This is an Abstract of Bids for a construction contract issued by the Department of the Army, Corps of Engineers, Savannah District Contracting Office for the FY26 Brunswick Inner Harbor Modifications Project. The solicitation number is W912HN26BA009, issued on May 15, 2026, with a bid opening date of June 15, 2026.
The project encompasses dredging and related work in Brunswick Harbor, consisting of six contract line items (CLINs): mobilization and demobilization for new work dredging; maintenance and unclassified dredging from station 0+900 to 5+300 (415,000 cubic yards baseline with overage pricing); maintenance and unclassified dredging from station 20+300 to 23+300 (200,000 cubic yards baseline with overage pricing); equipment rental and obstruction removal; dive team services with mobilization/demobilization and personnel; and standby time. The government estimate for base CLINs 0001-0006AB totaled $20,289,774.00. Three bids were received: Marinex at $19,138,783.00 (5.67% below estimate), SeaHawk at $8,695,570.00 (57.14% below estimate), and Weeks Marine at $53,630,000.00 (164.32% above estimate). All offerors submitted bid bonds for 20% of their bid amounts and acknowledged one amendment to the solicitation. The contracting officer is Chad Arnett.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES
15-May-26 15-Jun-26 1 1
4. ISSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
SIGNATURE DATE SIGNED
5. PROJECT TITLE AND SET ASIDE: 8. GOVERNMENT ESTIMATE
A. OFFEROR
FY26 Brunswick Inner Harbor Modifications Project
7A. ITEM NO. 7B. DESCRIPTION OF OFFERED ITEM D. UNIT E. Quantity F. ESTIMATED AMOUNT E. Quantity F. BID AMOUNT E. Quantity F. BID AMOUNT E. Quantity F. BID AMOUNT
0001 Mobilization and Demobilization new work dredging in Brunswick Harbor JOB 1 $ 7,380,614.00 1 $ 6,350,000.00 1 $ 3,298,620.00 1 $ 10,500,000.00
0002 Maintenance and Unclassified Dredging (SBR STA 0+900 to 5+300) (DO NOT BID THIS CLIN) 0002AA First 415,000 cubic yards CY 415,000 7,055,000.00$ 415,000 6,017,500.00$ 415,000 3,411,300.00$ 415,000 25,937,500.00$
0002AB All over 415,000 cubic yards CY 15,000 255,000.00$ 15,000 217,500.00$ 15,000 30,450.00$ 15,000 937,500.00$
0003 Maintenance and Unclassified Dredging (BR STA 20+300 to 23+300). (DO NOT BID THIS CLIN)
0003AA First 200,000 cubic yards CY 200,000 4,200,000.00$ 200,000 5,600,000.00$ 200,000 1,828,000.00$ 200,000 14,000,000.00$
0003AB All over 200,000 cubic yards CY 18,000 414,000.00$ 18,000 504,000.00$ 18,000 39,420.00$ 18,000 1,260,000.00$
0004 Equipment Rental and Obstruction Removal (DO NOT BID THI CLIN)
0004AA First day Days 1 56,566.00$ 1 20,000.00$ 1 4,500.00$ 1 35,000.00$
0004AB All Over First 1 Day Days 2 $ 223,820.00 2 $ 40,000.00 2 $ 8,460.00 2 $ 70,000.00
0005 Dive Team, Mob/Demob Personnel, Materials, and Equipment (DO NOT BID THIS CLIN)
0005AA First 6 Days Days 6 $ 67,662.00 6 $ 35,650.02 6 $ 36,900.00 6 $ 45,000.00
0005AB All Over 6 Days Days 6 $ 60,264.00 6 $ 35,650.02 6 $ 30,600.00 6 $ 45,000.00
0006 Standby Time (DO NOT BID THIS CLIN)
0006AA First Day Days 1 $ 144,212.00 6 $ 79,620.74 6 $ 2,400.00 6 $ 200,000.00
0006AB All Over 6 days Days 3 $ 432,636.00 6 $ 238,862.22 6 $ 4,920.00 6 $ 600,000.00
20,289,774.00$ 19,138,783.00$ 8,695,570.00$ 53,630,000.00$
TOTAL AMOUNT OF BASE CLINS 0001-0006AB 20,289,774.00$ 19,138,783.00$ 8,695,570.00$ 53,630,000.00$
-5.67% -57.14% 164.32%% Difference from IGE
BASE TOTAL
C. AMENDMENTS ACKNOWLEDGED
Yes
B. BID SECURITY (Type and Amount) Bid Bond 20%
6. NUMBER OF AMENDMENTS ISSUED: 1 C. REASONABLE CONTRACT
Weeks MarineMarinex SeaHawk
C. AMENDMENTS ACKNOWLEDGED Yes C. AMENDMENTS ACKNOWLEDGED Yes
B. BID SECURITY (Type and Amount) Bid Bond 20%
B. BID SECURITY (Type and Amount) Bid Bond 20%
NO. 1
Contracting Officer (Chad Arnett)
W912HN26BA009
ABSTRACT OF BIDS - CONSTRUCTION
Department of the Army, Corps of Engineers Savannah District Contracting Office
100 W Oglethorpe Ave.
Savannah, GA 31401
NO. 2
I CERTIFY that I have opened, read, and recorded on this abstract all offers received In response to this solicitation.
9. OFFERS
NO. 3
(Check A, B or C and complete D, E A. OFFEROR B. OFFEROR
Bid Abstract