This bid abstract document outlines a solicitation for Atlantic Intracoastal Waterway Selective Sites Maintenance Dredging - Cumberland Dividing. The solicitation number is W912HN23B5003 issued by the Department of the Army Corps of Engineers Engineering District Savannah. The bid opening date was June 22, 2023. The solicitation involves maintenance dredging at stations 679+00 to 775+00 and open water placement on New Island. It also includes two options for dredging additional areas and open water placement. Bids were received from seven contractors and ranged from $4.17M to $12.3M compared to the IGE of $5.57M. The apparent low bidder was Southwind Construction Corp at $4.17M.

View the file

Other files

File Type Posted
Attendance Report AIWW Cumberland.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES

15-May-23 22-Jun-23 1 1

4. ISSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

SIGNATURE DATE SIGNED

Glenda A. Canty

5. PROJECT TITLE AND SET ASIDE: 8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E and F.) X B A. OFFEROR A. OFFEROR Atlantic Intracoastal Waterway Selective Sites Maintenance Dredging - Cumberland Dividing A. HIRED LABOR

7A. ITEM NO.

7B. DESCRIPTION OF OFFERED ITEM 7C.

EST QTY.

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

0001 Mobilization and Demobilization Maintenance Dredging in Atlantic Intracoastal Waterway 1 Job $ 1,821,000.00 $ 1,821,000.00 $ 2,188,000.00 $ 2,188,000.00 $ - $ -

0002 Base - Dredging of Maintenance Material Stations 679+00 to 775+00 Cumberland Dividng - Open- Water Placement on New Island

0002AA First 145,000 Cubic Yards 145,000 CY $ 11.95 $1,732,750.00 $ 11.00 $ 1,595,000.00 $ - $ -

0002AB All Over 145,000 Cubic Yards 15,000 CY 11.95$ $179,250.00 11.00$ 165,000.00$ -$ -$

Total Base 3,733,000.00$ 3,948,000.00$ -$ -$

0003 Option Mobilization and Demobilization Maintenance Dredging in Atlantic Intracoastal Waterway for Options 1 Job 108,400.00$ 108,400.00$ 500,000.00$ 500,000.00$ -$ -$

0004 Option Dredging of Maintenance Material Sations 825+00 and Open Water Placement on New Bird Island

0004AA Option First 60,000 Cubic Yards 60,000 CY $ 15.10 $ 906,000.00 $ 13.00 $ 780,000.00 $ - $ -

0004AB Option All Over 60,000 Cubic Yards 5,000 CY $ 15.10 $ 75,500.00 $ 13.00 $ 65,000.00 $ - $ -

Total Option 1 1,089,900.00$ $ 1,345,000.00 $ -

0005 Option Dredging of Maintenance Material Stations 925+00 to 947+00 and Opern-Water Placement on New Bird Island

0005AA Option First 37,000 Cubic Yards 37,000 CY $ 17.70 $ 654,900.00 $ 14.00 $ 518,000.00 $ -

0005AB Option All Over 5,000 Cubic Yards 5,000 CY $ 17.70 $88,500.00 $ 14.00 $ 70,000.00 $ - $ -

Total Option 2 743,400.00$ 588,000.00$ $0.00

TOTAL OVERALL BID (CLIN No. 0001 thru 0005AB) 5,566,300.00$ $5,881,000.00 $0.00 $0.00 % Difference from IGE 5.65% #DIV/0!

Cotrell Contracting Corporation Ahtna Marine & Construction Company LLC

6. NUMBER OF AMENDMENTS ISSUED: C. REASONABLE CONTRACT

C. AMENDMENTS ACKNOWLEDGED

Yes

C. AMENDMENTS ACKNOWLEDGED

yes

B. REASONABLE CONTRACT

(WITHOUT PROFIT) B. BID SECURITY (Type and Amount) 20% B. BID SECURITY (Type and Amount)

20%

“Source Selection Information -- See FAR 2.101 and 3.104.”

NO. 1

Contracting Officer

W912HN23B5003

ABSTRACT OF Bids - CONSTRUCTION

Department of the Army, Corps of Engineers Savannah District Contracting Office

100 W Oglethorpe Ave.

Savannah, GA 31401

9. OFFERS

NO. 2

I CERTIFY that I have opened, read, and recorded on this abstract all offers received In response to this solicitation.

1. SOLICITATION NUMBER PAGE OF PAGES

2 2 ABSTRACT OF OFFERS - CONSTRUCTIONINSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on

CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE

NO. 3 NO. 4 NO. 5 NO. 6

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (TYPE AND AMT) B. BID SECURITY (TYPE AND AMT) B. BID SECURITY(TYPE AND AMT) B. BID SECURITY (TYPE AND AMT)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED A. B. C.

ITEM ESTIMATED UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

0001 1 Job 4,000,000.00$ 4,000,000.00$ 2,400,000.00$ 2,400,000.00$ 2,012,421.83$ 2,012,421.83$ 1,446,894.00$ 1,446,894.00$

0002AA 145,000 CY 23.00$ 3,335,000.00$ 17.30$ 2,508,500.00$ 13.50$ 1,957,500.00$ 22.84$ 3,311,800.00$ 0002AB 15,000 CY 23.00$ 345,000.00$ 17.30$ 259,500.00$ 13.64$ 204,600.00$ 22.83$ 342,450.00$

Base 7,680,000.00$ 5,168,000.00$ 4,174,521.83$ 5,101,144.00$ 0003 1 Job 1,200,000.00$ 1,200,000.00$ ########### 1,350,000.00$ 50,752.87$ 50,752.87$ 461,514.00$ 461,514.00$ 0004 -$ -$

0004AA 60,000 CY 30.00$ 1,800,000.00$ 17.30$ 1,038,000.00$ 15.51$ 930,600.00$ 28.14$ 1,688,400.00$ 0004AB 5,000 CY 30.00$ 150,000.00$ 17.30$ 86,500.00$ 16.39$ 81,950.00$ 28.14$ 140,700.00$ Option 1 3,150,000.00$ 2,474,500.00$ 1,063,302.87$ 2,290,614.00$

0005 -$ -$ 0005AA 37,000 CY 35.00$ 1,295,000.00$ 22.00$ 814,000.00$ 20.83$ 770,710.00$ 33.17$ 1,227,290.00$ 0005AB 5,000 CY 35.00$ 175,000.00$ 22.00$ 110,000.00$ 21.52 107,600.00$ 34.04 170,200.00$ Option 2 1,470,000.00$ 924,000.00$ 878,310.00$ 1,397,490.00$

TOTAL $12,300,000.00 8,566,500.00$ $6,116,134.70 8,789,248.00$

% Difference from

IGE

120.97% 53.90% 9.88% 57.90%

IGE

5,566,300.00$

Camenzind Dutra JV LLC Seaward Marine Corporation Southwind Construction Corp

Waterfront Propert Services LLC dba Gator Dredging

20% and $3M 20% 20% and $3M 20% yes Yes Yes yes