Questions W912HN23Q5004
Q: What is the year of install of the WSHP?
A: The year the existing unit was installed is unknown. The number plate on the existing unit states it was manufactured in Oct 2003.
Q: How far up is the WSHP located above the ceiling tiles?
A: The existing WSHP is approximately twelve inches (12in) above the existing ACT Ceiling.
Q: On sketch A3, what is the purpose of the space within double bi-fold doors? Is it a storage closet?
A: Yes, this area is intended to be general storage for office supplies.
Q: What are the total number of terminations for voice from existing communication closet?
A: There are ten (10) existing termination points and three (3) new termination points; 13 total termination points. Therefore, thirteen (13) total voice terminations and twenty-six
(26) data terminations.
Q: Can you provide specifications on the new light fixture to be installed in New Comms Closet?
A: No preferred surface mounted light fixture. Fixture to be LED must be submitted and approved by Government prior to installation.
Q: CLIN option 0003 reads replace WSHP & controls in Building 714. But on Pg 15 of
W912HN23Q5004, Option 1, HVAC reads, Controls hardware will be removed and re-installed by Gillem DPW Maintenance contractor. Can you clarify who is responsible for controls?
A: The contractor being awarded the contract is responsible to coordinate and pay for the controls removal and reinstall; POC detailed below;
Andrew. P. Baldwin Program Manager / Site Engineer Re-Engineered Business Solutions, Inc. (RBS) 280 Clearlake Road Cocoa, Florida 32922-8672 Cell: (678)315-3307 Email: abaldwin@RBSIncorporated.com
Q: For the 52.222-23 clause, we plan to use only ONE subcontractor for each trade which means they are 100% for each trade. How can we satisfy goals for minority of 21.2% and Female participation of 6.9% for EACH trade?
A: In accordance with subject contract clause, “the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects” . It mailto:abaldwin@RBSIncorporated.com is the responsibility of the Contractor to ensure that they are in compliance with the terms of the contract.
Q: Do we need to submit bid bond along with our submission?
A: Please refer to contact Clause 52.228-13