B.08-Projnet Q&A Report.pdf
PDF 3 MB Posted
- Solicitation number
- W912HN26BA003
About this file
This is a Bid Inquiry Contractor Report containing 126 inquiries and government responses for federal contract W912HN26BA003, the HAAF Military Working Dog Kennel project. The solicitation is issued by the U.S. Army Corps of Engineers for construction of a military working dog kennel facility at Hunter Army Airfield in Georgia.
The project requires design-build construction services including site preparation, building construction, utilities installation, and equipment procurement. Key scope items include kennel structures with wire mesh cages, veterinary facilities, HVAC systems, electrical systems with standby generator, plumbing, fire protection systems with nitrogen generator, security systems with NIPRNET and SIPRNET networks, and landscape restoration. The contractor must furnish and install (CFCI) kennel equipment, veterinary equipment, and furniture/fixtures. Base bid infrastructure for Options 1 and 2 must be included regardless of whether options are exercised. The total period of performance is 840 calendar days from Notice to Proceed, with liquidated damages applying to the single period of performance encompassing all base work and any exercised options. The solicitation requires 8(a) small business certification; contractors without this certification cannot be considered. Contractor responsibilities include temporary utilities (except electric, which is privatized), system startup and commissioning, asbestos and lead abatement, NPDES permit compliance, and coordination with utility providers. The government will provide certain items including the ARMAG device, electrical meter installation, NPDES permit transfer, and stormwater pollution prevention plan. Site visit details are on pages 76-77, with bid acceptance scheduled in two periods. All pricing goes in the bid schedule with Amendment 0001 correcting the unit price column and grand total section. No classified information, Federal Contract Information, or Cybersecurity Maturity Model Certification (CMMC) is required for this contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Classified information is NOT permitted on this site.
Bid Inquiry Contractor Report All Inquiries
Project: HAAF Military Working Dog Kennel Review: W912HN26BA003-HAAF Working Dog Kennel (00001) (sorted by CommentID ) Displaying 126 inquiries.
Id Discipline Sheet Detail Spec 11774356 Site Solicitiation Site visit details Comment Classification: UNCLASSIFIED (U)
Can you please provide the date and time of the site visit for the Kennel project. Thank you.
On: Mar 31 2026.
Government Response. . The site visit information is on pages 76 and 77 of the solicitation. On: Mar 31 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11774496 General Sharing Details Comment Classification: UNCLASSIFIED (U) can the plans and specs be shared publicly or just to controlled group?
On: Mar 31 2026.
Government Response. . The plans and specs may be shared to other public companies that are participating in the preparation of a bid. On: Mar 31 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11775285 Contracting RFP Division 1 Comment Classification: UNCLASSIFIED (U)
WE HAVE READ THRU THE RFP AND BID PACKAGE AND CANNOT FIND THE DATE AND TIME OF THE VISIT. PLEASE
PROVIDE A DATE AND TIME OF THE SITE VISIT.
On: Mar 31 2026.
Government Response. . The site visit information is on pages 76 and 77 of the solicitation. On: Mar 31 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11777290 Contracting NA NA NA Comment Classification: UNCLASSIFIED (U)
Would the Government consider including small business's without 8a status to participate in this solicitaion?
On: Apr 01 2026.
Government Response. . Offers from firms that are not certified 8(a) program participants cannot be considered for this requirement. On: Apr 02 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11779239 Other Section 00 45 00 Section 00 45 00 Comment Classification: UNCLASSIFIED (U)
Are we required to complete and submit Section 00 45 00- Representations and Certifications (pages 29 through 38) with our Volume II submission?
On: Apr 02 2026.
Government Response. . You will only need to complete the requirements that are stated for Volume II. On: Apr 03
Current Request Status: Request Closed
Information for this report is procurement sensitive.
5/5/26, 11:27 AM ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 1/25 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=CommentID https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Discipline https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Sheet https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Detail https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=SpecText
11779249 Other Page 24 Section 00 10 00 Comment Classification: UNCLASSIFIED (U)
Page 24 asks us to provide unit and total pricing for all line items and that they are to be placed in the bid schedule. The Bid Schedule Pricing Instructions (page 4) say that, "All pricing shall be placed in the Bid schedule below. Do not place pricing in the CLINs." There doesn't appear to be a place on the Bid Schedule to insert our price since we are not to place pricing in the CLINS. Can you please clarify the pricing requirements?
On: Apr 02 2026.
Government Response. . Amendment 0001 is being posted on 3 April 2026 to correct the bid acceptance schedule periods by including the unit price column and grand total amount section.
All pricing shall be placed in the bid schedule. There are two bid schedule acceptance periods. Bidders shall provide pricing for both bid acceptance periods. On: Apr 03 2026
Current Request Status: Request Closed Information for this report is procurement sensitive.
11782700 Equipment I-101 N/A N/A Comment Classification: UNCLASSIFIED (U)
Sheet I-101 references a significant amount of Veterinary Equipment and FF&E and note 5 "Refer to FF&E Package for Furniture Procurement Information." There is no FF&E package included in the bid documents and specifications provided in Division 11 and 12 do not clearly define equipment requirements. Please provide all CFCI and GFCI product data sheets.
On: Apr 06 2026.
Government Response. . The SID, FF&E, and Veterinary Equipment information will be provided in a forthcoming amendment. On: Apr 06 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11783779 General Page 31 Reps and Certs General
Comment Classification: UNCLASSIFIED (U)
On Page 31 of the RFP, the document references representations and certifications; however, there does not appear to be a corresponding requirement for submission of representations and certifications elsewhere in the Solicitation.
Please confirm whether offerors are required to submit representations and certifications with their proposal. If not required for submission, please confirm whether representations and certifications that are current and complete in SAM.gov are sufficient.
On: Apr 06 2026.
Government Response. . Offerors are not required to separately complete and submit the representations and certifications referenced on page 31 of the solicitation with their proposal, as they are not listed as a requirement under Volume I or Volume II in the instructions to offerors (page 25).
However, by submitting an offer, bidders are confirming that their representations and certifications are current and complete within their System for Award Management (SAM.gov) account. This is a mandatory requirement. As stated on page 1 of the solicitation, "BIDDERS MUST BE REGISTERED IN THE SYSTEM OF AWARD MANAGEMENT."
This process is governed by Federal Acquisition Regulation (FAR) 52.204-8, "Annual Representations and Certifications," which is included in this solicitation. This clause allows for the offeror's required representations and certifications to be incorporated by reference from their SAM.gov registration. By submitting an offer, the offeror verifies that its SAM.gov information is current, accurate, and complete as of the date the offer is submitted. Offerors must also maintain an active registration throughout the procurement process, as required by FAR 52.204-7, "System for Award Management."
In summary, a separate submission of representations and certifications is not required. A current and complete registration in SAM.gov is sufficient. On: Apr 07 2026
Current Request Status: Request Closed Information for this report is procurement sensitive.
11791887 Landscape Architecture Spec Spec Comment Classification: UNCLASSIFIED (U)
In the specifications there is a requirement for irrigation. RFI Question: Is there supposed to be an full irrigation system installed or temporary irrigation only until landscape is established and Certificate of Occupancy is received?
On: Apr 10 2026.
5/5/26, 11:27 AM ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 2/25
Government Response. . Contractor must provide temporary watering in accordance with the specifications. On:
Apr 15 2026
Current Request Status: Request Closed Information for this report is procurement sensitive.
11791893 Specifications Spec Spec Comment Classification: UNCLASSIFIED (U)
Can the Pre Bid Site Visit sign in sheet please get posted in an amendment ?
On: Apr 10 2026.
Government Response. . Posting of the sign in sheet is forthcoming. On: Apr 13 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11791903 Landscape Architecture Spec Spec Comment Classification: UNCLASSIFIED (U)
The specifications have a Sod Spec. But not a landscape plan. - RFI Question: Where is the Sod Supposed to Go ?
On: Apr 10 2026.
Government Response. . Stabilize disturbed areas in accordance with erosion control plans and specifications. On:
Apr 15 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11805449 General wire mesh cages / dog kennels Comment Classification: UNCLASSIFIED (U)
The specifications appear to list multiple materials and finishes for the kennel units and wire mesh, including carbon steel, galvanized steel, and stainless steel. Please confirm the intended material and finish for:
1.) Wire mesh (Section 2.1.3) 2.)Kennel unit framing (Section 2.6)
On: Apr 21 2026.
Government Response. . Please review drawings to include all building elevations, and A-401 for material selections at the Kennel units and wire mesh. On: Apr 24 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11805462 General wire mesh cages / dog kennels Comment Classification: UNCLASSIFIED (U)
Manufacturer recommendations indicate a hot-dip galvanized finish (rather than stainless steel) for durability in kennel applications. Please confirm if hot-dip galvanization is the required finish for all kennel components.
On: Apr 21 2026.
Government Response. . Please review drawings for material selections, specifically all building elevations and A-
401 for Kennel material selections. Provide per the drawings accordingly. On: Apr 24 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11807723 Cost Engineering na na Comment Classification: UNCLASSIFIED (U)
Clarify if the government will provide a tax exemption certificate to the contractor for materials installed in the project.
If a sales tax exemption certificate will not be provided, please confirm that the contractor and subcontractors are required to include all state, county, and municipality sales tax, use taxes, and fees within the proposal total.
On: Apr 22 2026.
Government Response. . Based on Georgia law and regulations, the government will not provide a sales tax exemption certificate for materials purchased by a contractor or subcontractor for U.S. Army Corps of Engineers construction project in Chatham County, Georgia.
https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 3/25
Clause 52.229-3 Federal, State, and Local Taxes is included in this solicitation. The below information is included in this clause for all contractors and its subcontractors.
(1) The contract price includes all applicable Federal, State, and local taxes and duties, except as provided in subparagraph (b)(2)(i) of this clause.
(2) Taxes imposed under 26 U.S.C. 5000C may not be-
(i) Included in the contract price; nor
(ii) Reimbursed. On: Apr 24 2026
Current Request Status: Request Closed Information for this report is procurement sensitive.
11807725 Specifications 07 61 14.00 20 Comment Classification: UNCLASSIFIED (U)
Roof Standing Seam Metal Panels call for zinc coated panels. Please clarify if standard Kynar finish may be used instead. This will help reduce costs to the government.
On: Apr 22 2026.
Government Response. . Provide finish as indicated in the specifications. On: Apr 24 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11807726 Electrical ES101 Comment Classification: UNCLASSIFIED (U)
Drawing ES101, Keynote 2 states that CEMC is to provide the underground primary conduit, conductors, concrete pad, and the pad mounted transformer. Please confirm the costs associated with these activities are not to be included in the contractor's pricing. If so, please provide a funded CLIN to the contractor to use.
On: Apr 22 2026.
Government Response. . These costs are not to be included in the contractor's price. The government will contract separately with Canoochee CEMC. On: Apr 23 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11807727 Electrical ES101 Comment Classification: UNCLASSIFIED (U)
Drawing ES101, Keynote 2 states that CEMC is to provide the underground primary conduit, conductors, concrete pad, and the pad mounted transformer. Please confirm the costs associated with these activities are not to be included in the contractor's pricing. If so, please provide a funded CLIN to the contractor to use.
On: Apr 22 2026.
Government Response. . These costs are not to be included in the contractor's price. The government will contract separately with Canoochee CEMC. On: Apr 23 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11807728 Electrical ES101 Comment Classification: UNCLASSIFIED (U)
Drawing ES101, Keynote 2 states that the Primary and secondary terminations at the fransformer will be by CEMC. Please clarify if the secondaries/feeders conduit and conductors shall be provided and installed by the contractor.
On: Apr 22 2026.
Government Response. . Installation and material of transformer's secondary cables and conduits shall be provided by contractor. On: Apr 27 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11807730 Electrical ES101 Comment Classification: UNCLASSIFIED (U)
Drawing ES101, Keynote 1 states that the site light poles, fixtures, cables, and connections will be provided by CEC. Please confirm the costs associated with these activities are not to be included in the contractor's pricing. If so, please provide a funded CLIN to the contractor to use.
https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 4/25
On: Apr 22 2026.
Government Response. . These costs are not to be included in the contractor's price. The government will contract separately with Canoochee CEMC. On: Apr 23 2026
Current Request Status: Request Closed Information for this report is procurement sensitive.
11807731 Electrical ES101 Comment Classification: UNCLASSIFIED (U)
Drawing ES101, Keynote 1 states that the site light poles, fixtures, cables, and connections will be provided by CEC. Clarify if this is for all site lighting poles, or just the pole indicated with Keynote 1.
On: Apr 22 2026.
Government Response. . All site light poles, fixtures, cables and connections will be provided by CEC as keynote#1 is indicated "typical". On: Apr 27 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11807732 Electrical ES101 Comment Classification: UNCLASSIFIED (U)
Drawing ES101, Keynote 9 and 10 states to provide 6"x6" double gang junction boxes. In conjunction with the RFI above, clarify if this will be provided and installed by CEMC, and if the costs associated are to be included in the contractor's pricing.
On: Apr 22 2026.
Government Response. . The 6"X6" double gang JB will be furnished and installed by the contractor and coordinated with CEMC. On: Apr 27 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11807740 Utilities Engineering na na Comment Classification: UNCLASSIFIED (U)
Clarify who performs the tap for the water main and the gas main.
Clarify who performs the tap for the new fire hydrant shown on sheet CU101 for FH-1 Clarify if contractor is providing and installing the new water meter, or if this is being provided and installed by local utility.
Clarify if contractor is providing and installing the new gas meter, or if this is being provided and installed by local utility Clarify if contractor is providing and installing the new electric meter, or if this is being provided and installed by the local utility.
On: Apr 22 2026.
Government Response. . The contractor shall provide all the materials and labor for these items/tasks. Only electric is privatized for this project. On: Apr 23 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11807742 Utilities Engineering M701 Comment Classification: UNCLASSIFIED (U)
Sheet M701 shows a Building Water Meter, as well as a DCW and DHW Water Meter. Please clarify if contractor is required to provide and install all, or if the local utility will provide and install one or more water meters.
On: Apr 22 2026.
Government Response. . Flow meters are in addition to other shown meters, and are for reporting to the BAS only.
Meters shown on M-701, P-102, and P-402 are to be provided by the contractor as indicated on M-701 notes 2, 4, and
5. On: Apr 27 2026
Current Request Status: Request Closed Information for this report is procurement sensitive.
11807761 Cost Engineering na na https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 5/25
Reducing the amount of field supervisory personnel will help reduce costs to the government. Please clarify if a qualified single individual with the role of Superintendent may also be dual-hatted or triple-hatted with the roles of QCM and/or SSHO.
On: Apr 22 2026.
Government Response. . No changes are planned for the supervisory personnel. Bid as shown in the solicitation.
On: Apr 23 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11807762 Cost Engineering na na Comment Classification: UNCLASSIFIED (U)
Reducing the amount of field supervisory personnel will help reduce costs to the government. Please clarify if a qualified single individual with the role of Superintendent may also be dual-hatted or triple-hatted with the roles of QCM and/or SSHO.
On: Apr 22 2026.
Government Response. . No changes are planned for the supervisory personnel. Bid as shown in the solicitation.
On: Apr 23 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11807996 General I-101 Comment Classification: UNCLASSIFIED (U)
1) Please provide the detailed specifications for the veterinary equipment referenced in the project documents.
2) Please confirm whether the veterinary equipment is designated as Contractor-Furnished, Contractor-Installed (CFCI). If not, please clarify the responsible party for furnishing and installation.
On: Apr 22 2026.
Government Response. . 1) Amendment 2 provided a separate file with Veterinary Equipment requirements.
2) The veterinary equipment is CFCI. On: Apr 23 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11808477 Contracting General Comment Classification: UNCLASSIFIED (U)
RFP states that Options 1 & 2 might be awarded either at the same time as the base bid award or anytime later resulting in extension of the project schedule for 90 days. Any schedule extension automatically increases the cost of the project. To avoid additional cost burden please elaborate on possibility to award these Options together with the base bid.
On: Apr 22 2026.
Government Response. . Please bid as solicited. On: Apr 23 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11808590 Architectural Hazmat Comment Classification: UNCLASSIFIED (U)
Hazmat Survey released in Amendment 002, Findings, states that contractors are expected to calculate their own quantities for pricing. Does it mean we have to provide our own hazmat survey? If we can't price abatement based on the provided Survey, please advise if hazmat work will be treated as a contract modification since the extent of the work is unknown or provide quantities for bidding purposes.
On: Apr 22 2026.
Government Response. . The extent of the materials is shown in the surveys. The tests show results of sampled areas. The contractor shall price the full associated area based on the sampled locations. On: Apr 23 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11809195 Environmental Engineering Division 2 Comment Classification: UNCLASSIFIED (U) https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 6/25
Since the site utilities and the foundation work will require dewatering we are asking if the existing ground water is contaminated and if so can you furnish the test results of the existing ground water?
On: Apr 23 2026.
Government Response. . The ground water is not known to be contaminated. On: Apr 23 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11809200 Environmental Engineering Division 2 Comment Classification: UNCLASSIFIED (U)
If discovered the existing ground water is contaminated can the water generated from the de-watering activity remain on site?
Non-treated?
On: Apr 23 2026.
Government Response. . If water is later found to be contaminated, disposition will be determined in a separate action depending on the quantity and type. On: Apr 23 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11809370 Fire Protection/Life Safety FX501 A4 21 13 16 Comment Classification: UNCLASSIFIED (U)
Will the government provide a hard specification for the nitrogen generator to ensure all bidders are quoting the same installation?
On: Apr 23 2026.
Government Response. . Nitrogen generator make and model will not be a specified item since it cannot be sole sourced. The specification is performance based with minimum requirements IAW UFC and NFPA requirements. On:
Apr 27 2026
Current Request Status: Request Closed Information for this report is procurement sensitive.
11809505 General N/A N/A N/A Comment Classification: UNCLASSIFIED (U)
Will the DOW require lightning protection/grounding & bonding on security personnel gate?
On: Apr 23 2026.
Government Response. . No, Lightning protection on security personnel gate not required. On: Apr 27 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11809507 General N/A N/A N/A Comment Classification: UNCLASSIFIED (U)
Will the DOW require lightning protection/grounding & bonding on cantilever slide gate?
On: Apr 23 2026.
Government Response. . No, lightning protection/grounding & bonding on slide gate not required. On: Apr 27 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11809509 General N/A N/A N/A Comment Classification: UNCLASSIFIED (U)
I do not see any grounding details for the foundation or columns on these sheets.
Suggestion: Bonding from the facility ground grid to concrete incased rebar (Ufer) is required on column and foundation pads per
NEC 250.50.
On: Apr 23 2026.
Government Response. . Refer to sheet EG701 for concrete encased electrode and structural steel bonding as part of the building's grounding electrode system in compliance with 250.50 On: Apr 27 2026 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 7/25
Current Request Status: Request Closed Information for this report is procurement sensitive.
11809510 General N/A N/A N/A Comment Classification: UNCLASSIFIED (U)
Question: Will the electrical contractor have the ability to use trench cards and rebar stakes rather than stirrup stands?
Suggestion: Trench cards are sturdier and user-friendly installation. These cards would have an exact dimension
Please Advise
On: Apr 23 2026.
Government Response. . No, refer to ductbank section for steel reinforcement, detail A1/ES501. On: Apr 27 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11809511 General N/A N/A N/A Comment Classification: UNCLASSIFIED (U)
Question: Will the DOW want lightning protection installed on camera poles?
Suggestion: Please use risk assessment prone to lightning strikes in various nearby areas NFPA 780.
Please Advise
On: Apr 23 2026.
Government Response. . Lightning protection on camera poles is not required. On: Apr 27 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11809513 General N/A N/A N/A Comment Classification: UNCLASSIFIED (U)
What amperage/voltage/ preferred manufacturer is required to the generator receptacle called out in detail A1?
Please Advise
On: Apr 23 2026.
Government Response. . Refer to detail A5/ES505 keynote #4 for additional information. On: Apr 27 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11809516 General N/A N/A N/A Comment Classification: UNCLASSIFIED (U)
Question: Will the electrical contractor be able to use precast lighting pole bases in replace of Sono tube and concrete pouring on site?
Suggestion: Anchors are not prone to damage or fitment issues.
Please Advise
On: Apr 23 2026.
Government Response. . No, refer to detail A1/ES502 for camera pole requirements. On: Apr 27 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11813367 Fire Protection/Life Safety FA-501 Division 28 Comment Classification: UNCLASSIFIED (U)
Drawing FA-501- Is there a basis for design for the smoke control panel?
On: Apr 27 2026.
https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 8/25
Government Response. . The basis of design for the smoke control panel is from the requirements in NFPA 92 Section 6.4.5.4 for Firefighters Smoke Control Stations. On: Apr 30 2026
Current Request Status: Request Closed Information for this report is procurement sensitive.
11813371 Fire Protection/Life Safety Drawing GI001 Detail A.18 Division 28 Comment Classification: UNCLASSIFIED (U)
Detail A.18 indicates a smoke control system is required. Drawing GI002, Detail B.18 indicates a smoke control system is not required. Please clarify.
On: Apr 27 2026.
Government Response. . In accordance with UFC 3-600-01 Section 4-7.5 for Animal Housing Facilities, the DFPE will determine if a smoke control system is required. The DFPE for this project required that a smoke control system be provided for the main building but not for the break area / storage. Detail A.18 is for the main building and B.18 for the break area / storage. On: Apr 30 2026
Current Request Status: Request Closed Information for this report is procurement sensitive.
11813375 Fire Protection/Life Safety Division 28 Comment Classification: UNCLASSIFIED (U)
Are there standard controls at Hunter Army Airfield that the smoke control system will be required to interface?
On: Apr 27 2026.
Government Response. . No, there are not. On: Apr 30 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11813449 Civil Drawing CS101 Key Note 9 Comment Classification: UNCLASSIFIED (U)
What is the extent of the installation requirements for the ARMAG? Is the contractor required to install only the concrete?
On: Apr 27 2026.
Government Response. . As stated in the plans, contractor is to construct the concrete pad and install ARMAG including connections to the pad. Refer to structural sheet S511, detail F5. Government will furnish the ARMAG. On:
Apr 30 2026
Current Request Status: Request Closed Information for this report is procurement sensitive.
11813452 Civil Drawing CU504 Detail A6 Comment Classification: UNCLASSIFIED (U)
Are the lift station controls local to the lift station? Will the controls be connected to a network?
On: Apr 27 2026.
Government Response. . Lift station controls are local only. (See A5/ES505) On: Apr 30 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11813472 Structural Drawing S501 Detail D1 Comment Classification: UNCLASSIFIED (U)
Please provide additional details for the trench drain. The detail shows what appears to be a formed drain, but calls for a prefabricated drain.
On: Apr 27 2026.
Government Response. . Interior trench drain assembly (integral anchor system, trench body, grating, general assembly, etc.) is prefab/precast. Design intent is to provide prefabricated assembly into cast in place concrete as detail D1/S-501 references. On: Apr 30 2026
Current Request Status: Request Closed Information for this report is procurement sensitive.
11813473 Structural Drawing S501 Detail D1 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 9/25
Will steel angle be required under the trench drain grate?
On: Apr 27 2026.
Government Response. . Steel angle is not required at precast/prefabricated drains. Precast/prefabricated drains will provide support for and include the trench drain grate. On: Apr 30 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11813486 Architectural Drawing A303 Detail A7 Comment Classification: UNCLASSIFIED (U)
What gauge are the 6" metal studs?
On: Apr 27 2026.
Government Response. . Please refer to specification 13 34 19 METAL BUILDING SYSTEMS and 05 40 00 COLD-
FORMED METAL FRAMING for stud gauge requirements. On: Apr 30 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11813487 Architectural Drawing A303 Detail A7 Comment Classification: UNCLASSIFIED (U)
The 6-inch metal studs will span to the top of the gable at the entry. Are 6-inch metal studs adequate as shown?
On: Apr 27 2026.
Government Response. . Coordinate with specification 13 34 19 METAL BUILDING SYSTEMS and 05 40 00
COLD-FORMED METAL FRAMING as this is delegated design. On: Apr 30 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11814635 Contracting RFP Comment Classification: UNCLASSIFIED (U)
What is the requirement for the 8A contractors Bonafide office
On: Apr 28 2026.
Government Response. . All 8(a) contractors should contact their local SBA representative for precise details, etc.
On: Apr 30 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11817130 General Amendment 003 General N/A Comment Classification: UNCLASSIFIED (U)
We have reviewed Amendment 0003 and understand that its purpose is to remove the following DFARS clauses and provisions:
• DFARS 252.204-7008
• DFARS 252.204-7012
• DFARS 252.204-7019
• DFARS 252.204-7020
• DFARS 252.204-7021
• DFARS 252.204-7025
Within Amendment 0003, there are several sections of bolded text. Can you please confirm whether this bolded language is intended to replace or supersede the deleted DFARS requirements, or if the intent is solely to delete the clauses with no replacement language?
On: Apr 30 2026.
Government Response. . For the SF-30, its intent is solely to delete the clauses with no replacement language.
On: Apr 30 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 10/25
11817654 Materials architectural Spec 7
Per the attached drawing and finish schedule, can this product be substituted?
(Attachment: Extracted_pages_from_07_Architectural.pdf) On: Apr 30 2026.
Government Response. . The MWD Kennels are required to be designed as shown and specified throughout the contract documents. Attached prefabricated units are not acceptable. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11817831 Architectural A-211 Comment Classification: UNCLASSIFIED (U)
The roof panel is indicated in the drawings and standing metal seam with a Kynar finish; however, the gauge is not specified.
Could you please confirm the required gauge and the standing seam type?
On: Apr 30 2026.
Government Response. . Please review specification 07 61 14.00 20 for Standing Seam Metal Roof requirements to include roof gauge. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11817835 Architectural A-211 Comment Classification: UNCLASSIFIED (U)
The wall panel is noted in the drawings as IMP. However, upon reviewing the details, it appears to be a single-skin panel, and the specifications are not clearly defined. Could you please advise on the panel type and required gauge?
On: Apr 30 2026.
Government Response. . Provide IMP. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11817869 Architectural Section 4.11 – "FF&E Interior Furnishings Styles and Types"
Comment Classification: UNCLASSIFIED (U)
Please provide the manufacture and model numbers for the required appliances for this project.
On: Apr 30 2026.
Government Response. . This information cannot be provided. Sole source or proprietary information/brand/etc cannot be directed. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11817890 Mechanical M-701 Comment Classification: UNCLASSIFIED (U)
Please provide spec details for all utility meters intended to be integrated into the Building Direct Digital Control (DDC) system.
On: Apr 30 2026.
Government Response. . Water flow meter info provided in 22 00 00 section 2.10. Gas meter info provided in 23
09 13 section 2.5.7.3. Electrical meter info provided in 26 20 00 section 2.12.4. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11817901 Architectural Section 07 21 13 – Thermal Insulation Comment Classification: UNCLASSIFIED (U)
Would MBI Insulation be approved for building insulation in lieu of Rigid Board insulation?
On: Apr 30 2026.
Government Response. . Provide insulation as detailed and specified in the project documents. On: May 04 2026
5/5/26, 11:27 AM ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 11/25 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicFileDownload&strApp=&strPrevCob=BicPublicReportAll&strShown=Extracted_pages_from_07_Architectural.pdf&intView=1
Current Request Status: Request Closed
11819579 Site 00 10 00 – CLIN 0002 Comment Classification: UNCLASSIFIED (U)
The contractor is required to reimburse the Government $3,950.42 for timber removal prior to harvesting. Please confirm where this cost should be carried within the bid schedule (CLIN 0002 or separate line item).
On: May 01 2026.
Government Response. . CLIN 0002 On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819580 Site 00 10 00 – CLIN 0002 Comment Classification: UNCLASSIFIED (U)
CLIN 0002 includes all sitework, paving, and utilities for Option 1 and Option 2 regardless of whether those options are exercised. Please confirm that all infrastructure for Options 1 and 2 must be included in the Base Bid even if the options are not awarded.
On: May 01 2026.
Government Response. . Correct. All infrastructure for Options 1 and 2 must be included in the Base Bid even if the options are not awarded. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819581 Contracting docs Comment Classification: UNCLASSIFIED (U)
Amendment 0002 adds Asbestos and Lead Surveys, FF&E, SID, and Veterinary Equipment packages but states no spec or drawing revisions. Please confirm that these newly added documents are fully incorporated into the scope and pricing requirements.
On: May 01 2026.
Government Response. . The SF30 incorporates the documents into the scope and pricing requirements. On: May
04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819582 Contracting docs Comment Classification: UNCLASSIFIED (U)
Please confirm whether the FF&E and Veterinary Equipment packages are to be priced exclusively under Options 3 and 4, or if any associated infrastructure is required within base scope.
On: May 01 2026.
Government Response. . Infrastructure is required as part of the base scope. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819583 Contracting 1 Comment Classification: UNCLASSIFIED (U)
Amendment 0001 identifies a total project Period of Performance of 840 calendar days from Notice to Proceed. Please confirm that this duration includes all base work and any exercised options.
On: May 01 2026.
Government Response. . See 00 10 00 for duration and period of performance. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819585 Contracting 1 Comment Classification: UNCLASSIFIED (U) https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 12/25
Please confirm bid guarantee (bid bond) requirements, including percentage and acceptable forms, as this information is not clearly identified in the current solicitation package.
On: May 01 2026.
Government Response. . The answers to your inquiry are found in clause 52.228-1 (bid guarantee). On: May 04
Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819606 Contracting 1 Comment Classification: UNCLASSIFIED (U)
Please confirm Performance and Payment Bond requirements, including percentages and timing of submission following award.
On: May 01 2026.
Government Response. . The answer to your inquiry is on the bonds section ( under Volume II of the solicitation).
Additional detailed information can be found in clause 52.228-15. This clause is on the solicitation. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819608 Utilities Engineering 1 1 Comment Classification: UNCLASSIFIED (U)
The solicitation notes that privatized electrical utilities will be installed by others. Please confirm all utility connection responsibilities, including coordination, tie-ins, and any contractor-provided temporary services.
On: May 01 2026.
Government Response. . Contractor is required to coordinate with the utility provider for temporary power.
Responsibilities are contained in the drawings and specifications. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819609 Site 1 1 Comment Classification: UNCLASSIFIED (U)
With the addition of asbestos and lead surveys via Amendment 0002, please confirm whether abatement is included in base scope or to be handled as a separate line item or modification
On: May 01 2026.
Government Response. . Asbestos and Lead is included in the base scope and pricing. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819610 Contracting 00 21 00; 00 72 00 (DFARS 252.204-7021, 252.204-7025)
Comment Classification: UNCLASSIFIED (U)
Please confirm whether this project will require contractor information systems to process, store, or transmit Federal Contract Information (FCI), Controlled Unclassified Information (CUI), or both.
On: May 01 2026.
Government Response. . FCI and CMMC is not required for this contract. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819612 Contracting 00 21 00; 00 72 00 Comment Classification: UNCLASSIFIED (U)
Please identify the specific contract deliverables, submittals, or communications that the Government anticipates will be designated as FCI under this contract.
On: May 01 2026.
Government Response. . FCI and CMMC is not required for this contract. On: May 04 2026 Current Request Status: Request Closed https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 13/25
11819613 Contracting 00 21 00; 00 72 00 Comment Classification: UNCLASSIFIED (U)
Please confirm whether any portion of the contract drawings, specifications, or supporting documents for this project are designated as Controlled Unclassified Information (CUI).
On: May 01 2026.
Government Response. . This project contains no CUI. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819615 Contracting DFARS 252.204-7021 Comment Classification: UNCLASSIFIED (U)
Please confirm whether CMMC Level 1 certification is required to be in place prior to contract award or may be obtained after award but prior to performance involving FCI.
On: May 01 2026.
Government Response. . FCI and CMMC is not required for this contract. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819617 Contracting DFARS 252.204-7021 Comment Classification: UNCLASSIFIED (U)
Please confirm whether all subcontractors and suppliers are required to meet CMMC Level 1 requirements, or only those whose information systems will process, store, or transmit FCI.
On: May 01 2026.
Government Response. . FCI and CMMC is not required for this contract. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819618 Contracting DFARS 252.204-7021 Comment Classification: UNCLASSIFIED (U)
Please clarify whether routine construction administration activities (e.g., submittals, RFIs, schedules, daily reports) are considered to involve processing or transmitting FCI for purposes of CMMC applicability.
On: May 01 2026.
Government Response. . FCI and CMMC is not required for this contract. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819619 Contracting DFARS 252.204-7021 Comment Classification: UNCLASSIFIED (U)
Please clarify the Prime Contractor's responsibility for verifying CMMC compliance of lower-tier subcontractors and suppliers.
On: May 01 2026.
Government Response. . CMMC Level 1 is not required for this contract for the GC or subcontractors or suppliers.
On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819622 Contracting DFARS 252.204-7021 Comment Classification: UNCLASSIFIED (U)
Please confirm whether verification of subcontractor CMMC compliance is required through SPRS submissions or if alternative documentation will be acceptable.
On: May 01 2026.
https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 14/25
Government Response. . CMMC Level 1 is not required for this contract for the GC or subcontractors or suppliers.
On: May 04 2026
Current Request Status: Request Closed Information for this report is procurement sensitive.
11819623 Contracting DFARS 252.204-7021 Comment Classification: UNCLASSIFIED (U)
Please confirm whether subcontractor CMMC compliance must be verified prior to subcontract award or may be verified during contract performance.
On: May 01 2026.
Government Response. . CMMC Level 1 is not required for this contract for the GC or subcontractors or suppliers.
On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819625 Contracting DFARS 252.204-7021 Comment Classification: UNCLASSIFIED (U)
Please confirm the required extent of DFARS 252.204-7021 flowdown to subcontractors and suppliers, including applicability to lower-tier vendors.
On: May 01 2026.
Government Response. . DFARS 252.204-7008, DFARS 252.204-7012, DFARS 252.204-7019, DFARS 252.204-
7020, DFARS 252.204-7021 and DFARS 252.204-7025 was removed by Amendment 0003 On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819626 Contracting 00 21 00; 00 72 00 Comment Classification: UNCLASSIFIED (U)
Please confirm whether the inclusion of DFARS 252.204-7021 and 252.204-7025 is intended to apply fully to this construction contract or is included as a standard clause without project-specific application.
On: May 01 2026.
Government Response. . DFARS 252.204-7008, DFARS 252.204-7012, DFARS 252.204-7019, DFARS 252.204-
7020, DFARS 252.204-7021 and DFARS 252.204-7025 was removed by Amendment 0003 On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819628 Contracting Amendment 0001 Comment Classification: UNCLASSIFIED (U)
Please confirm whether the stated Period of Performance of 840 calendar days includes all option work if exercised or applies to base work only.
On: May 01 2026.
Government Response. . See 00 10 00. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819630 Contracting Section 00 10 00 Comment Classification: UNCLASSIFIED (U)
Please confirm whether option work, if awarded, will have separate Notices to Proceed and independent completion durations.
On: May 01 2026.
Government Response. . There will be one period of performance for the contract. See 00 10 00 for Period of
Performance. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819631 Contracting Section 00 10 00 https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 15/25
Please confirm whether Liquidated Damages will apply to base completion only or to final completion including any exercised options.
On: May 01 2026.
Government Response. . There will be one Period Of Performance. See 00 10 00 for Period of Performance. LDs apply to the one period of performance in which all work (base and exercised options) shall be completed. On: May 04
Current Request Status: Request Closed Information for this report is procurement sensitive.
11819633 Contracting Section 00 72 00 Comment Classification: UNCLASSIFIED (U)
Please confirm whether progress payments will be based on percentage of completion of the overall contract or by individual
CLIN.
On: May 01 2026.
Government Response. . Payments must be based on work completed associated with the appropriate CLIN(S)
On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819634 Contracting Section 00 72 00 Comment Classification: UNCLASSIFIED (U)
Please confirm whether stored materials may be billed for payment and whether off-site stored materials are eligible.
On: May 01 2026.
Government Response. . Stored and off site materials may be billed for payment but must meet the requirements of the associated FAR Clause and supporting information. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819637 Civil 01 14 00 Comment Classification: UNCLASSIFIED (U)
Please confirm whether there are any restrictions on working hours, including nights, weekends, or holidays.
On: May 01 2026.
Government Response. . See solicitation 01 14 00 On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819638 Civil 01 14 00 Comment Classification: UNCLASSIFIED (U)
Please confirm whether escort requirements will be required for contractor personnel during construction.
On: May 01 2026.
Government Response. . There are no escort requirements. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819640 Civil 01 14 00 Comment Classification: UNCLASSIFIED (U)
Please confirm the anticipated processing time for base access for contractor and subcontractor personnel.
On: May 01 2026.
Government Response. . Plan for 2 weeks for workers to obtain a long term pass. For one time access such as deliveries, those can be completed in 1-2 days. On: May 04 2026 Current Request Status: Request Closed https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont 16/25
11819641 Civil 01 11 00 Comment Classification: UNCLASSIFIED (U)
Please confirm whether adjacent facilities will remain operational during construction and identify any required operational constraints impacting sequencing.
On: May 01 2026.
Government Response. . Adjacent facilities will remain operational. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819642 Civil Drawings / General Comment Classification: UNCLASSIFIED (U)
Please confirm whether designated laydown and staging areas will be provided on-site or if the contractor must provide off-site staging.
On: May 01 2026.
Government Response. . See site drawings for laydown information. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819643 Utilities Engineering 01 50 00 Comment Classification: UNCLASSIFIED (U)
Please confirm whether temporary utilities (power and water) will be provided by the Government or must be fully provided by the Contractor.
On: May 01 2026.
Government Response. . See Division 01 specifications. Contractor shall provide. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819644 Utilities Engineering 01 50 00 Comment Classification: UNCLASSIFIED (U)
Please confirm whether on-site fuel storage is permitted for construction operations.
On: May 01 2026.
Government Response. . On site fuel storage is not permitted. On: May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819645 Utilities Engineering Division 33 Comment Classification: UNCLASSIFIED (U)
Please confirm whether utility shutdowns will be required for tie-ins and identify any restrictions on timing or duration of outages.
On: May 01 2026.
Government Response. . Contractor shall submit plans for such action for review and approval after award. On:
May 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
11819646 Architectural Division 11 / 12 Comment Classification: UNCLASSIFIED (U)
Please confirm whether kennel equipment, including runs, gates, and specialty hardware, is Contractor-furnished and installed or Government-furnished.
On: May 01 2026.
Government Response. . Equipment shown in the solicitation is CFCI. On: May 04 2026 Current Request Status: Request Closed…