set Mortar and Latex-Portland Cement Mortar

Use dry-set or latex-portland cement to install tile in accordance with TCNA Hdbk. Use latex-portland cement when installing porcelain ceramic tile.

3.4.3 Urethane Grout

Prepare and install urethane grout in accordance with TCNA Hdbk.

3.5 EXPANSION JOINTS

Form and seal joints as specified in Section 07 92 00 JOINT SEALANTS.

SECTION 09 30 10 Page 6

3.5.1 Walls

Provide expansion joints at control joints in backing material. Wherever backing material changes, install an expansion joint to separate the different materials.

3.6 CLEANING AND PROTECTING

Upon completion, thoroughly clean tile surfaces in accordance with manufacturer's approved cleaning instructions . Do not use acid for cleaning glazed tile. Clean floor tile with resinous grout or with factory mixed grout in accordance with printed instructions of the grout manufacturer. After the grout has set, provide a protective coat of a noncorrosive soap or other approved method of protection for tile wall surfaces. Cover tiled floor areas with building paper before foot traffic is permitted over the finished tile floors. Provide board walkways on tiled floors that are to be continuously used as passageways by workmen.

Replace damaged or defective tiles.

SECTION 09 30 10 Page 7

SECTION 09 30 10 Page 8

SECTION 09 67 23.13

STANDARD RESINOUS FLOORING

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A990/A990M (2023) Standard Specification for Castings, Iron-Nickel-Chromium and Nickel Alloys, Specially Controlled for Pressure-Retaining Parts for Corrosive Service

ASTM C881/C881M (2020a) Standard Specification for Epoxy-Resin-Base Bonding Systems for Concrete

ASTM D445 (2019a) Standard Test Method for Kinematic Viscosity of Transparent and Opaque Liquids (and Calculation of Dynamic Viscosity)

ASTM D523 (2014; R 2018) Standard Test Method for Specular Gloss

ASTM D570 (1998; E 2010; R 2010) Standard Test Method for Water Absorption of Plastics

ASTM D638 (2014) Standard Test Method for Tensile Properties of Plastics

ASTM D696 (2016) Standard Test Method for Coefficient of Linear Thermal Expansion of Plastics Between -30 degrees C and 30 degrees C With a Vitreous Silica Dilatometer

ASTM D1475 (2013) Standard Test Method for Density of Liquid Coatings, Inks, and Related Products

ASTM D1544 (2004; R 2010) Standard Test Method for Color of Transparent Liquids (Gardner Color Scale)

ASTM D1652 (2011; E 2012) Standard Test Method for Epoxy Content of Epoxy Resins

ASTM D2240 (2015; E 2017) Standard Test Method for Rubber Property - Durometer Hardness

SECTION 09 67 23.13 Page 1

ASTM D2471 (1999) Standard Test Method for Gel Time and Peak Exothermic Temperature of Reacting Thermosetting Resins

ASTM D4259 (2018) Standard Practice for Preparation of Concrete by Abrasion Prior to Coating Application

ASTM F1869 (2023) Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride

ASTM F2170 (2019a) Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes

1.2 ADMINISTRATIVE REQUIREMENTS

1.2.1 Pre-Installation Meetings

Pre-installation Conference: Conduct conference at Project site.

1.2.2 Product Data

Within 30 days of contract award, submit manufacturer's catalog data for the following items:

a. Epoxy-Resin Binder/Matrix.

b. Cured Epoxy Binder.

c. Aggregate.

d. Surface Sealing Coat.

1.2.3 Design Mix Data

Within 30 days of contract award, submit design mix data for the following items, including a complete list of ingredients and admixtures:

a. Epoxy-Resin Binder/Matrix.

b. Cured Epoxy Binder.

c. Surface Sealing Coat.

Ensure applicable test reports verify the mix has been successfully tested and meets design requirements.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SECTION 09 67 23.13 Page 2

SD-02 Shop Drawings

Installation Drawings ; G, AE

SD-03 Product Data

Manufacturer's Catalog Data ; G

SD-04 Samples

Hardboard Mounted Epoxy Flooring ; G

Floor Topping ; G

Mockups ; G

SD-05 Design Data

Design Mix Data ; G, AE

SD-07 Certificates

Listing of Product Installations

Referenced Standards Certificates

SD-11 Closeout Submittals

Warranty ; G

1.4 DELIVERY, STORAGE, AND HANDLING

Protect materials from weather, soil, and damage during delivery, storage, and construction. Deliver materials in original packages, containers, or bundles bearing brand name and name of material.

Maintain materials used in the installation of floor topping at a temperature between 65 and 85 degrees F.

1.5 QUALITY CONTROL

Prior to commencement of work, submit referenced standards certificates for the following, showing conformance with the referenced standards…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .